Establishment profile
CONCRETE NOR'WEST
EAST OF 620 FAIRHAVEN RD, BURLINGTON, WA, 98233
327320 — Ready-Mix Concrete Manufacturing
Summary
CONCRETE NOR'WEST has accumulated 12 OSHA violations across 7 inspections over 36 years of recorded history.
The establishment sits in the 96th percentile for violations within its industry-state peer group of 67,391 employers. Inspection frequency runs at the 100th percentile. The most recent enforcement activity was recorded 10 years ago.
Federal records were found in 3 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
CONCRETE NOR'WEST appears in OSHA workplace safety, WHD wage enforcement, and MSHA mine safety records only. No matching records were found in EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
57% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 11 distinct standards shown · 12 citations in this view.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 0248.100902 B | 2 | 1 | — | Mar 1990 | Mar 1990 |
| 29 CFR 0246.5003 | 1 | 1 | — | Jun 1992 | Jun 1992 |
| 29 CFR 0246.850502 E | 1 | 1 | — | Jun 1992 | Jun 1992 |
| 29 CFR 0246.850709 C | 1 | 1 | — | Jun 1992 | Jun 1992 |
| 29 CFR 0249.560507 B 01 | 1 | 1 | — | May 1990 | May 1990 |
| 29 CFR 0249.560701 B | 1 | 1 | — | May 1990 | May 1990 |
| 29 CFR 0240.004001 A 01 | 1 | 1 | — | May 1990 | May 1990 |
| 29 CFR 0249.560706 D | 1 | 1 | — | May 1990 | May 1990 |
| 29 CFR 0240.750101 A | 1 | 1 | — | May 1990 | May 1990 |
| 29 CFR 0241.800302 | 1 | 1 | — | May 1990 | May 1990 |
| 29 CFR 0245.653101 | 1 | 1 | — | May 1990 | May 1990 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Worse on violations than nearly every other employer in NAICS 3273 within WA. Peer group: 67,391 employers. This establishment has 12 OSHA violations; peer median is 2.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for CONCRETE NOR'WEST. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for CONCRETE NOR'WEST. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 10+ years. Most recent activity: 10 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
Department of Labor Wage & Hour Division — minimum-wage, overtime, child-labor, FMLA, and prevailing-wage enforcement.
Wage and hour breakdown by law
Per-statute totals across all closed DOL Wage & Hour cases against this employer. Backwages reflect amounts the agency assessed; civil penalty is the separate fine where applicable. Some acts (Davis-Bacon, SCA, CWHSSA, H-2B, CCPA) don't carry a civil penalty field in DOL's data. 1 statute · 7 violations · $0 in backwages
| Statute | Period | Cases | Violations | Workers | Backwages | Civil penalty |
|---|---|---|---|---|---|---|
| FMLA (family & medical leave) | Nov 2015 | 1 | 7 | — | — | — |
Source: DOL WHD enforcement database, aggregated per statute. Lifetime totals. A case can cite multiple statutes — so the total here may exceed the case count in the table above.
Wage and hour cases
Closed DOL Wage & Hour Division cases (FLSA, FMLA, H-2B, MSPA, and related statutes). Backwages reflect amounts the agency assessed; civil penalty (CMP) is a separate fine levied on top, where the statute provides for one (FLSA / H-1B / H-2A / MSPA / FMLA / EPPA / FLSA Child Labor; other acts have no CMP column in DOL’s data). The Statutes column lists which laws each case cited. 1 case · 7 violations · $0 in backwages · 1 worker affected
| Case period | Industry | Statutes | Violations | Workers | Backwages | Civil penalty |
|---|---|---|---|---|---|---|
| Nov 2014 – Nov 2015 | Ready-Mix Concrete Manufacturing | FMLA | 7 | 1 | — | — |
Source: DOL WHD enforcement database. Cases shown reflect those the agency has closed and made public. A violation count is the agency’s tally of cited violations (one violation can affect many workers); the workers column counts distinct employees the agency found to be affected.
