Skip to main content

Establishment profile

WILDLANDS INC

1941 SAINT ST, RICHLAND, WA, 99354
561730Landscaping Services

Download as PDF →

OSHA inspections
1
over 9 years
Violations
8
$600 in penalties
Penalties
$600
$75 avg

Summary

WILDLANDS INC has accumulated 8 OSHA violations across 1 inspection over 9 years of recorded history, with $600 in total assessed penalties.

The establishment sits in the 92nd percentile for violations within its industry-state peer group of 2,633 employers. The most recent enforcement activity was recorded 9 years ago.

Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

WILDLANDS INC appears in OSHA workplace safety and FMCSA motor carrier registration records only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

Inspections
1
0.1 / yr · last 9 yrs
Violations
8
0.9 / yr
Penalties
$600
$75 avg / violation
38% serious62% other
Inspection trigger · planned
1 of 1

100% of inspections at this establishment produced violations,

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 8 distinct standards shown · 8 citations in this view · $600 in penalties.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
296-800-1503011$300Sep 2016Sep 2016
296-800-2501511$150Sep 2016Sep 2016
296-800-26010(1)11$150Sep 2016Sep 2016
296-863-6000511Sep 2016Sep 2016
296-24-47517(12)11Sep 2016Sep 2016
296-901-14012(6)11Sep 2016Sep 2016
296-800-1601011Sep 2016Sep 2016
296-800-2702011Sep 2016Sep 2016

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

92nd

Worse on violations than most other employers in NAICS 5617 within WA. Peer group: 2,633 employers. This establishment has 8 OSHA violations; peer median is 2.

Fewer violationsMore violations
Penalty percentile
62nd
peer median: $100
Inspection frequency
0th
peer median: 1

Safety self-report (OSHA 300A)

No self-reported injury rates filed with OSHA's Injury Tracking Application for WILDLANDS INC. Verify directly with OSHA Injury Tracking Application

Industry benchmark

Industry avg TRIR
3.0
BLS SOII 2024
Industry avg DART
2.0
BLS SOII 2024
Self-reported TRIR
Not in OSHA ITA

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Planned
1

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for WILDLANDS INC. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
9 years ago

No federal enforcement activity has been recorded against this establishment in 9+ years. Most recent activity: 9 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for WILDLANDS INC. Verify directly with Wage and Hour Division

Mine safety (MSHA)

No MSHA mine safety violations on file for WILDLANDS INC. Verify directly with Mine Safety and Health Administration

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for WILDLANDS INC. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for WILDLANDS INC. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for WILDLANDS INC. Verify directly with Environmental Protection Agency

Motor carrier safety (FMCSA)

