Skip to main content

Establishment profile

Rand Construction

1428 West 9th Street, Kansas City, MO, 64101
Operated by Rand Construction Company · 1 of 5 establishments
236220Commercial and Institutional Building Construction

Download as PDF →

OSHA inspections
0
over 9 years
Violations
0
Penalties
$0
Violations across 3 federal agencies
Enforcement actions from multiple agencies may indicate systemic compliance issues across functions.
Context
No OSHA inspections on record. This does not mean the employer is violation-free — OSHA inspects a small fraction of workplaces annually.

Summary

Rand Construction has no OSHA inspection history on file. Federal records covering wage, environmental, labor relations, and other agencies are noted below where present.

The most recent federal enforcement activity was recorded 9 years ago.

Federal records were found in 3 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

Rand Construction appears in WHD wage enforcement, MSHA mine safety, NLRB labor relations, and FMCSA motor carrier registration records only. No matching records were found in OSHA workplace safety, EPA environmental compliance, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

No OSHA inspections, citations, or accidents on file for Rand Construction. Verify directly with Occupational Safety and Health Administration

Safety self-report (OSHA 300A)

Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.

DART rate
0.0
vs industry
−1.3
TRIR
0.6
vs industry
−1.6

Reported for 120 average annual employees at this establishment.

Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.

Industry benchmark

Industry avg TRIR
2.2
BLS SOII 2024
Industry avg DART
1.3
BLS SOII 2024
Self-reported TRIR
0.6
OSHA ITA Form 300A (employer self-reported)

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for Rand Construction. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
9 years ago

No federal enforcement activity has been recorded against this establishment in 9+ years. Most recent activity: 9 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

Cases
1
Back wages owed
$15,069
Employees affected
9

Department of Labor Wage & Hour Division — minimum-wage, overtime, child-labor, FMLA, and prevailing-wage enforcement.

Wage and hour breakdown by law

Per-statute totals across all closed DOL Wage & Hour cases against this employer. Backwages reflect amounts the agency assessed; civil penalty is the separate fine where applicable. Some acts (Davis-Bacon, SCA, CWHSSA, H-2B, CCPA) don't carry a civil penalty field in DOL's data. 1 statute · 13 violations · $15,069 in backwages

StatutePeriodCasesViolationsWorkersBackwagesCivil penalty
Davis-Bacon (federal construction)Jun 20171139$15,069

Source: DOL WHD enforcement database, aggregated per statute. Lifetime totals. A case can cite multiple statutes — so the total here may exceed the case count in the table above.

Wage and hour cases

Closed DOL Wage & Hour Division cases (FLSA, FMLA, H-2B, MSPA, and related statutes). Backwages reflect amounts the agency assessed; final payment may differ. 1 case · $15,069 in backwages · 9 workers affected

Case periodIndustryBackwagesWorkers
Feb 2016 – Jun 2017Commercial and Institutional Building Construction$15,0699

Source: DOL WHD enforcement database. Cases shown reflect those the agency has closed and made public.

Mine safety (MSHA)

Company-level in MO — for Rand Construction Company, not this location alone

Violations
11
Assessed penalties
$9,322

Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other Rand Construction Company operations in the same state.

MSHA citations

Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 11 citations · 3S&S · 11 contractor · $9,322 proposed / $3,346 paid.

CitationMineDateSectionS&SNegligenceProposedPaid
8774130
Sugar Creek Ug Mine
Jackson, MO
contractor: Rand Construction Co
Mar 2014YesHighNegligence$8,000$2,222
9539720
Sugar Creek Ug Mine
Jackson, MO
contractor: Rand Construction Co
Jan 2023NoHighNegligence$346$148
9536119
Sugar Creek Ug Mine
Jackson, MO
contractor: Rand Construction Co
Jan 2022NoModNegligence$133$133
9452544
Sugar Creek Ug Mine
Jackson, MO
contractor: Rand Construction Co
Apr 2019YesModNegligence$132$132
9404472
Sugar Creek Ug Mine
Jackson, MO
contractor: Rand Construction Co
Aug 2018YesLowNegligence$128$128
9531035
Sugar Creek Ug Mine
Jackson, MO
contractor: Rand Construction Co
Dec 2020NoModNegligence$125$125
9452543
Sugar Creek Ug Mine
Jackson, MO
contractor: Rand Construction Co
Apr 2019NoLowNegligence$121$121
9409477
Sugar Creek Ug Mine
Jackson, MO
contractor: Rand Construction Co
Mar 2019NoModNegligence$121$121
9351646
Sugar Creek Ug Mine
Jackson, MO
contractor: Rand Construction Co
Apr 2017NoModNegligence$116$116
8855902
Sugar Creek Ug Mine
Jackson, MO
contractor: Rand Construction Co
May 2015NoModNegligence$100$100
8774129
Sugar Creek Ug Mine
Jackson, MO
contractor: Rand Construction Co
Mar 2014No

Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).

