Skip to main content

Establishment profile

THE BOEING COMPANY

14 BANSHEE RD, HAZELWOOD, MO, 63042
Operated by Boeing Co · 1 of 297 establishments
336411Aircraft Manufacturing

Download as PDF →

OSHA inspections
7
over 27 years
Violations
4
$2,500 in penalties
Penalties
$2,500
$625 avg
Violations across 3 federal agencies
Enforcement actions from multiple agencies may indicate systemic compliance issues across functions.
Accident investigations on record
1 National Emphasis Program inspections · 1 OSHA follow-up

Summary

THE BOEING COMPANY has accumulated 4 OSHA violations across 7 inspections over 27 years of recorded history, with $2,500 in total assessed penalties.

The establishment sits in the 45th percentile for violations within its industry-state peer group of 39 employers. Inspection frequency runs at the 100th percentile. The most recent enforcement activity was recorded 1 year ago.

Federal records were found in 3 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

THE BOEING COMPANY appears in OSHA workplace safety, EPA environmental compliance, and NLRB labor relations records only. No matching records were found in WHD wage enforcement, MSHA mine safety, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

Inspections
7
0.3 / yr · last 27 yrs
Violations
4
0.1 / yr
Penalties
$2,500
$625 avg / violation
Inspection trigger · complaint
6 of 7

43% of inspections at this establishment produced violations,

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 4 distinct standards shown · 4 citations in this view · $2,500 in penalties.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
29 CFR 1910.0157 G0211$2,500Nov 1998Nov 1998
29 CFR 1910.1200 H0111Dec 2008Dec 2008
29 CFR 1910.0022 A0111Aug 2004Aug 2004
29 CFR 1910.0022 A0311Aug 2004Aug 2004

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

45th

Below average violations in NAICS 3364 within MO. Peer group: 39 employers. This establishment has 4 OSHA violations; peer median is 4.

Fewer violationsMore violations
Penalty percentile
42nd
peer median: $4,781
Inspection frequency
100th
peer median: 2

Safety self-report (OSHA 300A)

No self-reported injury rates filed with OSHA's Injury Tracking Application for THE BOEING COMPANY. Verify directly with OSHA Injury Tracking Application

Industry benchmark

Industry avg TRIR
2.0
BLS SOII 2024
Industry avg DART
1.4
BLS SOII 2024
Self-reported TRIR
Not in OSHA ITA

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Complaint
6

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

Self-reported events under 29 CFR 1904.39 (24-hour notification of hospitalization, amputation, or loss of an eye) · Jun 2018

Reports
1
Hospitalizations
1
Amputations
0
Eye losses
0

Most frequent event: Trip over self without fall

Source: OSHA Severe Injury Reports (federal OSHA only; state-plan states like California, Oregon, and Washington maintain their own programs and do not consistently report into this feed).

Severe injury reports — events

Each row is a hospitalization, amputation, or eye-loss event the employer self-reported to OSHA under 29 CFR 1904.39. Narratives are written by the reporting employer.

DateEventBody partOutcome
Jun 11, 2018Trip over self without fallAnkle(s)Hospitalized

Source: OSHA Severe Injury Reports. Federal-OSHA jurisdiction only by default; some state-plan programs report voluntarily.

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
1 year ago

Most recent federal enforcement activity recorded 1 year ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for THE BOEING COMPANY. Verify directly with Wage and Hour Division

Mine safety (MSHA)

No MSHA mine safety violations on file for THE BOEING COMPANY. Verify directly with Mine Safety and Health Administration

Labor relations (NLRB)

Company-level in MO — for Boeing Co, not this location alone

Total cases
5
Unfair labor practice
5

National Labor Relations Board — unfair labor practice charges and union representation cases. The NLRB records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other Boeing Co locations in the same state.

