Establishment profile
THE JAMAR COMPANY
3800 W 2ND ST, DULUTH, MN, 55807
238160 — Roofing Contractors
EIN 411509431
Summary
THE JAMAR COMPANY has accumulated 4 OSHA violations across 3 inspections over 38 years of recorded history, with $477 in total assessed penalties.
The establishment sits in the 82nd percentile for violations within its industry-state peer group of 5,782 employers. Inspection frequency runs at the 97th percentile. The most recent enforcement activity was recorded 12 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
THE JAMAR COMPANY appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
67% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 4 distinct standards shown · 4 citations in this view · $477 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1926.0025 A | 1 | 1 | $200 | Aug 1987 | Aug 1987 |
| 29 CFR 1926.0500 D 1 | 1 | 1 | $110 | Aug 1987 | Aug 1987 |
| 29 CFR 1926.0500 B 7 | 1 | 1 | $95 | Aug 1987 | Aug 1987 |
| 29 CFR 5206.070002 | 1 | 1 | $72 | Nov 1987 | Nov 1987 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Worse on violations than most other employers in NAICS 2381 within MN. Peer group: 5,782 employers. This establishment has 4 OSHA violations; peer median is 2.
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 758 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for THE JAMAR COMPANY. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 12+ years. Most recent activity: 12 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for THE JAMAR COMPANY. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in MN — for THE JAMAR COMPANY, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other THE JAMAR COMPANY operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 31S&S · 100 contractor · $26,717 proposed / $24,038 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 8739709 | Keetac St Louis, MN contractor: The Jamar Company | Apr 2013 | — | Yes | ModNegligence | $1,530 | $1,530 |
| 8739694 | Keetac St Louis, MN contractor: The Jamar Company | Apr 2013 | — | Yes | ModNegligence | $1,530 | $1,530 |
| 8946693 | United Plant St Louis, MN contractor: The Jamar Company | Dec 2016 | — | Yes | ModNegligence | $1,123 | $1,123 |
| 8744308 | Plant 4 Itasca, MN contractor: The Jamar Company | Jan 2015 | — | No | NoNegligence | $1,111 | $100 |
| 8840628 | Northshore Mining Company Lake, MN contractor: The Jamar Company | Jan 2015 | — | Yes | ModNegligence | $1,111 | $1,111 |
| 9481220 | Keetac St Louis, MN contractor: The Jamar Company | Apr 2020 | — | Yes | ModNegligence | $1,076 | $1,076 |
| 9484900 | Minntac Plant St Louis, MN contractor: The Jamar Company | Dec 2024 | — | Yes | ModNegligence | $755 | $755 |
| 8853585 | Keetac St Louis, MN contractor: The Jamar Company | Jun 2017 | — | Yes | ModNegligence | $677 | $677 |
| 9380372 | Northshore Mining Company Lake, MN contractor: The Jamar Company | Jan 2018 | — | Yes | ModNegligence | $638 | $638 |
| 5115688 | Minntac Mine St Louis, MN contractor: The Jamar Company | Apr 2026 | — | Yes | ModNegligence | $592 | — |
| 5115476 | Keetac St Louis, MN contractor: The Jamar Company | Mar 2026 | — | Yes | ModNegligence | $592 | — |
| 8840639 | Northshore Mining Company Lake, MN contractor: The Jamar Company | Jan 2015 | — | Yes | LowNegligence | $499 | $499 |
| 9481667 | Keetac St Louis, MN contractor: The Jamar Company | Apr 2021 | — | Yes | ModNegligence | $487 | $487 |
| 8739731 | Keetac St Louis, MN contractor: The Jamar Company | Apr 2013 | — | Yes | ModNegligence | $460 | $460 |
