Establishment profile
WHEELER MACHINERY CO
4901 WEST 2100 SOUTH, SALT LAKE CITY, UT, 84120
Operated by Campbell Companies/Wheeler Machinery Co
811310 — Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
EIN 870306419
Summary
WHEELER MACHINERY CO has accumulated 33 OSHA violations across 9 inspections over 42 years of recorded history, with $7,440 in total assessed penalties.
The establishment sits in the 98th percentile for violations within its industry-state peer group of 57 employers. Inspection frequency runs at the 100th percentile. The most recent enforcement activity was recorded 14 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
WHEELER MACHINERY CO appears in OSHA workplace safety, MSHA mine safety, and FMCSA motor carrier registration records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
67% of inspections at this establishment produced violations, with 4 inspections producing serious-or-greater violations.
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 20 distinct standards shown · 21 citations in this view · $7,440 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1000.5 D03 | 2 | 2 | $3,700 | Jul 1999 | Sep 2005 |
| 29 CFR 1910.0212 A01 | 1 | 1 | $1,875 | Jan 2012 | Jan 2012 |
| 29 CFR 1910.0147 C06 I | 1 | 1 | $1,625 | Jan 2012 | Jan 2012 |
| GEN01781312 1 | 1 | 1 | $240 | Apr 1984 | Apr 1984 |
| 29 CFR 1910.0134 A01 | 1 | 1 | — | Sep 2005 | Sep 2005 |
| 29 CFR 1910.0254 D09 III | 1 | 1 | — | Sep 2005 | Sep 2005 |
| 29 CFR 1910.0141 G02 | 1 | 1 | — | Sep 2005 | Sep 2005 |
| 29 CFR 1910.0219 F03 | 1 | 1 | — | Jul 1999 | Jul 1999 |
| 29 CFR 1910.0107 B05 I | 1 | 1 | — | Jul 1999 | Jul 1999 |
| 29 CFR 1910.0151 C | 1 | 1 | — | Jul 1999 | Jul 1999 |
| 29 CFR 1910.0107 C09 I | 1 | 1 | — | Jul 1999 | Jul 1999 |
| 29 CFR 1910.0305 B02 | 1 | 1 | — | Jul 1999 | Jul 1999 |
| 29 CFR 1910.0107 E02 | 1 | 1 | — | Jul 1999 | Jul 1999 |
| 29 CFR 1910.0213 D01 | 1 | 1 | — | Jul 1999 | Jul 1999 |
| 29 CFR 1910.0134 C01 | 1 | 1 | — | Jul 1999 | Jul 1999 |
| 29 CFR 1910.0253 B04 III | 1 | 1 | — | Feb 1991 | Feb 1991 |
| 29 CFR 1910.0134 B01 | 1 | 1 | — | Feb 1991 | Feb 1991 |
| 29 CFR 1910.0184 I09 IV | 1 | 1 | — | Feb 1991 | Feb 1991 |
| 29 CFR 1910.0212 A03 II | 1 | 1 | — | Feb 1991 | Feb 1991 |
| 29 CFR 1910.0242 A | 1 | 1 | — | Feb 1991 | Feb 1991 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Worse on violations than nearly every other employer in NAICS 8113 within UT. Peer group: 57 employers. This establishment has 33 OSHA violations; peer median is 2.
