Establishment profile
STURGEON ELECTRIC COMPANY, INC.
106TH PLACE AND ATCHINSON, HENDERSON, CO, 80640
Operated by MYR GROUP INC · 1 of 252 establishments
EIN 363158643
Summary
STURGEON ELECTRIC COMPANY, INC. has accumulated 5 OSHA violations across 3 inspections over 38 years of recorded history, with $19,000 in total assessed penalties.
The establishment sits in the 79th percentile for violations within its industry-state peer group of 25,051 employers. Inspection frequency runs at the 96th percentile. The most recent enforcement activity was recorded 6 years ago.
Federal records were found in 4 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
STURGEON ELECTRIC COMPANY, INC. appears in OSHA workplace safety, WHD wage enforcement, MSHA mine safety, NLRB labor relations, OFLC visa and labor certification (historical), and FMCSA motor carrier registration records only. No matching records were found in EPA environmental compliance, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
100% of inspections at this establishment produced violations, with 2 inspections producing serious-or-greater violations.
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 5 distinct standards shown · 5 citations in this view · $19,000 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1926.0652 A01 | 1 | 1 | $12,500 | Apr 2001 | Apr 2001 |
| 29 CFR 1926.1101 E01 | 1 | 1 | $4,500 | Aug 1999 | Aug 1999 |
| 29 CFR 1926.0651 J02 | 1 | 1 | $1,500 | Apr 2001 | Apr 2001 |
| 29 CFR 1926.1101 K03 I | 1 | 1 | $500 | Aug 1999 | Aug 1999 |
| 29 CFR 1926.0025 A | 1 | 1 | — | Aug 1987 | Aug 1987 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Above average violations in NAICS 2211 within CO. Peer group: 25,051 employers. This establishment has 5 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 178 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for STURGEON ELECTRIC COMPANY, INC.. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 6+ years. Most recent activity: 6 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
Department of Labor Wage & Hour Division — minimum-wage, overtime, child-labor, FMLA, and prevailing-wage enforcement.
Wage and hour breakdown by law
Per-statute totals across all closed DOL Wage & Hour cases against this employer. Backwages reflect amounts the agency assessed; civil penalty is the separate fine where applicable. Some acts (Davis-Bacon, SCA, CWHSSA, H-2B, CCPA) don't carry a civil penalty field in DOL's data. 1 statute · 7 violations · $8,668 in backwages
| Statute | Period | Cases | Violations | Workers | Backwages | Civil penalty |
|---|---|---|---|---|---|---|
| FLSA — minimum wage & overtime | Feb 2004 – Jul 2010 | 2 | 7 | 7 | $8,668 | — |
Source: DOL WHD enforcement database, aggregated per statute. Lifetime totals. A case can cite multiple statutes — so the total here may exceed the case count in the table above.
Wage and hour cases
Closed DOL Wage & Hour Division cases (FLSA, FMLA, H-2B, MSPA, and related statutes). Backwages reflect amounts the agency assessed; civil penalty (CMP) is a separate fine levied on top, where the statute provides for one (FLSA / H-1B / H-2A / MSPA / FMLA / EPPA / FLSA Child Labor; other acts have no CMP column in DOL’s data). The Statutes column lists which laws each case cited. 3 cases · 7 violations · $8,668 in backwages · 8 workers affected
| Case period | Industry | Statutes | Violations | Workers | Backwages | Civil penalty |
|---|---|---|---|---|---|---|
| Apr 2018 – Apr 2020 | Other Electric Power Generation | — | — | 0 | — | — |
| Jul 2008 – Jul 2010 | Electrical Contractors and Other Wiring Installation Contractors | FLSA | 4 | 5 | $8,197 | — |
| Jan 2004 – Feb 2004 | Electrical Contractors and Other Wiring Installation Contractors | FLSA | 3 | 3 | $470 | — |
Source: DOL WHD enforcement database. Cases shown reflect those the agency has closed and made public. A violation count is the agency’s tally of cited violations (one violation can affect many workers); the workers column counts distinct employees the agency found to be affected.