| 8739708 | Keetac St Louis, MN contractor: The Jamar Company | Apr 2013 | — | Yes | ModNegligence | $460 | $460 |
| 8739707 | Keetac St Louis, MN contractor: The Jamar Company | Apr 2013 | — | Yes | ModNegligence | $460 | $460 |
| 8664190 | Minntac Plant St Louis, MN contractor: The Jamar Company | May 2012 | — | Yes | ModNegligence | $460 | $460 |
| 6490598 | Northshore Mining Company Lake, MN contractor: The Jamar Company | Apr 2014 | — | Yes | ModNegligence | $425 | $425 |
| 8740965 | United Plant St Louis, MN contractor: The Jamar Company | Mar 2014 | — | Yes | ModNegligence | $425 | $425 |
| 9696672 | Keetac St Louis, MN contractor: The Jamar Company | Jan 2024 | — | Yes | ModNegligence | $388 | $388 |
| 8897106 | United Plant St Louis, MN contractor: The Jamar Company | Apr 2017 | — | No | ModNegligence | $387 | $387 |
| 9486771 | Northshore Mining Company Lake, MN contractor: The Jamar Company | Mar 2023 | — | Yes | ModNegligence | $376 | $376 |
| 5115001 | Keetac St Louis, MN contractor: The Jamar Company | Apr 2025 | — | Yes | LowNegligence | $366 | $366 |
| 8739695 | Keetac St Louis, MN contractor: The Jamar Company | Apr 2013 | — | No | ModNegligence | $308 | $308 |
| 8664142 | Minntac Plant St Louis, MN contractor: The Jamar Company | Apr 2012 | — | Yes | ModNegligence | $308 | $308 |
| 6192461 | Minntac Plant St Louis, MN contractor: The Jamar Company | Mar 2006 | — | Yes | ModNegligence | $286 | $286 |
| 8666900 | Northshore Mining Company Lake, MN contractor: The Jamar Company | Apr 2015 | — | No | ModNegligence | $285 | $285 |
| 8739975 | Minntac Plant St Louis, MN contractor: The Jamar Company | Mar 2014 | — | No | ModNegligence | $285 | $285 |
| 5115507 | Keetac St Louis, MN contractor: The Jamar Company | Apr 2026 | — | No | ModNegligence | $267 | — |
| 8665216 | Minntac Plant St Louis, MN contractor: The Jamar Company | May 2012 | — | No | ModNegligence | $243 | $243 |
| 6493502 | Minntac Plant St Louis, MN contractor: The Jamar Company | Jan 2010 | — | Yes | ModNegligence | $243 | $243 |
| 6553192 | Minntac Plant St Louis, MN contractor: The Jamar Company | Apr 2011 | — | Yes | ModNegligence | $224 | $224 |
| 9449443 | Keetac St Louis, MN contractor: The Jamar Company | Mar 2020 | — | No | ModNegligence | $217 | $217 |
| 9449439 | Keetac St Louis, MN contractor: The Jamar Company | Mar 2020 | — | No | ModNegligence | $217 | $217 |
| 9448576 | Keetac St Louis, MN contractor: The Jamar Company | Feb 2020 | — | Yes | NoNegligence | $217 | — |
| 8664143 | Minntac Plant St Louis, MN contractor: The Jamar Company | Apr 2012 | — | No | ModNegligence | $207 | $207 |
| 8897804 | Keetac St Louis, MN contractor: The Jamar Company | Jun 2017 | — | No | ModNegligence | $173 | $173 |
| 8897387 | United Plant St Louis, MN contractor: The Jamar Company | Feb 2017 | — | No | ModNegligence | $173 | $173 |
| 8897380 | United Plant St Louis, MN contractor: The Jamar Company | Feb 2017 | — | No | ModNegligence | $173 | $173 |
| 9449480 | Keetac St Louis, MN contractor: The Jamar Company | Jan 2022 | — | No | ModNegligence | $169 | $169 |
| 8885397 | Keetac St Louis, MN contractor: The Jamar Company | Apr 2025 | — | No | LowNegligence | $151 | $151 |
| 6838397 | Keetac St Louis, MN contractor: The Jamar Company | Mar 2025 | — | Yes | LowNegligence | $151 | $151 |
| 9481672 | Keetac St Louis, MN contractor: The Jamar Company | Apr 2021 | — | No | ModNegligence | $146 | $146 |
| 9625337 | Keetac St Louis, MN contractor: The Jamar Company | Apr 2023 | — | No | LowNegligence | $143 | $143 |
