Establishment profile
RINKER MATERIALS
6150 SOUTH 35TH AVENUE, PHOENIX, AZ, 85003
238990 — All Other Specialty Trade Contractors
Summary
RINKER MATERIALS has accumulated 0 OSHA violations across 1 inspection over 20 years of recorded history.
The most recent federal enforcement activity was recorded 20 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
RINKER MATERIALS appears in OSHA workplace safety, MSHA mine safety, and NLRB labor relations records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
Peer comparison
Fewer violations than most other employers in NAICS 2389 within AZ. Peer group: 1,167 employers. This establishment has 0 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for RINKER MATERIALS. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for RINKER MATERIALS. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 20+ years. Most recent activity: 20 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for RINKER MATERIALS. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in AZ — for RINKER MATERIALS, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other RINKER MATERIALS operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 55S&S · 98 contractor · $112,697 proposed / $77,582 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 6318499 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Jan 2006 | — | Yes | LowNegligence | $31,000 | $9,000 |
| 6416240 | CEMEX - MARICOPA Pinal, AZ contractor: RINKER MATERIALS | Aug 2007 | — | Yes | ModNegligence | $7,400 | — |
| 6416555 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Apr 2008 | — | Yes | ModNegligence | $5,503 | $5,503 |
| 6416010 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Jun 2007 | — | No | ModNegligence | $5,080 | $1,026 |
| 6416274 | Green Valley Pima, AZ contractor: Rinker Materials | Oct 2007 | — | Yes | ModNegligence | $4,689 | $4,689 |
| 6310590 | CEMEX - FLORENCE Pinal, AZ contractor: RINKER MATERIALS | Feb 2006 | — | Yes | HighNegligence | $3,100 | $3,100 |
| 6306350 | Green Valley Pima, AZ contractor: Rinker Materials | Jul 2006 | — | No | HighNegligence | $2,500 | $2,500 |
| 6416276 | Green Valley Pima, AZ contractor: Rinker Materials | Oct 2007 | — | Yes | ModNegligence | $2,106 | $2,106 |
| 6416009 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Jun 2007 | — | No | ModNegligence | $2,106 | $2,106 |
| 6330841 | CEMEX-PRESCOTT/FAIN Yavapai, AZ contractor: RINKER MATERIALS | Sep 2007 | — | Yes | ModNegligence | $1,944 | $1,944 |
| 6429015 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Jul 2008 | — | No | ModNegligence | $1,795 | $1,795 |
| 6415526 | Green Valley Pima, AZ contractor: Rinker Materials | May 2007 | — | Yes | ModNegligence | $1,412 | $1,412 |
| 6309703 | CEMEX - FLORENCE Pinal, AZ contractor: RINKER MATERIALS | Jun 2005 | — | No | HighNegligence | $1,300 | $1,105 |
| 6306115 | CEMEX - CAMP VERDE Yavapai, AZ contractor: RINKER MATERIALS | Apr 2006 | — | Yes | ModNegligence | $1,238 | $750 |
| 6416554 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Apr 2008 | — | No | ModNegligence | $1,111 | $1,111 |
| 6416492 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Jan 2008 | — | No | ModNegligence | $1,111 | $1,111 |
| 6416491 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Jan 2008 | — | No | ModNegligence | $1,111 | $1,111 |
| 6416490 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Jan 2008 | — | No | ModNegligence | $1,111 | $1,111 |
| 6416489 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Jan 2008 | — | No | ModNegligence | $1,111 | $1,111 |
| 6416487 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Jan 2008 | — | No | ModNegligence | $1,111 | $1,111 |
| 6416486 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Jan 2008 | — | No | ModNegligence | $1,111 | $1,111 |
| 6416485 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Jan 2008 | — | No | ModNegligence | $1,111 | $1,111 |
| 6325994 | PR GYPSUM - WINKELMAN MINE Pinal, AZ contractor: RINKER MATERIALS | Jul 2007 | — | Yes | ModNegligence | $1,000 | $1,000 |
