Skip to main content

Establishment profile

SVT ASSOCIATES INC

7620 EXECUTIVE DR, EDEN PRAIRIE, MN, 55344
334413Semiconductor and Related Device Manufacturing

Download as PDF →

OSHA inspections
2
over 15 years
Violations
7
$1,960 in penalties
Penalties
$1,960
$280 avg

Summary

SVT ASSOCIATES INC has accumulated 7 OSHA violations across 2 inspections over 15 years of recorded history, with $1,960 in total assessed penalties.

The establishment sits in the 75th percentile for violations within its industry-state peer group of 132 employers. Inspection frequency runs at the 44th percentile. The most recent enforcement activity was recorded 12 years ago.

Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

SVT ASSOCIATES INC appears in OSHA workplace safety record only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls. Single-agency enforcement records typically indicate either a discrete incident-based inspection or a low-risk operational profile.

OSHA workplace safety

Inspections
2
0.1 / yr · last 15 yrs
Violations
7
0.5 / yr
Penalties
$1,960
$280 avg / violation
86% serious14% other
Inspection trigger · planned
2 of 2

100% of inspections at this establishment produced violations, with 2 inspections producing serious-or-greater violations.

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 7 distinct standards shown · 7 citations in this view · $1,960 in penalties.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
29 CFR 1910.0151 C11$770Aug 2010Aug 2010
29 CFR 1910.0215 A0411$210Jan 2014Jan 2014
29 CFR 1910.0215 D0311$210Jan 2014Jan 2014
29 CFR 1910.0215 A0111$210Aug 2010Aug 2010
29 CFR 1910.0212 A0111$210Aug 2010Aug 2010
29 CFR 1910.0134 H02 I11$210Aug 2010Aug 2010
29 CFR 1910.1200 H03 IV11$140Jan 2014Jan 2014

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

75th

Above average violations in NAICS 3344 within MN. Peer group: 132 employers. This establishment has 7 OSHA violations; peer median is 3.

Fewer violationsMore violations
Penalty percentile
63rd
peer median: $1,248
Inspection frequency
44th
peer median: 2

Safety self-report (OSHA 300A)

No self-reported injury rates filed with OSHA's Injury Tracking Application for SVT ASSOCIATES INC. Verify directly with OSHA Injury Tracking Application

Industry benchmark

Industry avg TRIR
0.8
BLS SOII 2024
Industry avg DART
0.4
BLS SOII 2024
Self-reported TRIR
Not in OSHA ITA

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Planned
2

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for SVT ASSOCIATES INC. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
12 years ago

No federal enforcement activity has been recorded against this establishment in 12+ years. Most recent activity: 12 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for SVT ASSOCIATES INC. Verify directly with Wage and Hour Division

Mine safety (MSHA)

No MSHA mine safety violations on file for SVT ASSOCIATES INC. Verify directly with Mine Safety and Health Administration

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for SVT ASSOCIATES INC. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for SVT ASSOCIATES INC. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for SVT ASSOCIATES INC. Verify directly with Environmental Protection Agency

EPA-registered facilities

Every EPA ECHO facility associated with this employer, sorted most-significant first. Each row links to EPA’s Detailed Facility Report for the source-of-truth record. Permits column lists active programs (Air = Clean Air Act, Water = Clean Water Act, RCRA = hazardous waste, TRI = Toxics Release Inventory reporting). 1 facility.

FacilityPermitsStatusInspectionsFormal actionsPenaltiesLast inspectedECHO
SVT ASSOCIATES INC
7620 EXECUTIVE DR · EDEN PRAIRIE, MN, 55344
RCRANo Violation Identified00View →

Source: EPA ECHO (Enforcement and Compliance History Online). Compliance status follows EPA’s own labels (“Sig Violation” = significant noncompliance; QNCR = quarters of noncompliance over the recent reporting window). Inactive facilities (struck through) retain historical enforcement records even after operations ceased.

