Establishment profile
BRYANT'S LAND AND DEVELOPMENT INDUSTRIES, INC.
159 DEPOT STREET, BURNSVILLE, NC, 28714
561730 — Landscaping Services
Summary
BRYANT'S LAND AND DEVELOPMENT INDUSTRIES, INC. has accumulated 3 OSHA violations across 1 inspection over 14 years of recorded history, with $100 in total assessed penalties.
The establishment sits in the 69th percentile for violations within its industry-state peer group of 1,461 employers. The most recent enforcement activity was recorded 14 years ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
BRYANT'S LAND AND DEVELOPMENT INDUSTRIES, INC. appears in OSHA workplace safety and FMCSA motor carrier registration records only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
100% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 3 distinct standards shown · 3 citations in this view · $100 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1910.0215 B09 | 1 | 1 | $100 | Jan 2012 | Jan 2012 |
| 29 CFR 1910.0023 C01 | 1 | 1 | — | Jan 2012 | Jan 2012 |
| 29 CFR 1910.0215 A04 | 1 | 1 | — | Jan 2012 | Jan 2012 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Above average violations in NAICS 5617 within NC. Peer group: 1,461 employers. This establishment has 3 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for BRYANT'S LAND AND DEVELOPMENT INDUSTRIES, INC.. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for BRYANT'S LAND AND DEVELOPMENT INDUSTRIES, INC.. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 14+ years. Most recent activity: 14 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for BRYANT'S LAND AND DEVELOPMENT INDUSTRIES, INC.. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
No MSHA mine safety violations on file for BRYANT'S LAND AND DEVELOPMENT INDUSTRIES, INC.. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for BRYANT'S LAND AND DEVELOPMENT INDUSTRIES, INC.. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for BRYANT'S LAND AND DEVELOPMENT INDUSTRIES, INC.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for BRYANT'S LAND AND DEVELOPMENT INDUSTRIES, INC.. Verify directly with Environmental Protection Agency →
Motor carrier safety (FMCSA)
Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for BRYANT'S LAND AND DEVELOPMENT INDUSTRIES, INC.. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- Department of TransportationPROJECT NP-GRSM 10N(3), 19(1), 107(1): SCHEDULE A - LAKEVIEW DRIVE EAST (SWAIN COUNTY, NC). WORK INCLUDES PERFORMING FULL DEPTH RECLAMATION WITH CEMENT STABILIZATION AND CONSTRUCTING ASPHALT CONCRETE PAVEMENT OF 6.41 MILES OF LAKEVIEW DRIVE EAST ANcontract · Last action 2026-04-02$29,698,622
- Department of TransportationPROJECT NC NP BLRI 2K13; NC NP BLRI 2K14 THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 316.4, 325.8 AND 325.9. THE WORK INCLUDES BRIDGE RAIL REPLACEMENT CONCRETE REPAIR, RIPRAP PLACEMENT, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS, CULVERcontract · Last action 2026-03-16$10,685,836