| 6416273 | Green Valley Pima, AZ contractor: Rinker Materials | Oct 2007 | — | No | ModNegligence | $946 | $946 |
| 6416272 | Green Valley Pima, AZ contractor: Rinker Materials | Oct 2007 | — | No | ModNegligence | $946 | $946 |
| 6330836 | CEMEX - CAMP VERDE Yavapai, AZ contractor: RINKER MATERIALS | Sep 2007 | — | No | ModNegligence | $873 | $873 |
| 6306114 | CEMEX - CAMP VERDE Yavapai, AZ contractor: RINKER MATERIALS | Apr 2006 | — | Yes | ModNegligence | $838 | $500 |
| 6309398 | CEMEX-GRAY MOUNTAIN Coconino, AZ contractor: RINKER MATERIALS | Jun 2005 | — | Yes | ModNegligence | $838 | $838 |
| 6326162 | CEMEX - CORTARO WET Pima, AZ contractor: Rinker Materials | Mar 2007 | — | Yes | ModNegligence | $800 | $800 |
| 6330417 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Dec 2006 | — | No | HighNegligence | $800 | $800 |
| 6330416 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Dec 2006 | — | No | HighNegligence | $800 | $800 |
| 6310798 | CEMEX - MARICOPA Pinal, AZ contractor: RINKER MATERIALS | Feb 2006 | — | No | HighNegligence | $700 | $60 |
| 6416172 | CEMEX-SIERRA VISTA Cochise, AZ contractor: Rinker Materials | Mar 2008 | — | Yes | ModNegligence | $634 | $634 |
| 6416678 | CEMEX - CAMP VERDE Yavapai, AZ contractor: RINKER MATERIALS | Feb 2008 | — | Yes | ModNegligence | $634 | $634 |
| 6416676 | CEMEX - CAMP VERDE Yavapai, AZ contractor: RINKER MATERIALS | Feb 2008 | — | Yes | ModNegligence | $634 | $634 |
| 6309672 | CEMEX - BEELINE Maricopa, AZ contractor: RINKER MATERIALS | May 2007 | — | Yes | ModNegligence | $634 | $634 |
| 6330762 | CEMEX - CAMP VERDE Yavapai, AZ contractor: RINKER MATERIALS | Nov 2006 | — | Yes | ModNegligence | $614 | $614 |
| 6428309 | CEMEX-GLOBE/BIXBY Gila, AZ contractor: RINKER MATERIALS | Jun 2008 | — | Yes | ModNegligence | $585 | $585 |
| 6416674 | CEMEX-PRESCOTT/FAIN Yavapai, AZ contractor: RINKER MATERIALS | Feb 2008 | — | Yes | ModNegligence | $585 | $585 |
| 6416673 | CEMEX-PRESCOTT/FAIN Yavapai, AZ contractor: RINKER MATERIALS | Feb 2008 | — | Yes | ModNegligence | $585 | $585 |
| 6416669 | CEMEX-PRESCOTT/FAIN Yavapai, AZ contractor: RINKER MATERIALS | Feb 2008 | — | Yes | ModNegligence | $585 | $585 |
| 6416664 | CEMEX-PRESCOTT/FAIN Yavapai, AZ contractor: RINKER MATERIALS | Feb 2008 | — | Yes | ModNegligence | $585 | $585 |
| 6427606 | CEMEX - MCCORMICK Coconino, AZ contractor: RINKER MATERIALS | Jan 2008 | — | Yes | ModNegligence | $585 | $585 |
| 6329816 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Dec 2006 | — | Yes | ModNegligence | $524 | $524 |
| 6329811 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Dec 2006 | — | Yes | ModNegligence | $524 | $524 |
| 6329806 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Dec 2006 | — | Yes | ModNegligence | $524 | $524 |
| 6306095 | Rinker Materials Fletcher/Perkinsvil Pit Yavapai, AZ | Mar 2006 | — | No | HighNegligence | $475 | $475 |
| 6306094 | Rinker Materials Fletcher/Perkinsvil Pit Yavapai, AZ | Mar 2006 | — | No | HighNegligence | $475 | $475 |
| 6415527 | Green Valley Pima, AZ contractor: Rinker Materials | May 2007 | — | No | ModNegligence | $425 | $425 |
| 6330454 | CEMEX - NOGALES Santa Cruz, AZ contractor: Rinker Materials | Jan 2007 | — | No | HighNegligence | $400 | $400 |
| 6309034 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | May 2005 | — | No | HighNegligence | $400 | $400 |
| 6295793 | CEMEX - MARICOPA Pinal, AZ contractor: RINKER MATERIALS | Oct 2004 | — | No | HighNegligence | $400 | $400 |
| 6330835 | CEMEX - CAMP VERDE Yavapai, AZ contractor: RINKER MATERIALS | Sep 2007 | — | No | ModNegligence | $392 | $392 |
| 6311499 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Jan 2006 | — | Yes | ModNegligence | $375 | $375 |
| 6309038 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Jan 2006 | — | Yes | ModNegligence | $375 | $375 |
| 6309036 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Jan 2006 | — | Yes | ModNegligence | $375 | $375 |
