Skip to main content

Establishment profile

POWDERMET INC.

24112 ROCKWELL DRIVE, EUCLID, OH, 44117
331314Secondary Smelting and Alloying of Aluminum

Download as PDF →

OSHA inspections
4
over 17 years
Violations
6
$1,188 in penalties
Penalties
$1,188
$198 avg
Accident investigations on record
3 National Emphasis Program inspections

Summary

POWDERMET INC. has accumulated 6 OSHA violations across 4 inspections over 17 years of recorded history, with $1,188 in total assessed penalties.

The establishment sits in the 45th percentile for violations within its industry-state peer group of 72 employers. Inspection frequency runs at the 63rd percentile. The most recent enforcement activity was recorded 17 years ago.

Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

POWDERMET INC. appears in OSHA workplace safety record only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls. Single-agency enforcement records typically indicate either a discrete incident-based inspection or a low-risk operational profile.

OSHA workplace safety

Inspections
4
0.2 / yr · last 17 yrs
Violations
6
0.4 / yr
Penalties
$1,188
$198 avg / violation
33% serious67% other
Inspection trigger · complaint
4 of 4

75% of inspections at this establishment produced violations, with 2 inspections producing serious-or-greater violations.

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 6 distinct standards shown · 6 citations in this view · $1,188 in penalties.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
29 CFR 1910.0169 A02 II11$750Feb 2009Feb 2009
29 CFR 1910.0146 C0211$438Feb 2009Feb 2009
29 CFR 1910.0132 D0211Oct 2009Oct 2009
29 CFR 1910.0134 F0211Oct 2009Oct 2009
29 CFR 1910.1450 F0211Oct 2009Oct 2009
29 CFR 1910.1450 F03 IV11Oct 2009Oct 2009

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

45th

Below average violations in NAICS 3313 within OH. Peer group: 72 employers. This establishment has 6 OSHA violations; peer median is 8.

Fewer violationsMore violations
Penalty percentile
23rd
peer median: $8,380
Inspection frequency
63rd
peer median: 2

Safety self-report (OSHA 300A)

No self-reported injury rates filed with OSHA's Injury Tracking Application for POWDERMET INC.. Verify directly with OSHA Injury Tracking Application

Industry benchmark

Industry avg TRIR
2.9
BLS SOII 2024
Industry avg DART
2.0
BLS SOII 2024
Self-reported TRIR
Not in OSHA ITA

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Complaint
4

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for POWDERMET INC.. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
17 years ago

No federal enforcement activity has been recorded against this establishment in 17+ years. Most recent activity: 17 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for POWDERMET INC.. Verify directly with Wage and Hour Division

Mine safety (MSHA)

No MSHA mine safety violations on file for POWDERMET INC.. Verify directly with Mine Safety and Health Administration

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for POWDERMET INC.. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for POWDERMET INC.. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for POWDERMET INC.. Verify directly with Environmental Protection Agency

EPA-registered facilities

Every EPA ECHO facility associated with this employer, sorted most-significant first. Each row links to EPA’s Detailed Facility Report for the source-of-truth record. Permits column lists active programs (Air = Clean Air Act, Water = Clean Water Act, RCRA = hazardous waste, TRI = Toxics Release Inventory reporting). 1 facility.

FacilityPermitsStatusInspectionsFormal actionsPenaltiesLast inspectedECHO
POWDERMET
24112 ROCKWELL DR · EUCLID, OH, 44117
AirRCRANo Violation Identified00View →

Source: EPA ECHO (Enforcement and Compliance History Online). Compliance status follows EPA’s own labels (“Sig Violation” = significant noncompliance; QNCR = quarters of noncompliance over the recent reporting window). Inactive facilities (struck through) retain historical enforcement records even after operations ceased.

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for POWDERMET INC.. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$3.2M
Obligated (all-time)
$14.4M
Awards
49
Top agency
Department of Defense
$11.9M
Company-wide — POWDERMET INC (across 2 entities)
Obligated (5-yr)
$4.5M
Obligated (all-time)
$18.2M
Awards (all-time)
59

Consolidated across all USAspending recipient entities under this corporate parent — not attributable to this single location.