DOT number
544158
Operation
A

Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for WILDLANDS INC. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$2.2M
Obligated (all-time)
$12.5M
Awards
88
Top agency
Department of Agriculture
$6.9M
Top agencies by obligation (this location)
Department of Agriculture$6.9M
Department of the Interior$5.5M
Department of Defense$92K
Largest awards (top 50 of 88)
  • Department of Agriculture
    IGF::OT::IGF I-90 SNOQUALMIE PASS EAST PROJECT - PHASE 1B RESTORATION SITES
    contract · Last action 2016-12-05
    $1,543,526
  • Department of Agriculture
    BPA CALL IS AWARDED UNDER THE FOREST SERVICE, REGION 6, BLANKET PURCHASE AGREEMENT (BPA) FOR RESTORATION SERVICES. PLANT INSTALLATION AT I-90 PHASE 2 RESTORATION SITES.
    contract · Last action 2023-02-07
    $1,384,873
  • Department of the Interior
    RECOVERY WHIS-150392 REVEGETATION SERVICES TO RESTORE CRYSTAL CREEK QUARRY, WHISKEYTOWN NATIONAL RECREATION AREA, CA THE CONTRACTOR SHALL STABILIZE AND RECLAIM ACTIVELY ERODING AREAS AT THE QUARRY. SERVICES INCLUDE STABILIZATION OF THE SITE IN A MANNER WHICH MEETS EROSION CONTROL REGULATIONS AND PREVENTS EROSION INTO CRYSTAL CREEK, MINIMIZATION OF HAZARDS TO VISITORS, IMPROVMENT OF SOIL CONDITIONS FOR NATIVE VEGETATION TO COLONIZE THE SITE, MINIMIZE THE CONDITIONS FAVORABLE TO SPREAD OF NOXIOUS WEEDS AND INVASIVE PLANTS, IMPROVE SITE AESTHETICS, TRAILHEAD AND PARKING DELINEATION, SEED COLLECTION/CUTTINGS, PLANT PROPAGATION, AND PLANT INSTALLATION.
    contract · Last action 2012-11-08
    $948,722
  • Department of Agriculture
    (OKW) BOT I-90 PHASE 3 PLANT GROWOUT FOR THE I-90 SNOQUALMIE PASS EAST RESTORATION PROJECT.
    contract · Last action 2024-04-24
    $799,659
  • Department of the Interior
    RECOVERY GRSA 137342 - WORK CONSISTS OF RESTORATION OF 13 GRAVEL PITS AT GREAT SAND DUNES NATIONAL PARK
    contract · Last action 2013-07-30
    $603,490
  • Department of the Interior
    IGF::OT::IGF X:NOGRN FORT LARNED NATIONAL HISTORIC SITE (FOLS) VEGETATION MANAGEMENT, REVEGETATION AND RE-CONTOURING OF AREAS IMPACTED BY CONSTRUCTION FOR ACCESS ROAD, BRIDGE AND PARKING AREA, FOLS 153996
    contract · Last action 2024-03-06
    $564,237
  • Department of Agriculture
    IGF::OT::IGF(;54 NR G&A HISTORIC COLUMBIA RIVER HIGHWAY STATE TRAIL- SEGMENTS A-C)
    contract · Last action 2022-01-24
    $515,498
  • Department of Agriculture
    HIGHWAY 97: S. CENTURY DRIVE TO USFS BOUNDARY
    contract · Last action 2025-04-25
    $490,098
  • Department of Agriculture
    RESTORATION SERVICES FOR VIENTO TO MITCHELL POINT CROSSING
    contract · Last action 2024-04-17
    $420,667
  • Department of the Interior
    IGF::OT::IGF FOLA - 153996 REVEGETATION AND RE-CONTOURING OF AREAS IMPACTED BY CONSTRUCTION OF ACCESS ROAD, BRIDGE, AND PARKING AREA, FORT LARNED NATIONAL HISTORIC SITE, LARNED, KANSAS
    contract · Last action 2020-09-25
    $419,187
  • Department of Agriculture
    OR140 KLAMATH COUNTY BOAT MARINA TO LAKESHORE DRIVE
    contract · Last action 2024-08-16
    $368,640
  • Department of the Interior
    IGF::OT::IGF 2013 JARBIDGE FIELD OFFICE FALL FUELS PLANTING
    contract · Last action 2013-08-28
    $316,966
  • Department of Agriculture
    LAKE CHELAN EROSION CONTROL PHASE 8 SITES 5A AND 5B
    contract · Last action 2020-01-07
    $257,995
  • Department of Agriculture
    IGF::OT::IGF (WYCHUS RIPARIAN PLANTING)
    contract · Last action 2017-11-06
    $224,811
  • Department of the Interior
    WA HANFORD RCH NM WAHLUKE SLOPE BAR
    contract · Last action 2025-11-24
    $181,006
  • Department of the Interior
    BURNED AREA RECOVERY EFFORTS AT HAGERMAN FOSSIL BEDS NM, INCLUDING APPLICATION OF HERBICIDE, IMPRINT SEEDING OF NATIVE FORBS, AND AERIAL SEEDING OF SAGEBRUSH.