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for SVT ASSOCIATES INC. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$83K
Obligated (all-time)
$3.7M
Awards
46
Top agency
National Aeronautics and Space Administration
$2.3M
Top agencies by obligation (this location)
National Aeronautics and Space Administration$2.3M
Department of Defense$1.3M
Department of Commerce$164K
Largest awards
  • Department of Defense
    SUPERLATTICE LONG-WAVE INFRARED DETECTOR
    contract · Last action 2012-02-03
    $611,196
  • National Aeronautics and Space Administration
    INTEGRATED PRODUCTION OF ULTRA-LOW DEFECT GAN FILMS AND DEVICES FOR HIGH-POWER AMPLIFIERS HIGH QUALITY GAN EPITAXIAL FILMS ARE ONE OF THE KEYS TO CURRENT EFFORTS FOR DEVELOPMENT OF BOTH HIGH-POWER/HIGH-SPEED ELECTRONIC DEVICES AND OPTOELECTRONIC DEVICES. IN FACT, SOLID STATE LIGHTING, HIGH-TEMPERATURE AND HIGH-POWER ELECTRONICS, MICROELECTRONIC AND MECHANICAL SENSORS, AND HIGH-EFFICIENCY SOLAR CELLS ARE ALL POISED AT A NEW LEVEL OF DEVELOPMENT. THIS ENORMOUS MARKET IS WAITING FOR LOW-COST, HIGH QUALITY SUBSTRATES TO ACHIEVE PERFORMANCE AND FABRICATION ECONOMIES OF SCALE. AFTER ACHIEVING DISLOCATION DENSITIES BELOW 1E7 CM-2 IN THE PHASE I WORK, THIS NASA SBIR PHASE II PROJECT ADDRESSES THE DEVELOPMENT OF A DISLOCATION FILTER THAT CAN ROUTINELY PREPARE LOW-STRESS GAN THIN FILMS WITH THREADING DISLOCATION DENSITIES BELOW 1E6 CM-2. THE METHOD RELIES ON USING A LOW-ANGLE ION BEAM TO INDUCE BOTH NANOFILTER FOR DEFECT REDUCTIONS AND TO INHIBIT DROPLET FORMATION AT LOW GROWTH TEMPERATURES. DISLOCATION DENSITIES HAVE SO FAR BEEN DETERMINED BY STANDARD ETCH PIT DENSITIES METHOD. THE GOAL THE PROJECT TO OPTIMIZE THE MULTIPLE DEFECT NANOFILTER WITH SMOOTHENING BY TRANSITION LAYERS IN BETWEEN FILTERS TO REDUCE THE TD TO LESS THAN 1E6 CM-2 AND PROCESS, FABRICATE HIGH PERFORMANCE HEMT FOR SOLID STATE HIGH POWER AMPLIFIER (SSPA) APPLICATIONS. TO OBTAIN A MORE PRACTICAL EVALUATION OF THE EFFECTIVENESS AND COMMERCIAL VIABILITY OF THE METHOD, HETEROJUNCTION FIELD EFFECT TRANSISTORS WITH HIGH ELECTRON MOBILITY WILL BE FABRICATED IN THESE ULTRA-LOW DEFECT DENSITY FILMS. THESE HIGH-QUALITY MATERIAL BASED HIGH ELECTRON MOBILITY TRANSISTORS (HEMTS) WILL ENABLE HIGH LINEARITY POWER AMPLIFIERS WITH EXCELLENT THERMAL STABILITY AND FREQUENCY RESPONSE. THE PROPOSED METHOD TO GROW ON LOW-STRESS, LOW-DISLOCATION DENSITY FILMS WILL LEAD TO THE PRODUCTION OF ELECTRONIC DEVICES OF UNPARALLELED PERFORMANCE.
    contract · Last action 2011-02-16
    $599,970
  • National Aeronautics and Space Administration
    PR 4200228087 SBIR PHASE II -- HIGH PERFORMANCE DUAL BAND PHOTODETECTOR ARRAYS FOR MID-WAVELENGTH INFRARED (MWIR), LONG-WAVELENGTH INFRARED (LWIR) IMAGING. DEVELOP MATERIAL GROWTH AND DEVICE PROCESSING TECHNIQUES TO FABRICATE DUAL-BAND MID-WAVELENGTH INFRARED (MWIR) / LONG-WAVELENGTH INFRARED (LWIR) PHOTODETECTOR FOCAL PLANE TWO-DIMENSIONAL (2D) ARRAYS. THE ACTIVE STRUCTURE IS BASED ON INAS/GA(IN)SB TYPE-II SUPERLATTICES. OF PARAMOUNT INTEREST IS THE ABILITY TO TUNE THIS MATERIAL TO MWIR AND LWIR WAVELENGTHS BASED ON THE SUPERLATTICE PAIR THICKNESS. THE