Skip to main content

Establishment profile

WHEELER MACHINERY CO

4901 WEST 2100 SOUTH, SALT LAKE CITY, UT, 84120
Operated by Campbell Companies/Wheeler Machinery Co
811310Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
EIN 870306419

Download as PDF →

OSHA inspections
9
over 42 years
Violations
33
$7,440 in penalties
Penalties
$7,440
$225 avg
Violations across 2 federal agencies
Enforcement actions from multiple agencies may indicate systemic compliance issues across functions.
Accident investigations on record
2 OSHA follow-ups

Summary

WHEELER MACHINERY CO has accumulated 33 OSHA violations across 9 inspections over 42 years of recorded history, with $7,440 in total assessed penalties.

The establishment sits in the 98th percentile for violations within its industry-state peer group of 57 employers. Inspection frequency runs at the 100th percentile. The most recent enforcement activity was recorded 14 years ago.

Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

WHEELER MACHINERY CO appears in OSHA workplace safety, MSHA mine safety, and FMCSA motor carrier registration records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

Inspections
9
0.2 / yr · last 42 yrs
Violations
33
0.8 / yr
Penalties
$7,440
$225 avg / violation
21% serious79% other
Inspection trigger · complaint
3 of 9
Inspection trigger · planned
3 of 9

67% of inspections at this establishment produced violations, with 4 inspections producing serious-or-greater violations.

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 20 distinct standards shown · 21 citations in this view · $7,440 in penalties.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
29 CFR 1000.5 D0322$3,700Jul 1999Sep 2005
29 CFR 1910.0212 A0111$1,875Jan 2012Jan 2012
29 CFR 1910.0147 C06 I11$1,625Jan 2012Jan 2012
GEN01781312 111$240Apr 1984Apr 1984
29 CFR 1910.0134 A0111Sep 2005Sep 2005
29 CFR 1910.0254 D09 III11Sep 2005Sep 2005
29 CFR 1910.0141 G0211Sep 2005Sep 2005
29 CFR 1910.0219 F0311Jul 1999Jul 1999
29 CFR 1910.0107 B05 I11Jul 1999Jul 1999
29 CFR 1910.0151 C11Jul 1999Jul 1999
29 CFR 1910.0107 C09 I11Jul 1999Jul 1999
29 CFR 1910.0305 B0211Jul 1999Jul 1999
29 CFR 1910.0107 E0211Jul 1999Jul 1999
29 CFR 1910.0213 D0111Jul 1999Jul 1999
29 CFR 1910.0134 C0111Jul 1999Jul 1999
29 CFR 1910.0253 B04 III11Feb 1991Feb 1991
29 CFR 1910.0134 B0111Feb 1991Feb 1991
29 CFR 1910.0184 I09 IV11Feb 1991Feb 1991
29 CFR 1910.0212 A03 II11Feb 1991Feb 1991
29 CFR 1910.0242 A11Feb 1991Feb 1991

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

98th

Worse on violations than nearly every other employer in NAICS 8113 within UT. Peer group: 57 employers. This establishment has 33 OSHA violations; peer median is 2.

Fewer violationsMore violations
Penalty percentile
95th
peer median: $750
Inspection frequency
100th
peer median: 1

Safety self-report (OSHA 300A)

Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.

DART rate
0.0
vs industry
−1.8
TRIR
1.0
vs industry
−1.4

Reported for 761 average annual employees at this establishment.

Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.

Industry benchmark

Industry avg TRIR
2.4
BLS SOII 2024
Industry avg DART
1.8
BLS SOII 2024
Self-reported TRIR
1.0
OSHA ITA Form 300A (employer self-reported)

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Planned
3
Complaint
3
Accident
2
Follow-up
1

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for WHEELER MACHINERY CO. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
14 years ago

No federal enforcement activity has been recorded against this establishment in 14+ years. Most recent activity: 14 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for WHEELER MACHINERY CO. Verify directly with Wage and Hour Division

Mine safety (MSHA)

Company-level in UT — for Campbell Companies/Wheeler Machinery Co, not this location alone

Violations
51
Assessed penalties
$26,797

Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other Campbell Companies/Wheeler Machinery Co operations in the same state.

MSHA citations

Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 51 citations · 9S&S · 51 contractor · $26,797 proposed / $26,797 paid.