Mine safety (MSHA)
Company-level in CO — for MYR GROUP INC, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other MYR GROUP INC operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 10 citations · 3S&S · 10 contractor · $25,848 proposed / $25,848 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 9906711 | Climax Mine Lake, CO contractor: Sturgeon Electric Co Inc | Oct 2023 | — | Yes | ModNegligence | $10,302 | $10,302 |
| 9906710 | Climax Mine Lake, CO contractor: Sturgeon Electric Co Inc | Sep 2023 | — | Yes | ModNegligence | $10,302 | $10,302 |
| 9906712 | Climax Mine Lake, CO contractor: Sturgeon Electric Co Inc | Oct 2023 | — | Yes | ModNegligence | $4,273 | $4,273 |
| 9535884 | Climax Mine Lake, CO contractor: Sturgeon Electric Co Inc | Mar 2023 | — | No | ModNegligence | $252 | $252 |
| 6422293 | HENDERSON OPERATIONS Clear Creek, CO contractor: Sturgeon Electric Co Inc | Feb 2008 | — | No | ModNegligence | $176 | $176 |
| 9535885 | Climax Mine Lake, CO contractor: Sturgeon Electric Co Inc | Mar 2023 | — | No | ModNegligence | $143 | $143 |
| 6422299 | HENDERSON OPERATIONS Clear Creek, CO contractor: Sturgeon Electric Co Inc | Feb 2008 | — | No | ModNegligence | $100 | $100 |
| 6422298 | HENDERSON OPERATIONS Clear Creek, CO contractor: Sturgeon Electric Co Inc | Feb 2008 | — | No | ModNegligence | $100 | $100 |
| 6422297 | HENDERSON OPERATIONS Clear Creek, CO contractor: Sturgeon Electric Co Inc | Feb 2008 | — | No | ModNegligence | $100 | $100 |
| 6422296 | HENDERSON OPERATIONS Clear Creek, CO contractor: Sturgeon Electric Co Inc | Feb 2008 | — | No | ModNegligence | $100 | $100 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
Company-level in CO — for MYR GROUP INC, not this location alone
National Labor Relations Board — unfair labor practice charges and union representation cases. The NLRB records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other MYR GROUP INC locations in the same state.
NLRB cases
National Labor Relations Board cases involving this employer. Includes unfair labor practice (ULP) filings and representation election proceedings. NLRB enforcement is process-driven; no per-case monetary penalty is assessed (remedies are case-by-case backpay orders, posting requirements, election re-runs, etc.). 1 case · 1 ULP
| Case number | Type | Filed | Closed | Status | Region |
|---|---|---|---|---|---|
| 27-CA-020603 | Unfair labor practice | Aug 2007 | Nov 2007 | Closed | Region 27, Denver, Colorado |
Source: NLRB case files. Rows shown are those the agency has published. Region numbers (1–31) correspond to NLRB's geographic offices.
Visa & labor certification (OFLC) — historical
Office of Foreign Labor Certification — labor condition applications for H-1B, H-2A, H-2B visa programs. Wage ratio = offered / prevailing wage. Historical data only: DOL ended OFLC Performance Data Disclosure publication in 2026, so the figures above reflect filings through the last ingested cycle and are not being refreshed. Treat as a historical snapshot, not a current signal.
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for STURGEON ELECTRIC COMPANY, INC.. Verify directly with Environmental Protection Agency →
EPA-registered facilities
Every EPA ECHO facility associated with this employer, sorted most-significant first. Each row links to EPA’s Detailed Facility Report for the source-of-truth record. Permits column lists active programs (Air = Clean Air Act, Water = Clean Water Act, RCRA = hazardous waste, TRI = Toxics Release Inventory reporting). 1 facility · 1 marked inactive.
| Facility | Permits | Status | Inspections | Formal actions | Penalties | Last inspected | ECHO |
|---|---|---|---|---|---|---|---|
STURGEON ELECTRIC COMPANY 12150 EAST 112TH AVENUE · HENDERSON, CO, 80640 | RCRA | No Violation Identified | 0 | 0 | — | — | View → |
Source: EPA ECHO (Enforcement and Compliance History Online). Compliance status follows EPA’s own labels (“Sig Violation” = significant noncompliance; QNCR = quarters of noncompliance over the recent reporting window). Inactive facilities (struck through) retain historical enforcement records even after operations ceased.
Motor carrier safety (FMCSA)
Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for STURGEON ELECTRIC COMPANY, INC.. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
Consolidated across all USAspending recipient entities under this corporate parent — not attributable to this single location.