Mine safety (MSHA)
Company-level in WA — for CONCRETE NOR'WEST, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other CONCRETE NOR'WEST operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 57S&S · 96 contractor · $165,788 proposed / $74,226 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 7954121 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Jul 2009 | — | Yes | HighNegligence | $70,000 | $8,210 |
| 6338769 | Getchell Pit Snohomish, WA contractor: Concrete Nor'west | Jul 2003 | — | Yes | ModNegligence | $19,000 | $1,000 |
| 6338768 | Getchell Pit Snohomish, WA contractor: Concrete Nor'west | Jul 2003 | — | Yes | HighNegligence | $19,000 | $19,000 |
| 7954123 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Jul 2009 | — | Yes | HighNegligence | $9,122 | $9,122 |
| 7954140 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Aug 2009 | — | Yes | ModNegligence | $7,176 | $2,161 |
| 7954128 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Aug 2009 | — | Yes | HighNegligence | $5,645 | $5,645 |
| 7954132 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Aug 2009 | — | Yes | HighNegligence | $3,784 | $3,784 |
| 6399357 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Oct 2008 | — | Yes | LowNegligence | $2,536 | $2,536 |
| 7954122 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Jul 2009 | — | No | ModNegligence | $2,473 | $500 |
| 6480425 | Getchell Pit Snohomish, WA contractor: Concrete Nor'west | Apr 2009 | — | Yes | ModNegligence | $2,282 | $1,826 |
| 7954610 | Getchell Pit Snohomish, WA contractor: Concrete Nor'west | Jul 2009 | — | No | ModNegligence | $2,106 | $1,474 |
| 7954124 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Jul 2009 | — | No | ModNegligence | $2,000 | $436 |
| 6399372 | Belleville Skagit, WA contractor: Concrete Nor'West | Jan 2009 | — | Yes | HighNegligence | $2,000 | $1,700 |
| 7954125 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Jul 2009 | — | No | ModNegligence | $1,944 | $392 |
| 7954126 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Aug 2009 | — | Yes | ModNegligence | $1,530 | $1,530 |
| 6399355 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Oct 2008 | — | Yes | LowNegligence | $687 | $687 |
| 7954136 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Aug 2009 | — | Yes | LowNegligence | $460 | $460 |
| 6399353 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Oct 2008 | — | No | HighNegligence | $460 | $460 |
| 6336031 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Oct 2001 | — | Yes | ModNegligence | $317 | $317 |
| 7990541 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Feb 2001 | — | Yes | LowNegligence | $317 | $317 |
| 7954130 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Aug 2009 | — | No | ModNegligence | $308 | $308 |
| 6433626 | Getchell Pit Snohomish, WA contractor: Concrete Nor'west | Apr 2008 | — | Yes | ModNegligence | $308 | $308 |
| 6336032 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Oct 2001 | — | Yes | ModNegligence | $294 | $294 |
| 7954615 | Jordan Site Snohomish, WA | Jul 2009 | — | Yes | LowNegligence | $285 | $125 |
| 7954612 | Jordan Site Snohomish, WA | Jul 2009 | — | Yes | ModNegligence | $285 | $285 |
| 7990540 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Feb 2001 | — | No | ModNegligence | $277 | $277 |
| 7979171 | Peterson Pit Skagit, WA contractor: Concrete Nor'West | Mar 2000 | — | Yes | ModNegligence | $259 | $259 |
| 7979170 | Peterson Pit Skagit, WA contractor: Concrete Nor'West | Mar 2000 | — | Yes | ModNegligence | $259 | $259 |