Labor relations (NLRB)

Company-level in MO — for Rand Construction Company, not this location alone

Total cases
1
Unfair labor practice
1

National Labor Relations Board — unfair labor practice charges and union representation cases. The NLRB records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other Rand Construction Company locations in the same state.

NLRB cases

National Labor Relations Board cases involving this employer. Includes unfair labor practice (ULP) filings and representation election proceedings. NLRB enforcement is process-driven; no per-case monetary penalty is assessed (remedies are case-by-case backpay orders, posting requirements, election re-runs, etc.). 1 case · 1 ULP

Case numberTypeFiledClosedStatusRegion
17-CA-024930Unfair labor practiceAug 2010Aug 2010ClosedRegion 14, Saint Louis, Missouri

Source: NLRB case files. Rows shown are those the agency has published. Region numbers (1–31) correspond to NLRB's geographic offices.

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for Rand Construction. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for Rand Construction. Verify directly with Environmental Protection Agency

Motor carrier safety (FMCSA)

DOT number
428583
Operation
A

Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for Rand Construction. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$10.2M
Obligated (all-time)
$89.5M
Awards
70
Top agency
General Services Administration
$84.7M
Top agencies by obligation (this location)
General Services Administration$84.7M
Department of Defense$2.6M
Department of Veterans Affairs$2.2M
Department of Agriculture$3K
Largest awards (top 50 of 70)
  • General Services Administration
    IGF::OT::IGF USN NEDC OFFICE SPACE AND SERVER ROOM, 2306 E. BANNISTER ROAD, KANSAS CITY, MO
    contract · Last action 2017-03-29
    $11,419,442
  • General Services Administration
    IGF::OT::IGF 8930 WARD PARKWAY FEDERAL BUILDING, KANSAS CITY, MO CONTRACT NO GS-06-P-16-GZ-D-7011 / TASK ORDER 47G0219F0007 N1511310B USDA DISC PHASE POD 1B RENOVATION
    contract · Last action 2021-04-15
    $6,211,290
  • General Services Administration
    GENERATOR PLANT EXPANSION
    contract · Last action 2009-10-01
    $4,492,292
  • General Services Administration
    IGF::OT::IGF 8930 WARD PARKWAY FEDERAL BUILDING, 8930 WARD PARKWAY, KANSAS CITY, MO, USDA NITC POD 1 RENOVATION PHASE 1 (NO653680).
    contract · Last action 2015-01-09
    $4,056,220
  • General Services Administration
    PCN: B1096851C USDA COMPUTER RM EX GEN PROJECT 8930 WARD PARKWAY KANSAS CITY, MO 64114-3302 BASE: $2,992,230.00 OPT#1 27,950.00 OPT#2 4,200.00 OPT#4A 649,640.00 #4C (16,500.00) ------------- TOTAL $3,657,520.00
    contract · Last action 2012-07-12
    $3,732,503
  • General Services Administration
    BLDG: MO0134ZZ 6000 SQ FT DATA CTR EXPANSION FOLLOW ON TO GS06P07GYD0029/GSP611GY5040 FEDERAL BUILDING 8930 WARD PKWY KANSAS CITY, MO 64114-3302 PCN: N0081320A CONTRACT AWARD
    contract · Last action 2013-03-21
    $3,262,108
  • General Services Administration