- Department of TransportationPROJECT NP-GRSM 11(4): THE WORK IN SCHEDULE A INCLUDES THE REPLACEMENT OF THE TUNNEL DRAINAGE SYSTEM AND CHASES, REPAIRING CRACKED, SPALLED, AND DELAMINATED AREAS OF THE TUNNEL WALL, PERMANENT PAVEMENT MARKINGS, WALL DELINEATORS, DRAINAGE IMPROVEMcontract · Last action 2024-04-18$9,821,057
- Department of TransportationNP-GRSM (10N(1) AND 10N(2) THE PROJECT CONSISTS OF REHABILITATING APPROXIMATELY 2.44 MILES OF NEWFOUND GAP ROAD FROM MP 12.32 TO MP 14.76 AND RESURFACING APPROXIMATELY 6.18 MILES OF NEWFOUND GAP ROAD FROM MP 6.14 TO MP 12.32, INCLUDING PARKING AREAScontract · Last action 2024-07-18$7,907,593
- Department of TransportationPROJECT NP SER PMS FY18(1) THE PROJECT CONSISTS OF PAVEMENT PRESERVATION TREATMENT IN CAPE HATTERAS NATIONAL SEASHORE, FORT RALEIGH NATIONAL HISTORIC SITE, AND WRIGHT BROTHERS NATIONAL MEMORIAL. THE WORK INCLUDES THIN ASPHALT PAVEMENT OVERLAY, CHIP SEAL, MICRO SURFACING, ASPHALT PAVEMENT MILLING, FULL-DEPTH ASPHALT PATCHING, CRACK CLEANING AND SEALING, PAVEMENT MARKING INSTALLATION, AND OTHER MISCELLANEOUS WORK.contract · Last action 2023-01-20$7,726,441
- Department of TransportationPROJECT NP BISO 10(2): THE PROJECT CONSISTS OF THE RESURFACING OF APPROXIMATELY 7.6 MILES OF THE LEATHERWOOD FORD ROAD, INCLUDING THE RESURFACING OF THE BANDY CREEK BRIDGE AND CUMBERLAND RIVER BRIDGE. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULcontract · Last action 2024-07-31$7,290,604
- Department of TransportationPROJECT TN NP GRSM 21(1): THE PROJECT CONSISTS OF ASPHALT CONCRETE PAVING OF COSBY GOVERNMENT QUARTERS AND RANGER STATION ACCESS ROAD. THE WORK INCLUDES REPLACING ROCK CREEK BOTTOMLESS ARCH/STRUCTURAL PLATE, DRAINAGE IMPROVEMENT, SHOULDER AND DITCHcontract · Last action 2025-09-16$6,072,761
- Department of TransportationIGF::OT::IGF SCHEDULE A: PARTICIPATION IN DESIGN OF THE PROJECT LOCATED NEAR MILEPOST 242 OF THE BLUE RIDGE PARKWAY IN ALLEGHANY COUNTY, NORTH CAROLINA (COMMONLY KNOWN AS ALLIGATOR BACK AND ICE ROCK AREAS). OPTION B: IF THE CMGC CONTRACTOR IS AWARDED OPTION B, THE WORK WILL INCLUDE ALL CONSTRUCTION WORK MENTIONED UNDER THE DESIGN PROJECT (SCHEDULE A) INCLUDING ROADWAY RECONSTRUCTION; QUALITY ASSURANCE AND QUALITY CONTROL FOR CONSTRUCTION; TEMPORARY TRAFFIC CONTROL; AND OVERALL PROJECT MANAGEMENT.contract · Last action 2017-05-10$4,999,720
- Department of TransportationPROJECT NC NP GRSM 10S(1): THE PROJECT CONSISTS OF PLACING A THIN LIFT ASPHALT CONCRETE PAVEMENT OVERLAY ON NEWFOUND GAP ROAD FROM MP 20.9 TO 27.9, ASSOCIATED PARKING AREAS, AND PULL-OFFS. THE WORK INCLUDES PERFORMING ASPHALT PAVEMENT MICRO-MILLINGcontract · Last action 2026-04-20$4,631,666
- Department of TransportationIGF::OT::IGF PROJECT: FTNP-BLRI 2A15 THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 12 MILES OF THE BLUE RIDGE PARKWAY FROM MILEPOST (MP) 217.17 TO MP 229.68, INCLUDING THE EXIT/ENTRANCE RAMPS TO N.C. ROUTE 18 AND U.S. ROUTE 21, AND THREE PARKING AREAS/OVERLOOKS. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL AND PARTIAL DEPTH PAVEMENT PATCHING, ASPHALT CONCRETE PAVEMENT OVERLAY, BRIDGE JOINT CLEANING AND RESEALING, STONE MASONRY REPAIRS, DRAINAGE REPLACEMENTS, RIPRAP INSTALLATION, AND OTHER MISCELLANEOUS WORK.contract · Last action 2020-02-26$4,413,170
