Establishment profile
SPRING CREEK CORPORATION
15110 HARDIN-WAPAK RD., ANNA, OH, 45302
Operated by Spring Creek Corporation
238110 — Poured Concrete Foundation and Structure Contractors
EIN 344460671
Summary
SPRING CREEK CORPORATION has accumulated 1 OSHA violation across 1 inspection over 1 year of recorded history, with $10,426 in total assessed penalties.
The establishment sits in the 14th percentile for violations within its industry-state peer group of 14,469 employers. The most recent enforcement activity was recorded 1 year ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
SPRING CREEK CORPORATION appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
100% of inspections at this establishment produced violations,
Peer comparison
Fewer violations than most other employers in NAICS 2381 within OH. Peer group: 14,469 employers. This establishment has 1 OSHA violation; peer median is 2.
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 25 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
Self-reported events under 29 CFR 1904.39 (24-hour notification of hospitalization, amputation, or loss of an eye) · Feb 2025
Most frequent event: Contact incidents unspecified
Source: OSHA Severe Injury Reports (federal OSHA only; state-plan states like California, Oregon, and Washington maintain their own programs and do not consistently report into this feed).
Severe injury reports — events
Each row is a hospitalization, amputation, or eye-loss event the employer self-reported to OSHA under 29 CFR 1904.39. Narratives are written by the reporting employer.
| Date | Event | Body part | Outcome | |
|---|---|---|---|---|
| Feb 4, 2025 | Contact incidents unspecified | Other finger(s) n.e.c. | Amputation |
Source: OSHA Severe Injury Reports. Federal-OSHA jurisdiction only by default; some state-plan programs report voluntarily.
Activity timeline
Most recent federal enforcement activity recorded 1 year ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for SPRING CREEK CORPORATION. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in OH — for Spring Creek Corporation, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other Spring Creek Corporation operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 39 citations · 12S&S · 39 contractor · $4,051 proposed / $4,051 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 7822182 | Vandemark Quarry Shelby, OH contractor: Spring Creek Corp | Feb 2000 | — | Yes | HighNegligence | $850 | $850 |
| 7833271 | Hardin Sand and Gravel Shelby, OH contractor: Spring Creek Corp | Aug 2000 | — | Yes | ModNegligence | $224 | $224 |
| 7833267 | Hardin Sand and Gravel Shelby, OH contractor: Spring Creek Corp | Aug 2000 | — | Yes | ModNegligence | $224 | $224 |
| 7834248 | Vandemark Quarry Shelby, OH contractor: Spring Creek Corp | Dec 2000 | — | Yes | ModNegligence | $184 | $184 |
| 7833618 | Hardin Sand and Gravel Shelby, OH contractor: Spring Creek Corp | Mar 2000 | — | Yes | ModNegligence | $173 | $173 |
| 7822179 | Vandemark Quarry Shelby, OH contractor: Spring Creek Corp | Feb 2000 | — | Yes | ModNegligence | $161 | $161 |
| 6147374 | Vandemark Quarry Shelby, OH contractor: Spring Creek Corp | Sep 2003 | — | Yes | ModNegligence | $143 | $143 |
| 7833266 | Hardin Sand and Gravel Shelby, OH contractor: Spring Creek Corp | Aug 2000 | — | Yes | ModNegligence | $140 | $140 |
| 7822180 | Vandemark Quarry Shelby, OH contractor: Spring Creek Corp | Feb 2000 | — | Yes | ModNegligence | $131 | $131 |
| 7833620 | Hardin Sand and Gravel Shelby, OH contractor: Spring Creek Corp | Mar 2000 | — | Yes | LowNegligence | $122 | $122 |
| 6147375 | Vandemark Quarry Shelby, OH contractor: Spring Creek Corp | Sep 2003 | — | Yes | ModNegligence | $83 | $83 |
| 7822181 | Vandemark Quarry Shelby, OH contractor: Spring Creek Corp | Feb 2000 | — | Yes | LowNegligence | $66 | $66 |
| 4548107 | Hardin Sand and Gravel Shelby, OH contractor: Spring Creek Corp | Aug 2004 | — | No | HighNegligence | $60 | $60 |
| 4548106 | Hardin Sand and Gravel Shelby, OH contractor: Spring Creek Corp | Aug 2004 | — | No | ModNegligence | $60 | $60 |
| 6148891 | Vandemark Quarry Shelby, OH contractor: Spring Creek Corp | Aug 2004 | — | No | ModNegligence | $60 | $60 |
| 6148890 | Vandemark Quarry Shelby, OH contractor: Spring Creek Corp | Aug 2004 | — | No | ModNegligence | $60 | $60 |
| 6148849 | Hardin Sand and Gravel Shelby, OH contractor: Spring Creek Corp | Mar 2004 | — | No | ModNegligence | $60 | $60 |
| 6148848 | Hardin Sand and Gravel Shelby, OH contractor: Spring Creek Corp | Mar 2004 | — | No | ModNegligence | $60 | $60 |
| 6148830 | Vandemark Quarry Shelby, OH contractor: Spring Creek Corp | Jan 2004 | — | No | LowNegligence | $60 | $60 |
| 6147377 | Vandemark Quarry Shelby, OH contractor: Spring Creek Corp | Sep 2003 | — | No | ModNegligence | $60 | $60 |
| 6147376 | Vandemark Quarry Shelby, OH contractor: Spring Creek Corp | Sep 2003 | — | No | LowNegligence | $60 | $60 |