    contract · Last action 2012-01-09
    $177,027
  • Department of Agriculture
    THE CLE ELUM POOL RAISE THROUGH THE BUREAU OF RECLAMATION IS PART OF THE YAKIMA BASIN INTERGRATED PLAN TO INCREASE WATER RESERVES BY RAISING THE LEVEL OF THE CLE ELUM RESERVOIR BY THREE FEET. FOREST SERVICE HAS AN INTERAGENCY AGREEMENT WITH THE DEPAR
    contract · Last action 2025-10-29
    $170,981
  • Department of Agriculture
    PROVIDE RESTORATION SERVICES FOR HCRHST SEGMENT F MITCHEL POINT CROSSING INCLUDING IMSTALLING NATIVE PLANTS, NOXIOUS WEED MONITORING, NOXIOUS WEED TREATMENT, HYDROSEEDING, AND MINOR EARTH MOVEMENT.
    contract · Last action 2023-09-23
    $165,648
  • Department of the Interior
    IGF::OT::IGF CAVE-16570/17830 - CARLSBAD CAVERNS NATIONAL PARK EXOTICS CONTROL AND WATERLINE REVEGETATION
    contract · Last action 2017-02-02
    $157,641
  • Department of the Interior
    HYDRO-SEED AND HYDRO-MULCH ALONG ROAD RECONSTRUCTION PROJECT
    contract · Last action 2014-03-20
    $145,833
  • Department of the Interior
    RESTORATION/IMPLEMENTATION PLAN DUNES RESTORATION
    contract · Last action 2009-12-17
    $135,017
  • Department of the Interior
    IGF::OT::IGF X:NOGRN CLIFFSHELF HEADWALL 11&12 SITE WORK AND REVEGITATION, BADLANDS NATIONAL PARK, SOUTH DAKOTA, BADL 203937
    contract · Last action 2018-09-17
    $110,194
  • Department of the Interior
    IGF::OT::IGF THRO-113252 - RESEEDING AND EROSION CONTROL FOR REVEGETATION OF ROADSIDE DISTURBANCES OF SOUTH UNIT LOOP ROAD, THEODORE ROOSEVELT NATIONAL PARK, NORTH DAKOTA
    contract · Last action 2020-11-02
    $105,714
  • Department of the Interior
    ROUTE 10 AND SPUR ROADS REVEGETATION, CANYON DE CHELLY NATIONAL MONUMENT, CACH - 107809 SERVICES INCLUDE RE-GRADING; INSTALLATION OF SEDIMENT CONTROL WATTLES, EROSION CONTROL FABRIC, AND BONDED FIBER MATRIX; AND HYDRO SEEDING ALONG THE ROAD.
    contract · Last action 2012-08-01
    $104,737
  • Department of the Interior
    REVEGETATION SERVICES FOR PARKING AREA SALVAGE AND REVEGETATION, CRATERS OF THE MOON NATIONAL MONUMENT AND PRESERVE, IDAHO. WORK INCLUDES CLEARING AND REVEGETATING SELECT LOCATIONS OF SIX DIFFERENT PARKING AREAS ALONG THE PARK LOOP ROAD; REMOVING, MULCHING, STORING, AND REPLACING PLANT AND ROCK MATERIAL; AND CREATION OF VERTICAL MULCH.
    contract · Last action 2012-03-20
    $101,897
  • Department of the Interior
    PLANT PROPAGATION SEQUOIA AND KINGS CANYON NATIONAL PARKS
    contract · Last action 2014-04-28
    $99,840
  • Department of the Interior
    VEGETATION RESTORATION
    contract · Last action 2012-06-13
    $99,138
  • Department of the Interior
    PLANTS
    contract · Last action 2009-09-16
    $98,650
  • Department of Agriculture
    PURCHASE RESTORATION SERVICES FOR SH-21 CERVIDAE WILDLIFE OVERCROSSING REVEGETATION
    contract · Last action 2023-07-18
    $93,917
  • Department of the Interior
    RIPARIAN REHABILITATION WORK FOR MID-COLUMBIA NWR COMPLEX, BURBANK WA
    contract · Last action 2011-05-04
    $86,901
  • Department of Agriculture
    DETROIT FLATS SHORELINE ENHANCEMENT
    contract · Last action 2019-07-08
    $76,883
  • Department of the Interior
    IGF::OT::IGF G:EPREF CAVE-116245 REVEGITATION OF WATER AND SEWER LINES AND EXOTIC PLANT MANAGEMENT, CARLSBAD NATIONAL PARK, CARLSBAD, NEW MEXICO
    contract · Last action 2016-08-24
    $75,300
  • Department of the Interior
    HYDRO MULCHING/SEEDING, FERTILIZING AND PLANTING OF DISTURBANCE AFTER CONSTRUCTION ON SCENIC DRIVE, CAPITOL REEF NATIONAL PARK, UT CARE-57955
    contract · Last action 2012-05-08
    $74,322
  • Department of Agriculture
    54 NR G&A ODOT EAGLE CREEK
    contract · Last action 2022-01-24
    $71,019