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 761 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for WHEELER MACHINERY CO. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 14+ years. Most recent activity: 14 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for WHEELER MACHINERY CO. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in UT — for Campbell Companies/Wheeler Machinery Co, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other Campbell Companies/Wheeler Machinery Co operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 51 citations · 9S&S · 51 contractor · $26,797 proposed / $26,797 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 8996494 | Airport Pit Washington, UT contractor: Wheeler Machinery Co | Apr 2020 | — | Yes | HighNegligence | $10,373 | $10,373 |
| 8996496 | Airport Pit Washington, UT contractor: Wheeler Machinery Co | Apr 2020 | — | Yes | HighNegligence | $4,194 | $4,194 |
| 9727460 | Beck Street Salt Lake, UT contractor: Wheeler Machinery Co | Jul 2022 | — | Yes | ModNegligence | $1,358 | $1,358 |
| 9399847 | Vernal Pit & Mill Uintah, UT contractor: Wheeler Machinery Co | Dec 2019 | — | Yes | ModNegligence | $1,263 | $1,263 |
| 9308814 | Kennecott Keystone Underground Salt Lake, UT contractor: Wheeler Machinery Co | Jun 2017 | — | Yes | ModNegligence | $1,123 | $1,123 |
| 8930604 | Staker Parson Fast Pack Tooele, UT contractor: Wheeler Machinery Co | Sep 2015 | — | Yes | ModNegligence | $1,026 | $1,026 |
| 5055234 | Bauer Pit Tooele, UT contractor: Wheeler Machinery Co | Aug 2025 | — | Yes | ModNegligence | $697 | $697 |
| 9829248 | OK and Hidden Treasure Beaver, UT contractor: Wheeler Machinery Co | Feb 2025 | — | No | HighNegligence | $592 | $592 |
| 5055235 | Bauer Pit Tooele, UT contractor: Wheeler Machinery Co | Aug 2025 | — | No | ModNegligence | $465 | $465 |
| 8837518 | Portable #2 Summit, UT contractor: Wheeler Machinery Co | Aug 2017 | — | Yes | ModNegligence | $453 | $453 |
| 9826650 | Amrize Devil's Slide Plant Morgan, UT contractor: Wheeler Machinery Co | Jan 2025 | — | No | ModNegligence | $398 | $398 |
| 9907346 | Vernal Pit & Mill Uintah, UT contractor: Wheeler Machinery Co | Aug 2024 | — | No | ModNegligence | $357 | $357 |
| 9347640 | Bingham Canyon Mine Salt Lake, UT contractor: Wheeler Machinery Co | Jul 2018 | — | Yes | ModNegligence | $311 | $311 |
| 9725632 | HANSEN PIT Salt Lake, UT contractor: Wheeler Machinery Co | Dec 2022 | — | No | ModNegligence | $295 | $295 |
| 8757286 | Bingham Canyon Mine Salt Lake, UT contractor: Wheeler Machinery Co | Mar 2015 | — | No | ModNegligence | $263 | $263 |
| 8757052 | Bingham Canyon Mine Salt Lake, UT contractor: Wheeler Machinery Co | Mar 2014 | — | No | ModNegligence | $190 | $190 |
| 8756287 | Bingham Canyon Mine Salt Lake, UT contractor: Wheeler Machinery Co | Jul 2013 | — | No | ModNegligence | $176 | $176 |
| 9907345 | Vernal Pit & Mill Uintah, UT contractor: Wheeler Machinery Co | Aug 2024 | — | No | ModNegligence | $161 | $161 |
| 6320170 | Vernal Pit & Mill Uintah, UT contractor: Wheeler Machinery Co | May 2008 | — | No | ModNegligence | $150 | $150 |
| 9907347 | Vernal Pit & Mill Uintah, UT contractor: Wheeler Machinery Co | Aug 2024 | — | No | ModNegligence | $147 | $147 |
| 9907605 | Bingham Canyon Mine Salt Lake, UT contractor: Wheeler Machinery Co | Mar 2024 | — | No | ModNegligence | $147 | $147 |
| 9907604 | Bingham Canyon Mine Salt Lake, UT contractor: Wheeler Machinery Co | Mar 2024 | — | No | ModNegligence | $147 | $147 |
| 9155234 | SUFCO Sevier, UT contractor: Wheeler Machinery Co | Mar 2022 | — | No | ModNegligence | $133 | $133 |
| 9654592 | Bingham Canyon Mine Salt Lake, UT contractor: Wheeler Machinery Co | Jan 2022 | — | No | ModNegligence | $133 | $133 |
| 6580943 | Mountain Valley Stone Inc Summit, UT contractor: Wheeler Machinery Co | Dec 2011 | — | No | ModNegligence | $127 | $127 |
| 9474384 | Bingham Canyon Mine Salt Lake, UT contractor: Wheeler Machinery Co | Jul 2020 | — | No | ModNegligence | $123 | $123 |