NLRB cases

National Labor Relations Board cases involving this employer. Includes unfair labor practice (ULP) filings and representation election proceedings. NLRB enforcement is process-driven; no per-case monetary penalty is assessed (remedies are case-by-case backpay orders, posting requirements, election re-runs, etc.). 5 cases · 5 ULP

Case numberTypeFiledClosedStatusRegion
14-CA-282021Unfair labor practiceAug 2021Feb 2023ClosedRegion 14, Saint Louis, Missouri
14-CA-279873Unfair labor practiceJul 2021Jul 2021ClosedRegion 14, Saint Louis, Missouri
14-CA-079843Unfair labor practiceApr 2012May 2012ClosedRegion 14, Saint Louis, Missouri
14-CA-070442Unfair labor practiceDec 2011Feb 2012ClosedRegion 14, Saint Louis, Missouri
14-CA-025655Unfair labor practiceJul 1999Feb 2000ClosedRegion 14, Saint Louis, Missouri

Source: NLRB case files. Rows shown are those the agency has published. Region numbers (1–31) correspond to NLRB's geographic offices.

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for THE BOEING COMPANY. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

EPA inspections
2
Quarters non-compliant
9
Formal actions
1

EPA Enforcement and Compliance History — Clean Air Act, Clean Water Act, RCRA, Safe Drinking Water Act. Status: Significant Violation.

EPA-registered facilities

Every EPA ECHO facility associated with this employer, sorted most-significant first. Each row links to EPA’s Detailed Facility Report for the source-of-truth record. Permits column lists active programs (Air = Clean Air Act, Water = Clean Water Act, RCRA = hazardous waste, TRI = Toxics Release Inventory reporting). 1 facility · 1 significant noncompliance.

FacilityPermitsStatusInspectionsFormal actionsPenaltiesLast inspectedECHO
THE BOEING CO
NORTH LINDBERGH BOULEVARD & MCDONNELL BOULEVARD · HAZELWOOD, MO, 63042
AirWaterRCRATRISignificant Violation
QNCR 9
21Apr 2025View →

Source: EPA ECHO (Enforcement and Compliance History Online). Compliance status follows EPA’s own labels (“Sig Violation” = significant noncompliance; QNCR = quarters of noncompliance over the recent reporting window). Inactive facilities (struck through) retain historical enforcement records even after operations ceased.

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for THE BOEING COMPANY. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$44.2M
Obligated (all-time)
$369.2M
Awards
112
Top agency
Department of Defense
$286.9M
Company-wide — THE BOEING COMPANY (across 148 entities)
Obligated (5-yr)
$62.0B
Obligated (all-time)
$325.7B
Awards (all-time)
180,783

Consolidated across all USAspending recipient entities under this corporate parent — not attributable to this single location.