    IGF::OT::IGF USMC MCCOG, BUILDING LOCATION: BANNISTER FEDERAL COMPLEX, 2306 BANNISTER RD, KANSAS CITY MO 64131. THE PURPOSE OF THIS PROJECT IS TO RENOVATE EXISTING SPACE TO BUILD OUT APPROXIMATELY 14,800 SF OF WORKSPACE TO ACCOMMODATE USMC MCCOG MISSION.
    contract · Last action 2020-03-16
    $3,130,523
  • General Services Administration
    IGF::OT::IGF FOR OTHER FUNTIONS IMMEDIATELY UPON SIGNATURE OF THIS GSA 300 BY THE CONTRACTING OFFICER, THE TASK ORDER FOR WORK, AS DESCRIBED IN THE TASK ORDER AGREEMENT DATED 5/22/2014, FOR PROJECT RMO00593, IS HEREBY AWARDED. THE SOLICITATION AND OFFER FORM RECEIVED FROM RAND CONSTRUCTION COMPANY ON 6/11/2014, SIGNED/DATED ON 6/11/2014, IS HEREBY INCORPORATED INTO THIS TASK ORDER. RMO00593 2312 BANNISTER SHELL IMPROVEMENTS - USDA, SHELL AND ASBESTOS ABATEMENT 2312 EAST BANNISTER ROAD KANSAS CITY, MISSOURI
    contract · Last action 2015-01-14
    $2,907,079
  • Department of Defense
    HST POWER PLANT STATION DRAIN REPLACEMENT
    contract · Last action 2025-07-03
    $2,599,503
  • General Services Administration
    IGF::OT::IGF USMC MCCS BANNISTER RENOVATION, BUILDING LOCATION: BANNISTER FEDERAL COMPLEX, 2306 BANNISTER RD, KANSAS CITY MO 64131. THE PURPOSE OF THIS PROJECT IS TO RENOVATE EXISTING SPACE TO BUILD OUT APPROXIMATELY 21,000 SF OF WORKSPACE TO ACCOMMODATE USMC MCCS MISSION.
    contract · Last action 2018-05-18
    $2,528,157
  • General Services Administration
    IGF::OT::IGF FOR OTHER FUNCTIONS AWARD IT INFRASTRUCTURE&INSTALL GENERATORS USMC 2306 E. BANNISTER RD, KANSAS CITY, MO
    contract · Last action 2014-05-12
    $2,299,409
  • General Services Administration
    8930 WARD PARKWAY KANSAS CITY MO 64414 - UNITED STATES DEPARTMENT OF AGRICULTURE POD 3 CHILLER
    contract · Last action 2023-07-10
    $2,189,212
  • Department of Veterans Affairs
    RENOVATE THE COMPUTER ROOM IN THE MAIN HOSPITAL
    contract · Last action 2011-02-08
    $2,177,680
  • General Services Administration
    DISC POWER RELIABILITY 8930 WARD PARKWAY KANSAS CITY, MO 64114
    contract · Last action 2019-12-20
    $2,161,000
  • General Services Administration
    IGF::OT::IGF FOR OTHER FUNCTIONS NEW CONSTRUCTION AWARD (KS0094ZZ) AIR INFILTRATION IMPROVEMTNS RKS00073/RKS00074/RKS00075 ROBERT J. DOLE U.S. COURTHOUSE 500 STATE AVENUE KANSAS CITY, KS 66101
    contract · Last action 2015-04-07
    $2,066,058
  • General Services Administration
    IGF::OT::IGF 2306 E. BANNISTER RD., KANSAS CITY MO 64131-3061. CONTRACT NO. GS-06-P-16-GZ-D-7011 / TASK ORDER NO. 47PG0217F0020 FOR BAS REPLACEMENT.
    contract · Last action 2020-02-27
    $2,039,784
  • General Services Administration
    LOCATION: 8930 WARD PARKWAY, KANSAS CITY MO THIS AWARD IS FOR PROJECT N2017936 WP USDA DISC PARALLEL GEAR.
    contract · Last action 2023-07-12
    $2,034,940
  • General Services Administration
    IGF::OT::IGF MO0134ZZ 8930 WARD PARKWAY FEDERAL BUILDING, KANSAS CITY, MO. THIS IS A TASK ORDER AGAINST THE REGION 6 (R6) MULTIPLE-AWARD, INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) TASK ORDER CONTRACT FOR RENOVATION WORK TO APPROXIMATELY 21,840 SQUARE FOOT AT 8930 WARD PARKWAY IN KANSAS CITY, MO. FINISHED PROJECT WILL INCLUDE A PROFESSIONAL WORK AREA OF APPROXIMATELY 12-16 PRIVATE OFFICES AND OPEN SPACE FOR 80 WORKSTATIONS.