CONTRACTOR SHALL PERFORM SPECIFIC TASKS, AS FOLLOWS: UTILIZE ENERGY-BAND STRUCTURE MODELING TO STUDY THE DESIGN OF THE DUAL-BAND TYPE-II INAS/(IN)GASB SUPERLATTICE PHOTO DETECTORS THAT REQUIRE EXCELLENT CONTROL OF MBE GROWTH AND UNIQUE DEVICE FABRICATION TECHNIQUES. TUNE THE GROWTH PROCEDURE BASED ON BOTH THIN-FILM CHARACTERIZATION AND ELECTRICAL AND OPTICAL MEASUREMENTS. EMPLOY X-RAY DIFFRACTION (XRD), ATOMIC FORCE MICROSCOPE (AFM), HALL, SCAN ELECTRON MICROSCOPE (SEM), TRANSMISSION ELECTRON MICROSCOPE (TEM) TO CHARACTERIZE THE MOLECULAR BEAM EPITAXY (MBE) GROWN MATERIALS. THESE MEASUREMENTS AS WELL AS THE RESULTS FROM PHOTODETECTOR CHARACTERIZATION WILL BE USED TO FURTHER IMPROVE THE PHOTODETECTOR DESIGNS AND MATERIAL GROWTH. USE ATOMIC HYDROGEN TO DESORB SURFACE NATIVE OXIDE ON MESA-ETCHED PHOTO DETECTOR STRUCTURES AT LOW TEMPERATURES. STUDY MBE REGROWTH FOR SURFACE/SIDEWALL PASSIVATION. ENCAPSULATE THE PHOTO DETECTOR DEVICES TO HELP ACHIEVE LONG TERM DEVICE STABILITY. INTEGRATE OUR CURRENT ATOMIC LAYER DEPOSITION (ALD) SYSTEM WITH THE MBE SYSTEM TO CARRY OUT ALD ENCAPSULATION WITHOUT EXPOSING THE REGROWTH SAMPLE TO AIR. BASED ON FEEDBACK FROM THE DEVICE PROCESSING AND PASSIVATION TESTS, DEVELOP A STRATEGY TO CREATE THE DUAL-BAND DETECTOR STRUCTURE. THIS INCLUDES PRODUCING A NEW PHOTO MASK SET WHICH TAKES INTO ACCOUNT THE PIXEL ETCHING AND PASSIVATION LAYER STEPS. THE PHOTODETECTOR WILL BE THEN CHARACTERIZED IN TERMS OF CURRENT-VOLTAGE (I-V) MEASUREMENT, PHOTO RESPONSE TESTING, TEMPERATURE CHARACTERISTICS, AND UNIFORMITY EVALUATION. FABRICATE LINEAR DUAL-BAND ARRAYS WILL BE FABRICATED IN-HOUSE. THE ULTIMATE GOAL WILL BE TO SUPPORT DEVELOPMENT OF MWIR/LWIR FOCAL PLANE ARRAYS THAT COMBINES THE ATTRIBUTES OF LARGE PIXEL FORMAT (128 X 128, HIGH DETECTIVITY) AND LOW NOISE OVER A WIDE-RANGE OF 3-15 UM. EVALUATE DIFFERENT COMMERCIALIZATION OPTIONS INCLUDING INDUSTRIAL PARTNERSHIP AND A POSSIBLE SPIN OFF.
    contract · Last action 2009-12-18
    $599,371
  • National Aeronautics and Space Administration
    IGF::OT::IGF SVT ASSOCIATES PROPOSES AN NOVEL TYPE II SUPERLATTICE STRUCTURE TO EXTEND THE CUTOFF WAVELENGTH AND CBIRD SL PHOTO DIODE STRUCTURE WITH UNIPOLAR BARRIERS TO SUPPRESS DARK CURRENT OF SL DETECTORS GROWN ON GASB SUBSTRATE. THIS INAS/GASB SUPERLATTICE MATERIAL SYSTEM IS CAPABLE OF INFRARED DETECTION IN MWIR/LWIR SPECTRAL RANGE, DEPENDING ON LAYER THICKNESS OF EACH SUPERLATTICE PERIOD. THE GOAL OF THIS PROGRAM IS TO DEVELOP HIGH PERFORMANCE TYPE II SL BASED FPA FOR 5-14 UM DETECTION. PHOTODETECTOR ARRAYS USING THIS MATERIAL ARE OF GREAT INTEREST TO THE NASA FOR VARIOUS APPLICATIONS INCLUDING, IN PARTICULAR, IMAGING AND OPTICAL DETECTION, AND OBJECT DISCRIMINATION WHEN TRACKING TARGETS IN SPACE OR PERFORMING ASTRONOMICAL OBSERVATIONS. THESE LWIR PHOTO DETECTORS CAN ALSO FIND APPLICATION TO INFRARED-BASED CHEMICAL IDENTIFICATION SYSTEMS AND TERRESTRIAL MAPPING. APPLYING THE DARK CURRENT SUPPRESSION AND CUTOFF WAVELENGTH EXTENSION PROCESS TO THE TYPE-II SUPERLATTICE DETECTORS SHOULD RESULT IN HIGHER OPERATING TEMPERATURE, EXTENDED CUTOFF WAVELENGTH, AND IMPROVED QUANTUM EFFICIENCY, ALL IMPORTANT FACTORS THAT SHOULD SIGNIFICANTLY ENHANCE FPA OPERATION. WE INTEND TO CHARACTERIZE THE POSITIVE EFFECTS OF PROPOSED TECHNIQUES IN PHASE I. IN PHASE II WE WILL REFINE THE TECHNIQUES TO REALIZE PASSIVE-COOLED HIGH-PERFORMANCE LWIR FPAS WITH QUANTUM EFFICIENCY LARGER THAN 60%.