Top agencies by obligation (this location)
Department of Defense$11.9M
National Aeronautics and Space Administration$2.4M
Department of Transportation$150K
Largest awards
  • Department of Defense
    8509302706!DEFENSE R&DEXPERIMENTAL DEVEL
    contract · Last action 2024-01-24
    $1,794,723
  • Department of Defense
    DEFENSE ADVANCED RESEARCH PROJECTS AGENCY (DARPA) DIRECT TO PHASE II SMALL BUSINESS INNOVATION RESEARCH (SBIR) CONTRACT FOR EFFORT ENTITLED "LOAD BEARING THERMAL PROTECTION STRUCTURE FOR HYPERSONIC FLIGHT".
    contract · Last action 2024-09-30
    $1,506,280
  • Department of Defense
    IGF::OT::IGF PH II SBIR: NANODIELECTRICS FOR HIGH ENERGY DENSITY CAPACITORS
    contract · Last action 2015-08-10
    $999,999
  • Department of Defense
    SBIR PHASE II POWDERMET INC. PROPOSAL #L2S-0044 TITLED "DEVELOPMENT OF ANISOTROPIC SINTERED NDFEB MAGNET CONSOLIDATION CAPACITY"
    contract · Last action 2025-06-26
    $999,999
  • Department of Defense
    PITCH DAY - PHASE II - POWDERMET
    contract · Last action 2024-04-08
    $949,876
  • National Aeronautics and Space Administration
    IGF::OT::IGF THE TECHNICAL APPROACH PROPOSED IN THE PHASE II PROGRAM BUILDS ON THE ENCOURAGING RESULTS OF THE PHASE I PROGRAM, IN THE EXCELLENT ENERGY STORAGE PERFORMANCE OVER A BROAD TEMPERATURE RANGE. IN THIS PHASE II PROGRAM, THE PROPOSAL NANOCOMPOSITE FILMS WILL BE FEATURE AS HIGH ENERGY DENSITY (>12 J/CC), DIELECTRIC BREAKDOWN STRENGTH (>600 MV/M), HIGH WIDE OPERATING VOLTAGE (HUNDRED VOLT TO KILOVOLT), HIGH POWER DENSITY (>4 MW/CC) AS WELL AS HIGH ENERGY STORAGE EFFICIENCY (>96%). THE CAPACITOR ENERGY STORAGE MODULE FABRICATED FROM THE DEVELOPED FILMS WILL BE FEATURE AS HIGH ENERGY DENSITY (>5 J/CC), HIGH WIDE OPERATING VOLTAGE (HUNDRED VOLT TO KILOVOLT), HIGH POWER DENSITY (>2 MW/CC), HIGH RADIATION ENVIRONMENT, HIGH SHOCK (UP TO A 1000GPEAK) AND VIBRATION (UP TO 60 GRMS) RESISTANCE, SAFE AND LONG CYCLE LIFE OF 1,000,000 CYCLES AT ROOM TEMPERATURE AND MORE THAN 100,000 CYCLES AT 400?C FOR FUTURE NASA SCIENTIFIC MISSION IN HARSH ENVIRONMENT. THE THIS CONTINUED DEVELOPMENT WILL FURTHER PROVE FEASIBILITY OF THIS TECHNOLOGY AND MOVE THE TECHNOLOGY FROM SPACE TRL LEVEL 3/4, DEMONSTRATED IN THE PHASE I, TO A TRL LEVEL 5/6 AT THE END OF THE PHASE II, WITH PARTS THAT COULD BE TESTED IN NASA ION THRUSTER PROPULSION DISCHARGE POWER SYSTEM (4 KW, 200 VDC AND 20 AMPS) BY THE END OF THE TWO-YEAR PHASE II IF AN APPLICABLE SYSTEM IS FOUND FOR TESTING.
    contract · Last action 2018-06-03
    $754,712
  • Department of Defense
    PROGRESS REPORT
    contract · Last action 2014-09-11
    $747,851
  • Department of Defense
    SBIR PHASE II TOPIC AF083-244
    contract · Last action 2011-09-16
    $747,290
  • Department of Defense
    PHASE II SBIR
    contract · Last action 2013-03-18