    contract · Last action 2017-12-22
    $2,024,953
  • General Services Administration
    IGF::OT::IGF FOR OTHER FUNTIONS IMMEDIATELY UPON SIGNATURE OF THIS GSA 300 BY THE CONTRACTING OFFICER, THE TASK ORDER FOR WORK, AS DESCRIBED IN THE TASK ORDER AGREEMENT DATED 08/21/2013, FOR PROJECT N0722485, IS HEREBY AWARDED. THE SOLICITATION AND OFFER FORM RECEIVED FROM RAND CONSTRUCTION COMPANY ON 9/10/2013, SIGNED/DATED ON 9/10/2013, IS HEREBY INCORPORATED INTO THIS TASK ORDER. FOR AWARD CONSTRUCTION/DESIGN SERVICES N0722485 USMC SERVER ROOM 1052C&1052D USMC TSO 2306 E. BANNISTER ROAD KANSAS CITY, MO 64131
    contract · Last action 2014-05-12
    $1,842,890
  • General Services Administration
    IGF::OT::IGF SIA00019 IA0027AA UNITED STATES COURTHOUSE 131 E 4TH STREET, DAVENPORT, IA 52801 GS-06P-12-GZ-D-0018 RAND CONSTRUCTION COMPANY 1428 WEST 9TH STREET, KANSAS CITY, MO 64101-1220 NEW AWARD CONSTRUCTION SERVICES BASE AND OPTION 1 PCN SIA00019 - WI 1110 WINDOW RESTORATION(BA64) NEW AWARD CONSTRUCTION SERVICES - OPTION 2 PCN SIA00019 WI 1110 WINDOW RESTORATION(BA64) NEW AWARD CONSTRUCTION SERVICES - OPTION 2 PCN SIA00023 WI 1112 WINDOW RESTORATION (BA64)
    contract · Last action 2013-08-26
    $1,742,833
  • General Services Administration
    IGF::OT::IGF AWARD CONSTRUCTION SERVICES, 2312 BANNISTER FEMA/USAN/SFO. PERIOD OF PERFORMANCE 93 CALENDAR DAYS.
    contract · Last action 2015-09-24
    $1,588,348
  • General Services Administration
    RMO22861 BOLLING FEDERAL BUILDING ROOF REPLACEMENT AND ROOF FALL PROTECTION 601 E 12TH ST. KANSAS CITY MISSOURI
    contract · Last action 2023-06-27
    $1,476,354
  • General Services Administration
    BANNISTER FEDERAL COMPLEX, 2306 - 2312 BANNISTER RD, KANSAS CITY MO 64131. IMMEDIATELY UPON SIGNATURE OF THE CONTRACTING OFFICER, RMO22700 WEST DOCK UPGRADES IS HEREBY AWARDED TO PROVIDE THE CONSTRUCTION REQUIREMENTS LISTED IN THE SOW.
    contract · Last action 2022-02-08
    $1,466,891
  • General Services Administration
    RECOVERY: TAS::47 4543::TAS THE WORK TO BE DELIVERED UNDER THIS TASK ORDER IS DEMOLITION OF EXISTING MEMBRANE ROOF ASSEMBLY AND REPLACEMENT WITH A NEW HIGH PERFORMANCE COOL ROOF ASSEMBLY ON ALL ROOF LEVELS. SCOPE ALSO INCLUDES A 22 KW PHOTOVOLTAIC ARRAY SYSTEM ON A PORTION OF THE NEW ROOF.
    contract · Last action 2010-09-17
    $1,381,903
  • General Services Administration
    IGF::OT::IGF 8930 WARD PARKWAY FEDERAL BUILDING, KANSAS CITY, MO. THIS IS A TASK ORDER AGAINST THE REGION 6 (R6) MULTIPLE-AWARD, INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) TASK ORDER CONTRACT FOR CONSTRUCTION SERVICES, FOR THE STATES OF IOWA, KANSAS, MISSOURI, AND NEBRASKA FOR THE VA RELOCATION AT THE FEDERAL BUILDING AT 8930 WARD PARKWAY, KANSAS CITY, MO 64114. THIS TASK ORDER CONTAINS REQUIREMENTS FOR CONSTRUCTION PHASE WORK. THE VETERAN AFFAIRS RELOCATION INCLUDES RENOVATION TO APPROXIMATELY 9,999 SQUARE FEET AT 8930 WARD PARKWAY IN KANSAS CITY, MISSOURI. WORK INCLUDES DEMOLITION, NEW WALLS, PAINT, CARPET, MECHANICAL, ELECTRICAL, PLUMBING, AND TELECOMMUNICATIONS. THE WORK IS ANTICIPATED TO BE ON THE SECOND FLOOR OF THE BUILDING, AND THE FINISHED PROJECT WILL INCLUDE A PROFESSIONAL WORK AREA OF APPROXIMATELY 8-12 PRIVATE OFFICES AND OPEN SPACE FOR 90 CUBES.
