Skip to main content

Establishment profile

CPC MATERIALS INC

1105 117TH STREET SE, LAKE STEVENS, WA, 98258
Operated by CPC Materials Inc · 1 of 2 establishments
327320Ready-Mix Concrete Manufacturing
EIN 952901640

Download as PDF →

OSHA inspections
1
over 11 years
Violations
0
Penalties
$0

Summary

CPC MATERIALS INC has accumulated 0 OSHA violations across 1 inspection over 11 years of recorded history.

The most recent federal enforcement activity was recorded 11 years ago.

Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

CPC MATERIALS INC appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

Inspections
1
0.1 / yr · last 11 yrs
Violations
0
0.0 / yr
Penalties
$0
Inspection trigger · referral
1 of 1

Peer comparison

0th

Fewer violations than most other employers in NAICS 3273 within WA. Peer group: 228 employers. This establishment has 0 OSHA violations; peer median is 2.

Fewer violationsMore violations
Penalty percentile
0th
peer median: $165
Inspection frequency
0th
peer median: 1

Safety self-report (OSHA 300A)

Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.

DART rate
4.8
vs industry
+3.2
TRIR
11.2
vs industry
+8.7

Reported for 55 average annual employees at this establishment.

Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.

Industry benchmark

Industry avg TRIR
2.5
BLS SOII 2024
Industry avg DART
1.6
BLS SOII 2024
Self-reported TRIR
11.2
OSHA ITA Form 300A (employer self-reported)

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Referral
1

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for CPC MATERIALS INC. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
11 years ago

No federal enforcement activity has been recorded against this establishment in 11+ years. Most recent activity: 11 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for CPC MATERIALS INC. Verify directly with Wage and Hour Division

Mine safety (MSHA)

Company-level in WA — for CPC Materials Inc, not this location alone

Violations
29
Assessed penalties
$4,074

Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other CPC Materials Inc operations in the same state.

MSHA citations

Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 29 citations · 3S&S · 29 contractor · $4,074 proposed / $4,074 paid.

CitationMineDateSectionS&SNegligenceProposedPaid
9505601
Hamilton
Skagit, WA
contractor: CPC Materials Inc.
Oct 2020YesHighNegligence$482$482
8882180
Hamilton
Skagit, WA
contractor: CPC Materials Inc.
Jan 2025NoHighNegligence$177$177
8882178
Hamilton
Skagit, WA
contractor: CPC Materials Inc.
Jan 2025NoHighNegligence$177$177
5107002
Hamilton
Skagit, WA
contractor: CPC Materials Inc.
Jun 2025NoModNegligence$151$151
8882179
Hamilton
Skagit, WA
contractor: CPC Materials Inc.
Jul 2024NoLowNegligence$151$151
9683767
Hamilton
Skagit, WA
contractor: CPC Materials Inc.
Oct 2023NoModNegligence$143$143
8882025
Hamilton
Skagit, WA
contractor: CPC Materials Inc.
Mar 2017YesModNegligence$135$135
9616973
Hamilton
Skagit, WA
contractor: CPC Materials Inc.
Nov 2022NoModNegligence$133$133
9616780
Hamilton
Skagit, WA
contractor: CPC Materials Inc.
Jun 2022NoLowNegligence$133$133
9505603
Hamilton
Skagit, WA
contractor: CPC Materials Inc.
Oct 2020NoModNegligence$123$123
9505602
Hamilton
Skagit, WA
contractor: CPC Materials Inc.
Oct 2020NoModNegligence$123$123
9505200
Hamilton
Skagit, WA
contractor: CPC Materials Inc.
Oct 2020NoModNegligence$123$123
9505166
Hamilton
Skagit, WA
contractor: CPC Materials Inc.
Jul 2020NoModNegligence$123$123
9434376
Hamilton
Skagit, WA
contractor: CPC Materials Inc.
Jan 2020NoLowNegligence$123$123
9434375
Hamilton
Skagit, WA
contractor: CPC Materials Inc.
Jan 2020NoModNegligence$123$123
9434247
Hamilton
Skagit, WA
contractor: CPC Materials Inc.
Jun 2019NoModNegligence$121$121
9434246
Hamilton
Skagit, WA
contractor: CPC Materials Inc.
Jun 2019NoModNegligence$121$121
9434245
Hamilton
Skagit, WA
contractor: CPC Materials Inc.
Jun 2019YesLowNegligence$121$121
9378486
Hamilton
Skagit, WA
contractor: CPC Materials Inc.
Mar 2019NoLowNegligence$121$121
9378485
Hamilton
Skagit, WA
contractor: CPC Materials Inc.
Mar 2019NoModNegligence$121$121
9378484
Hamilton
Skagit, WA
contractor: CPC Materials Inc.
Mar 2019NoModNegligence$121$121
9378034
Hamilton
Skagit, WA
contractor: CPC Materials Inc.
Mar 2018NoLowNegligence$118$118
9378033
Hamilton
Skagit, WA
contractor: CPC Materials Inc.
Mar 2018NoLowNegligence$118$118
9378032
Hamilton
Skagit, WA
contractor: CPC Materials Inc.
Mar 2018NoModNegligence$118$118
8882027
Hamilton
Skagit, WA
contractor: CPC Materials Inc.
Mar 2017NoModNegligence$116$116
8882026
Hamilton
Skagit, WA
contractor: CPC Materials Inc.
Mar 2017NoModNegligence$116$116
8881391
Cascade Quarry
Snohomish, WA
contractor: CPC Materials, Inc.
Oct 2016NoLowNegligence$114$114
8881794
Cascade Quarry
Snohomish, WA
contractor: CPC Materials, Inc.
Jun 2016NoModNegligence$114$114
8881793
Cascade Quarry
Snohomish, WA
contractor: CPC Materials, Inc.
Jun 2016NoModNegligence$114$114

Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for CPC MATERIALS INC. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for CPC MATERIALS INC. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for CPC MATERIALS INC. Verify directly with Environmental Protection Agency

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for CPC MATERIALS INC. Verify directly with UVA Corporate Prosecution Registry

Inspection history

DateTriggerViolationsSeriousPenalty
2015-06-11Referral0$0

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Part of a larger organization

CPC MATERIALS INC is one of 2 establishments rolled up under the parent organization CPC Materials Inc.

Federal enforcement records on this page represent activity at this specific establishment only. The full enforcement footprint of CPC Materials Inc across all 2 of its tracked locations is viewable on the parent profile.

Other employers in this industry and state

Other employers in ready-mix concrete manufacturing within WA, ordered by federal enforcement volume:

Other locations under this parent

Other establishments operated by CPC Materials Inc, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on CPC MATERIALS INC from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code. This establishment resolves to the parent rollup CPC Materials Inc, which operates 2 establishments in our dataset.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is CPC MATERIALS INC's OSHA violation history?
CPC MATERIALS INC has 1 OSHA inspection on record with 0 violations and $0 in total penalties.
How does CPC MATERIALS INC's safety record compare to its industry?
CPC MATERIALS INC operates in the ready-mix concrete manufacturing industry. The industry average Total Recordable Incident Rate (TRIR) is 2.5. CPC MATERIALS INC's self-reported DART rate is 4.81 compared to an industry average of 1.6.