- Department of TransportationPROJECT NP-FOOT PMS(2) THE PROJECT CONSISTS OF PAVEMENT PRESERVATION TREATMENT (ASPHALT CONCRETE PAVEMENT AND CHIP SEAL), CRACK SEALING, FILLING, AND SEALING, ASPHALT PAVEMENT PATCHING, PAVEMENT MARKINGS, AND OTHER MISCELLANEOUS WORK ON THE FOOTHIcontract · Last action 2024-07-31$4,263,207
- Department of TransportationPROJECT NP-BLRI PVT PRES FY 22(1): THE PROJECT CONSISTS OF THIN LIFT ASPHALT OVERLAY OF ROADWAYS, OVERLOOKS, AND PARKING AREAS ALONG THE BLUE RIDGE PARKWAY FROM MP 394.67 TO MP 469.50. THE WORK INCLUDES ASPHALT PATCHING, CRACK CLEANING AND SEALINGcontract · Last action 2023-12-11$3,634,892
- Department of TransportationTHE PROJECT CONSISTS OF THE RESTORATION AND STABILIZATION OF THE BLUE RIDGE PARKWAY SLIDE AREA AT MP 400.8 WITH GROUND ANCHORS. THE WORK INCLUDES ROADWAY EXCAVATION, SLOPE SCALING, GROUTING, SHOTCRETE, PAVEMENT REPAIRS, AND OTHER MISCELLANEOUS WORK.contract · Last action 2013-07-15$3,596,069
- Department of AgricultureTHE PROPOSED WORK INCLUDES EMERGENCY HAZARDOUS DEBRIS REMOVAL ON FEDERAL LANDS TO MANAGE IMMEDIATE THREATS TO PUBLIC HEALTH AND SAFETY, PROTECT THE LOCAL ECONOMY, AND MINIMIZE THE INTRODUCTION OF CONTAMINANTS INTO THE NEARBY WATERWAY. INCLUDES APPROPcontract · Last action 2026-03-09$3,544,391
- Department of TransportationIGF::OT::IGF PROJECT: BLRI 2P18 THE PROJECT CONSISTS OF THE RESTORATION AND STABILIZATION OF THE SLIDE AREA ON THE BLUE RIDGE PARKWAY AT MILEPOST 374.5 AND APPROXIMATELY 0.13 MILES OF PAVEMENT RECONSTRUCTION. THE STABILIZATION WORK INCLUDES THE CONSTRUCTION OF MECHANICALLY STABILIZED EARTH RETAINING WALLS WITH GEOGRID REINFORCEMENT, WELDED WIRE FENCING, AND MECHANICALLY PLACED SPECIAL ROCK EMBANKMENT. THE WORK ALSO INCLUDES EARTHWORK, AGGREGATE BASE, SUPERPAVE ASPHALT CONCRETE PAVEMENT, DRAINAGE IMPROVEMENTS, RIPRAP, AND OTHER MISCELLANEOUS WORK.contract · Last action 2020-05-08$3,446,682
- Department of TransportationPROJECT: NP-BLRI 1E10 THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 10.25 MILES OF THE BLUE RIDGE PARKWAY, FROM MILEPOST (MP) 27.24 TO MP 37.49, INCLUDING THE RECONSTRUCTION OF THE STILLHOUSE HOLLOW (MP 31.84) AND YANKEE HORSE RIDGE (MP 34.67) OVERLOOKS. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL-DEPTH ASPHALT PAYMENT RECONSTRUCTION, CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT OVERLAY, STRUCTURAL CONCRETE REPAIRS, EPOXY INJECTION CRACK REPAIRS, STONE MASONRY REPAIRS, DRAINAGE REPAIRS, AND OTHER MISCELLANEOUS WORK.contract · Last action 2020-12-17$3,415,568
- Department of TransportationNC ERFO NP BLRI 2024-1(9) THE PROJECT CONSISTS OF ROADWAY EXCAVATION, EMBANKMENT CONSTRUCTION, CULVERT REPLACEMENT, PAVEMENT PATCHING, REESTABLISHING SLOPE, BACKFILLING WITH FALLEN SOIL, TURF ESTABLISHMENT AND TOPSOIL, STONE MASONRY WORK, AND OTHEcontract · Last action 2026-04-20$2,631,167