| 9486772 | Northshore Mining Company Lake, MN contractor: The Jamar Company | Mar 2023 | — | No | ModNegligence | $143 | $143 |
| 9625308 | Keetac St Louis, MN contractor: The Jamar Company | Feb 2023 | — | No | ModNegligence | $143 | $143 |
| 9625271 | Keetac St Louis, MN contractor: The Jamar Company | Dec 2022 | — | No | LowNegligence | $143 | $143 |
| 8664182 | Minntac Plant St Louis, MN contractor: The Jamar Company | Apr 2012 | — | Yes | LowNegligence | $138 | $138 |
| 9449595 | Keetac St Louis, MN contractor: The Jamar Company | Apr 2022 | — | No | ModNegligence | $133 | $133 |
| 9486291 | Keetac St Louis, MN contractor: The Jamar Company | Apr 2022 | — | No | LowNegligence | $133 | $133 |
| 9380490 | United Plant St Louis, MN contractor: The Jamar Company | Jan 2018 | — | No | LowNegligence | $128 | $128 |
| 9481225 | Keetac St Louis, MN contractor: The Jamar Company | Apr 2020 | — | No | ModNegligence | $123 | $123 |
| 9481224 | Keetac St Louis, MN contractor: The Jamar Company | Apr 2020 | — | No | ModNegligence | $123 | $123 |
| 9481219 | Keetac St Louis, MN contractor: The Jamar Company | Apr 2020 | — | No | ModNegligence | $123 | $123 |
| 9449445 | Keetac St Louis, MN contractor: The Jamar Company | Mar 2020 | — | No | ModNegligence | $123 | $123 |
| 9480822 | Minorca Mine St Louis, MN contractor: The Jamar Company | Mar 2020 | — | No | ModNegligence | $123 | $123 |
| 9449442 | Keetac St Louis, MN contractor: The Jamar Company | Mar 2020 | — | No | LowNegligence | $123 | $123 |
| 9449441 | Keetac St Louis, MN contractor: The Jamar Company | Mar 2020 | — | No | ModNegligence | $123 | $123 |
| 9449440 | Keetac St Louis, MN contractor: The Jamar Company | Mar 2020 | — | No | LowNegligence | $123 | $123 |
| 9449438 | Keetac St Louis, MN contractor: The Jamar Company | Mar 2020 | — | No | ModNegligence | $123 | $123 |
| 9449437 | Keetac St Louis, MN contractor: The Jamar Company | Mar 2020 | — | No | ModNegligence | $123 | $123 |
| 9448575 | Keetac St Louis, MN contractor: The Jamar Company | Feb 2020 | — | No | ModNegligence | $123 | $123 |
| 9385291 | Minntac Mine St Louis, MN contractor: The Jamar Company | Apr 2019 | — | No | LowNegligence | $121 | $121 |
| 9384712 | United Plant St Louis, MN contractor: The Jamar Company | Jan 2019 | — | No | ModNegligence | $121 | $121 |
| 9380446 | United Plant St Louis, MN contractor: The Jamar Company | Jan 2018 | — | No | ModNegligence | $118 | $118 |
| 9380356 | Northshore Mining Company Lake, MN contractor: The Jamar Company | Jan 2018 | — | No | ModNegligence | $118 | $118 |
| 8897553 | Minorca Mine St Louis, MN contractor: The Jamar Company | Dec 2017 | — | No | LowNegligence | $118 | $118 |
| 8897388 | United Plant St Louis, MN contractor: The Jamar Company | Feb 2017 | — | No | ModNegligence | $116 | $116 |
| 8897344 | United Plant St Louis, MN contractor: The Jamar Company | Jan 2017 | — | No | LowNegligence | $116 | $116 |
| 8897605 | Northshore Mining Company Lake, MN contractor: The Jamar Company | Jan 2017 | — | No | LowNegligence | $116 | $116 |
| 8897604 | Northshore Mining Company Lake, MN contractor: The Jamar Company | Oct 2016 | — | No | LowNegligence | $116 | $116 |
| 8897603 | Northshore Mining Company Lake, MN contractor: The Jamar Company | Jul 2016 | — | No | LowNegligence | $116 | $116 |
| 8946410 | United Plant St Louis, MN contractor: The Jamar Company | Sep 2016 | — | No | LowNegligence | $114 | $114 |
| 8839407 | Northshore Mining Company Lake, MN contractor: The Jamar Company | Feb 2014 | — | No | ModNegligence | $112 | $112 |