- General Services AdministrationDFC Y-SIDE SUBSTATION TRANSFORMER REPLACEMENT AT THE DENVER FEDERAL CENTER, LAKEWOOD, COLORADOcontract · Last action 2025-07-29$3,604,113
- General Services AdministrationHIGH-LOW VOLTAGE AND SOLAR OPERATIONS AND MAINTENANCE AT THE DENVER FEDERAL CENTER, LAKEWOOD, COLORADOcontract · Last action 2025-07-29$3,085,633
- General Services AdministrationIGF::OT::IGF OPERATION AND MAINTENANCE OF HIGH AND LOW VOLTAGE AND SOLAR OPERATIONS AT THE DENVER FEDERAL CENTER, LAKEWOOD, COLORADOcontract · Last action 2020-09-29$2,714,226
- General Services AdministrationHIGH/LOW VOLTAGE AND SOLAR PARK OPERATION, MAINTENANCE, AND REPAIR SERVICES FOR DFC, LAKEWOOD, COLORADO.contract · Last action 2014-12-15$2,494,581
- General Services AdministrationAWARD FOR HIGH-LOW VOLTAGE AND PV OPERATIONS & MAINTENANCE AT THE DENVER FEDERAL CENTER, LAKEWOOD, COLORADOcontract · Last action 2025-10-29$1,254,610
- General Services AdministrationAWARD FOR THE BUILDING 41 SERVICE C AND TRANSFORMERS AT BUILDING 54 AND BUILDING 55, DENVER FEDERAL CENTER, LAKEWOOD, COLORADOcontract · Last action 2026-04-09$808,265
- Department of TransportationFIBER OPTIC CABLE INSTALLATION DENVER INT'L AIRPORT TAS::69 8107::TAScontract · Last action 2010-09-02$632,503
- Department of Veterans AffairsIGF::OT::IGF POWER SUPPLY FOR EMERGENCY POWERcontract · Last action 2014-09-08$597,848
- General Services AdministrationAWARD FOR INSTALLATION OF BUILDING 53 F AND G LINE ELECTRICAL UPGRADE FOR DENVER FEDERAL CENTER, LAKEWOOD, COcontract · Last action 2022-02-24$567,990
- Department of TransportationINSTALLATION OF FIBER OPTICS CABLES AND ASSOCIATED ITEMS WITHIN THE AIR OPERATION AREA (AOA) OF THE DENVER INTERNATIONAL AIRPORT.contract · Last action 2012-02-14$555,858
- Department of Veterans AffairsIGF::OT::IGF EMERGENCY SWITCHGEAR REPAIRcontract · Last action 2014-08-28$412,150
- General Services AdministrationIGF::OT::IGF ELECTRICAL GRID UPGRADES AT THE DENVER FEDERAL CENTER, LAKEWOOD, COLORADO.contract · Last action 2017-07-05$408,955
- Department of TransportationSEA 16C ALSF BRIDGE REFURBISHMENT STUDY.contract · Last action 2012-02-22$400,312
- Department of TransportationFIBER OPTICS PROJECT DENVER IA TAS::69 8107::TAS IGF::OT::IGF IGF::OT::IGFcontract · Last action 2013-11-06$316,670
- General Services AdministrationAWARD FOR INSTALL TRAFFIC CONTROL LIGHTING AT DFC GATE 1 AT THE DENVER FEDERAL CENTER, LAKEWOOD, COLORADOcontract · Last action 2023-01-03$288,968
- General Services AdministrationTASK ORDER TO INSTALL ADDITIONAL ELECTRICAL FEED TO BUILDING 8, PUMPHOUSE ON THE DENVER FEDERAL CENTER, LAKEWOOD, COcontract · Last action 2023-01-18$246,913
- General Services AdministrationTASK ORDER FOR UTILITY UPGRADES AT BUILDING 53 C D1 AND D2 AT THE DENVER FEDERAL CENTER, LAKEWOOD, COLORADOcontract · Last action 2023-12-13$204,937
- General Services AdministrationBUILDING 56 ELECTRICAL SERVICE REPLACEMENTS AT THE DENVER FEDERAL CENTER, LAKEWOOD, COLORADOcontract · Last action 2024-08-14$165,598
- General Services AdministrationELECTRIAL REPAIRS AND REPLACEMENT, DENVER FEDERAL CENTER, LAKEWOOD, COLORADOcontract · Last action 2025-09-30$148,597
- General Services AdministrationSOLAR ARRAY REPAIRS ON THE DENVER FEDERAL CENTER, LAKEWOOD, COLORADOcontract · Last action 2024-01-03$145,844
- General Services AdministrationIGF::OT::IGF REPAIR OF PHOTO VOLTAIC PANELS AT VARIOUS LOCATIONS THE DENVER FEDERAL CENTER, LAKEWOOD, COLORADOcontract · Last action 2017-08-30$143,673
- General Services AdministrationBUILDING 67 BOR EM POWER AT THE DENVER FEDERAL CENTER, LAKEWOOD, COLORADOcontract · Last action 2024-09-09$139,411