    contract · Last action 2017-02-13
    $1,212,497
  • General Services Administration
    N1797008 USAO 4_5TH FLOOR RENO MO0050ZZ 400 E 9TH ST, KANSAS CITY MO 64106 DESIGN-BUILD SERVICES TO REPLACE FLOOR AND WALL COVERING IN THE DESIGNATED SPACES.
    contract · Last action 2021-05-19
    $1,195,437
  • General Services Administration
    8930 WARD PARKWAY, KANSAS CITY, MO. 47PG0219F0014 NPPD&DCAA BACKFILLS 8930 WARD PARKWAY IS HEREBY AWARDED TO PROVIDE NECESSARY CONSTRUCTION SERVICES IN ACCORDANCE WITH THE SPECIFICATIONS AND OFFER FORM SIGNED 12/19/2018 AND VERIFIED ON 12/28/2018. PROPOSAL DOCUMENTS ARE HEREBY INCORPORATED INTO THIS CONTRACT. THE PERIOD OF PERFORMANCE FOR THIS CONTRACT IS 120 CALENDAR DAYS, TO BE COMPLETED BY 05/02/2019. (PLUS 60 CALENDAR DAYS FOR CLOSEOUT). NOTICE TO PROCEED IS ESTIMATED TO BE ISSUED AROUND JANUARY 16, 2019, PROVIDING BONDS AND INSURANCE ARE RECEIVED AND VERIFIED. THE NTP MODIFICATION WILL ESTABLISH FIRM PERIOD OF PERFORMANCE DATES.
    contract · Last action 2019-07-22
    $1,192,949
  • General Services Administration
    IGF::OT::IGF FRANK CARLSON FB&US CH, 444 SE QUINCH, TOPEKA, KS 66603 NEW AWARD FOR RESTROOM RESTORATION AND VAV REPLACEMENT THROUGHOUT FEDERAL BUILDING.
    contract · Last action 2015-12-01
    $1,164,880
  • General Services Administration
    IGF::OT::IGF BANNISTER FEDERAL BUILDING LOCATION: 2306 BANNISTER ROAD, KANSAS CITY, MO 64131. IMMEDIATELY UPON SIGNATURE OF THE CONTRACTING OFFICER, TASK ORDER N1541571 IS HEREBY ISSUED TO MODIFY THE EXISTING USMC ENTERPRISE SERVICE DESK (ESD).THE NEW EQUIPMENT WILL BE HOUSED IN AN EXISTING ROOM IDENTIFIED AS A UPS ROOM WITH NEW COOLING EQUIPMENT.
    contract · Last action 2018-06-27
    $1,156,169
  • General Services Administration
    2306 BANNISTER FEDERAL BUILDING, 2306 BANNISTER ROAD, KANSAS CITY, MISSOURI 64131. DESIGN BUILD SCIF ROOM FOR THE UNITED STATES DEPARTMENT OF AGRICULTURE.
    contract · Last action 2024-04-19
    $1,143,372
  • General Services Administration
    IGF::OT::IGF 8930 WARD PARKWAY FEDERAL BUILDING, KANSAS CITY, MO CONTRACT NO. GS-06-P-16-GZ-D-7011 / TASK ORDER NO. 47PG0217F0007. THE NATIONAL INFORMATION TECHNOLOGY CENTER (NITC) IS COMPRISED OF 30,985 SF OF COMPUTER ROOM DATA CENTER, SUPPORTED BY OFFICE SPACE. THE DATA CENTER IS CURRENTLY CONFIGURED AS THREE PODS. THE GOAL OF THIS PROJECT (N1511310) IS TO REPLACE THE EXISTING LEGACY UNINTERRUPTED POWER SUPPLY (UPS).
    contract · Last action 2017-09-07
    $1,062,850
  • General Services Administration
    IGF::OT::IGF 8930 WARD PARKWAY FEDERAL BUILDING ROOF REPLACEMENT (RMO00397)
    contract · Last action 2014-04-18
    $1,055,179
  • General Services Administration
    8930 WARD PARKWAY FEDERAL BUILDING KANSAS CITY, MO THIS PROJECT PROVIDES FOR WATER PROOFING AN INTERIOR EXPANSION JOINT THAT SPANS THE SECOND FLOOR OF THE FEDERAL BUILDING.
    contract · Last action 2020-04-02
    $931,900
  • General Services Administration