Top agencies by obligation (this location)
Department of Defense$286.9M
National Aeronautics and Space Administration$79.7M
Department of Homeland Security$1.8M
Department of Transportation$700K
Department of Commerce$200K
Largest awards (top 50 of 112)
  • Department of Defense
    HYFLY2
    contract · Last action 2024-08-05
    $42,247,314
  • National Aeronautics and Space Administration
    THIS CONTRACT IS FOR THE DESIGN AND FABRICATION OF RADIATION HARDENED CHIPLET DEVICES
    contract · Last action 2021-06-16
    $30,519,622
  • Department of Defense
    CET 19-911, MAGPIE PHASE 1 THE PURPOSE OF THIS TASK IS TO ANALYZE AND DESIGN ADVANCED TECHNOLOGY MICROELECTRONICS, SOFTWARE AND ALGORITHM SOLUTIONS TO ADD CAPABILITY AND IMPROVE PERFORMANCE OF THE MICROELECTRONICS-BASED JOINT DIRECT ATTACK MUNITIONS (JDAM) SYSTEM.
    contract · Last action 2024-05-06
    $23,658,712
  • Department of Defense
    GENESIS
    contract · Last action 2025-06-26
    $21,301,661
  • Department of Defense
    IGF::OT::IGF CET 17-782, UNDERTAKER EXTRA LARGE UNMANNED UNDERSEA VEHICLE (XLUUV) PAYLOAD TEST-BED, PHASE 1 THE PURPOSE OF THIS TASK IS TO PERFORM AT-SEA TESTING OF AN EXTRA-LARGE UNMANNED UNDERSEA VEHICLE (XLUUV) SYSTEM TO EVALUATE THE PLATFORM, IDENTIFY XLUUV SYSTEM UPDATES TO OPERATE AS AN UNDERTAKER PAYLOAD INTEGRATION AND TEST VEHICLE, TO PERFORM RISK REDUCTION AND LONG LEAD-TIME PARTS EFFORTS TO ENABLE BUILDING A PROTOTYPE UNDERTAKER TEST BED FOR INTEGRATION OF EXPERIMENTAL PAYLOADS WITHIN A CONDENSED THREE (3) YEAR SCHEDULE. TASKS INCLUDE ANALYSIS, TESTING AND DEMONSTRATION OF THE BASELINE XLUUV SYSTEM'S ENDURANCE, RANGE AND CAPABILITY FOR RAPID INTEGRATION OF NEW PAYLOADS; DEVELOPING UPDATES TO THE BASELINE XLUUV TO MEET UNDERTAKER PROGRAM OBJECTIVES; REDUCING PROGRAM SCHEDULE RISK BY PURCHASING OR BUILDING LONG LEAD-TIME PARTS; AND ASSOCIATED ENGINEERING SUPPORT EFFORTS.
    contract · Last action 2020-09-15
    $15,994,050
  • Department of Defense
    IGF::OT::IGF BOEING LOCKHEED OR NORTHROP DEMONSTRATION INCLUDING ENGINE
    contract · Last action 2025-12-01
    $14,700,000
  • Department of Defense
    CET 18-888, HIGH ALTITUDE ADVANCED NAVIGATION DESIGN DEMONSTRATION - SMALL DIAMETER BOMB I (SDB I) THE PURPOSE OF THIS TASK IS TO DEVELOP, INTEGRATE, AND TEST AN OPTICAL NAVIGATION SOLUTION FOR THE SDB I WEAPON SYSTEM TO OPERATE IN GPS-DENIED ENVIRONMENTS FROM HIGH ALTITUDES, FROM CAPTIVE CARRIAGE TO LAUNCH, AND ULTIMATELY TO IMPACT.
    contract · Last action 2023-06-26
    $14,203,526
  • National Aeronautics and Space Administration
    IGF::OT::IGF TRANSONIC TRUSS-BRACED WING HIGH-SPEED AND LOW-SPEED DESIGN AND TESTS THE SCOPE OF THIS TASK IS TO REFINE THE DESIGN OF A LONG-RANGE CRUISE M=0.8 N+3 TTBW AIRCRAFT WITH HIGH-FIDELITY TOOLS FOR HIGH-SPEED CONDITIONS AND INCORPORATE ANY LESSONS LEARNED FROM RECENT WIND TUNNEL TEST DATA OBTAINED, AND CONDUCT A HIGH-SPEED WIND TUNNEL TEST. DEVELOP THE LOW SPEED HIGH LIFT CONFIGURATION FOR A M=0.8 CONFIGURATION IF OPTIONS ARE EXERCISED. AN ADDITIONAL OPTIONAL OBJECTIVE IS TO GATHER EXPERIMENTAL DATA FOR THE LOW SPEED CONFIGURATION VIA WIND TUNNEL TEST.TO DEVELOP AN ADVANCED, N+3 LONG-RANGE CRUISE M=0.8 CONVENTIONAL TUBE-AND-WING CONFIGURATION WHICH UTILIZES AN EQUIVALENT LEVEL OF ADVANCED AIRFRAME AND ENGINE TECHNOLOGY AS THE M=0.8 N+3 TRUSS-BRACED WING CONCEPT DESIGN (SCOPE 2.1 - 1. ABOVE).
    contract · Last action 2020-08-27
    $11,993,610
  • Department of Defense
    MILITARY TACTICAL MEANS