- General Services AdministrationINSTALL PARKING LOT LIGHTING AT BUILDING 1A, DENVER FEDERAL CENTER, LAKEWOOD, COLORADOcontract · Last action 2022-09-07$129,054
- General Services AdministrationREPLACEMENT OF THE 115KV SWITCHGEAR AT THE MAIN SUBSTATION, DENVER FEDERAL CENTER.contract · Last action 2011-09-08$126,830
- General Services AdministrationIGF::OT::IGF AWARD TO UPGRADE THE DFC X-Y FEED PARALLEL TRANSFORMER PROJECT AT THE AT THE DENVER FEDERAL CENTER, LAKEWOOD, COLORADO.contract · Last action 2019-08-13$126,513
- General Services AdministrationIGF::OT::IGF TASK ORDER TO REPAIR/REPLACE LIGHT POLE FIXTURES AT THE DENVER FEDERAL CENTER, LAKEWOOD, COLORADO.contract · Last action 2018-09-27$126,404
- General Services AdministrationTASK ORDER FOR SITE WIDE UTILITY IMPROVEMENTS AT THE DENVER FEDERAL CENTER, LAKEWOOD, COLORADOcontract · Last action 2021-08-29$109,108
- General Services AdministrationELECTRIC REPAIRS AND MAIN SUBSTATION REPAIR DUE TO STORM DAMAGE ON JULY 20, 2009 AT THE DENVER FEDERAL CENTER, LAKEWOOD, COLORADO.contract · Last action 2009-07-22$98,746
- General Services AdministrationLIGHTING & UTILITY SUPPORT FOR GATE 4 RELOCATION, DENVER FEDERAL CENTER, LAKEWOOD, COLORADOcontract · Last action 2010-09-16$98,259
- General Services Administrationcontract · Last action 2008-09-25$97,951
- Department of Veterans AffairsCOVID SHORE POWER SERVICEScontract · Last action 2021-05-24$97,598
- General Services AdministrationIGF::OT::IGF - UTILITY POLE REMOVAL AND LIGHTING UPGRADE AT THE DENVER FEDERAL CENTER, LAKEWOOD, COLORADOcontract · Last action 2018-07-13$95,147
- General Services AdministrationREPLACE VACUUM BOTTLES AND BUSHINGS AT MAIN SUBSTATION X AND Y TAP CHANGERS.contract · Last action 2008-09-23$91,018
- General Services AdministrationTHE PURPOSE OF THIS CONTRACT IS TO PROVIDE SERVICE TO REPLACE THE BUILDING 85 TRANSFORMER AT THE DENVER FEDERAL CENTER.contract · Last action 2020-04-08$89,637
- General Services AdministrationIGF::OT::IGF AWARD TO PERFORM SITE WIDE ELECTRICAL IMPROVEMENTS AT THE DENVER FEDERAL CENTER, LAKEWOOD, COLORADO.contract · Last action 2018-09-13$86,821
- General Services AdministrationB45 MOTOR CONTROL CENTER, LAKEWOOD, COLORADOcontract · Last action 2026-02-24$75,555
- General Services AdministrationTASK ORDER FOR BUILDING 15 LIGHTING CIRCUITRY AT THE DENVER FEDERAL CENTER, LAKEWOOD, COLORADOcontract · Last action 2022-07-21$74,929
- General Services AdministrationTASK ORDER FOR GATE 4 POLE LIGHTING AND LED OPTIONS AT THE DENVER FEDERAL CENTER, LAKEWOOD, COLORADOcontract · Last action 2020-01-29$73,993
- General Services AdministrationTASK ORDER FOR THE INSTALL ELECTRIC VEHICLE CHARGING STATIONS GPG & R8 FERMATA CHARGING STATIONS AT BUILDING 40, DENVER FEDERAL CENTER, LAKEWOOD, COLORADOcontract · Last action 2025-07-09$72,202
- General Services AdministrationTASK ORDER TO REWIRE SECTIONS OF SOLAR ARRAYS DFC WIDE RENEWABLE ENERGY SYSTEM REPAIRS AT THE DENVER FEDERAL CENTER, LAKEWOOD, COLORADOcontract · Last action 2022-07-21$66,325
- Department of Veterans AffairsDERMATOLOGY LIGHT CONVERSION AND INSTALLATIONcontract · Last action 2019-03-13$62,453
- General Services AdministrationREPLACE TWO OIL SWITCHES IN THE MAIN SUBSTATION ON THE DENVER FEDERAL CENTER, LAKEWOOD, CO.contract · Last action 2009-09-18$60,608
- General Services AdministrationTASK ORDER FOR B810 PARKING AND WEST 4TH PLACE LED LIGHT RETROFITS AT THE DENVER FEDERAL CENTER, LAKEWOOD, COLORADOcontract · Last action 2025-06-09$60,017
- General Services AdministrationIGF::OT::IGF - INSTALL OUTDOOR POLE LIGHTING AT VARIOUS LOCATIONS AT THE DENVER FEDERAL CENTER, LAKEWOOD, COLORADOcontract · Last action 2018-03-19$59,467