| 6192457 | Minntac Plant St Louis, MN contractor: The Jamar Company | Mar 2006 | — | Yes | LowNegligence | $107 | $107 |
| 8847792 | Minntac Mine St Louis, MN contractor: The Jamar Company | Feb 2015 | — | No | ModNegligence | $100 | $100 |
| 8840434 | Northshore Mining Company Lake, MN contractor: The Jamar Company | Jan 2015 | — | No | LowNegligence | $100 | $100 |
| 8839665 | Northshore Mining Company Lake, MN contractor: The Jamar Company | Jun 2014 | — | No | ModNegligence | $100 | $100 |
| 8839664 | Northshore Mining Company Lake, MN contractor: The Jamar Company | Jun 2014 | — | No | LowNegligence | $100 | $100 |
| 8839663 | Northshore Mining Company Lake, MN contractor: The Jamar Company | Jun 2014 | — | No | ModNegligence | $100 | $100 |
| 8740091 | United Plant St Louis, MN contractor: The Jamar Company | Dec 2013 | — | No | ModNegligence | $100 | $100 |
| 8739732 | Keetac St Louis, MN contractor: The Jamar Company | Apr 2013 | — | No | LowNegligence | $100 | $100 |
| 8739696 | Keetac St Louis, MN contractor: The Jamar Company | Apr 2013 | — | No | LowNegligence | $100 | $100 |
| 8665761 | Minntac Mine St Louis, MN contractor: The Jamar Company | Feb 2013 | — | No | ModNegligence | $100 | $100 |
| 8665720 | Minntac Maintenance Dept. St Louis, MN contractor: The Jamar Company | Dec 2012 | — | No | ModNegligence | $100 | $100 |
| 8665204 | Minntac Plant St Louis, MN contractor: The Jamar Company | May 2012 | — | No | ModNegligence | $100 | $100 |
| 8665203 | Minntac Plant St Louis, MN contractor: The Jamar Company | May 2012 | — | No | ModNegligence | $100 | $100 |
| 8664181 | Minntac Plant St Louis, MN contractor: The Jamar Company | Apr 2012 | — | No | ModNegligence | $100 | $100 |
| 8664805 | Keetac St Louis, MN contractor: The Jamar Company | Dec 2011 | — | No | ModNegligence | $100 | $100 |
| 8664012 | Minntac Plant St Louis, MN contractor: The Jamar Company | Dec 2011 | — | No | ModNegligence | $100 | $100 |
| 8664011 | Minntac Plant St Louis, MN contractor: The Jamar Company | Dec 2011 | — | No | LowNegligence | $100 | $100 |
| 6491998 | Minntac Plant St Louis, MN contractor: The Jamar Company | Feb 2011 | — | Yes | LowNegligence | $100 | $100 |
| 6553395 | United Plant St Louis, MN contractor: The Jamar Company | Feb 2011 | — | No | LowNegligence | $100 | $100 |
| 6491985 | Minntac Plant St Louis, MN contractor: The Jamar Company | Feb 2011 | — | No | ModNegligence | $100 | $100 |
| 6553099 | Minntac Plant St Louis, MN contractor: The Jamar Company | Jan 2011 | — | No | ModNegligence | $100 | $100 |
| 6553068 | Minntac Plant St Louis, MN contractor: The Jamar Company | Dec 2010 | — | Yes | ModNegligence | $100 | $100 |
| 6492981 | Keetac St Louis, MN contractor: The Jamar Company | May 2010 | — | No | ModNegligence | $100 | $100 |
| 6192472 | Minntac Plant St Louis, MN contractor: The Jamar Company | Mar 2006 | — | No | ModNegligence | $60 | $60 |
| 6192460 | Minntac Plant St Louis, MN contractor: The Jamar Company | Mar 2006 | — | No | ModNegligence | $60 | $60 |
| 6192459 | Minntac Plant St Louis, MN contractor: The Jamar Company | Mar 2006 | — | No | ModNegligence | $60 | $60 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for THE JAMAR COMPANY. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for THE JAMAR COMPANY. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for THE JAMAR COMPANY. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for THE JAMAR COMPANY. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
Consolidated across all USAspending recipient entities under this corporate parent — not attributable to this single location.