| 6336174 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Jun 2002 | — | Yes | ModNegligence | $248 | $248 |
| 6336173 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Jun 2002 | — | Yes | ModNegligence | $248 | $248 |
| 7963630 | Oak Harbor Pit Island, WA contractor: Concrete Nor'West | Feb 2007 | — | Yes | HighNegligence | $247 | $247 |
| 6336052 | Siper Road Pit Whatcom, WA contractor: Concrete Nor'West | Jan 2002 | — | Yes | ModNegligence | $242 | $242 |
| 7995496 | Oak Harbor Pit Island, WA contractor: Concrete Nor'West | May 2001 | — | Yes | LowNegligence | $242 | $242 |
| 7963627 | Boulder Hill Pit Island, WA contractor: Concrete Nor'West | Feb 2007 | — | Yes | ModNegligence | $228 | $228 |
| 6384251 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | May 2006 | — | Yes | ModNegligence | $228 | $228 |
| 6399371 | Belleville Skagit, WA contractor: Concrete Nor'West | Jan 2009 | — | No | HighNegligence | $224 | $224 |
| 7981471 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Apr 2008 | — | No | ModNegligence | $224 | $224 |
| 7981469 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Apr 2008 | — | No | ModNegligence | $224 | $224 |
| 8565249 | Jordan Site Snohomish, WA | Oct 2010 | — | Yes | ModNegligence | $212 | $212 |
| 7954131 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Aug 2009 | — | No | ModNegligence | $207 | $207 |
| 7974912 | Oak Harbor Pit Island, WA contractor: Concrete Nor'West | Jan 2000 | — | Yes | ModNegligence | $207 | $207 |
| 7974910 | Oak Harbor Pit Island, WA contractor: Concrete Nor'West | Jan 2000 | — | Yes | ModNegligence | $207 | $207 |
| 7974907 | Oak Harbor Pit Island, WA contractor: Concrete Nor'West | Jan 2000 | — | Yes | ModNegligence | $207 | $207 |
| 7963625 | Boulder Hill Pit Island, WA contractor: Concrete Nor'West | Feb 2007 | — | Yes | ModNegligence | $191 | $191 |
| 6396086 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Dec 2006 | — | Yes | ModNegligence | $191 | $191 |
| 6399400 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Dec 2009 | — | Yes | ModNegligence | $190 | $190 |
| 6384007 | Boulder Hill Pit Island, WA contractor: Concrete Nor'West | Jan 2006 | — | Yes | ModNegligence | $177 | $177 |
| 6344026 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Sep 2002 | — | Yes | ModNegligence | $173 | $173 |
| 7974911 | Oak Harbor Pit Island, WA contractor: Concrete Nor'West | Jan 2000 | — | Yes | ModNegligence | $173 | $173 |
| 8611981 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Nov 2013 | — | No | ModNegligence | $150 | $150 |
| 8611980 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Nov 2013 | — | No | ModNegligence | $150 | $150 |
| 6480430 | Siper Road Pit Whatcom, WA contractor: Concrete Nor'West | Apr 2009 | — | Yes | ModNegligence | $150 | $150 |
| 6480412 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Mar 2009 | — | No | ModNegligence | $150 | $120 |
| 6480410 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Mar 2009 | — | No | ModNegligence | $150 | $150 |
| 6480409 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Mar 2009 | — | No | ModNegligence | $150 | $120 |
| 6480407 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Mar 2009 | — | No | ModNegligence | $150 | $120 |
| 6480406 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Mar 2009 | — | No | ModNegligence | $150 | $120 |
| 6399373 | Belleville Skagit, WA contractor: Concrete Nor'West | Jan 2009 | — | Yes | ModNegligence | $150 | $150 |