    RECOVERY TAS::47 4543::TAS THIS PROJECT WILL TAKE PLACE AT BUILDING #IA0027ZZ, WHICH IS THE US COURTHOUSE AT 131 EAST 4TH STREET IN DAVENPORT, IA. THE U.S. COURTHOUSE IN DAVENPORT WAS BUILT IN 1932-1933 AND IS A TIER ONE (1) ASSET OF GSA REGION 6. THIS BUILDING ORIGINALLY FUNCTIONED AS THE U.S. COURTHOUSE AND POST OFFICE. STEMMING FROM THE COMPLETION OF A PROSPECTUS PROJECT IN 2005, IT WAS CONVERTED INTO A U.S. COURTHOUSE SOLELY OCCUPIED BY THE 8TH DISTRICT COURT OF SOUTHERN IOWA. THE BUILDING OCCUPIES ROUGHLY 74,400 GSF. IN 2007, EMC ENGINEERS PREPARED A SCOPE OF WORK (EMC #1C10649-000). THIS PROJECT WILL BE PERFORMED IN CONFORMANCE WITH THIS RE-COMMISSIONING SCOPE OF WORK. THE RE-COMMISSIONING CALLS FOR THE HVAC SYSTEM TO BE REPLACED AND THAT THE HVAC SYSTEM COMPONENTS TO BE REVISED. THIS BUILDING IS STILL PRODUCING REVENUE AND HOUSING SATISFIED TENANTS. IN ORDER TO MAINTAIN THIS SATISFACTION AND EXTEND THE LIFE AND PERFORMANCE OF THIS BUILDING, THIS PROJECT SHOULD BE COMPLETED. THE GOAL OF THIS PROJECT IS TO REDUCE ENERGY DEMAND, REDUCE OPERATION AND MAINTENANCE COSTS, IMPROVE BUILDING SYSTEM CONTROL AND OCCUPANT COMFORT. AS OPTIONS, THE FOLLOWING ITEMS WILL BE INCLUDED IN THE SCOPE OF WORK: OPTION 1 PROVIDE ACTUAL CONSTRUCTION PHASE SERVICES. OPTION 2 PROVIDE AND INSTALL REVISIONS TO THE EXISTING CHILLED WATER PIPING AND DISTRIBUTION SYSTEM. IT WILL BE MODIFIED TO A VARIABLE PRIMARY FLOW SYSTEM, INCLUDING REVISING THE EXISTING PIPING, ADDING ADDITIONAL CONTROLS AND ADDING A VFD TO THE EXISTING CHILLED WATER DISTRIBUTION PUMPS. OPTION 3 PROVIDE AND INSTALL CARD READERS TO SIX EXISTING DOORS, INCLUDING ANY DOOR HARDWARE MODIFICATIONS, CONDUIT AND WIRING. ON FEBRUARY 17, 2009, THE PRESIDENT SIGNED PUBLIC LAW 111-5, THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (ARRA). THIS PROJECT IS PART OF THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009. THIS PROJECT WILL ADHERE TO THE FEDERAL GOVERNMENT S MISSION OF CREATING JOBS, PLACING PEOPLE BACK TO WORK STIMULATING THE ECONOMY AND TRANSFORMING FEDERAL BUILDINGS INTO HIGH PERFORMANCE GREEN BUILDINGS. WITH THIS PROJECT, ACTIONS WILL BE TAKEN TO DECREASE ENERGY CONSUMPTION AND DECREASE THE CARBON FOOTPRINT OF FEDERAL BUILDINGS THROUGH ENERGY CONSERVATION EFFORTS.
    contract · Last action 2012-11-20
    $894,588
  • General Services Administration
    IGF::OT::IGF 8930 WARD PARKWAY FEDERAL BUILDING PARAPET BUILD-UP AND FALL PROTECTION (RMO00509) 8930 WARD PARKWAY KANSAS CITY, MO 64114
    contract · Last action 2014-04-24
    $855,957
  • General Services Administration
    IGF::OT::IGF USMC VOIP INFRASTRUCTURE, BUILDING LOCATION: BANNISTER FEDERAL COMPLEX, 2306 BANNISTER RD, KANSAS CITY MO 64131. THE PURPOSE OF THIS PROJECT IS TO ROUTE REQUIRED POWER THROUGHOUT THE BANNISTER BLDG. THE ROUTING OF THE REQUIRED POWER IS TO BE COMPLETED IN A WAGON WHEEL FASHION, FROM EACH OF THE 11 TELECOM CLOSETS CONNECTING TO A CENTRALIZED UPS LOCATION. ELECTRICAL POWER WILL BE ROUTED FROM THE UPS TO A AUTOMATIC TRANSFER SWITCH, THAT IS CURRENTLY IN PLACE AND LOCATED IN THE USMC SERVER ROOM 1052 AND IS SUPPORTED BY BACKUP GENERATOR ON WEST DOCK. PROJECT ALSO INCLUDES UPS AND COOLING EQUIPMENT TO SUPPORT VOIP REQUIREMENTS, AND TO PROVIDE ADDITIONAL ELECTRICAL OUTLETS IN TELE CLOSETS.