- Department of TransportationPROJECT: NP-NACE 17(2), 18(2), 19(2), 118(1), 206(1) THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF FORT DUPONT DRIVE, FORT DAVIS DRIVE, RIDGE PICNIC AREA, RIDGE PICNIC AREA LOOP, AND THE RECONSTRUCTION OF LANHAM ESTATES LOOP ROAD. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL, ROADWAY EXCAVATION, SEPARATION-STABILIZATION GEOTEXTILE INSTALLATION, ASPHALT PAVEMENT MILLING, FULL-DEPTH ASPHALT PAVEMENT PATCHING, ASPHALT PAVEMENT OVERLAY, DRAINAGE IMPROVEMENTS AND REPLACEMENTS, INSTALLATION OF PERMANENT STORMWATER MANAGEMENT BMPS, LANDSCAPING AND OTHER MISCELLANEOUS WORK.contract · Last action 2020-07-15$2,591,048
- Department of TransportationPROJECT NP-GRSM 17(1): THE PROJECT CONSISTS OF RESURFACING CLINGMANS DOME ACCESS ROAD, INCLUDING PARKING AREAS AND PULL-OFFS, WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES ASPHALT PAVEMENT PATCHING, REMOVAL OF EXISTING PAVEMENTcontract · Last action 2023-10-24$2,549,083
- Department of TransportationIGF::OT::IGF PROJECT NO. NP - GRSM 15(2), 16(1) THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 7.7 MILES OF LAUREL CREEK ROAD, 0.8 MILES OF TOWNSEND ENTRANCE ROAD, AND 2.0 MILES OF TREMONT ROAD, INCLUDING NUMEROUS PARKING AREAS AND PULL-OFFS, ALL WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT OVERLAY, SHOULDER RECONDITIONING, TRAFFIC DETECTOR LOOP AND PERMANENT SIGN REPLACEMENT, AND OTHER MISCELLANEOUS WORK.contract · Last action 2021-05-17$2,317,955
- Department of TransportationPROJECT NP-BLRI 2J17 THE PROJECT INCLUDES INSTALLING A DRAINAGE SYSTEM, REPLACEMENT OF ASPHALT CONCRETE PAVEMENT, INSTALLATION OF LIGHTWEIGHT CONCRETE SLAB, REPLACING BRIDGE SIDEWALK, REPLACING AND RESETTING BRIDGE CURB, REPLACING STONE MASONRY AT Pcontract · Last action 2022-09-27$2,300,212
- Department of TransportationPROJECT VA ERFO NPS BLRI 2020-1(2): THE PROJECT CONSISTS OF SLIDE REPAIR AT MP 119.7 AND MP 127.9. THE WORK INCLUDES SLOPE STABILIZATION REPAIRS WITH SOIL NAIL SYSTEM AND SHOULDER RECONSTRUCTION AT MP 119.7, A MECHANICALLY STABILIZED EARTH WALL Acontract · Last action 2024-07-29$2,299,847
- Department of TransportationIGF::OT::IGF PROJECT: FW-CHN 10(1) THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 2.65 MILES OF THE BEACH ACCESS ROAD INCLUDING RECONSTRUCTION OF THE PULL-OFFS AND ADJACENT BIKE TRAIL, AND APPROXIMATELY 0.09 MILES OF THE WOODLAND TRAIL ACCESS ROAD, AS WELL AS THE ASSATEAGUE LIGHTHOUSE AND WOODLAND TRAIL PARKING AREAS. THE WORK INCLUDES EARTHWORK, AGGREGATE BASE, ASPHALT PAVEMENT MILLING, FULL-DEPTH PAVEMENT PATCHING, ASPHALT PAVEMENT WIDENING, SUPERPAVE ASPHALT CONCRETE PAVEMENT OVERLAY, CONCRETE CURB, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.contract · Last action 2019-06-12$2,215,760
- Department of TransportationBLRI 2H14contract · Last action 2020-04-07$2,109,127