    contract · Last action 2022-04-26
    $11,350,946
  • Department of Defense
    SYSTEM EXPLORATION OF ENGINE CONCEPT (SEEC)
    contract · Last action 2024-04-05
    $10,078,518
  • Department of Defense
    IGF::OT::IGF CET 17-778, P-8A DSA P360 FULLY INTEGRATED SOLUTION. THE PURPOSE OF THIS TASK IS TO ANALYZE, MODIFY, FABRICATE, TEST, INTEGRATE AND DOCUMENT THE HARDWARE NECESSARY TO INCORPORATE THE P-360 WEAPON REPLACEABLE ASSEMBLY (WRA) INTO THE P-8A WEAPON SYSTEMS INTEGRATION LABORATORY (WSIL) AND TO DEFINE THE MODIFICATIONS REQUIRED TO INTEGRATE, TEST AND VALIDATE THE SYSTEM ONBOARD A P-8A AIRCRAFT.
    contract · Last action 2022-08-08
    $9,090,508
  • Department of Defense
    LITTLE HORNED OWL
    contract · Last action 2024-03-11
    $7,995,753
  • Department of Defense
    ASSURED AUTONOMY IN THE AIRCRAFT DOMAIN
    contract · Last action 2024-07-31
    $7,672,807
  • Department of Defense
    BOEING AUTOMATED RAPID CERTIFICATION OF SOFTWARE (ARCOS) ASSESSMENT(BARCOSA)
    contract · Last action 2024-02-12
    $6,991,896
  • Department of Defense
    IGF::OT::IGF DARPA RESEARCH PROJECT.
    contract · Last action 2024-09-29
    $6,979,281
  • National Aeronautics and Space Administration
    CONDUCT A FOLLOW-ON, LOW-SPEED WIND TUNNEL INVESTIGATION, USING THE EXISTING LOW-SPEED TTBW MODEL, THAT WILL ADD TO AND BUILD UPON THE LARC 14- BY 22-FOOT SUBSONIC TUNNEL INVESTIGATION THAT WAS CUT SHORT IN THE FALL OF 2019. ANALYZE TEST DATA AND REP
    contract · Last action 2022-09-27
    $6,007,836
  • Department of Defense
    DEMO 1 - VALIDATION OF EXTENDED DURABILITY LIFE PROJECT
    contract · Last action 2020-10-28
    $5,642,774
  • Department of Defense
    IGF::OT::IGF THE OBJECTIVE OF THE CIRCUIT REALIZATION AT FASTER TIMESCALES (CRAFT) PROGRAM IS TO DEVELOP TOOLS TO REVOLUTIONIZE THE DESIGN AND FABRICATION OF CUSTOM INTEGRATED CIRCUITS MORE EFFICIENTLY TO ENABLE HIGH-PERFORMANCE ELECTRONIC SOLUTIONS FASTER AND WITH MORE FLEXIBILITY.
    contract · Last action 2024-09-20
    $5,337,175
  • Department of Defense
    IGF::OT::IGF - LASER BOND INSPECTION - VALIDATION PATH TO CERTIFICATION
    contract · Last action 2023-04-24
    $4,991,516
  • National Aeronautics and Space Administration
    PROPULSION AIRFRAME AEROACOUSTICS AND AIRCRAFT SYSTEM NOISE FLIGHT TEST ON THE ECODEMONSTRATOR 2019 BOEING 787 TESTBED AIRCRAFT. THE SCOPE OF THIS TASK ORDER IS TO PERFORM A TEST FLIGHT CAMPAIGN TO ACQUIRE ACOUSTIC FLIGHT DATA FOR THE PURPOSES OF PAA EFFECTS AND AIRCRAFT SYSTEM NOISE OBJECTIVES WITH THE CONTRACTOR PROVIDING FLIGHT SERVICES, AIRCRAFT DATA AND INFORMATION, ACOUSTIC INSTRUMENTATION, AND DATA PROCESSING SERVICES.
    contract · Last action 2020-08-21
    $4,815,494
  • Department of Defense
    IGF::OT::IGF INTEGRITY AND RELIABILITY OF INTEGRATED CIRCUITS (IRIS) PHASE 3. PROGRAM WILL INVESTIGATE THE EFFECTS OF EXTREME PHYSICAL STRESSES ON WEAR-OUT AND AGING MECHANISMS IN CMOS COMPONENTS FABRICATED IN TECHNOLOGIES AT THE 28NM AND/OR 14NM LITHOGRAPHY NODE. PERFORMERS WILL EXPLORE EFFECTS IN BOTH FRONT END OF LINE (FEOL) AND/OR BACK END OF LINE (BEOL) TO CREATE PREDICTIVE MODELS AND TO TEST HOW PRECISELY SPECIFIC WEAR-OUT MECHANISMS CAN BE ASSERTED.
    contract · Last action 2024-09-30
    $4,351,239
  • Department of Defense
    IGF::OT::IGF "ADVANCED MANUFACTURING OF OXIDE-OXIDE CERAMIC MATRIX COMPOSITE (CMC)"
    contract · Last action 2020-08-18
    $4,128,404
  • Department of Defense
    IGF::OT::IGF SUBSONIC RADAR EMISSIONS SIMULATOR SET (SUBRESS) DEVELOPMENT PROGRAM