    contract · Last action 2013-05-07
    $124,884
  • National Aeronautics and Space Administration
    SVT ASSOCIATES PROPOSES AN NOVEL TYPE II SUPERLATTICE STRUCTURE TO EXTEND THE CUTOFF WAVELENGTH AND CBIRD SL PHOTO DIODE STRUCTURE WITH UNIPOLAR BARRIERS TO SUPPRESS DARK CURRENT OF SL DETECTORS GROWN ON GASB SUBSTRATE. THIS INAS/GASB SUPERLATTICE MATERIAL SYSTEM IS CAPABLE OF INFRARED DETECTION IN MWIR/LWIR SPECTRAL RANGE, DEPENDING ON LAYER THICKNESS OF EACH SUPERLATTICE PERIOD. THE GOAL OF THIS PROGRAM IS TO DEVELOP HIGH PERFORMANCE TYPE II SL BASED FPA FOR 6-14 UM DETECTION. PHOTO DETECTOR ARRAYS USING THIS MATERIAL ARE OF GREAT INTEREST TO THE NASA FOR VARIOUS APPLICATIONS INCLUDING, IN PARTICULAR, IMAGING AND OPTICAL DETECTION, AND OBJECT DISCRIMINATION WHEN TRACKING TARGETS IN SPACE OR PERFORMING ASTRONOMICAL OBSERVATIONS. THESE LWIR PHOTO DETECTORS CAN ALSO FIND APPLICATION TO INFRARED-BASED CHEMICAL IDENTIFICATION SYSTEMS AND TERRESTRIAL MAPPING. APPLYING THE DARK CURRENT SUPPRESSION AND CUTOFF WAVELENGTH EXTENSION PROCESS TO THE TYPE II SUPERLATTICE DETECTORS SHOULD RESULT IN HIGHER OPERATING TEMPERATURE, EXTENDED CUTOFF WAVELENGTH, AND IMPROVED QUANTUM EFFICIENCY, ALL IMPORTANT FACTORS THAT SHOULD SIGNIFICANTLY ENHANCE FPA OPERATION. WE INTEND TO CHARACTERIZE THE POSITIVE EFFECTS OF PROPOSED TECHNIQUES IN PHASE I. IN PHASE II WE WILL REFINE THE TECHNIQUES TO REALIZE PASSIVE-COOLED HIGH-PERFORMANCE LWIR FPAS WITH QUANTUM EFFICIENCY LARGER THAN 50%.
    contract · Last action 2012-02-13
    $124,859
  • National Aeronautics and Space Administration
    INTEGRATED PRODUCTION OF ULTRA-LOW DEFECT GAN FILMS AND DEVICES FOR HIGH-POWER AMPLIFIERS
    contract · Last action 2008-01-18
    $100,000
  • National Aeronautics and Space Administration
    IN THIS SBIR PHASE I PROGRAM, WE PROPOSE TO FABRICATE HIGH-EFFICIENCY AND RADIATION HARD SOLAR CELLS BASED ON INGAN MATERIAL SYSTEM THAT CAN COVER THE WHOLE SOLAR SPECTRUM BY ADJUSTING THE ALLOY COMPOSITION. THE MAIN PROGRAM OBJECTIVES INCLUDE THE FABRICATION OF INGAN-BASED SOLAR CELLS ON LARGE DIAMETER SUBSTRATES, WITH EXTERNAL EFFICIENCY IN EXCESS OF 35%, AND CAPABLE OF LONG LIFE OPERATION IN HIGH RADIATION ENVIRONMENT OF SPACE AT ELEVATED TEMPERATURES.
    contract · Last action 2010-01-26
    $99,984
  • National Aeronautics and Space Administration
    GAN-BASED, LOW-VOLTAGE AVALANCHE PHOTODIODES FOR ROBUST AND COMPACT UV IMAGERS THIS PHASE I SBIR PROGRAM IS DIRECTED TOWARD THE DEVELOPMENT OF A NOVEL LOW-VOLTAGE (~10V) ALGAN-BASED MULTI-QUANTUM WELL (MQW) AVALANCHE PHOTODIODE (APD) ON LOW-COST SUBSTRATES. THE HIGH-GAIN, HIGH-SPEED AND LOW-NOISE OPERATION OF THE PROPOSED DEVICE ALLOW THE REPLACEMENT OF BULKIER AND MORE FRAGILE PHOTOMULTIPLIER TUBES (PMTS) FOR MANY UV PHOTON-COUNTING AND IMAGING APPLICATIONS. IN PARTICULAR, REDUCTION IN SIZE AND WEIGHT IN ADDITION TO IMPROVEMENTS IN RELIABILITY AND RUGGEDNESS COMPARED TO PMTS, MAKE THIS TECHNOLOGY VERY SUITABLE FOR SOME OF THE NASA'S PLANNED SPACE MISSIONS AS WELL AS OTHER CIVILIAN AND DEFENSE APPLICATIONS THAT REQUIRE HIGH-SENSITIVITY, SOLAR-BLIND UV DETECTION.