    contract · Last action 2018-08-24
    $828,390
  • General Services Administration
    400 E 9TH ST, KANSAS CITY, MO 64106. AWARD FOR WHITTAKER COOLING TOWER FIRE SUPPRESSION AND FIRE SPRINKLER TEST DRAINS
    contract · Last action 2024-04-09
    $632,075
  • General Services Administration
    IGF::OT::IGF - RICHARD BOLLING FEDERAL BUILDING, 601 EAST 12TH STREET, KANSAS CITY, MO 64106 - THIS CONTRACT WAS AWARDED TO DESIGN&CONSTRUCT APPROX. 14,000 SQ. FT. OF SPACE TO ACCOMMODATE AN ADDITIONAL 100 EMPLOYEES AT THE BOLLING SSA TELESERVICE CENTER
    contract · Last action 2019-05-31
    $587,668
  • General Services Administration
    FPD EXPANSION AND ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD PROJECT, ROBERT J. DOLE, 500 STATE AVENUE, KANSAS CITY, KS 66101, PROJECT NO. N1558030, THIS ORDER IS ISSUED TO RECONFIGURE AND OR REMODEL THEIR EXISTING SPACE.
    contract · Last action 2019-02-12
    $585,183
  • General Services Administration
    NITC FIBER ENTRY&SECURITY FENCE 8930 WARD PARKWAY KANSAS CITY, MO THIS PROJECT PROVIDES FOR CONSTRUCTION SERVICES AS REQUIRED TO INSTALL A BELOW GRADE COMMUNICATIONS VAULT AND A SECURE FENCE.
    contract · Last action 2019-05-13
    $507,396
  • General Services Administration
    THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO CORRECT ALL IDENTIFIED PLATFORM ISSUES TO COMPLY WITH APPLICABLE FEDERAL AND STATE REGULATIONS, PER THE SOW DATED JULY 23, 2018 AND IN ACCORDANCE WITH THE BASE CONTRACT GS-06-P-16-GZ-D-7011 AND CONTRACT SPECIFICATIONS. THE SOW DATED JULY 23, 2018, DRAWINGS DATED 06012018 AND THE CONTRACTOR'S PROPOSAL DATED AUGUST 6, 2018 ARE HEREBY INCORPORATED BY REFERENCE. WORK WILL TAKE PLACE AT THE BANNISTER FB, 2306-2312 E. BANNISTER RD., KANSAS CITY, MO 64131. TERRY BLANTON IS DESIGNATED AS THE CONTRACTING OFFICERS REPRESENTATIVE FOR THIS WORK.
    contract · Last action 2020-08-10
    $455,395
  • General Services Administration
    IGF::OT::IGF BLDG: MO0035ZZ USDA-FSA DEHUMIDIFICATION PROJECT LOCATION: BANNISTER FEDERAL BUILDING 2312 BANNISTER ROAD KANSAS CITY, MO 64131 WORK TO BE COMPLETED IS TO CONTROL HUMIDIFICATION ISSUES THAT ARE CAUSING MECHANICAL MALFUNCTIONS IN THE TENANT SPACES.
    contract · Last action 2016-10-12
    $383,296
  • General Services Administration
    PROBRATION OFFICE RENOVATION ROBERT J. DOLE U.S. COURTHOUSE 500 STATE AVENUE KANSAS CITY, MO 64101
    contract · Last action 2009-11-17
    $368,821
  • General Services Administration
    IGF::OT::IGF BLDG: KS0085ZZ SSA REMODEL 850 NEBRASKA AVE KANSAS CITY, KS 66101-2112 PCN: N0289685/N0366854 AWARD OPTION1 OPTION2
    contract · Last action 2012-11-07
    $317,581
  • General Services Administration
    IGF::OT::IGF - WHITTAKER USCH AND FEDERAL BUILDING, 400 E. 9TH ST., KCMO, 64106 - THIS CONTRACT WAS AWARDED TO PROVIDE DESIGN&CONSTRUCTION FOR A CONFERENCE ROOM RENOVATION FOR THE U.S. ATTORNEYS AT WHITTAKER ON THE 5TH FLOOR.
    contract · Last action 2019-05-16
    $316,426
  • General Services Administration