    contract · Last action 2020-10-08
    $3,772,344
  • National Aeronautics and Space Administration
    IGF::OT::IGFX-PLANE RISK REDUCTION SUPPORT
    contract · Last action 2019-10-17
    $3,439,499
  • Department of Defense
    CYBER RESILIENCE OF LEGACY ICCS IGF::OT::IGF
    contract · Last action 2020-11-09
    $3,363,914
  • National Aeronautics and Space Administration
    THE OBJECTIVE OF THIS REQUIREMENT IS TO ASSIST NASA IN REDUCING THE RISK AND COST OF POTENTIAL FUTURE FLIGHT DEMONSTRATION PROCUREMENT(S) THAT SUPPORT THE ACCOMPLISHMENT OF MID- AND FAR-TERM COMMUNITY OUTCOMES, AND THE ACCOMPLISHMENT OF THE NASA ARMD CRITICAL COMMITMENT ASSOCIATED WITH SUBSONIC TRANSPORTS.
    contract · Last action 2020-01-15
    $3,307,008
  • National Aeronautics and Space Administration
    IGF::OT::IGF LOW DRAG ACOUSTIC LINER FLIGHT TEST ON B737-MAX TESTBED AIRCRAFT ACOUSTIC LINER FLIGHT TEST. THE SCOPE OF THIS TASK ORDER IS TO ADVANCE THE NASA MDOF LOW DRAG ACOUSTIC LINER TECHNOLOGY DEVELOPED UNDER THE AATT PROJECT TO A TRL 7 BY PERFORMING TEST FLIGHTS WITH THE TECHNOLOGY INSTALLED ON A COMMERCIAL AIRLINER ENGINE INLET WITH THE CONTRACTOR PROVIDING FLIGHT SERVICES AND AIRCRAFT ACCESS.
    contract · Last action 2023-08-28
    $3,238,328
  • Department of Defense
    CET 18-880, MPRC EW THE PURPOSE OF THIS TASK IS TO CONDUCT ENGINEERING SYSTEM DESIGN EVALUATION, SYSTEM BUILD, SYSTEM INTEGRATION AND TEST, SHIPBOARD INSTALLATION AND ENGINEERING SUPPORT ACTIVITIES REQUIRED IN THE DELIVERY OF TWO SUITES.
    contract · Last action 2021-11-17
    $3,169,969
  • Department of Defense
    IMPACT DAMAGE ANALYSIS TOOLS FOR COMPOSITE STRUCTURAL CERTIFICATION (IDAT)
    contract · Last action 2024-05-13
    $2,937,378
  • Department of Defense
    THE ADVANCED TECHNOLOGY SUPPORT PROGRAM (ATSP) CONTRACT ACQUIRES PROGRESSIVE MICROELECTRONIC CAPABILITY SOLUTIONS FOR THE SEA SWARMING PLATFORMS FOR INSTRUMENTATION AND DESTRUCT RELAY (SEASPIDR) WIDOW 2.0 SYSTEM.
    contract · Last action 2025-12-18
    $2,631,768
  • Department of Defense
    IGF::OT::IGF - NEAR NET SHAPE INLET FOR AN EXPENDABLE HIGH SPEED CRUISE MISSILE
    contract · Last action 2025-07-15
    $2,594,829
  • Department of Defense
    FAIL-SAFE TECHNOLOGIES FOR BONDED UNITIZED COMPOSITED STRUCTURES (FASTBUCS)
    contract · Last action 2023-12-13
    $2,577,815
  • National Aeronautics and Space Administration
    IGF::OT::IGF ASSIST NASA IN DEFINING THE TECHNICAL APPROACH, SCHEDULE, AND COST FOR PROCEEDING WITH POTENTIAL X-PLANE PROCUREMENT(S) THAT SUPPORT ACCOMPLISHMENT OF NASA'S GOALS AND OBJECTIVES FOR THE ULTRA EFFICIENT SUBSONIC TRANSPORT THRUST.
    contract · Last action 2018-06-14
    $2,572,808
  • Department of Defense
    SYNTACTIC METAL MATRIX COMPOSITES FOR MULTIFUNCTIONAL AND TUNABLE HYPERSONIC AIRFRAME HOT STRUCTURES
    contract · Last action 2025-12-03
    $2,419,641
  • National Aeronautics and Space Administration
    IGF::OT::IGF FUELEAP (FOSTERING ULTRA-EFFICIENT, LOW-EMITTING AVIATION POWER) POWER SYSTEM DESIGN, ANALYSIS, AND TESTING THE SCOPE OF THIS TASK ORDER IS TO DEVELOP ENGINEERING DATA TO SUPPORT THE DESIGN AND DEVELOPMENT OF A HEAVY-FUEL, HYBRID-ELECTRIC SOFC POWER SYSTEM (SOFC POWER SYSTEM) FOR AN AIRBORNE FLIGHT DEMONSTRATOR. THIS INCLUDES IDENTIFYING SYSTEM-LEVEL TRADEOFFS, IDENTIFYING PERFORMANCE, COST AND RISK OF DESIGN ALTERNATIVES, SELECTING COMPONENTS, AND QUANTIFYING SYSTEM PERFORMANCE THROUGH INTEGRATED ANALYSIS AND TESTING. THIS TASK ORDER SHALL GENERATE PRELIMINARY DESIGN DATA, TEST PLANS, AND SHALL EXECUTE COMPONENT-LEVEL AND INTEGRATED TESTED FOR SELECTED HIGH-RISK COMPONENTS, INCLUDING THE SOFC STACK AND FUEL REFORMER.