    contract · Last action 2009-01-15
    $99,972
  • National Aeronautics and Space Administration
    THIS PROPOSAL IS DIRECTED TOWARD THE DEVELOPMENT OF INNOVATIVE HIGH-EFFICIENCY UV PHOTOCATHODES BASED ON THE WIDE BANDGAP III-NITRIDE SEMICONDUCTORS FOR RELIABLE OPERATION AT HIGH TEMPERATURE AND HIGH RADIATION ENVIRONMENTS FOR FUTURE NASA MISSIONS NEAR THE SUN AND IN DEEP ATMOSPHERES OF VENUS AND JUPITER. THE PROPOSED WORK INCLUDES THE INCORPORATION OF THESE PHOTOCATHODES ON AL2O3-BASED HIGH-TEMPERATURE MICRO-CHANNEL PLATES (MCPS) FOR HIGH-SENSITIVITY UV PHOTON COUNTING AND IMAGING
    contract · Last action 2011-07-21
    $99,948
  • National Aeronautics and Space Administration
    ADVANCED COATING TECHNOLOGY FOR ENHANCED PERFORMANCE OF MICROCHANNEL PLATES FOR UV DETECTORS
    contract · Last action 2008-01-18
    $99,917
  • National Aeronautics and Space Administration
    SVT ASSOCIATES PROPOSES AN INNOVATIVE DIGITAL ALLOY TECHNIQUE TO EXTEND THE CUTOFF WAVELENGTH OF INASSB BEYOND 5 UM, A WIDER BAND GAP INALASSB LAYER INSERTED INTO DEPLETION REGION TO SUPPRESS DARK CURRENT, AND ATOMIC LAYER DEPOSITION TECHNIQUE TO COAT RADIATION-HARD MATERIAL ALN ON INASSB DETECTORS GROWN ON GASB SUBSTRATE. THIS DIGITAL ALLOY INASSB MATERIAL SYSTEM IS CAPABLE OF INFRARED DETECTION BETWEEN 0.4-5 UM, DEPENDING ON LAYER THICKNESS OF THE PERIOD OF EACH DIGITAL ULTRA THIN SUPERLATTICE. THE GOAL OF THIS PROGRAM IS TO DEVELOP INASSB-BASED FPA FOR 0.4-5 UM DETECTION AT ROOM TEMPERATURE. PHOTO DETECTOR ARRAYS USING THIS MATERIAL ARE OF GREAT INTEREST TO THE NASA FOR VARIOUS APPLICATIONS INCLUDING, IN PARTICULAR, IMAGING AND OPTICAL DETECTION, AND OBJECT DISCRIMINATION WHEN TRACKING TARGETS IN SPACE OR PERFORMING ASTRONOMICAL OBSERVATIONS. THESE MWIR PHOTO DETECTORS CAN ALSO FIND APPLICATION TO INFRARED-BASED CHEMICAL IDENTIFICATION SYSTEMS AND TERRESTRIAL MAPPING. APPLYING THE DARK CURRENT SUPPRESSION AND CUTOFF WAVELENGTH EXTENSION PROCESS TO THE INASSB-BASED DETECTORS SHOULD RESULT IN HIGHER OPERATING TEMPERATURE, EXTENDED CUTOFF WAVELENGTH, AND RADIATION-HARD DEVICES, ALL IMPORTANT FACTORS THAT SHOULD SIGNIFICANTLY ENHANCE FPA OPERATION. WE INTEND TO CHARACTERIZE THE POSITIVE EFFECTS OF PROPOSED TECHNIQUES IN PHASE I. IN PHASE II WE WILL REFINE THE TECHNIQUES TO REALIZE HIGH-PERFORMANCE MWIR FPAS OPERATING AT AMBIENT TEMPERATURES.
    contract · Last action 2011-07-21
    $99,688
  • Department of Defense
    SBIR PH I ACTION
    contract · Last action 2007-11-15
    $97,396
  • National Aeronautics and Space Administration
    RECENTLY, RESONANT-TUNNELING-DIODE (RTD) BASED CIRCUITS EMPLOYING MONOLITHICALLY-INTEGRATED RTD ON HIGH ELECTRON MOBILITY (HEMT) STRUCTURES HAVE BEEN DEVELOPED IN A NUMBER OF III-V SYSTEMS IN ORDER TO IMPROVE OPERATIONAL SPEED. THE MAIN GOAL OF THIS PROGRAM IS TO DEVELOP WIDE TEMPERATURE-OPERABLE RADIATION HARD MONOLITHICALLY-INTEGRATED ELECTRONICS BASED ON WIDE BANDGAP III-NITRIDE EPITAXIAL STRUCTURES. IN THE PHASE I PROGRAM, WE PROPOSE TO DEVELOP SAME-WAFER DISCRETE DEVICES (CAPACITORS, HEMTS, AND RTDS) BY EMPLOYING A NOVEL MULTI-LAYER ALN/GAN HETEROSTRUCTURE DESIGN, AND TO DEMONSTRATE THE RADIATION HARDNESS OF THESE DEVICES.