| 8943358 | Bingham Canyon Mine Salt Lake, UT contractor: Wheeler Machinery Co | Aug 2017 | — | No | ModNegligence | $116 | $116 |
| 8943357 | Bingham Canyon Mine Salt Lake, UT contractor: Wheeler Machinery Co | Aug 2017 | — | No | ModNegligence | $116 | $116 |
| 8943356 | Bingham Canyon Mine Salt Lake, UT contractor: Wheeler Machinery Co | Aug 2017 | — | No | ModNegligence | $116 | $116 |
| 6320010 | Bingham Canyon Mine Salt Lake, UT contractor: Wheeler Machinery Co | Sep 2008 | — | No | ModNegligence | $112 | $112 |
| 8931048 | Vernal Pit & Mill Uintah, UT contractor: Wheeler Machinery Co | Apr 2016 | — | No | ModNegligence | $100 | $100 |
| 8483236 | HUNTER PREP PLANT Emery, UT contractor: Wheeler Machinery Co | Jul 2014 | — | No | ModNegligence | $100 | $100 |
| 8483235 | HUNTER PREP PLANT Emery, UT contractor: Wheeler Machinery Co | Jul 2014 | — | No | ModNegligence | $100 | $100 |
| 8593509 | Leamington Cement Plant Juab, UT contractor: Wheeler Machinery Co | Apr 2014 | — | No | LowNegligence | $100 | $100 |
| 8757054 | Bingham Canyon Mine Salt Lake, UT contractor: Wheeler Machinery Co | Mar 2014 | — | No | ModNegligence | $100 | $100 |
| 8757053 | Bingham Canyon Mine Salt Lake, UT contractor: Wheeler Machinery Co | Mar 2014 | — | No | ModNegligence | $100 | $100 |
| 8756321 | Leamington Cement Plant Juab, UT contractor: Wheeler Machinery Co | Aug 2013 | — | No | ModNegligence | $100 | $100 |
| 8756297 | Bingham Canyon Mine Salt Lake, UT contractor: Wheeler Machinery Co | Jul 2013 | — | No | HighNegligence | $100 | $100 |
| 8454888 | Savage Coal Terminal Carbon, UT contractor: Wheeler Machinery Co | Feb 2009 | — | No | ModNegligence | $100 | $100 |
| 6319342 | Bingham Canyon Mine Salt Lake, UT contractor: Wheeler Machinery Co | Jan 2007 | — | No | ModNegligence | $60 | $60 |
| 6318141 | Bingham Canyon Mine Salt Lake, UT contractor: Wheeler Machinery Co | Mar 2006 | — | No | ModNegligence | $60 | $60 |
| 6318134 | Bingham Canyon Mine Salt Lake, UT contractor: Wheeler Machinery Co | Mar 2006 | — | No | ModNegligence | $60 | $60 |
| 6318133 | Bingham Canyon Mine Salt Lake, UT contractor: Wheeler Machinery Co | Mar 2006 | — | No | ModNegligence | $60 | $60 |
| 4715490 | Wildcat Loadout Carbon, UT contractor: Wheeler Machinery Co | Oct 2003 | — | No | HighNegligence | $60 | $60 |
| 7635410 | SUFCO Sevier, UT contractor: Wheeler Machinery Co | Jun 2003 | — | No | ModNegligence | $60 | $60 |
| 6273267 | Bingham Canyon Mine Salt Lake, UT contractor: Wheeler Machinery Co | Jan 2003 | — | No | ModNegligence | $55 | $55 |
| 6274297 | Leamington Cement Plant Juab, UT contractor: Wheeler Machinery Co | Dec 2002 | — | No | ModNegligence | $55 | $55 |
| 6273609 | Amrize Utelite Site Summit, UT contractor: Wheeler Machinery Co | Aug 2002 | — | No | ModNegligence | $55 | $55 |
| 6272764 | Bingham Canyon Mine Salt Lake, UT contractor: Wheeler Machinery Co | Feb 2002 | — | No | ModNegligence | $55 | $55 |
| 6271738 | Salem Pit Utah, UT contractor: Wheeler Machinery Co | Dec 2000 | — | No | ModNegligence | $55 | $55 |
| 8996493 | Airport Pit Washington, UT contractor: Wheeler Machinery Co | Apr 2020 | — | No | — | — | — |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for WHEELER MACHINERY CO. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for WHEELER MACHINERY CO. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for WHEELER MACHINERY CO. Verify directly with Environmental Protection Agency →
Motor carrier safety (FMCSA)
Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for WHEELER MACHINERY CO. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- Department of the InteriorUCB HER IDIQ CONTRACT - CIBOLA UNIT 1 PHASE 3contract · Last action 2025-05-12$2,162,490
- Department of the InteriorUCB HER IDIQ CONTRACT - CIBOLA UNIT 1 PHASE 2contract · Last action 2025-07-14$1,461,686
- Department of the InteriorYMCA POND PAD HERcontract · Last action 2025-09-11$1,183,017