| 7974915 | Oak Harbor Pit Island, WA contractor: Concrete Nor'West | Jan 2000 | — | Yes | LowNegligence | $150 | $150 |
| 7974914 | Oak Harbor Pit Island, WA contractor: Concrete Nor'West | Jan 2000 | — | Yes | LowNegligence | $150 | $150 |
| 7963623 | Boulder Hill Pit Island, WA contractor: Concrete Nor'West | Feb 2007 | — | Yes | ModNegligence | $144 | $144 |
| 7990218 | Trapline Pit Whatcom, WA contractor: Concrete Nor'West | Apr 2000 | — | Yes | ModNegligence | $140 | $140 |
| 6399354 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Oct 2008 | — | No | ModNegligence | $138 | $138 |
| 6399352 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Oct 2008 | — | No | ModNegligence | $138 | $138 |
| 6433630 | Getchell Pit Snohomish, WA contractor: Concrete Nor'west | Apr 2008 | — | Yes | ModNegligence | $138 | $138 |
| 6433628 | Getchell Pit Snohomish, WA contractor: Concrete Nor'west | Apr 2008 | — | Yes | ModNegligence | $138 | $138 |
| 6433620 | Getchell Pit Snohomish, WA contractor: Concrete Nor'west | Apr 2008 | — | Yes | ModNegligence | $138 | $138 |
| 7974901 | Oak Harbor Pit Island, WA contractor: Concrete Nor'West | Jan 2000 | — | Yes | ModNegligence | $131 | $131 |
| 7974898 | Oak Harbor Pit Island, WA contractor: Concrete Nor'West | Jan 2000 | — | Yes | ModNegligence | $131 | $131 |
| 7974897 | Oak Harbor Pit Island, WA contractor: Concrete Nor'West | Jan 2000 | — | Yes | ModNegligence | $131 | $131 |
| 6480424 | Getchell Pit Snohomish, WA contractor: Concrete Nor'west | Apr 2009 | — | No | ModNegligence | $127 | $127 |
| 6433581 | Cheiftain Powerscreen Skagit, WA contractor: Concrete Nor'West | Feb 2009 | — | Yes | ModNegligence | $127 | $127 |
| 6433577 | Cheiftain Powerscreen Skagit, WA contractor: Concrete Nor'West | Feb 2009 | — | Yes | ModNegligence | $127 | $127 |
| 6355175 | Boulder Hill Pit Island, WA contractor: Concrete Nor'West | Jun 2004 | — | Yes | ModNegligence | $124 | $124 |
| 6363023 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Jun 2004 | — | Yes | ModNegligence | $124 | $124 |
| 8611983 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Nov 2013 | — | No | ModNegligence | $117 | $117 |
| 8610931 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | May 2013 | — | No | ModNegligence | $117 | $117 |
| 6336168 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | May 2002 | — | Yes | ModNegligence | $104 | $104 |
| 8881093 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Jan 2016 | — | No | LowNegligence | $100 | $100 |
| 8786597 | Boulder Hill Pit Island, WA contractor: Concrete Nor'West | Sep 2015 | — | No | LowNegligence | $100 | $100 |
| 8786442 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Apr 2015 | — | No | LowNegligence | $100 | $100 |
| 8786507 | Island County RM Island, WA contractor: Concrete Nor'West | Dec 2014 | — | Yes | LowNegligence | $100 | $100 |
| 8780099 | Boulder Hill Pit Island, WA contractor: Concrete Nor'West | Nov 2014 | — | No | LowNegligence | $100 | $100 |
| 8786444 | Belleville Skagit, WA contractor: Concrete Nor'West | Aug 2014 | — | No | LowNegligence | $100 | $100 |
| 8780902 | Island County RM Island, WA contractor: Concrete Nor'West | Aug 2014 | — | No | ModNegligence | $100 | $100 |
| 8780648 | Boulder Hill Pit Island, WA contractor: Concrete Nor'West | Jul 2014 | — | No | LowNegligence | $100 | $100 |
| 8780647 | Boulder Hill Pit Island, WA contractor: Concrete Nor'West | Jul 2014 | — | No | ModNegligence | $100 | $100 |
| 8612040 | Belleville Skagit, WA contractor: Concrete Nor'West | Mar 2014 | — | No | ModNegligence | $100 | $100 |