    contract · Last action 2012-03-14
    $96,891
  • Department of Defense
    ATOMIC FLUX MONITOR
    contract · Last action 2013-02-20
    $84,340
  • Department of Defense
    MOLECULAR BEAM EPITAY SYSTEMS PR# 63-9080-19
    contract · Last action 2019-09-16
    $83,950
  • Department of Defense
    IGF::OT::IGF STATUS REPORT
    contract · Last action 2014-07-02
    $79,925
  • Department of Defense
    ARL REQUIRES ONE (1) MOLECULAR BEAM EPITAXY (MBE) COMPATIBLE ION BEAM SOURCE REQUIRED FOR GROWTH OF CUBIC BORON NITRIDE.
    contract · Last action 2024-07-31
    $51,300
  • Department of Defense
    STAGE/MANIPULATOR
    contract · Last action 2011-08-03
    $43,920
  • Department of Defense
    MODEL SVTA-DFLT-100
    contract · Last action 2019-07-11
    $37,850
  • National Aeronautics and Space Administration
    TWO EFFUSION CELL SYSTEM FOR MULTI GROWTH CHAMBER
    contract · Last action 2010-12-13
    $36,540
  • Department of Defense
    HIGH TEMP EFFUSION CELL MODEL:
    contract · Last action 2011-07-11
    $35,000
  • National Aeronautics and Space Administration
    SAP PURCHASE REQUISITION: 4200247421. UHV BEAM EVAPORATION OF ELEMENTAL HALFNIUM. SHALL BE FULLY EQUIVALENT TO THE SVT-EBSH-4.5-C FROM SVT ASSOCIATES WITH THE FOLLOWING ADDITIONAL REQUIREMENTS: 1. ASSEMBLY SHALL BE COMPLETELY COMPATIBLE WITH EXISTING GOVERNMENT OWNED CREATEC-BRAND-MBE (MELCULAR BEAM EPITAXIAL) SYSTEM OR EQUIVALENT AND MOUNTED ON A STANDARD OD 4.5" CF TYPE UHV (ULTRA HIGH VACUUM) STAINLESS STEEL FLANGE. A. COMPLETE SYSTEM SHALL BE CERTIFIED HELIUM-LEAK TESTED IN ULTRA GIGH VACUUM TO LESS THAN 1E-10 MILLIBAR-LITER PER SECOND. B. SHALL HAVE AN IN-VACUUM LENGTH OF AT LEAST 257 MILLIMETERS AND LESS THAN 260 MILLIMETERS, MEASURED FROM THE CELL FLANGE FACE TO THE FURTHEST PART ON THE CELL. 2. CHALL ACCOMODATE HALFNIUM "SHOT" IN A HEARTH STYLE WITH COMPATIBLE CRUCIBLE TO AACOMODATE AT LEAST 2 CUBIC CENTIMETERS IN VOLUME OF HALFNIUM "SHOT." A. HEARTH SHALL BE ANGLED AS SPECIFIED BY END USER AT TIME OF MANUFACTURE. B. HEARTH-LINER SHALL BE OF COMPATIBLE MATERIAL FOR HALFNIUM, SUCH AS GRAPHITE. 3. SHALL BE CAPABLE OF SOURCE-HEATING WITHIN THE TEMPERATURE RANGE OF 150 DEGREES CELSIUS TO AT LEAST 3000 DEGREES CELSIUS. 4. SHALL INCLUDE WATER COOLING TO THE HEARTH ASSEMBLY USING A MATERIAL EQUAL TO OR GREATER THAN THAT OF A COPPER HEAT SINK ASSEMBLY. 5. SHALL INCLUDE PROVISION TO PURCHASE OPTIONAL CRUCIBLE LINERS FROM OEM. 6. SHALL IMPLEMENT AN APPROXIMATE FULL CIRCLE FILAMENT AROUND THE TOP OF THE HEARTH TO ELIMINATE "HOT SPOTS" ON THE HALFNIUM SHOT. A. WITH THE FILAMENT GUARANTEED TO BE "OUT OF THE LINE-OF-SIGHT" TO EFFECTIVELY PROVIDE MAINTENANCE-FREE CHANGE OF CRUCIBLE-LINERS CONTAINING A SOURCE MATERIAL DIFFERENT THAN HALFNIUM. B. DEPOSITION RATES CONTROLLABLE AND PROVIDE EQUAL TO OR GREATER THAN DEPOSITION RATES OF 0.2 NANOMETERS PER MINUTE AT A TARGET DISTANCE OF 100 MILLIMETERS USING A HALFNIUM SOURCE TEMPERATURE OF APPROXIMATELY 3100 DEGREE CELSIUS. 