- Department of the InteriorPLANET RANCH HER PHASE 2contract · Last action 2020-04-13$834,814
- Department of the InteriorHEAVY EQUIPMENT RENTAL FOR PHASE 3 OF THE PLANET RANCH CONSTRUCTION PROJECT.contract · Last action 2020-11-20$616,029
- Department of the InteriorHYRUM CHANNEL HERcontract · Last action 2025-09-04$539,098
- Department of the InteriorDUCA HERcontract · Last action 2019-08-19$501,032
- Department of Veterans AffairsIGF::OT::IGF EMERGENCY TEMP TRANSFORMERcontract · Last action 2022-02-08$483,806
- Department of the InteriorPLANET RANCH HER PHASE 1 TASK ORDERcontract · Last action 2019-10-24$446,883
- Department of the InteriorPROVO DELTA HER TASK ORDER FOR PAO BRIDGE WORKcontract · Last action 2023-05-04$428,760
- Department of the InteriorHER FOR CIBOLA UNIT 1 PROJECTcontract · Last action 2022-10-20$414,745
- Department of the InteriorPROVO RIVER DELTA HER YEAR 1contract · Last action 2021-04-13$412,206
- Department of the InteriorPROVO DELTA HER YEAR 4.5contract · Last action 2024-06-27$397,395
- Department of the InteriorSECTION 26 HERcontract · Last action 2022-07-19$370,250
- Department of the InteriorPROVO DELTA HER YEAR 4 TASK ORDERcontract · Last action 2024-03-01$368,285
- Department of the InteriorLOWER DUCHESNE WETLANDS FY18contract · Last action 2019-04-09$362,030
- Department of the InteriorLOWER DUCHESNE HER TASK ORDER FY 19contract · Last action 2020-01-28$352,617
- Department of DefenseSCRAPERScontract · Last action 2020-08-12$340,000
- Department of the InteriorOURAY NFH HERcontract · Last action 2026-04-14$291,854
- Department of the InteriorHEAVY EQUIPMENT RENTAL TASK ORDER FOR THE SOUTHERN NATIVE AQUATIC RESOURCE & RECOVERY CENTER (SNARRC) FISH HATCHERY EXPANSION.contract · Last action 2024-07-24$267,984
- Department of the InteriorCOOK LAKE HERcontract · Last action 2020-04-13$264,693
- Department of the InteriorPROVO DELTA HER YEAR 5contract · Last action 2025-04-28$261,260
- Department of the InteriorPROVO DELTA HER YEAR 2.5contract · Last action 2021-06-10$252,019
- Department of DefenseBASE YEAR LEASE TRACKHOEcontract · Last action 2012-09-17$241,393
- Department of the InteriorROCK CREEK HERcontract · Last action 2025-08-14$234,642
- U.S. Agency for Global MediaPOWER SUPPLY CONTRACT - CATERPILLAR DISEL GENERATORcontract · Last action 2011-04-01$226,888
- Department of the InteriorNAVAJO DAM WATER TRUCKcontract · Last action 2026-02-26$222,333
- Department of Veterans AffairsSECONDARY ELECTRICAL PANEL CORRECTIONScontract · Last action 2016-09-28$219,250
- Department of the InteriorPLANET RANCH PHASE 4 HEAVY EQUIPMENT RENTAL (HER)contract · Last action 2020-11-05$219,209
- Department of DefenseAP655D ASPHALT PAVERcontract · Last action 2009-05-08$219,000
- Department of the InteriorSECTION 26 HER 2025contract · Last action 2025-09-02$215,462
- Department of the InteriorPROVO DELTA HER TASK ORDERcontract · Last action 2021-03-17$213,324
- Department of the InteriorRENT BARGE EQUIPMENT FROM LEE'S FERRY UP THE COLORADO RIVER TO THE SLOUGH LOCATION PER THE STATEMENT OF WORK (SOW). PERIOD OF PERFORMANCE IS FROM 25 FEBRUARY 2025 TO 1 MAY 2025.contract · Last action 2025-05-15$211,326
- Department of the InteriorBEAL LAKE HERcontract · Last action 2019-08-02$210,229
- Department of the InteriorSECTION 26 HER PHASE 2contract · Last action 2023-07-10$207,579
- Department of the InteriorEMERGENCY GENERATOR REPAIRS AT HALLS CROSSING, GLEN CANYON NATIONAL RECREATION AREA (GLCA).contract · Last action 2024-07-31$206,319
- Department of the InteriorMVCA HER PHASE 2contract · Last action 2018-12-13$202,047
- Department of the InteriorRENT EQUIPMENT TO DEMOLISH UNSAFE/HAZARDOUS BUILDINGS AT DERINGER DAIRYcontract · Last action 2025-04-15$195,458
- Department of the InteriorSLAB LAKE HERcontract · Last action 2025-08-12$195,221
- Department of the InteriorLAS VEGAS WASH FY 21 HERcontract · Last action 2020-12-31$194,149
- Department of the InteriorYMCA PHASE 1 HERcontract · Last action 2021-03-30$186,035