    contract · Last action 2024-07-18
    $2,206,498
  • Department of Defense
    IGF::OT::IGF GUIDANCE AND CONTROL SYSTEM DEVELOPMENT FOR AIRBREATHING HYPERSONIC AIRCRAFT
    contract · Last action 2021-06-21
    $2,074,757
  • Department of Defense
    IGF::OT::IGF ROBUST ENERGY MANAGEMENT AND GUIDANCE
    contract · Last action 2021-07-13
    $2,069,497
  • Department of Defense
    IGF::OT::IGF SIGNAL PROCESSING AT RF (SPAR) - DARPA SEEKS TO TRANSFORM RADIO FREQUENCY (RF) SYSTEMS BY DEVELOPING RF ANALOG SIGNAL PROCESSING AND NONRECIPROCAL TECHNOLOGIES THAT PERFORM UNPRECEDENTED LEVELS OF IN-BAND INTERFERENCE SUPPRESSION. THE SIGNAL PROCESSING AT RF (SPAR) TECHNOLOGY AIMS TO MITIGATE BOTH SELF AND EXTERNALLY GENERATED INTERFERING SIGNALS OF KNOWN AND UNKNOWN CHARACTERISTICS. THE GOAL OF SPAR IS TO DEMONSTRATE NOVEL IN-BAND SIGNAL INTERFERENCE MITIGATION TECHNOLOGIES USING ANALOG SIGNAL PROCESSING TECHNIQUES AS WELL AS NOVEL CHIP-SCALE CIRCULATOR APPROACHES.
    contract · Last action 2024-09-18
    $2,021,950
  • Department of Defense
    RESEARCH AND DEVELOPMENT
    contract · Last action 2023-08-29
    $2,020,256
  • Department of Defense
    IGF::OT::IGF F/A-18 AESA BIT/STABILITY/SYSTEM H14 AND H16 ANOMALY REPORTS AND CORRECTIONS OF DEFICIENCIES IMPROVEMENT SYSTEMS INTEGRATION PROGRAM.
    contract · Last action 2024-09-18
    $1,955,348
  • Department of Defense
    IGF::OT::IGF SURVIVABLE HYPERSONIC INTEGRATED BOEING APERTURE
    contract · Last action 2021-07-16
    $1,936,786
  • Department of Defense
    ENGINEERING SERVICES: THE PURPOSE OF THIS TASK IS TO DEVELOP, FABRICATE, AND TEST ONE (1) EACH V51 AND V53 RESS PODS.
    contract · Last action 2019-10-30
    $1,896,482
  • National Aeronautics and Space Administration
    IGF::OT::IGF ASSIST NASA IN DEFINING THE TECHNICAL APPROACH, SCHEDULE, AND COST FOR PROCEEDING WITH POTENTIAL X-PLANE PROCUREMENT(S) THAT SUPPORT ACCOMPLISHMENT OF NASA'S GOALS AND OBJECTIVES FOR THE ULTRA EFFICIENT SUBSONIC TRANSPORT THRUST.
    contract · Last action 2018-06-14
    $1,871,264
  • Department of Defense
    IGF::OT::IGF BOEING CHIPS PHASE 1 - BASE (CPFF). BOEING SOLID-STATE ELECTRONICS DEPARTMENT (SSED) AND ITS PARTNERS WILL DEVELOP A MODULAR DESIGN FLOW ENABLED BY INTERFACE STANDARDIZATION AND IP-USE, UNDER THE COMMON HETEROGENEOUS INTEGRATION AND IP REUSE STRATEGIES (CHIPS), TECHNICAL AREA 1: MODULAR DIGITAL SYSTEMS.
    contract · Last action 2018-11-20
    $1,868,803
  • Department of Defense
    CET 19-977, RADAR EMISSION SIMULATING SET V80 POD DEVELOPMENT THE PURPOSE OF THIS TASK IS TO DEVELOP, FABRICATE, AND TEST TWO PODS.
    contract · Last action 2020-04-14
    $1,734,335
  • Department of Defense
    IGF::OT::IGF STRUCTURALLY INTEGRATED SAFE ADVANCED BATTERY DEVELOPMENT
    contract · Last action 2023-06-05
    $1,701,898
  • Department of Defense
    LABOR
    contract · Last action 2009-12-22
    $1,646,793
  • Department of Defense
    SIGNAL PROCESING AT RF TECHNOLOGY TRANSITION
    contract · Last action 2021-09-08
    $1,593,271
  • Department of Defense
    IFG::OT::IFG DESI (TOPIC 1) - POWER BEAMING
    contract · Last action 2020-10-30
    $1,500,825
  • Department of Defense
    IGF::CL::IGF SOFTWARE DEFINED NAVAL BATTLEFIELD NETWORK CHANNEL AND OPTIMIZATION
    contract · Last action 2019-01-10
    $1,484,816