    $729,999
  • Department of Defense
    SBIR PHASE II, TOPIC #:A05-047
    contract · Last action 2010-07-08
    $729,999
  • National Aeronautics and Space Administration
    IN THIS PROPOSED PHASE II PROGRAM, BUILDS ON THE PHASE I FEAIBILITY WHERE A MULTIFUNCTIONAL LIGHTWEIGHT RADIATION SHIELD COMPOSITE WAS DEVELOPED AND FABRICATED. THIS STRUCTURAL RADIATION SHIELDING IS HIGH STRENGTH, SYNTACTIC POLYMERIC WHERE THE POLYMER IS FILLED WITH HIGH STRENGTH LOW Z MATERIAL. THE PHASE II PROGRAM WILL PROVIDE RADIATION MODELING AND TESTING FOR THESE NEW STRUCTURAL RADIATION SOLUTIONS AS WELL AS A PHYSICAL PROPERTY DATABASE FOR USING THEM IN SPACE HABITATS. THE PHASE II PROGRAM WILL ADDRESS ISSUES INCLUDING FLAMMABILITY, ATTACHMENT, AND INCORPORATION OF THESE NEW MATERIALS INTO EXISTING AND FUTURE SPACE HABITAT DESIGNS. THE ACCUMULATION OF THE PHASE II PROGRAM WILL BE PROTOTYPE COMPONENTS THAT CAN BE TESTED AT TRL LEVEL 5 OR FLOWN FOR TRL LEVEL 6.
    contract · Last action 2013-03-14
    $599,999
  • Department of Defense
    ULTRA LIGHT-WEIGHT ENERGY ABSORBING ARMOR, SBIR PHASE II EFFORT.
    contract · Last action 2010-11-29
    $358,740
  • Department of Defense
    SBIR PHASE I AWARD - L213-002-0038
    contract · Last action 2022-03-11
    $249,888
  • Department of Defense
    TRANSFORMATIVE DESIGN
    contract · Last action 2021-11-01
    $224,064
  • Department of Defense
    COMPOSITE ALUMINUM AIRCRAFT MATTING FOR HIGH-TEMPERATURE APPLICATIONS
    contract · Last action 2011-09-26
    $149,999
  • Department of Defense
    LONG RANGE AGILE UNMANNED AERIAL VEHICLES USING ADVANCED FUEL SOURCES THAT RESULT IN LONGER FLIGHT TIME.
    contract · Last action 2021-01-08
    $149,996
  • Department of Defense
    POWDERMET INC PH I SBIR PROPOSAL: A113-119-0488 NANODIELECTRICS FOR HIGH ENERGY DENSITY CAPACITORS
    contract · Last action 2013-05-03
    $149,995
  • Department of Transportation
    SBIR PHASE I ON TOPIC 20-PH4 ON COMPOSITE METAL FOAMS
    contract · Last action 2020-06-23
    $149,681
  • Department of Defense
    SBIR PH I
    contract · Last action 2022-08-08
    $140,000
  • National Aeronautics and Space Administration
    IGF::OT::IGF NASA REQUIRES HIGH ENERGY DENSITY, HIGH VOLTAGE, HIGH POWER AND HIGH EFFICIENCY CAPACITOR THAT CAN BE INTEGRATED INTO THE SYSTEM TO DECREASE THE MASS AND SPACE AT THE SYSTEM ARCHITECTURE LEVEL AND INCREASE THE EFFICIENCY. THE CURRENT STATE-OF-THE-ART OF THE CAPACITOR HAS LOW ENERGY, LOW POWER DENSITY AND LOW ENERGY STORAGE EFFICIENCY, MAKING THEM BULKY AND COSTLY FOR THE APPLIED SYSTEM. FOR THE NASA APPLICATION, IN ORDER TO MAINTAIN THE ENERGY OR POWER SYSTEM WORK PROPERTY, ONBOARD COOLING SYSTEMS HAS BEEN INSTALLED, WHICH IN TURN INCREASE THE MASS AND SPACE. THEREFORE, IT IS IMPORTANT TO DEVELOP IMPROVED CAPACITORS IN ENERGY