7. SHALL INCLUDE AN INTEGRATED BEAM FLUX MONITOR WITH: A. INTEGRATED COMMUNICATION INTERFACE. B. FEEDBACK CONTROLLER WITH ALL CABLES. C. HARDWIRED INTERLOCK TO COOLING-WATER FLOW. D. MODIFIED FOR ELECTRON BEAM SOURCE WITH COLLECTION GRID. 8. SHALL INCLUDE ALL CABLES AND A POWER SUPPLY WITH THE FOLLOWING MINIMUM CAPABILITIES: A. ELECTRICAL: MINIMUM OF 3000 WATTS TOTAL POWER OUTPUT. B. POWER CABLES TO SURVIVE TO A MINIMUM TEMPERATURE OF 200 DEGREES CELSIUS. C. CONTROLS: MANUAL CONTROL OF SETTINGS BY USER INCLUDING FRONT PANEL CONTROL OF AT LEAST THE EMISSION CURRENT, HIGH VOLTAGE BIAS AND FILAMENT CURRENT. 9. SHALL INCLUDE CLOSED LOOP CONTROL VIA THE INTEGRATED FLUX MONITOR WITH THE POWER SUPPLY. 10. SHALL INCLUDE INSTALLATION HARDWARE FOR A 19-INCH RACK MOUNTING OF 6U OR LESS. 11. SHALL BE WIRED FOR 220VAC, SINGLE PHASE, 60HZ POWERLINE OPERATION. 12. SHALL INCLUDE ALL INSTALLATION, ON-SITE HALFNIUM-SOURCE DEMONSTRATION/DEPOSITION OF REQUIRED PERFORMANCE, AND TRAINING AND DOCUMENTATION.
    contract · Last action 2010-05-26
    $34,400
  • Department of Commerce
    THE PURPOSE OF THIS REQUIREMENT IS FOR A EFFUSION CELL SYSTEM WITH DUAL FILAMENT HEATING ELEMENTS TO BE USED IN THE CALCIUM RAMSEY-BORDE CALCIUM ATOM INTERFEROMETER RESEARCH AT NIST-BOULDER.
    contract · Last action 2015-09-21
    $32,700
  • Department of Defense
    CELL, DUAL FILAMENT EFFUSION.
    contract · Last action 2009-08-27
    $27,150
  • Department of Defense
    CRUCIBLE, 40CC DOUBLE WALLED STRAIGHT WA
    contract · Last action 2010-09-10
    $26,308
  • Department of Commerce
    RF PLASMA SOURCE FOR VEECO GEN10 MBE SYSTEM
    contract · Last action 2017-04-24
    $26,150
  • Department of Commerce
    DUAL FILAMENT EFFUSIVE CELL
    contract · Last action 2017-12-20
    $22,070
  • Department of Commerce
    EFFUSION CELL
    contract · Last action 2018-09-21
    $20,950
  • Department of Defense
    DUAL FILAMENT EFFUSION CELL
    contract · Last action 2016-04-27
    $18,950
  • Department of Commerce
    ITEM MODEL NUMBER: DD-6-450, PNEUMATIC SHUTTER UPGRADE, MODEL 6CC: 6CC STRAIGHT WALL PBN, SVTA-EC-C25: CABLE SET FOR EFFUSION CELL
    contract · Last action 2009-08-11
    $18,810
  • Department of Defense
    DUAL FILAMENT EFFUSION CELL
    contract · Last action 2020-07-16
    $18,650
  • Department of Defense
    IGF::OT::IGF DUAL FILAMENT EFFUSION CELL
    contract · Last action 2017-12-19
    $18,500
  • National Aeronautics and Space Administration
    P TYPE GAN WAFER
    contract · Last action 2008-09-08
    $18,100
  • Department of Defense
    MODEL SVTA-DFLT-100
    contract · Last action 2015-09-21
    $18,000
  • Department of Commerce
    OU68-25-NEW-249 ALUMINUM EFFUSION CELL
    contract · Last action 2025-08-08
    $16,250
  • Department of Commerce
    HIGH TEMPERATURE EFFUSION CELL
    contract · Last action 2022-12-23
    $15,750
  • Department of Defense
    IGF::OT::IGF EFFUSION CELL
    contract · Last action 2014-04-25
    $13,450