- Environmental Protection AgencyCONSTRUCTION OF THE ROOF REPLACEMENT PROJECT AT DULUTH, MNcontract · Last action 2011-02-17$426,679
- General Services AdministrationCONVERSION TO DISTRICT CHILLED WATERcontract · Last action 2010-08-24$164,850
- Department of JusticeBAS SYSTEM 4C2Xcontract · Last action 2019-05-29$134,350
- Department of the InteriorIGF::OT::IGF HVAC MAINTENANCE EASTERN COLORADOcontract · Last action 2025-04-02$53,421
- Department of DefenseVISITOR CENTER RESTROOMS REMODELING ---contract · Last action 2010-04-08$35,265
- Department of AgricultureIGF::OT::IGF FLOOD RESPONSE CULVERT ORDER - NUMEROUS CULVERTScontract · Last action 2016-09-16$17,779
- Department of DefenseSNOW RETENTION SYSTEM & SNOW DIVERTERScontract · Last action 2008-03-26$13,195
- Department of DefenseREPAIR A/C COMPRESSORcontract · Last action 2012-07-20$8,605
- Department of DefenseREPAIR BY REPLACEMENT OF TRANE CONDENSERcontract · Last action 2010-04-20$5,857
- Department of JusticeSUPPLY AND INSTALL NEW DUCT WORK FOR THE COMPUTER SERVER ROOM IN ADMIN BUILDING PER QUOTATION PROVIDED DUE TO EMERGENT NEED.contract · Last action 2018-06-13$4,415
Federal contract dollars to this establishment. Primary NAICS: 238160 - ROOFING CONTRACTORS. Last action: 2025-04-02. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2013-07-31 | Planned | 0 | — | $0 | |
| 1987-11-03 | Planned | 1 | — | $72 | |
| 1987-07-16 | Planned | 3 | 3 | $405 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in roofing contractors within MN, ordered by federal enforcement volume:
- BOWMAN CONSTRUCTIONNORTH BRANCH — 2 federal enforcement records
- THELEN HEATING & ROOFING INCDULUTH — 2 federal enforcement records
- THE JAMAR CODULUTH — 2 federal enforcement records
- TL CONSTRUCTION INCVIRGINIA — 2 federal enforcement records
- RANGE CORNICE & ROOFING COMPANYELY — 2 federal enforcement records
- LAKEHEAD CONSTRUCTORS INCDULUTH — 2 federal enforcement records
- STOCK ROOFING COMPANY, LLCGOLDEN VALLEY — 2 federal enforcement records
- SCHWICKERTS COMPANY INCMANKATO — 2 federal enforcement records
- STOCK ROOFING INCMINNEAPOLIS — 2 federal enforcement records
- BERGLUND HEATING SHEETMETAL & ROOFINGBEMIDJI — 2 federal enforcement records
Related searches
- Roofing ContractorsAll employers in this industry
- Employers in MNState-wide enforcement data
- Roofing Contractors in MNIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on THE JAMAR COMPANY from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is THE JAMAR COMPANY's OSHA violation history?
- THE JAMAR COMPANY has 3 OSHA inspections on record with 4 violations and $477 in total penalties.
- How does THE JAMAR COMPANY's safety record compare to its industry?
- THE JAMAR COMPANY operates in the roofing contractors industry. The industry average Total Recordable Incident Rate (TRIR) is 2.4. THE JAMAR COMPANY's self-reported DART rate is 0.49 compared to an industry average of 1.7.