- Department of TransportationPROJECT LA ERFO FW SBN 2020-2(1) THE PROJECT CONSISTS OF THE REPAIR AND REPLACEMENT OF THE DAMAGED INFRASTRUCTURE CAUSED BY A SIGNIFICANT STORM EVENT IN AUGUST 2020. THE WORK INCLUDES BOTH DESIGN AND CONSTRUCTION WORK RELATED TO PLAN, DESIGN, MANAcontract · Last action 2026-03-18$2,039,750
- Department of TransportationTHE PROJECT CONSISTS OF ROADWAY AND GEOTECHNICAL RETAINING WALL WORK ONLY. IT INCLUDES THE RESTORATION AND STABILIZATION OF THE BLUE RIDGE PARKWAY SLIDE AREA AT MP 364.72 BY MECHANICALLY STABILIZED EARTH WALLS AND ROCK BOLTING WITH MORTARED STONE FACING. CONSTRUCTION INCLUDES PAVEMENT REPAIRS TO THE PARKWAY, TOPSOIL, TURF ESTABLISHMENT, AND OTHER MISCELLANEOUS WORK. THE WORK REQUIRES CONTRACTOR DESIGN OR CONSTRUCTION EXPERIENCE PER SECTIONS 255 AND 260 OF THE FP AND SCR S.contract · Last action 2015-04-09$1,980,065
- Department of TransportationPROJECT NP-GRSM 26(2),137(1) THE PROJECT CONSISTS OF RESURFACING CADES COVE LOOP ROAD AND CADES COVE CAMPGROUND ENTRANCE ROAD, INCLUDING PARKING AREAS AND PULL-OFFS, WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES ASPHALT PAVEMENTcontract · Last action 2024-05-14$1,959,197
- Department of TransportationPROJECT NP SER BMS FY22(1) THE PROJECT CONSISTS OF PREVENTIVE MAINTENANCE REPAIRS ON 19 BRIDGES WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES THE REPAIR OF DETERIORATED EXPANSION JOINTS, ASPHALT PAVEMENT CRACK SEALING AND FILLcontract · Last action 2025-05-14$1,924,744
- Department of AgricultureRECONSTRUCTION OF FLATWOODS RD#87. WORK INCLUDES PLACING GEOGRID, CRUSHED AGGREGATE, AND HOT MIX ASPHALT ON ROAD #87. PLACING CRUSHED AGGREGATE AND HOT MIX ASPHALT ON LITTLE OAK ROAD #87G IS INCLUDED AS ADD ITEMS.contract · Last action 2011-08-09$1,754,324
- Department of TransportationPROJECT NP BLRI 2J18, 2R21 THE PROJECT CONSISTS OF PERFORMING MAINTENANCE REPAIRS ON FOUR BRIDGES ON THE BLUE RIDGE PARKWAY. THE WORK INCLUDES REPLACEMENT OF BRIDGE BEARINGS, AND OTHER MISCELLANEOUS WORK.contract · Last action 2024-07-29$1,618,058
- Department of TransportationPROJECT MS NP SER PMS FY23(2) THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF ROADWAYS AND PARKING AREAS. THE WORK INCLUDES PAVEMENT MICRO SURFACING; THIN-LIFT OVERLAY; FULL DEPTH PATCHING; AND OTHER MISCELLANEOUS WORK.contract · Last action 2025-09-08$1,450,035
- Department of TransportationPROJECT AL CE BW T LAKES(1): THE PROJECT CONSISTS OF THE PAVEMENT REHABILITATION FOR LOCK 5 PARK AND LOCK 8 PARK INCLUDING ACCESS ROADS AND PARKING AREAS. THE WORK INCLUDES ASPHALT PAVEMENT OVERLAY, PLACING SHOULDER MATERIAL, FULL DEPTH PATCH SPOcontract · Last action 2024-02-12$1,313,275
- Department of TransportationGA PFH 2(1)contract · Last action 2019-01-11$1,238,861
- Department of TransportationIGF::OT::IGF PRA-BLRI 2P19, T14 THE PROJECT CONSISTS OF THE REHABILITATION OF THE BLUE RIDGE PARKWAY TANBARK RIDGE AND BUCK SPRING TUNNELS AT MILEPOSTS 374.24 AND 407.25, RESPECTIVELY. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, ASPHALT CONCRETE PAVEMENT OVERLAY, DRAINAGE CHASE AND CONCRETE LINING REPAIRS, DRAINAGE IMPROVEMENTS, PAVEMENT MARKINGS, AND OTHER MISCELLANEOUS WORK.contract · Last action 2020-05-26$1,191,303