DENSITY, SPEED, EFFICIENCY TO MINIMIZE THE SIZE AND MASS OF FUTURE POWER SYSTEM. IN THIS PROPOSAL, POWDERMET PROPOSED TO DEVELOP ANOTHER TYPE ADVANCED NANOCOMPOSITE CAPACITOR WITH ULTRA-HIGH ENERGY DENSITY, HIGH VOLTAGE, HIGH POWER AND HIGH ENERGY STORAGE EFFICIENCY. THIS NOVEL CAPACITOR WILL FEATURE ULTRA-HIGH ENERGY DENSITY (>40 J/CC), HIGH OPERATING VOLTAGE (>KILOVOLT), HIGH POWDER DENSITY (>MW/CC), ESPECIALLY HIGH ENERGY STORAGE EFFICIENCY (>95%).
    contract · Last action 2017-06-08
    $124,939
  • National Aeronautics and Space Administration
    ADVANCED SOFT MAGNETIC NANOCOMPOSITES FOR HIGH-FREQUENCY POWER APPLICATIONS IN ELECTRIFIED AIRCRAFT PROPULSION
    contract · Last action 2019-10-22
    $124,891
  • National Aeronautics and Space Administration
    IGF::OT::IGF THIS PHASE I SBIR CONTRACT WILL APPLY THE PRINCIPLES OF INTEGRATED MATERIALS COMPUTATIONAL ENGINEERING THE THE DESIGN AND FABRICATION OF A INTEGRAL THERMAL PROTECTION SYSTEM CYROGENIC STORAGE TANK. ANSYS MODELLING WILL BE CARRIED OUT TO SUB-OPTIMIZE THE MATERIALS PROPERTIES NECESSARY FOR AN INTEGRATED STRUCTURE-INSULATION-THERMAL PROTECTION SYSTEM USING MILTILAYERED THERMALLY INSULATING SYNTACTIC FOAMS CORE STRUCTURE. BY COMBINING STRUCTURAL AND INSULATION PERFORMANCE IN A HIGH TEMPERATURE STRUCTURE, A 65-100% REDUCTION IN PARASITIC THERMAL PROTECTION WEIGHT CAN BE ACHIEVED. MULTILAYER SANDWICH PANEL COUPONS WILL BE FABRICATED AND CHARACTERIZED FOR CRYOGENIC TO HIGH TEMPERATURE PROPERTIES AND THERMAL CYCLE RESPONSE TO VALIDATE THE MODEL, AND MANUFACTURING PATHFINDING EFFORTS WILL BE CONDUCTED FOR PRODUCTION OF CURVED MULTILAYERED SANDWICH PANELS. STRUCTURES.
    contract · Last action 2015-10-05
    $124,455
  • National Aeronautics and Space Administration
    IGF::OT::IGF NASA REQUIRES ADVANCED POWER ELECTRONIC AND ENERGY STORAGE DEVICES THAT CAN WORK AT VARIOUS TEMPERATURE (-100 DEGREE CELSIUS TO 400 DEGREE CELSIUS) AND HIGH OPERATING VOLTAGE WITH HIGH ENERGY AND POWER DENSITY WHERE TRADITIONAL POWER AND ENERGY STORAGE DEVICE CANNOT BE APPLIED. THE CURRENT STATE-OF-THE-ART OF THE CAPACITOR SUFFERS FROM TEMPERATURE RELIABILITY, ESPECIALLY AT HIGH TEMPERATURE, AS WELL AS LOW-ENERGY DENSITY, MAKING THEM BULKY AND COSTLY. POWER SYSTEMS FOR NASA MISSION MUST BE OPERATED EFFICIENTLY AT HIGH TEMPERATURES TO ELIMINATE THE NEED FOR ON BOARD COOLING SYSTEMS. THE HIGH PERFORMANCE CAPACITOR (TEMPERATURE RELIABILITY AND HIGH ENERGY DENSITY) WILL SAVE SPACE, REDUCE WEIGHT, AND IMPROVE RELIABILITY. THE PROPOSED PHASE I SBIR PROGRAM WILL DEMONSTRATE POWDERMET INC'S ABILITY TO PRODUCE AN ADVANCED NANOCOMPOSITE CAPACITOR CAN BE APPLIED IN HARSH AND EXTREME ENVIRONMENT AS REQUIRED BY NASA AEROSPACE EXPLORATION. THIS NOVEL CAPACITOR WILL FEATURE AS WIDE OPERATING TEMPERATURE (-100 DEGREE CELSIUS TO 400 DEGREE CELSIUS), HIGH OPERATING VOLTAGE (>KILOVOLT) AND HIGH-ENERGY DENSITY (>4 J/CC) AND HIGH POWDER DENSITY (>MW/CC) AS WELL AS OPERATING IN RADIATION ENVIRONMENT.