  • Department of Agriculture
    IGF::OT::IGF (HWY 26 PROJECT - REVEGETATION)
    contract · Last action 2016-03-29
    $70,133
  • Department of Defense
    MCCORMICK (PLANTING)
    contract · Last action 2020-03-24
    $66,450
  • Department of Agriculture
    COYOTE WALL ECOLOGICAL RESTORATION GREAT AMERICAN OUTDOORS ACT (GAOA) COLUMBIA RIVER GORGE NATIONAL SCENIC AREA (CRGNSA)
    contract · Last action 2024-11-13
    $64,817
  • Department of the Interior
    SUPPLY AND INSTALL 300 NATIVE RIPARIAN TREES FOR THE MID-COLUMBIA NWR, BURBANK, WA
    contract · Last action 2010-12-21
    $61,500
  • Department of the Interior
    GREEN ROOF AND SURROUNDING LANDSCAPE REVEGITATION, TALLGRASS PRAIRIE NATIONAL PRESERVE, COTTONWOOD FALLS, KANSAS, TAPR - 077288
    contract · Last action 2012-05-22
    $51,993
  • Department of the Interior
    PLANTS
    contract · Last action 2009-03-20
    $51,975
  • Department of Agriculture
    IGF::OT::IGF (54 NR G&A FHWA MIRROR LAKE TRAIL RELOCATION PROJECT)
    contract · Last action 2022-01-24
    $49,963
  • Department of the Interior
    CARLSBAD CAVERNS NATIONAL PARK - SUMMER 2012 RESEEDING
    contract · Last action 2013-02-13
    $48,780
  • Department of the Interior
    IGF::OT::IGF CONTRACTOR TO COMPLETE WILDFIRE RESTORATION WORK AT THE PALISADES FLAT PARCEL IN ACCORDANCE WITH THE PROPOSAL SUBMITTED ON 2-12-2015. TOTAL AMOUNT OF FUNDING OBLIGATED TO COVER THE PROPOSAL COST IS $48,747.20, ALL FAR CLAUSES IN IDIQ AG-04M3-C-14-0039 AND THOSE CONTAINED IN THE ATTACHED SPECIFICATIONS ARE APPLICABLE TO THIS TASK ORDER.
    contract · Last action 2015-02-20
    $48,747
  • Department of the Interior
    IGF::OT::IGF MORA-081946, STEVEN'S CANYON HYDROSEEDING, MOUNT RAINIER NATIONAL PARK, WASHINGTON SERVICES INCLUDE: RIPPING, HAND SEEDING,AND HYDROSEEDING
    contract · Last action 2017-01-27
    $48,041
  • Department of the Interior
    VOLCANO ROAD EROSION CONTROL AND REVEGITATION, CAPULIN VOLCANO NATIONAL MONUMENT, CAVO-090821
    contract · Last action 2012-06-01
    $44,482
  • Department of the Interior
    BEAR HOLLOW REFORESTATION GROW&PLANT IGF::OT::IGF
    contract · Last action 2015-11-23
    $43,050
  • Department of the Interior
    INSTALLATION OF COTTONWOOD POLES ON MCNARY NWR
    contract · Last action 2010-04-21
    $41,900
  • Department of the Interior
    RIPARIAN PLANTS
    contract · Last action 2011-01-18
    $40,238
  • Department of the Interior
    IGF::OT::IGF OTHER FUNCTIONS BADL 86786 REVEGETATION - SITE AND SEEDING WORK 2012 BADLANDS NATIONAL PARK INTERIOR, SD
    contract · Last action 2012-06-22
    $37,696
  • Department of the Interior
    OLYM-5375 REVEGETATION SERVICES FOR PLANT PROPAGATION AND DELIVERY FOR THE ELWHA RIVER ECOSYSTEM RESTORATION PROJECT, LAKE MILLS AND LAKE ALDWELL, OLYMPIC NATIONAL PARK, WA. SERVICES INCLUDE PROPAGATING CONIFER SEEDLINGS AND BARE-ROOT TREES AND SHRUBS.
    contract · Last action 2014-06-11
    $36,440

Federal contract dollars to this establishment. Primary NAICS: 115310 - SUPPORT ACTIVITIES FOR FORESTRY. Last action: 2025-11-24. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
2016-07-14Planned83$600

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Other employers in this industry and state

Other employers in landscaping services within WA, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on WILDLANDS INC from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is WILDLANDS INC's OSHA violation history?
WILDLANDS INC has 1 OSHA inspection on record with 8 violations and $600 in total penalties.
How does WILDLANDS INC's safety record compare to its industry?
WILDLANDS INC operates in the landscaping services industry. The industry average Total Recordable Incident Rate (TRIR) is 3.