    IGF::OT::IGF FOR OTHER FUNCTIONS AWARD OF MCEITS SPACE HARDENING 2306 BANNISTER FEDERAL BUILDING 2306 E. BANNISTER RD KANSAS CITY, MISSOURI RAND CONSTRUCTION COMPANY 1428 WEST 9TH STREET KANSAS CITY, MISSOURI 64101
    contract · Last action 2017-02-08
    $306,642
  • General Services Administration
    IGF::OT::IGF THIS CONTRACT IS ISSUED TO PROVIDE FOR THE HEAT LAMPS AND BOLLARD SYSTEM REPAIRS PROJECT AT THE US COURTHOUSE DAVENPORT, IA.
    contract · Last action 2013-05-30
    $291,555
  • General Services Administration
    IGF::OT::IGF - RICHARD BOLLING FEDERAL BUILDING, 601 EAST 12TH STREET, KANSAS CITY, MO 64106 - THIS CONTRACT WAS AWARDED TO REMODEL THE 3RD FLOOR IN THE FEDERAL BUILDING WHICH INCLUDED OFFICE FURNITURE.
    contract · Last action 2018-03-05
    $249,803
  • General Services Administration
    WORKPLACE 20/20 - PBS FIELD OFFICE TENANT IMPROVEMENTS FRANK CARLSON FEDERAL BUILDING AND COURTHOUSE 444 S.E. QUINCY TOPEKA, KS
    contract · Last action 2010-02-03
    $247,200
  • General Services Administration
    IGF::OT::IGF FOR OTHER FUNCTIONS BLDG: MO0127ZZ PCN: RMO00462 REPACE ELEVATOR SWITCHGEAR RICHARD A. BOLLING FEDERAL BUILDING 601 E 12TH ST KANSAS CITY, MO VENDOR: RAND CONSTRUCTION COMPANY GS-06P-11-GY-D-0032/GS-P-06-13-GY-5006 CONSTRUCTION CONTRACT AWARD FOR CONSTRUCTION SERVICES TO REPLACE SWITCHGEAR IN 4 EXISTING ELEVATORS IN ORDER TO MAINTAIN A GSA TIER 3 BUILDING CURRENTLY EARNING POSITIVE FUNDS FROM OPERATION WITH NO PLANS FOR DISPOSAL.
    contract · Last action 2013-06-20
    $210,797

Federal contract dollars to this establishment. Primary NAICS: 236220 - COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION. Last action: 2025-08-12. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

In the news

Part of a larger organization

Rand Construction is one of 5 establishments rolled up under the parent organization Rand Construction Company.

Federal enforcement records on this page represent activity at this specific establishment only. The full enforcement footprint of Rand Construction Company across all 5 of its tracked locations is viewable on the parent profile.

Other employers in this industry and state

Other employers in commercial and institutional building construction within MO, ordered by federal enforcement volume:

Other locations under this parent

Other establishments operated by Rand Construction Company, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on Rand Construction from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code. This establishment resolves to the parent rollup Rand Construction Company, which operates 5 establishments in our dataset.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is Rand Construction's OSHA violation history?
Rand Construction has no OSHA inspections on record.
How does Rand Construction's safety record compare to its industry?
Rand Construction operates in the commercial and institutional building construction industry. The industry average Total Recordable Incident Rate (TRIR) is 2.2. Rand Construction's self-reported DART rate is 0 compared to an industry average of 1.3.