    contract · Last action 2015-05-26
    $124,325
  • National Aeronautics and Space Administration
    IGF::OT::IGF DURING SPACE-FLIGHT SYSTEM DESIGN, CHOICE IN ELECTRONIC COMPONENTS/DEVICES IS AN IMPORTANT CHOICE WHEN CONSIDERING MAXIMUM FAILURE TOLERANCE FROM SPACE RADIATION EFFECTS. A TECHNOLOGY THAT CAN PROVIDE ENHANCED RELIABILITY OF FLIGHT ELECTRONICS BY SIGNIFICANTLY REDUCING EXPOSED RADIATION DAMAGE WITH MINIMUM SHIELD MASS OFFERS IMPROVED CHANCES FOR MISSION SUCCESS, AND THUS REDUCING SYSTEM ERRORS, SAVING PROGRAM COST AND RESOURCES. POWDERMET PROPOSES THE DEVELOPMENT OF A GRADIENT-Z POWDER ADDITIVE FOR PLASTICS THAT CAN TRANSFORM THEM INTO EFFECTIVE RADIATION SHIELDS. THE ELECTIVE EASE OF RADIATION HARDENING OFF-THE-SHELF ELECTRONICS WITH AN EASILY APPLIED SHIELDING ENCAPSULATE REDUCES COST AND TIME TO LAUNCH. THE TECHNICAL APPROACH WILL BE IN THE COMPUTATIONAL VALIDATION AND EXPERIMENTAL VERIFICATION OF A GRADIENT-Z MICROPOWDER COMPOSITE ADDITIVE FOR GRANTING RADIATION SHIELDING TO PLASTICS. THESE WILL BE COMPARED TO CONVENTIONAL GRADIENT-Z METAL LAY-UP DESIGNS. ADDITIONAL, THE PROGRAM WILL DEMONSTRATE THE ADDITIVE MANUFACTURING CAPACITY OF GRADIENT-Z MICROPOWDER COMPOSITES.
    contract · Last action 2016-06-03
    $123,995
  • National Aeronautics and Space Administration
    THE PROJECT WILL DEVELOP HIGH PERFORMANCE FILM CAPACITOR WITH HIGH TEMPERATURE CAPABILITY AND HIGH ENERGY STORAGE EFFICIENCY AT HIGH ELECTRIC FILED. IN THIS STUDY, THE PROPOSED NANOCOMPOSITE FILMS HAVE NEVER BEEN ATTEMPTED TO IMPROVE THEIR ENERGY STORAGE PERFORMANCE BEFORE. IF THE PROPOSED METHOD IS SUCCESSFUL, IT CAN BE ONE METHOD TO PILOT PLANT SCALE OF ADVANCED NANOCOMPOSITE FILMS FOR HIGH TEMPERATURE, HIGH VOLTAGE AND HIGH POWER CAPACITOR WITH HIGH ENERGY STORAGE EFFICIENCY. POWDERMET WILL SEEK TO OPTIMIZE THE APPROACH AND FABRICATION PROCESS BASED ON THE CURRENT RESULTS TO REACH HIGHER ENERGY DENSITY PULSE-POWER CAPACITOR AT HIGH TEMPERATURE FOR FUTURE COMMERCIAL CAPACITOR APPLICATION.
    contract · Last action 2019-02-13
    $123,702
  • Department of Defense
    SBIR PHASE I
    contract · Last action 2010-09-27
    $119,997
  • Department of Defense
    IGF::OT::IGF SBIR PHASE I - BASE PERIOD
    contract · Last action 2018-08-08
    $104,741
  • National Aeronautics and Space Administration