| 6147373 | Vandemark Quarry Shelby, OH contractor: Spring Creek Corp | Sep 2003 | — | No | ModNegligence | $60 | $60 |
| 6147372 | Vandemark Quarry Shelby, OH contractor: Spring Creek Corp | Sep 2003 | — | No | LowNegligence | $60 | $60 |
| 7835978 | Hardin Sand and Gravel Shelby, OH contractor: Spring Creek Corp | Sep 2003 | — | No | ModNegligence | $60 | $60 |
| 7835975 | Hardin Sand and Gravel Shelby, OH contractor: Spring Creek Corp | Sep 2003 | — | No | ModNegligence | $60 | $60 |
| 6146625 | Vandemark Quarry Shelby, OH contractor: Spring Creek Corp | Aug 2002 | 109(d) | No | LowNegligence | $55 | $55 |
| 6146031 | Hardin Sand and Gravel Shelby, OH contractor: Spring Creek Corp | Feb 2002 | — | No | ModNegligence | $55 | $55 |
| 7834247 | Vandemark Quarry Shelby, OH contractor: Spring Creek Corp | Dec 2000 | — | No | ModNegligence | $55 | $55 |
| 7834246 | Hardin Sand and Gravel Shelby, OH contractor: Spring Creek Corp | Dec 2000 | — | No | ModNegligence | $55 | $55 |
| 7834245 | Hardin Sand and Gravel Shelby, OH contractor: Spring Creek Corp | Dec 2000 | — | No | ModNegligence | $55 | $55 |
| 7833270 | Hardin Sand and Gravel Shelby, OH contractor: Spring Creek Corp | Aug 2000 | — | No | ModNegligence | $55 | $55 |
| 7833269 | Hardin Sand and Gravel Shelby, OH contractor: Spring Creek Corp | Aug 2000 | — | No | ModNegligence | $55 | $55 |
| 7833268 | Hardin Sand and Gravel Shelby, OH contractor: Spring Creek Corp | Aug 2000 | — | No | ModNegligence | $55 | $55 |
| 7833265 | Hardin Sand and Gravel Shelby, OH contractor: Spring Creek Corp | Aug 2000 | — | No | ModNegligence | $55 | $55 |
| 7833264 | Hardin Sand and Gravel Shelby, OH contractor: Spring Creek Corp | Aug 2000 | — | No | ModNegligence | $55 | $55 |
| 7833619 | Hardin Sand and Gravel Shelby, OH contractor: Spring Creek Corp | Mar 2000 | — | No | LowNegligence | $55 | $55 |
| 7833617 | Hardin Sand and Gravel Shelby, OH contractor: Spring Creek Corp | Mar 2000 | — | No | LowNegligence | $55 | $55 |
| 7833616 | Hardin Sand and Gravel Shelby, OH contractor: Spring Creek Corp | Mar 2000 | — | No | LowNegligence | $55 | $55 |
| 7833615 | Hardin Sand and Gravel Shelby, OH contractor: Spring Creek Corp | Mar 2000 | — | No | LowNegligence | $55 | $55 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for SPRING CREEK CORPORATION. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for SPRING CREEK CORPORATION. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for SPRING CREEK CORPORATION. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for SPRING CREEK CORPORATION. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2025-02-05 | Referral | 1 | — | $10,426 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Part of a larger organization
SPRING CREEK CORPORATION is one of 1 establishments rolled up under the parent organization Spring Creek Corporation.
Federal enforcement records on this page represent activity at this specific establishment only. The full enforcement footprint of Spring Creek Corporation across all 1 of its tracked locations is viewable on the parent profile.
Other employers in this industry and state
Other employers in poured concrete foundation and structure contractors within OH, ordered by federal enforcement volume:
- 21ST CENTURY CONCRETE CONSTRUCTION INC.CLEVELAND — 2 federal enforcement records
- J. Goss ConcreteMassillon — 2 federal enforcement records
- PHOENIX CEMENT INC.AVON — 2 federal enforcement records
- 21ST CENTURY CONCRETE CONSTRUCTIONNEW PHILADELPHIA — 2 federal enforcement records
- PHOENIX CEMENT INC.BEREA — 2 federal enforcement records
- NORTH AMERICAN CEMENTBAY VILLAGE — 2 federal enforcement records
- CLEVELAND CEMENT CONTRACTORS INC.CLEVELAND — 2 federal enforcement records
- CLEVELAND CEMENT CONTRACTORS INC.CLEVELAND — 2 federal enforcement records
- NORTH AMERICAN CEMENT CO. INC.LORAIN — 2 federal enforcement records
- Mulford Concrete Inc.Marion — 2 federal enforcement records
Related searches
- All Spring Creek Corporation locationsParent rollup
- Poured Concrete Foundation and Structure ContractorsAll employers in this industry
- Employers in OHState-wide enforcement data
- Poured Concrete Foundation in OHIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on SPRING CREEK CORPORATION from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code. This establishment resolves to the parent rollup Spring Creek Corporation.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is SPRING CREEK CORPORATION's OSHA violation history?
- SPRING CREEK CORPORATION has 1 OSHA inspection on record with 1 violation and $10,426 in total penalties.
- How does SPRING CREEK CORPORATION's safety record compare to its industry?
- SPRING CREEK CORPORATION operates in the poured concrete foundation and structure contractors industry. The industry average Total Recordable Incident Rate (TRIR) is 2.8. SPRING CREEK CORPORATION's self-reported DART rate is 0 compared to an industry average of 2.