Establishment profile
CRITICAL PATH INC
4114 W LAKE SAMMAMISH PKWY SE AND CORNER OF 137TH AVE SE, BELLEVUE, WA, 98008
238110 — Poured Concrete Foundation and Structure Contractors
Summary
CRITICAL PATH INC has accumulated 3 OSHA violations across 1 inspection over 4 years of recorded history, with $2,400 in total assessed penalties.
The establishment sits in the 54th percentile for violations within its industry-state peer group of 16,021 employers. The most recent enforcement activity was recorded 4 years ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
CRITICAL PATH INC appears in OSHA workplace safety record only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, CPSC product recalls, or NHTSA vehicle recalls. Single-agency enforcement records typically indicate either a discrete incident-based inspection or a low-risk operational profile.
OSHA workplace safety
100% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 3 distinct standards shown · 3 citations in this view · $2,400 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 296-155-680(10)(A) | 1 | 1 | $2,400 | Sep 2022 | Sep 2022 |
| 296-155-110(6) | 1 | 1 | — | Sep 2022 | Sep 2022 |
| 296-155-110(9) | 1 | 1 | — | Sep 2022 | Sep 2022 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Above average violations in NAICS 2381 within WA. Peer group: 16,021 employers. This establishment has 3 OSHA violations; peer median is 2.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for CRITICAL PATH INC. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for CRITICAL PATH INC. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 4+ years. Most recent activity: 4 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for CRITICAL PATH INC. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
No MSHA mine safety violations on file for CRITICAL PATH INC. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for CRITICAL PATH INC. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for CRITICAL PATH INC. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for CRITICAL PATH INC. Verify directly with Environmental Protection Agency →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2022-07-05 | Unprogrammed Related | 3 | 1 | $2,400 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in poured concrete foundation and structure contractors within WA, ordered by federal enforcement volume:
- SUNSET CEMENT FINISHING CO INCBONNEY LAKE — 2 federal enforcement records
- PACIFIC CONSTRUCTION SYSTEMSSEATTLE — 2 federal enforcement records
- RALPHS CONCRETE PUMPING INCMUKILTEO — 2 federal enforcement records
- LARUSSO CONCRETE INCSEATTLE — 2 federal enforcement records
- RALPHS CONCRETE PUMPING INCORTING — 2 federal enforcement records
- RALPHS CONCRETE PUMPING INCSEATTLE — 2 federal enforcement records
- RALPHS CONCRETE PUMPING INCPUYALLUP — 2 federal enforcement records
- MITCHELL TRUCKING & PAVING INCWENATCHEE — 2 federal enforcement records
- RALPHS CONCRETE PUMPING INCSEATTLE — 2 federal enforcement records
- RALPHS CONCRETE PUMPING INCLEAVENWORTH — 2 federal enforcement records
Related searches
- Poured Concrete Foundation and Structure ContractorsAll employers in this industry
- Employers in WAState-wide enforcement data
- Poured Concrete Foundation in WAIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on CRITICAL PATH INC from every major federal compliance and enforcement source. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is CRITICAL PATH INC's OSHA violation history?
- CRITICAL PATH INC has 1 OSHA inspection on record with 3 violations and $2,400 in total penalties.
- How does CRITICAL PATH INC's safety record compare to its industry?
- CRITICAL PATH INC operates in the poured concrete foundation and structure contractors industry. The industry average Total Recordable Incident Rate (TRIR) is 2.8.