| 6330233 | CEMEX-CASA GRANDE Pinal, AZ contractor: RINKER MATERIALS | Nov 2006 | — | Yes | ModNegligence | $350 | $350 |
| 6330231 | CEMEX-CASA GRANDE Pinal, AZ contractor: RINKER MATERIALS | Oct 2006 | — | Yes | ModNegligence | $350 | $350 |
| 6330226 | CEMEX-CASA GRANDE Pinal, AZ contractor: RINKER MATERIALS | Oct 2006 | — | Yes | ModNegligence | $350 | $350 |
| 6306159 | CEMEX-PRESCOTT/FAIN Yavapai, AZ contractor: RINKER MATERIALS | Jun 2006 | — | Yes | ModNegligence | $350 | $350 |
| 6416556 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Apr 2008 | — | No | ModNegligence | $334 | $334 |
| 6416553 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Apr 2008 | — | No | ModNegligence | $334 | $334 |
| 6416488 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Jan 2008 | — | No | ModNegligence | $334 | $334 |
| 6416484 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Jan 2008 | — | No | ModNegligence | $334 | $334 |
| 6310622 | CEMEX - MCCORMICK Coconino, AZ contractor: RINKER MATERIALS | Mar 2006 | — | No | ModNegligence | $327 | $327 |
| 6309702 | CEMEX - FLORENCE Pinal, AZ contractor: RINKER MATERIALS | Jun 2005 | — | No | ModNegligence | $310 | $310 |
| 6330116 | CEMEX-CASA GRANDE Pinal, AZ contractor: RINKER MATERIALS | Jun 2006 | — | Yes | ModNegligence | $305 | $305 |
| 6308959 | CEMEX - MARICOPA Pinal, AZ contractor: RINKER MATERIALS | May 2005 | — | No | HighNegligence | $300 | $300 |
| 6308897 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Sep 2004 | — | No | HighNegligence | $300 | $300 |
| 6330242 | CEMEX - MARICOPA Pinal, AZ contractor: RINKER MATERIALS | Nov 2006 | — | Yes | ModNegligence | $286 | $286 |
| 6330228 | CEMEX-CASA GRANDE Pinal, AZ contractor: RINKER MATERIALS | Oct 2006 | — | Yes | ModNegligence | $286 | $286 |
| 6330227 | CEMEX-CASA GRANDE Pinal, AZ contractor: RINKER MATERIALS | Oct 2006 | — | Yes | ModNegligence | $286 | $286 |
| 6310320 | CEMEX - CORTARO WET Pima, AZ contractor: Rinker Materials | Aug 2005 | — | Yes | ModNegligence | $286 | $286 |
| 6416275 | Green Valley Pima, AZ contractor: Rinker Materials | Oct 2007 | — | No | ModNegligence | $285 | $285 |
| 6326026 | CEMEX - BEELINE Maricopa, AZ contractor: RINKER MATERIALS | Sep 2007 | — | Yes | ModNegligence | $285 | $285 |
| 6415537 | Green Valley Pima, AZ contractor: Rinker Materials | May 2007 | — | No | ModNegligence | $285 | $285 |
| 6329602 | CEMEX - MCCORMICK Coconino, AZ contractor: RINKER MATERIALS | Nov 2006 | — | Yes | ModNegligence | $268 | $268 |
| 6416671 | CEMEX-PRESCOTT/FAIN Yavapai, AZ contractor: RINKER MATERIALS | Feb 2008 | — | Yes | ModNegligence | $263 | $263 |
| 6416666 | CEMEX-PRESCOTT/FAIN Yavapai, AZ contractor: RINKER MATERIALS | Feb 2008 | — | Yes | ModNegligence | $263 | $263 |
| 6416495 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Jan 2008 | — | No | ModNegligence | $263 | $263 |
| 6416494 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Jan 2008 | — | No | ModNegligence | $263 | $263 |
| 6416493 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Jan 2008 | — | No | ModNegligence | $263 | $263 |
| 6330840 | CEMEX-PRESCOTT/FAIN Yavapai, AZ contractor: RINKER MATERIALS | Sep 2007 | — | No | ModNegligence | $263 | $263 |
| 6330833 | CEMEX - CAMP VERDE Yavapai, AZ contractor: RINKER MATERIALS | Sep 2007 | — | No | ModNegligence | $263 | $263 |
| 6310589 | CEMEX - FLORENCE Pinal, AZ contractor: RINKER MATERIALS | Feb 2006 | — | Yes | ModNegligence | $247 | $247 |
| 6311564 | CEMEX - BEELINE Maricopa, AZ contractor: RINKER MATERIALS | Feb 2006 | — | Yes | ModNegligence | $228 | $228 |
| 6311563 | CEMEX - BEELINE Maricopa, AZ contractor: RINKER MATERIALS | Feb 2006 | — | Yes | ModNegligence | $228 | $228 |
| 6309039 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Jan 2006 | — | Yes | ModNegligence | $228 | $228 |
| 6308027 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Apr 2005 | — | Yes | ModNegligence | $228 | $228 |
| 6308011 | CEMEX-19TH AVE Maricopa, AZ contractor: Rinker Materials | Apr 2005 | — | Yes | ModNegligence | $228 | $228 |