| 8612039 | Belleville Skagit, WA contractor: Concrete Nor'West | Mar 2014 | — | No | ModNegligence | $100 | $100 |
| 8612038 | Belleville Skagit, WA contractor: Concrete Nor'West | Mar 2014 | — | No | ModNegligence | $100 | $100 |
| 8612267 | Island County RM Island, WA contractor: Concrete Nor'West | Jan 2014 | — | No | ModNegligence | $100 | $100 |
| 8780029 | Getchell Pit Snohomish, WA contractor: Concrete Nor'west | Nov 2013 | — | No | LowNegligence | $100 | $100 |
| 8611982 | BUTLER PIT Skagit, WA contractor: Concrete Nor'West | Nov 2013 | — | No | LowNegligence | $100 | $100 |
| 8611945 | Boulder Hill Pit Island, WA contractor: Concrete Nor'West | Aug 2013 | — | No | LowNegligence | $100 | $100 |
| 8611941 | Island County RM Island, WA contractor: Concrete Nor'West | Jul 2013 | — | No | LowNegligence | $100 | $100 |
| 6399469 | Getchell Pit Snohomish, WA contractor: Concrete Nor'west | Apr 2013 | — | No | ModNegligence | $100 | $100 |
| 6399468 | Getchell Pit Snohomish, WA contractor: Concrete Nor'west | Apr 2013 | — | No | ModNegligence | $100 | $100 |
| 8610760 | Jordan Site Snohomish, WA | Feb 2013 | — | Yes | LowNegligence | $100 | $100 |
| 6384593 | Island County RM Island, WA contractor: Concrete Nor'West | Feb 2013 | — | No | ModNegligence | $100 | $100 |
| 8610705 | Getchell Pit Snohomish, WA contractor: Concrete Nor'west | Oct 2012 | — | No | ModNegligence | $100 | $100 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for CONCRETE NOR'WEST. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for CONCRETE NOR'WEST. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for CONCRETE NOR'WEST. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for CONCRETE NOR'WEST. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 1994-02-15 | Unprogrammed Related | 0 | — | $0 | |
| 1992-05-12 | Planned | 3 | — | $0 | |
| 1991-04-30 | Planned | 0 | — | $0 | |
| 1991-04-30 | Planned | 0 | — | $0 | |
| 1990-03-08 | Planned | 3 | — | $0 | |
| 1990-03-08 | Planned | 2 | — | $0 | |
| 1990-03-08 | Planned | 4 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in ready-mix concrete manufacturing within WA, ordered by federal enforcement volume:
- CADMAN INCREDMOND — 3 federal enforcement records
- CADMAN (SEATTLE) INCSEATTLE — 3 federal enforcement records
- STANWOOD REDI-MIX INCSILVANA — 3 federal enforcement records
- FRED HILL MATERIALS INCBREMERTON — 3 federal enforcement records
- ELLENSBURG CEMENT PRODUCTS INCELLENSBURG — 2 federal enforcement records
- CALPORTLAND COMPANYKENMORE — 2 federal enforcement records
- CPM DEVELOPMENT CORPWENATCHEE — 2 federal enforcement records
- APPLE VALLEY SAND & GRAVELWENATCHEE — 2 federal enforcement records
- MILES SAND & GRAVEL COMPANYKENT — 2 federal enforcement records
- KNIFE RIVERSPOKANE VALLEY — 2 federal enforcement records
Related searches
- Ready-Mix Concrete ManufacturingAll employers in this industry
- Employers in WAState-wide enforcement data
- Ready-Mix Concrete Manufacturing in WAIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on CONCRETE NOR'WEST from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is CONCRETE NOR'WEST's OSHA violation history?
- CONCRETE NOR'WEST has 7 OSHA inspections on record with 12 violations and $0 in total penalties.
- How does CONCRETE NOR'WEST's safety record compare to its industry?
- CONCRETE NOR'WEST operates in the ready-mix concrete manufacturing industry. The industry average Total Recordable Incident Rate (TRIR) is 2.5.