  • Department of Commerce
    THIS ALUMINUM EFFUSION CELL AND CONICAL CRUCIBLE IS A REPLACEMENT FOR THE NIST OWNED VEECO GEN 10 MOLECULAR BEAM EPITAXY SYSTEM.
    contract · Last action 2016-10-28
    $11,600
  • National Aeronautics and Space Administration
    LOW TEMPERATURE EFFUSION CELL, 22CC CRUCIBLES: A1203 AND PBN, POWER SUPPLY AND CONTROL PACKAGE. QTY., 1 EACH. SHIPPING AND HANDLING.
    contract · Last action 2015-04-24
    $11,300
  • National Aeronautics and Space Administration
    MODULATION P-DOPED GAN PHOTCATHODE, QTY., 2 EACH. SHIPPING.
    contract · Last action 2014-09-11
    $7,660
  • Department of Defense
    SBIR PHASE II RESEARCH AND DEVELOPMENT
    contract · Last action 2009-07-22
    $0
  • Department of Defense
    PHASE II SCIENTIFIC RESEARCH
    contract · Last action 2008-09-22
    $0
  • Department of Defense
    SBIR PHASE II RESEARCH AND DEVELOPMENT
    contract · Last action 2008-06-20
    $0
  • Department of Defense
    200605!600113!2100!W911NF!USA MATERIEL COMMAND ACQUISITION!W911NF06C0015 !A!N! !N! ! !20051112!20061106!876868647!876868647!876868647!N!SVT ASSOCIATES, INCORPORATED !7620 EXECUTIVE DR !EDEN PRAIRIE !MN!55344!18116!053!27!EDEN PRAIRIE !HENNEPIN !MINNESOTA !+000000364844!N!N!000000364844!AZ11!RDTE/OTHER RESEARCH & DEVELOPMENT-BASIC RESEARCH !S1 !SERVICES !000 !NOT DISCERNABLE !541710!E! !3! ! ! ! ! !99990909!B! ! !A! !A!U!U!2!099!K! !Z!N!Z! ! !N!B!N!N! ! !A! !B!A!000!C!B!N! ! ! ! ! ! !0001! !
    contract · Last action 2007-11-05
    $0
  • Department of Defense
    200410!002256!2100!W9113M!USA SPACE AND STRATEGIC DEF CDR !W9113M04C0093 !A!N! !N! ! !20040728!20060728!876868647!876868647!876868647!N!SVT ASSOCIATES INCORPORATED !7620 EXECUTIVE DRIVE !EDEN PRAIRIE !MN!55344!18116!053!27!EDEN PRAIRIE !HENNEPIN !MINNESOTA !+000000350000!N!N!000000499955!AC23!RDTE/MISSILE AND SPACE SYSTEMS-ADV TECH DEV !A2 !MISSILE AND SPACE SYSTEMS !CAA !MDA SUPPORT !541710!E! !3! ! ! ! ! !99990909!B! ! !B! !A!U!J!2!099!K! !Z!N!Z! ! !N!B!N!N! ! !A! !B!A!00 !C!B!N! ! ! ! ! ! !0001! !
    contract · Last action 2010-11-05
    $-60
  • Department of Defense
    SBIR PHASE II, TOPIC #:A04-048
    contract · Last action 2013-09-09
    $-2,413

Federal contract dollars to this establishment. Primary NAICS: 541712 - RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY). Last action: 2025-08-08. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
2014-01-16Planned32$560
2010-07-19Planned44$1,400

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Other employers in this industry and state

Other employers in semiconductor and related device manufacturing within MN, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on SVT ASSOCIATES INC from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is SVT ASSOCIATES INC's OSHA violation history?
SVT ASSOCIATES INC has 2 OSHA inspections on record with 7 violations and $1,960 in total penalties.
How does SVT ASSOCIATES INC's safety record compare to its industry?
SVT ASSOCIATES INC operates in the semiconductor and related device manufacturing industry. The industry average Total Recordable Incident Rate (TRIR) is 0.8.