| 6329598 | CEMEX - MCCORMICK Coconino, AZ contractor: RINKER MATERIALS | Nov 2006 | — | Yes | ModNegligence | $217 | $217 |
| 6416033 | SHEEP HILL CINDER MINE Coconino, AZ contractor: Rinker Materials | Aug 2007 | — | Yes | ModNegligence | $207 | $207 |
| 6308969 | CEMEX-SIERRA VISTA Cochise, AZ contractor: Rinker Materials | Jul 2005 | — | Yes | ModNegligence | $203 | $203 |
| 6308517 | Green Valley Pima, AZ contractor: Rinker Materials | Dec 2004 | — | No | HighNegligence | $200 | $200 |
| 6308895 | CEMEX - CORTARO WET Pima, AZ contractor: Rinker Materials | Oct 2004 | — | No | HighNegligence | $200 | $200 |
| 6308894 | CEMEX-CASA GRANDE Pinal, AZ contractor: RINKER MATERIALS | Oct 2004 | — | No | HighNegligence | $200 | $200 |
| 6308518 | Green Valley Pima, AZ contractor: Rinker Materials | Sep 2004 | — | No | HighNegligence | $200 | $200 |
| 6330453 | CEMEX - NOGALES Santa Cruz, AZ contractor: Rinker Materials | Jan 2007 | — | Yes | ModNegligence | $191 | $191 |
| 6320665 | CEMEX - FLORENCE Pinal, AZ contractor: RINKER MATERIALS | Nov 2007 | — | Yes | ModNegligence | $190 | $190 |
| 6309674 | CEMEX - BEELINE Maricopa, AZ contractor: RINKER MATERIALS | May 2007 | — | Yes | ModNegligence | $190 | $190 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
Company-level in AZ — for RINKER MATERIALS, not this location alone
National Labor Relations Board — unfair labor practice charges and union representation cases. The NLRB records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other RINKER MATERIALS locations in the same state.
NLRB cases
National Labor Relations Board cases involving this employer. Includes unfair labor practice (ULP) filings and representation election proceedings. NLRB enforcement is process-driven; no per-case monetary penalty is assessed (remedies are case-by-case backpay orders, posting requirements, election re-runs, etc.). 1 case · 1 ULP
| Case number | Type | Filed | Closed | Status | Region |
|---|---|---|---|---|---|
| 28-CA-019538 | Unfair labor practice | Jul 2004 | Apr 2005 | Closed | Region 28, Phoenix, Arizona |
Source: NLRB case files. Rows shown are those the agency has published. Region numbers (1–31) correspond to NLRB's geographic offices.
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for RINKER MATERIALS. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for RINKER MATERIALS. Verify directly with Environmental Protection Agency →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2006-08-23 | Planned | 0 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in all other specialty trade contractors within AZ, ordered by federal enforcement volume:
- Buesing CorpPhoenix — 3 federal enforcement records
- SOUTHWEST INDUSTRIAL RIGGINGSCOTTSDALE — 3 federal enforcement records
- SOUTHWEST INDUSTRIAL RIGGINGPRESCOTT VALLEY — 3 federal enforcement records
- CEMEX, INCGILBERT — 3 federal enforcement records
- METAL MANAGEMENT ARIZONA, LLCTUCSON — 2 federal enforcement records
- MAXIM CRANE WORKS, L.P.PHOENIX — 2 federal enforcement records
- SOUTHWEST INDUSTRIAL RIGGINGSCOTTSDALE — 2 federal enforcement records
- PERKINS CINDERS, INC.SHOW LOW — 2 federal enforcement records
- STONE SOLUTIONS, LLCMESA — 2 federal enforcement records
- CONCRETE CORING COMPANY, INC.PHOENIX — 2 federal enforcement records
Related searches
- All Other Specialty Trade ContractorsAll employers in this industry
- Employers in AZState-wide enforcement data
- All Other Specialty in AZIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on RINKER MATERIALS from every major federal compliance and enforcement source. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is RINKER MATERIALS's OSHA violation history?
- RINKER MATERIALS has 1 OSHA inspection on record with 0 violations and $0 in total penalties.
- How does RINKER MATERIALS's safety record compare to its industry?
- RINKER MATERIALS operates in the all other specialty trade contractors industry. The industry average Total Recordable Incident Rate (TRIR) is 1.6.