    IN THIS PROPOSED PHASE I PROGRAM, A MULTIFUNCTIONAL LIGHTWEIGHT RADIATION SHIELD COMPOSITE WILL BE DEVELOPED AND FABRICATED. THIS STRUCTURAL RADIATION SHIELDING WILL BE A HIGH STRENGTH, SYNTACTIC POLYMERIC WHERE THE POLYMER IS FILLED WITH HIGH STRENGTH LOW Z MATERIAL. SPECIFICALLY, THIS PROGRAM WILL PRODUCE STRUCTURAL POLYMERIC ALUMINUM ALLOY-LIBH4 COMPOSITE MATERIALS LAYUPS. THESE STRUCTURAL COMPOSITES ARE DERIVED FROM SIMILAR STRUCTURES POWDERMET CURRENTLY PRODUCES USING HOLLOW SPHERES (LIGHTWEIGHT INSULATING STRUCTURES), AND MORE RECENTLY, ENERGETIC MATERIALS (SUCH AS KCLO4). THESE MATERIALS SERVE TO PROVIDE COMBINED STRUCTURAL PROPERTIES, THERMAL INSULATION, MASS-EFFICIENT RADIATION SHIELDING, AND COLLISION AND MICROMETEROID IMPACT ENERGY ADSORPTION.
    contract · Last action 2010-01-29
    $100,000
  • Department of Defense
    CONTRACT SUMMARY REPORT.
    contract · Last action 2009-03-27
    $100,000
  • Department of Defense
    MDA-SBIR PHASE I - BASIC EFFORT
    contract · Last action 2009-03-19
    $100,000
  • National Aeronautics and Space Administration
    THIS PROGRAM WILL MATURE AND FURTHER DEVELOP STRUCTURAL SYNTACTIC FOAM INSULATED INTEGRAL THERMAL PROTECTION SYSTEM (TPS) DESIGNS AND MATERIALS AS AN ENABLING TECHNOLOGY FOR THE HIGHLY RELIABLE, REUSABLE LAUNCH SYSTEM. THIS PROPOSED SBIR PROGRAM WILL BUILD ON POWDERMET'S EXTENSIVE PRIOR EXPERIENCE WITH SIC RIGID INSULATORS, CMCS, AND ULTRAHIGH-TEMPERATURE COATINGS, COMBINED WITH DESIGN MODELING FROM MR&D ASSOCIATES THAT IDENTIFIED POSITIVE DIRECTIONS NEEDED IN FOAM-SUPPORTED INTEGRAL STRUCTURAL TPS SYSTEMS.
    contract · Last action 2011-11-16
    $99,999
  • National Aeronautics and Space Administration
    THIS PROPOSAL RELATES TO A NEW MATERIALS CONCEPT FOR AN ALUMINUM-CARBON NANOFIBER COMPOSITE, HIGH THERMAL CONDUCTIVITY ULTRA LIGHTWEIGHT MATERIAL THAT WILL FORM THE BASIS FOR ROBUST, LIGHTWEIGHT DEPLOYABLE METALLIC RADIATOR DESIGNS. SPECIFICALLY, THIS PROGRAM WILL RESULT IN AVAILABILITY OF HIGH THERMAL CONDUCTIVITY, LOW COEFFICIENT OF EXPANSION, EXTREMELY LOW DENSITY CARBON NANOTUBE-REINFORCED ALUMINUM COMPOSITES SUITABLE FOR USE IN RADIATOR PANEL FACESHEETS, CLOSEOUTS, SUPPORTS AND JOINTS.
    contract · Last action 2011-07-22
    $99,999
  • Department of Defense
    SBIR PHASE I: TOPIC AF083-244 : POWDERMET INC.
    contract · Last action 2009-05-29
    $99,991
  • Department of Defense
    "ADVANCED HIGH STRENGTH LOW WEIGHT ALUMINUM NANOFOAM ALLOYS"
    contract · Last action 2009-03-23
    $98,999
  • Department of Defense
    PROGRESS REPORT
    contract · Last action 2013-05-15
    $79,999
  • Department of Defense
    SBIR PHASE I TOPIC N08-017
    contract · Last action 2008-05-12
    $79,999
  • Department of Defense
    SBIR PHASE 1 - NANOMATERIALS FOR THERMAL BATTERY
    contract · Last action 2012-05-31
    $79,999
  • Department of Defense
    N132-103 AWD
    contract · Last action 2014-03-25
    $79,496
  • Department of Defense
    PHASE I - SBIR
    contract · Last action 2011-03-17
    $70,000
  • Department of Defense
    BONDING OF ULTRAHIGH STRENGTH ALLOYS
    contract · Last action 2011-01-14
    $70,000
  • Department of Defense
    RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)
    contract · Last action 2008-05-09
    $70,000
  • Department of Defense
    THERMALLY ENGINEERED STRUCTURES FOR HYPERSONICS
    contract · Last action 2019-08-07
    $50,000
  • Department of Defense
    SBIR PHASE I TOPIC N07-004
    contract · Last action 2012-12-18
    $30,000
  • Department of Defense
    POWDER
    contract · Last action 2008-02-04
    $9,200
  • National Aeronautics and Space Administration
    CERMET PLASMA SPRAY POWDERS
    contract · Last action 2009-05-19
    $0
  • Department of Defense
    RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES
    contract · Last action 2009-02-02
    $0
  • Department of Defense
    NOVEL ENERGETIC MATERIALS SBIR II
    contract · Last action 2013-09-30
    $-1
  • Department of Defense
    200505!00A132!1700!N00030!STRATEGIC SYSTEMS PROGRAMS !N0003004C0067 !A!N! !N! ! !20050106!20070105!175863463!175863463!175863463!N!POWDERMET INC !24112 ROCKWELL DR !EUCLID !OH!44117!25704!035!39!EUCLID !CUYAHOGA !OHIO !+000000150000!N!N!000000000000!AC24!RDTE/MISSILE AND SPACE SYSTEMS-DEMO/VALID !A2 !MISSILE AND SPACE SYSTEMS !178 !TRIDENT II MISSILE !541710!E! !3! ! ! ! ! !20200930!B! ! !B! !A!N!U!2!001!K! !Z!N!Z! ! !N!A!N!N!Z! ! ! !D!A!000!A!B!N! ! ! ! !1700!N00030!0001! !
    contract · Last action 2012-08-14
    $-294
  • Department of Defense
    200508!000454!5700!FA9453!DET 8 AFRL/PKV8 !FA945305C0042 !A!N! !Y! ! !20050510!20070730!175863463!175863463!175863463!N!POWDERMET INC !24112 ROCKWELL DR !EUCLID !OH!44117!25704!035!39!EUCLID !CUYAHOGA !OHIO !+000000375000!N!N!000000749456!AC21!RDTE/MISSILE AND SPACE SYSTEMS-BASIC RESEARCH !A2 !MISSILE AND SPACE SYSTEMS !000 !* !541710!E! !3! ! ! ! ! !20200930!B! ! !B! !A!N!U!2!003!K! !Z!N!Z! ! !N!B!N!N! ! !Z! !B!A!000!C!B!N! ! ! ! ! ! !0001! !
    contract · Last action 2011-08-30
    $-535

Federal contract dollars to this establishment. Primary NAICS: 541712 - RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY). Last action: 2025-06-26. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
2009-05-06Complaint4$0
2009-05-06Complaint0$0
2008-11-14Complaint11$438
2008-09-10Complaint11$750

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Other employers in this industry and state

Other employers in secondary smelting and alloying of aluminum within OH, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on POWDERMET INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is POWDERMET INC.'s OSHA violation history?
POWDERMET INC. has 4 OSHA inspections on record with 6 violations and $1,187.5 in total penalties.
How does POWDERMET INC.'s safety record compare to its industry?
POWDERMET INC. operates in the secondary smelting and alloying of aluminum industry. The industry average Total Recordable Incident Rate (TRIR) is 2.9.