- Department of TransportationIGF::OT::IGF PROJECT: OCMU 10(2) THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 1.47 MILES OF PARK ROAD AND FOUR PARKING AREAS WITHIN THE OCMULGEE NATIONAL MONUMENT. THE WORK INCLUDES ASPHALT PAVEMENT MILLING, FULL-DEPTH PAVEMENT PATCHING AND WIDENING, ASPHALT CONCRETE PAVEMENT CHIP SEALING AND OVERLAY, CONCRETE CURB REPLACEMENT, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.contract · Last action 2020-03-17$911,566
- Department of TransportationPROJECT GRSM 15(1) THE PROJECT CONSISTS OF REPAIRING THE BOTE MOUNTAIN TUNNEL AND MILLING AND OVERLAY OF APPROXIMATELY 0.15-MILE OF LAUREL CREEK ROAD WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES REPAIR TO THE CONCRETE LINING, Rcontract · Last action 2021-05-18$841,236
- Department of AgricultureEMERGENCY ROAD REPAIRS TO 1.73 MILES OF ROAN MOUNTAIN ROAD INCLUDING MILLING, PATCHING AND OVERLAYS.contract · Last action 2025-12-01$770,560
- Department of DefenseDREDGING, STUMPY POINT BAYcontract · Last action 2011-03-18$680,682
- Department of TransportationIGF::OT::IGF THE PROJECT CONSISTS OF THE REHABILITATION AND RESURFACING OF APPROXIMATELY 4.4 MILES OF REFUGE ROUTE 11 FROM PRICHARD FARM ROAD TO REFUGE ROUTE 12, AND SIGNAGE IMPROVEMENTS TO THE INTERSECTION OF U.S. ROUTE 1 AND HEADQUARTERS ACCESS ROAD, ALL WITHIN THE CAROLINA SANDHILLS NATIONAL WILDLIFE REFUGE. THE WORK INCLUDES EARTHWORK, AGGREGATE ROADWAY RESURFACING, DITCH AND SHOULDER RECONDITIONING, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.contract · Last action 2020-05-12$675,699
- Department of TransportationIGF::OT::IGF PROJECT FW-GRDI 105(1)contract · Last action 2020-06-25$606,365
- Department of TransportationPROJECT TN ERFO NP GRSM 2020-1(1): THE PROJECT CONSISTS OF REPAIRING STORM DAMAGE ON TOWNSEND ENTRANCE ROAD WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES REMOVING A PAVED PULL-OFF, CONSTRUCTING A ROCKERY, PLACING AND GROUTING RIcontract · Last action 2023-04-18$596,533
- Department of TransportationPROJECT TN ERFO FS 2019-1(1): THE PROJECT CONSISTS OF SLOPE STABILIZATION REPAIRS OF A 0.17-MILE SEGMENT OF HALLS TOP ROAD (FS-207). THE WORK INCLUDES CONSTRUCTION OF ROCK FILLED GABION WALLS SYSTEM, DRAIN DIP CONSTRUCTION, AGGREGATE ROADWAY RESURFcontract · Last action 2023-04-10$485,143
- Department of TransportationPRA-BLRI BMS NC(2)contract · Last action 2013-05-14$476,584
- Department of AgricultureROTO MILLING ROAD MAINTENANCE IN THE NATIONAL FORESTS OF NORTH AND SOUTH CAROLINAcontract · Last action 2013-01-24$424,230
- Department of AgricultureROAD ROCK CRUSHING FOR CHEROKEE AND CHATTAHOOCHEE NFScontract · Last action 2012-06-28$414,409