- Department of Veterans AffairsIGF::OT::IGF EMERGENCY REPAIR OF ELECTRICAL SYSTEMcontract · Last action 2017-05-02$54,944
- General Services AdministrationB25 AND GATE 6 LIGHTING CIRC REPAIR AND B47 TRANSFORMER DISPOSAL AT THE DENVER FEDERAL CENTER, LAKEWOOD, COLORADOcontract · Last action 2022-05-19$52,803
- General Services AdministrationIGF::OT::IGF PHOTO VOLTAIC SYSTEM REPAIRS, DENVER FEDERAL CENTER, LAKEWOOD, COLORADOcontract · Last action 2014-08-07$50,936
- General Services AdministrationTASK ORDER TO ADD LIGHTING AT THE DENVER FEDERAL CENTER ALONG 3RD STREET, DENVER FEDERAL CENTER, LAKEWOOD, COLORADOcontract · Last action 2022-07-21$49,868
- General Services AdministrationTASK ORDER TO INSTALL LIGHTING AND NEW CIRCUIT AT DOG TRAINING AREA AT THE DENVER FEDERAL CENTER, LAKEWOOD, COLORADOcontract · Last action 2022-07-21$45,665
- Department of Veterans AffairsBUS DUCT REPLACEMENTcontract · Last action 2010-08-24$45,111
Federal contract dollars to this establishment. Primary NAICS: 561990 - ALL OTHER SUPPORT SERVICES. Last action: 2026-04-20. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2001-03-29 | Planned | 2 | 1 | $14,000 | |
| 1999-02-10 | Referral | 2 | 2 | $5,000 | |
| 1987-08-03 | Unprogrammed Related | 1 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Part of a larger organization
STURGEON ELECTRIC COMPANY, INC. is one of 252 establishments rolled up under the parent organization MYR GROUP INC.
Federal enforcement records on this page represent activity at this specific establishment only. The full enforcement footprint of MYR GROUP INC across all 252 of its tracked locations is viewable on the parent profile.
Other employers in this industry and state
Other employers in this industry within CO, ordered by federal enforcement volume:
- STURGEON ELECTRIC INC.BOULDER — 3 federal enforcement records
- XCEL ENERGYALAMOSA — 2 federal enforcement records
- ENXCO DEVELOPMENT CORPORATIONGROVER — 1 federal enforcement record
- PUBLIC SERVICE COMPANY OF COLORADODENVER — 1 federal enforcement record
- XCEL ENERGYBOULDER — 1 federal enforcement record
- XCEL ENERGYAURORA — 1 federal enforcement record
Other locations under this parent
Other establishments operated by MYR GROUP INC, ordered by federal enforcement volume:
- STURGEON ELECTRIC COMPANY, INC.PHOENIX, AZ — 4 federal enforcement records
- STURGEON ELECTRIC COMPANY, INCTUCSON, AZ — 3 federal enforcement records
- STURGEON ELECTRICDENVER, CO — 3 federal enforcement records
- STURGEON ELECTRIC COMPANY, INC.DENVER, CO — 3 federal enforcement records
- STURGEON ELECTRIC COPueblo, CO — 3 federal enforcement records
- STURGEON ELECTRICGUNNISON, CO — 3 federal enforcement records
- STURGEON ELECTRIC COMPANY, INC.TUCSON, AZ — 3 federal enforcement records
- STURGEON ELECTRICLAKEWOOD, CO — 3 federal enforcement records
- STURGEON ELECTRIC COMPANY, INC.BRECKENRIDGE, CO — 3 federal enforcement records
- STURGEON ELECTRIC COMPANY, INC.COMMERCE CITY, CO — 3 federal enforcement records
Related searches
- All MYR GROUP INC locationsParent rollup
- NAICS 221All employers in this industry
- Employers in COState-wide enforcement data
- Industry in COIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on STURGEON ELECTRIC COMPANY, INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code. This establishment resolves to the parent rollup MYR GROUP INC, which operates 252 establishments in our dataset.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is STURGEON ELECTRIC COMPANY, INC.'s OSHA violation history?
- STURGEON ELECTRIC COMPANY, INC. has 3 OSHA inspections on record with 5 violations and $19,000 in total penalties.