CitationMineDateSectionS&SNegligenceProposedPaid
8996494
Airport Pit
Washington, UT
contractor: Wheeler Machinery Co
Apr 2020YesHighNegligence$10,373$10,373
8996496
Airport Pit
Washington, UT
contractor: Wheeler Machinery Co
Apr 2020YesHighNegligence$4,194$4,194
9727460
Beck Street
Salt Lake, UT
contractor: Wheeler Machinery Co
Jul 2022YesModNegligence$1,358$1,358
9399847
Vernal Pit & Mill
Uintah, UT
contractor: Wheeler Machinery Co
Dec 2019YesModNegligence$1,263$1,263
9308814
Kennecott Keystone Underground
Salt Lake, UT
contractor: Wheeler Machinery Co
Jun 2017YesModNegligence$1,123$1,123
8930604
Staker Parson Fast Pack
Tooele, UT
contractor: Wheeler Machinery Co
Sep 2015YesModNegligence$1,026$1,026
5055234
Bauer Pit
Tooele, UT
contractor: Wheeler Machinery Co
Aug 2025YesModNegligence$697$697
9829248
OK and Hidden Treasure
Beaver, UT
contractor: Wheeler Machinery Co
Feb 2025NoHighNegligence$592$592
5055235
Bauer Pit
Tooele, UT
contractor: Wheeler Machinery Co
Aug 2025NoModNegligence$465$465
8837518
Portable #2
Summit, UT
contractor: Wheeler Machinery Co
Aug 2017YesModNegligence$453$453
9826650
Amrize Devil's Slide Plant
Morgan, UT
contractor: Wheeler Machinery Co
Jan 2025NoModNegligence$398$398
9907346
Vernal Pit & Mill
Uintah, UT
contractor: Wheeler Machinery Co
Aug 2024NoModNegligence$357$357
9347640
Bingham Canyon Mine
Salt Lake, UT
contractor: Wheeler Machinery Co
Jul 2018YesModNegligence$311$311
9725632
HANSEN PIT
Salt Lake, UT
contractor: Wheeler Machinery Co
Dec 2022NoModNegligence$295$295
8757286
Bingham Canyon Mine
Salt Lake, UT
contractor: Wheeler Machinery Co
Mar 2015NoModNegligence$263$263
8757052
Bingham Canyon Mine
Salt Lake, UT
contractor: Wheeler Machinery Co
Mar 2014NoModNegligence$190$190
8756287
Bingham Canyon Mine
Salt Lake, UT
contractor: Wheeler Machinery Co
Jul 2013NoModNegligence$176$176
9907345
Vernal Pit & Mill
Uintah, UT
contractor: Wheeler Machinery Co
Aug 2024NoModNegligence$161$161
6320170
Vernal Pit & Mill
Uintah, UT
contractor: Wheeler Machinery Co
May 2008NoModNegligence$150$150
9907347
Vernal Pit & Mill
Uintah, UT
contractor: Wheeler Machinery Co
Aug 2024NoModNegligence$147$147
9907605
Bingham Canyon Mine
Salt Lake, UT
contractor: Wheeler Machinery Co
Mar 2024NoModNegligence$147$147
9907604
Bingham Canyon Mine
Salt Lake, UT
contractor: Wheeler Machinery Co
Mar 2024NoModNegligence$147$147
9155234
SUFCO
Sevier, UT
contractor: Wheeler Machinery Co
Mar 2022NoModNegligence$133$133
9654592
Bingham Canyon Mine
Salt Lake, UT
contractor: Wheeler Machinery Co
Jan 2022NoModNegligence$133$133
6580943
Mountain Valley Stone Inc
Summit, UT
contractor: Wheeler Machinery Co
Dec 2011NoModNegligence$127$127
9474384
Bingham Canyon Mine
Salt Lake, UT
contractor: Wheeler Machinery Co
Jul 2020NoModNegligence$123$123
8943358
Bingham Canyon Mine
Salt Lake, UT
contractor: Wheeler Machinery Co
Aug 2017NoModNegligence$116$116
8943357
Bingham Canyon Mine
Salt Lake, UT
contractor: Wheeler Machinery Co
Aug 2017NoModNegligence$116$116
8943356
Bingham Canyon Mine
Salt Lake, UT
contractor: Wheeler Machinery Co
Aug 2017NoModNegligence$116$116
6320010
Bingham Canyon Mine
Salt Lake, UT
contractor: Wheeler Machinery Co
Sep 2008NoModNegligence$112$112
8931048
Vernal Pit & Mill
Uintah, UT
contractor: Wheeler Machinery Co
Apr 2016NoModNegligence$100$100
8483236
HUNTER PREP PLANT
Emery, UT
contractor: Wheeler Machinery Co
Jul 2014NoModNegligence$100$100
8483235
HUNTER PREP PLANT
Emery, UT
contractor: Wheeler Machinery Co
Jul 2014NoModNegligence$100$100
8593509
Leamington Cement Plant
Juab, UT
contractor: Wheeler Machinery Co
Apr 2014NoLowNegligence$100$100
8757054
Bingham Canyon Mine
Salt Lake, UT
contractor: Wheeler Machinery Co
Mar 2014NoModNegligence$100$100
8757053
Bingham Canyon Mine
Salt Lake, UT
contractor: Wheeler Machinery Co
Mar 2014NoModNegligence$100$100
8756321
Leamington Cement Plant
Juab, UT
contractor: Wheeler Machinery Co
Aug 2013NoModNegligence$100$100
8756297
Bingham Canyon Mine
Salt Lake, UT
contractor: Wheeler Machinery Co
Jul 2013NoHighNegligence$100$100
8454888
Savage Coal Terminal
Carbon, UT
contractor: Wheeler Machinery Co
Feb 2009NoModNegligence$100$100
6319342
Bingham Canyon Mine
Salt Lake, UT
contractor: Wheeler Machinery Co
Jan 2007NoModNegligence$60$60
6318141
Bingham Canyon Mine
Salt Lake, UT
contractor: Wheeler Machinery Co
Mar 2006NoModNegligence$60$60
6318134
Bingham Canyon Mine
Salt Lake, UT
contractor: Wheeler Machinery Co
Mar 2006NoModNegligence$60$60
6318133
Bingham Canyon Mine
Salt Lake, UT
contractor: Wheeler Machinery Co
Mar 2006NoModNegligence$60$60
4715490
Wildcat Loadout
Carbon, UT
contractor: Wheeler Machinery Co
Oct 2003NoHighNegligence$60$60
7635410
SUFCO
Sevier, UT
contractor: Wheeler Machinery Co
Jun 2003NoModNegligence$60$60
6273267
Bingham Canyon Mine
Salt Lake, UT
contractor: Wheeler Machinery Co
Jan 2003NoModNegligence$55$55
6274297
Leamington Cement Plant
Juab, UT
contractor: Wheeler Machinery Co
Dec 2002NoModNegligence$55$55
6273609
Amrize Utelite Site
Summit, UT
contractor: Wheeler Machinery Co
Aug 2002NoModNegligence$55$55
6272764
Bingham Canyon Mine
Salt Lake, UT
contractor: Wheeler Machinery Co
Feb 2002NoModNegligence$55$55
6271738
Salem Pit
Utah, UT
contractor: Wheeler Machinery Co
Dec 2000NoModNegligence$55$55
8996493
Airport Pit
Washington, UT
contractor: Wheeler Machinery Co
Apr 2020No

Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for WHEELER MACHINERY CO. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for WHEELER MACHINERY CO. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for WHEELER MACHINERY CO. Verify directly with Environmental Protection Agency

Motor carrier safety (FMCSA)

DOT number
1302
Operation
A

Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for WHEELER MACHINERY CO. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$12.9M
Obligated (all-time)
$27.6M
Awards
442
Top agency
Department of the Interior
$23.4M
Top agencies by obligation (this location)
Department of the Interior$23.4M
Department of Veterans Affairs$1.4M
Department of Defense$1.3M
U.S. Agency for Global Media$702K
Department of Agriculture$664K
Largest awards (top 50 of 442)
  • Department of the Interior
    UCB HER IDIQ CONTRACT - CIBOLA UNIT 1 PHASE 3
    contract · Last action 2025-05-12
    $2,162,490
  • Department of the Interior
    UCB HER IDIQ CONTRACT - CIBOLA UNIT 1 PHASE 2
    contract · Last action 2025-07-14
    $1,461,686
  • Department of the Interior
    YMCA POND PAD HER
    contract · Last action 2025-09-11
    $1,183,017
  • Department of the Interior
    PLANET RANCH HER PHASE 2
    contract · Last action 2020-04-13
    $834,814
  • Department of the Interior
    HEAVY EQUIPMENT RENTAL FOR PHASE 3 OF THE PLANET RANCH CONSTRUCTION PROJECT.
    contract · Last action 2020-11-20
    $616,029
  • Department of the Interior
    HYRUM CHANNEL HER
    contract · Last action 2025-09-04
    $539,098
  • Department of the Interior
    DUCA HER
    contract · Last action 2019-08-19
    $501,032
  • Department of Veterans Affairs
    IGF::OT::IGF EMERGENCY TEMP TRANSFORMER
    contract · Last action 2022-02-08
    $483,806
  • Department of the Interior
    PLANET RANCH HER PHASE 1 TASK ORDER
    contract · Last action 2019-10-24
    $446,883
  • Department of the Interior
    PROVO DELTA HER TASK ORDER FOR PAO BRIDGE WORK
    contract · Last action 2023-05-04
    $428,760
  • Department of the Interior
    HER FOR CIBOLA UNIT 1 PROJECT
    contract · Last action 2022-10-20
    $414,745
  • Department of the Interior
    PROVO RIVER DELTA HER YEAR 1
    contract · Last action 2021-04-13
    $412,206
  • Department of the Interior
    PROVO DELTA HER YEAR 4.5
    contract · Last action 2024-06-27
    $397,395
  • Department of the Interior
    SECTION 26 HER
    contract · Last action 2022-07-19
    $370,250
  • Department of the Interior
    PROVO DELTA HER YEAR 4 TASK ORDER
    contract · Last action 2024-03-01
    $368,285
  • Department of the Interior
    LOWER DUCHESNE WETLANDS FY18
    contract · Last action 2019-04-09
    $362,030
  • Department of the Interior
    LOWER DUCHESNE HER TASK ORDER FY 19
    contract · Last action 2020-01-28
    $352,617
  • Department of Defense
    SCRAPERS
    contract · Last action 2020-08-12
    $340,000
  • Department of the Interior
    OURAY NFH HER
    contract · Last action 2026-04-14
    $291,854
  • Department of the Interior
    HEAVY EQUIPMENT RENTAL TASK ORDER FOR THE SOUTHERN NATIVE AQUATIC RESOURCE & RECOVERY CENTER (SNARRC) FISH HATCHERY EXPANSION.
    contract · Last action 2024-07-24
    $267,984
  • Department of the Interior
    COOK LAKE HER
    contract · Last action 2020-04-13
    $264,693
  • Department of the Interior
    PROVO DELTA HER YEAR 5
    contract · Last action 2025-04-28
    $261,260