- Department of TransportationRECOVERY - SEALED BIDS FROM ALL BUSINESS CONCERNS WILL BE ACCEPTED FOR THE BLUE RIDGE PARKWAY PROJECT PRA-BLRI 2T13, SOLICITATION NUMBER DTFH71-10-B-00026, LOCATED IN HENDERSON COUNTY, NORTH CAROLINA. THE PROJECT CONSISTS OF THE REHABILITATION OF THE BUCK SPRINGS TUNNEL DRAINAGE CHASE AT MP 407.25. THE WORK INCLUDES STRUCTURAL CONCRETE, DRAINAGE IMPROVEMENTS, ASPHALT PAVEMENT MILLING, SUPERPAVE ASPHALT CONCRETE PAVEMENT, AND OTHER MISCELLANEOUS WORK.contract · Last action 2011-10-17$387,235
- Department of DefenseIGF::OT::IGF CONSTRUCT CONNECTOR ROADcontract · Last action 2018-04-16$371,988
- Department of TransportationPROJECT NP SER PMS FY20(1) THE PROJECT CONSISTS OF PAVEMENT PRESERVATION TREATMENT IN THE ANDREW JOHNSON NATIONAL HISTORIC SITE. THE WORK INCLUDES MICRO SURFACING AND OTHER MISCELLANEOUS WORK.contract · Last action 2023-01-30$331,407
- Department of AgricultureSOUTH TOE RIVER ROAD BRIDGEcontract · Last action 2010-08-23$274,990
- Department of TransportationIGF::OT::IGF PRA-BLRI 2S19 THE PROJECT CONSISTS OF THE REPAIR AND RESURFACING OF TWO SHORT SECTIONS OF THE BLUE RIDGE PARKWAY AT MP 400.1 AND 404.1. THE WORK INCLUDES FULL-DEPTH ROADWAY EXCAVATION WITH GEOGRID REINFORCING, ASPHALT PAVEMENT MILLING AND SUPERPAVE ASPHALT CONCRETE PAVEMENT OVERLAY, AGGREGATE-TOPSOIL SHOULDER STABILIZATION, AND OTHER MISCELLANEOUS WORK.contract · Last action 2020-07-01$236,767
Federal contract dollars to this establishment. Primary NAICS: 237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Last action: 2026-04-20. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2012-01-24 | Planned | 3 | 2 | $100 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in landscaping services within NC, ordered by federal enforcement volume:
- LANDMASTERS, INC.GASTONIA — 2 federal enforcement records
- EMPLOYMENT SOURCE INC.FAYETTEVILLE — 2 federal enforcement records
- CHURCH BROTHERS GRADING, INC.HUNTERSVILLE — 2 federal enforcement records
- ACE SERVICES, INC.DURHAM — 2 federal enforcement records
- The Budd GroupCharlotte — 2 federal enforcement records
- MARTIN EDWARDS & ASSOCIATES, INC.WILSON — 2 federal enforcement records
- COASTAL ENTERPRISES OF WILMINGTONSOUTHPORT — 2 federal enforcement records
- ROWE TREE COMPANY, INC.CURRIE — 2 federal enforcement records
- THE DAVEY TREE EXPERT COMPANYCHARLOTTE — 2 federal enforcement records
- FINAL GRADE, INC.SELMA — 2 federal enforcement records
Related searches
- Landscaping ServicesAll employers in this industry
- Employers in NCState-wide enforcement data
- Landscaping Services in NCIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on BRYANT'S LAND AND DEVELOPMENT INDUSTRIES, INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is BRYANT'S LAND AND DEVELOPMENT INDUSTRIES, INC.'s OSHA violation history?
- BRYANT'S LAND AND DEVELOPMENT INDUSTRIES, INC. has 1 OSHA inspection on record with 3 violations and $100 in total penalties.
- How does BRYANT'S LAND AND DEVELOPMENT INDUSTRIES, INC.'s safety record compare to its industry?
- BRYANT'S LAND AND DEVELOPMENT INDUSTRIES, INC. operates in the landscaping services industry. The industry average Total Recordable Incident Rate (TRIR) is 3.