- Department of the InteriorLINDERMAN DAM HERcontract · Last action 2022-01-13$182,698
- Department of the InteriorPROVO DELTA SMALL DAM HERcontract · Last action 2025-08-12$179,953
- Department of the InteriorLAS VEGAS WASH FY20 HEAVY EQUIPMENT RENTALcontract · Last action 2020-07-14$177,291
- Department of the InteriorLAS VEGAS WASH FY 19 HERcontract · Last action 2019-08-06$175,451
- Department of the InteriorGADENS POINT HERcontract · Last action 2022-04-05$169,950
- Department of Veterans AffairsEMERGENCY GENERATORS PM AND LOAD BANK TESTINGcontract · Last action 2024-04-24$167,332
- Department of the InteriorRENTAL OF HEAVY EQUIPMENT TO BE AIRLIFTED TO HIGH MOUNTAIN LAKEScontract · Last action 2012-02-10$167,293
- Department of the InteriorPROVO DELTA HER YEAR 3contract · Last action 2022-10-18$159,685
- Department of the InteriorGRCA - REPLACE NR GENERATOR #2contract · Last action 2020-07-01$148,900
Federal contract dollars to this establishment. Primary NAICS: 532412 - CONSTRUCTION, MINING, AND FORESTRY MACHINERY AND EQUIPMENT RENTAL AND LEASING. Last action: 2026-04-14. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2012-01-12 | Planned | 2 | 2 | $3,500 | |
| 2009-05-14 | Accident | 0 | — | $0 | |
| 2007-12-20 | Complaint | 0 | — | $0 | |
| 2005-07-22 | Complaint | 4 | 3 | $3,150 | |
| 1999-05-11 | Complaint | 9 | 1 | $550 | |
| 1991-01-23 | Planned | 5 | — | $0 | |
| 1987-09-24 | Follow-up | 0 | — | $0 | |
| 1987-08-14 | Planned | 11 | — | $0 | |
| 1984-04-11 | Accident | 2 | 1 | $240 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Part of a larger organization
WHEELER MACHINERY CO is one of 1 establishments rolled up under the parent organization Campbell Companies/Wheeler Machinery Co.
Federal enforcement records on this page represent activity at this specific establishment only. The full enforcement footprint of Campbell Companies/Wheeler Machinery Co across all 1 of its tracked locations is viewable on the parent profile.
Other employers in this industry and state
Other employers in commercial and industrial machinery and equipment (except automotive and electronic) repair and maintenance within UT, ordered by federal enforcement volume:
- Strategic Technology Institute (STI)Hill AFB — 2 federal enforcement records
- MCARTHUR WELDINGSAINT GEORGE — 1 federal enforcement record
- ROCKY MOUNTAIN RAIL CAR & REPAIR INCTOOELE — 1 federal enforcement record
- BRIGHAM IMPLEMENT CO INCBRIGHAM CITY — 1 federal enforcement record
- EQUIPMENT MAINTENANCEWEST VALLEY CITY — 1 federal enforcement record
- MOUNTAIN STATES TRAILER INCNORTH SALT LAKE — 1 federal enforcement record
- CARMAN REFRIGERATION & COMMERCIAL SERVICES AND SALSALT LAKE CITY — 1 federal enforcement record
- Trail Boss Enterprises, Inc.Hill AFB — 1 federal enforcement record
- EZARC WELDINGLINDON — 1 federal enforcement record
- WE MACHINE & WELDING INCROOSEVELT — 1 federal enforcement record
Related searches
- All Campbell Companies/Wheeler Machinery Co locationsParent rollup
- Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and MaintenanceAll employers in this industry
- Employers in UTState-wide enforcement data
- Commercial and Industrial in UTIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on WHEELER MACHINERY CO from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code. This establishment resolves to the parent rollup Campbell Companies/Wheeler Machinery Co.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is WHEELER MACHINERY CO's OSHA violation history?
- WHEELER MACHINERY CO has 9 OSHA inspections on record with 33 violations and $7,440 in total penalties.
- How does WHEELER MACHINERY CO's safety record compare to its industry?
- WHEELER MACHINERY CO operates in the commercial and industrial machinery and equipment (except automotive and electronic) repair and maintenance industry. The industry average Total Recordable Incident Rate (TRIR) is 2.4. WHEELER MACHINERY CO's self-reported DART rate is 0 compared to an industry average of 1.8.