  • Department of the Interior
    PROVO DELTA HER YEAR 2.5
    contract · Last action 2021-06-10
    $252,019
  • Department of Defense
    BASE YEAR LEASE TRACKHOE
    contract · Last action 2012-09-17
    $241,393
  • Department of the Interior
    ROCK CREEK HER
    contract · Last action 2025-08-14
    $234,642
  • U.S. Agency for Global Media
    POWER SUPPLY CONTRACT - CATERPILLAR DISEL GENERATOR
    contract · Last action 2011-04-01
    $226,888
  • Department of the Interior
    NAVAJO DAM WATER TRUCK
    contract · Last action 2026-02-26
    $222,333
  • Department of Veterans Affairs
    SECONDARY ELECTRICAL PANEL CORRECTIONS
    contract · Last action 2016-09-28
    $219,250
  • Department of the Interior
    PLANET RANCH PHASE 4 HEAVY EQUIPMENT RENTAL (HER)
    contract · Last action 2020-11-05
    $219,209
  • Department of Defense
    AP655D ASPHALT PAVER
    contract · Last action 2009-05-08
    $219,000
  • Department of the Interior
    SECTION 26 HER 2025
    contract · Last action 2025-09-02
    $215,462
  • Department of the Interior
    PROVO DELTA HER TASK ORDER
    contract · Last action 2021-03-17
    $213,324
  • Department of the Interior
    RENT BARGE EQUIPMENT FROM LEE'S FERRY UP THE COLORADO RIVER TO THE SLOUGH LOCATION PER THE STATEMENT OF WORK (SOW). PERIOD OF PERFORMANCE IS FROM 25 FEBRUARY 2025 TO 1 MAY 2025.
    contract · Last action 2025-05-15
    $211,326
  • Department of the Interior
    BEAL LAKE HER
    contract · Last action 2019-08-02
    $210,229
  • Department of the Interior
    SECTION 26 HER PHASE 2
    contract · Last action 2023-07-10
    $207,579
  • Department of the Interior
    EMERGENCY GENERATOR REPAIRS AT HALLS CROSSING, GLEN CANYON NATIONAL RECREATION AREA (GLCA).
    contract · Last action 2024-07-31
    $206,319
  • Department of the Interior
    MVCA HER PHASE 2
    contract · Last action 2018-12-13
    $202,047
  • Department of the Interior
    RENT EQUIPMENT TO DEMOLISH UNSAFE/HAZARDOUS BUILDINGS AT DERINGER DAIRY
    contract · Last action 2025-04-15
    $195,458
  • Department of the Interior
    SLAB LAKE HER
    contract · Last action 2025-08-12
    $195,221
  • Department of the Interior
    LAS VEGAS WASH FY 21 HER
    contract · Last action 2020-12-31
    $194,149
  • Department of the Interior
    YMCA PHASE 1 HER
    contract · Last action 2021-03-30
    $186,035
  • Department of the Interior
    LINDERMAN DAM HER
    contract · Last action 2022-01-13
    $182,698
  • Department of the Interior
    PROVO DELTA SMALL DAM HER
    contract · Last action 2025-08-12
    $179,953
  • Department of the Interior
    LAS VEGAS WASH FY20 HEAVY EQUIPMENT RENTAL
    contract · Last action 2020-07-14
    $177,291
  • Department of the Interior
    LAS VEGAS WASH FY 19 HER
    contract · Last action 2019-08-06
    $175,451
  • Department of the Interior
    GADENS POINT HER
    contract · Last action 2022-04-05
    $169,950
  • Department of Veterans Affairs
    EMERGENCY GENERATORS PM AND LOAD BANK TESTING
    contract · Last action 2024-04-24
    $167,332
  • Department of the Interior
    RENTAL OF HEAVY EQUIPMENT TO BE AIRLIFTED TO HIGH MOUNTAIN LAKES
    contract · Last action 2012-02-10
    $167,293
  • Department of the Interior
    PROVO DELTA HER YEAR 3
    contract · Last action 2022-10-18
    $159,685
  • Department of the Interior
    GRCA - REPLACE NR GENERATOR #2
    contract · Last action 2020-07-01
    $148,900