Federal contract dollars to this establishment. Primary NAICS: 541712 - RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY). Last action: 2026-04-15. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
2025-03-18Unprogrammed Related0$0
2023-03-03Complaint0$0
2023-02-09Complaint0$0
2008-10-28Complaint1$0
2004-03-22Complaint2$0
2002-10-02Complaint0$0
1998-10-29Complaint1$2,500

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Part of a larger organization

THE BOEING COMPANY is one of 297 establishments rolled up under the parent organization Boeing Co.

Federal enforcement records on this page represent activity at this specific establishment only. The full enforcement footprint of Boeing Co across all 297 of its tracked locations is viewable on the parent profile.

Other employers in this industry and state

Other employers in aircraft manufacturing within MO, ordered by federal enforcement volume:

Other locations under this parent

Other establishments operated by Boeing Co, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on THE BOEING COMPANY from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code. This establishment resolves to the parent rollup Boeing Co, which operates 297 establishments in our dataset.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is THE BOEING COMPANY's OSHA violation history?
THE BOEING COMPANY has 7 OSHA inspections on record with 4 violations and $2,500 in total penalties.
How does THE BOEING COMPANY's safety record compare to its industry?
THE BOEING COMPANY operates in the aircraft manufacturing industry. The industry average Total Recordable Incident Rate (TRIR) is 2.