Federal contract dollars to this establishment. Primary NAICS: 532412 - CONSTRUCTION, MINING, AND FORESTRY MACHINERY AND EQUIPMENT RENTAL AND LEASING. Last action: 2026-04-14. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
2012-01-12Planned22$3,500
2009-05-14Accident0$0
2007-12-20Complaint0$0
2005-07-22Complaint43$3,150
1999-05-11Complaint91$550
1991-01-23Planned5$0
1987-09-24Follow-up0$0
1987-08-14Planned11$0
1984-04-11Accident21$240

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Part of a larger organization

WHEELER MACHINERY CO is one of 1 establishments rolled up under the parent organization Campbell Companies/Wheeler Machinery Co.

Federal enforcement records on this page represent activity at this specific establishment only. The full enforcement footprint of Campbell Companies/Wheeler Machinery Co across all 1 of its tracked locations is viewable on the parent profile.

Other employers in this industry and state

Other employers in commercial and industrial machinery and equipment (except automotive and electronic) repair and maintenance within UT, ordered by federal enforcement volume:

About this data

This profile aggregates federal enforcement records on WHEELER MACHINERY CO from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code. This establishment resolves to the parent rollup Campbell Companies/Wheeler Machinery Co.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is WHEELER MACHINERY CO's OSHA violation history?
WHEELER MACHINERY CO has 9 OSHA inspections on record with 33 violations and $7,440 in total penalties.
How does WHEELER MACHINERY CO's safety record compare to its industry?
WHEELER MACHINERY CO operates in the commercial and industrial machinery and equipment (except automotive and electronic) repair and maintenance industry. The industry average Total Recordable Incident Rate (TRIR) is 2.4. WHEELER MACHINERY CO's self-reported DART rate is 0 compared to an industry average of 1.8.