Summary
SPOKANE ROCK PRODUCTS has no OSHA inspection history on file. Federal records covering wage, environmental, labor relations, and other agencies are noted below where present.
The most recent federal enforcement activity was recorded 0 days ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
SPOKANE ROCK PRODUCTS appears in MSHA mine safety record only. No matching records were found in OSHA workplace safety, WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls. Single-agency enforcement records typically indicate either a discrete incident-based inspection or a low-risk operational profile.
OSHA workplace safety
No OSHA inspections, citations, or accidents on file for SPOKANE ROCK PRODUCTS. Verify directly with Occupational Safety and Health Administration →
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for SPOKANE ROCK PRODUCTS. Verify directly with OSHA Injury Tracking Application →
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for SPOKANE ROCK PRODUCTS. Verify directly with Occupational Safety and Health Administration →
Activity timeline
Most recent federal enforcement activity recorded 0 days ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for SPOKANE ROCK PRODUCTS. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in WA — for SPOKANE ROCK PRODUCTS, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other SPOKANE ROCK PRODUCTS operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 15S&S · 67 contractor · $62,116 proposed / $18,616 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 8563221 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Oct 2010 | — | Yes | HighNegligence | $52,500 | $9,000 |
| 6478893 | Havana Quarry Spokane, WA | Jan 2010 | — | Yes | ModNegligence | $362 | $362 |
| 8563219 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Oct 2010 | — | Yes | ModNegligence | $285 | $285 |
| 8563336 | Havana Quarry Spokane, WA | Apr 2010 | — | Yes | ModNegligence | $162 | $162 |
| 6396277 | Havana Quarry Spokane, WA | Nov 2006 | — | Yes | ModNegligence | $154 | $154 |
| 6399658 | Havana Quarry Spokane, WA | Feb 2009 | — | Yes | ModNegligence | $150 | $150 |
| 6399657 | Havana Quarry Spokane, WA | Feb 2009 | — | Yes | ModNegligence | $150 | $150 |
| 8612096 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Jun 2014 | — | Yes | LowNegligence | $138 | $138 |
| 6480517 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Nov 2009 | — | Yes | ModNegligence | $138 | $138 |
| 6355227 | Havana Quarry Spokane, WA | Feb 2004 | — | Yes | ModNegligence | $135 | $135 |
| 8563220 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Oct 2010 | — | Yes | LowNegligence | $127 | $127 |
| 9370720 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Mar 2018 | — | No | ModNegligence | $118 | $118 |
| 8881012 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 8881011 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 6399604 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Oct 2008 | — | No | LowNegligence | $112 | $112 |
| 8780561 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Apr 2014 | — | Yes | ModNegligence | $108 | $108 |
| 8870945 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Dec 2015 | — | No | ModNegligence | $100 | $100 |
| 8784593 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Apr 2015 | — | No | ModNegligence | $100 | $100 |
| 8784592 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Apr 2015 | — | No | ModNegligence | $100 | $100 |
| 8784591 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Apr 2015 | — | No | ModNegligence | $100 | $100 |
| 8784860 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Nov 2014 | — | No | ModNegligence | $100 | $100 |
| 8784859 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Nov 2014 | — | No | ModNegligence | $100 | $100 |
| 8784858 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Nov 2014 | — | No | ModNegligence | $100 | $100 |
| 8612097 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Jun 2014 | — | No | ModNegligence | $100 | $100 |
| 8612095 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Jun 2014 | — | No | ModNegligence | $100 | $100 |
| 8780563 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Apr 2014 | — | No | LowNegligence | $100 | $100 |
| 8780562 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Apr 2014 | — | No | LowNegligence | $100 | $100 |
| 8780560 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Apr 2014 | — | No | ModNegligence | $100 | $100 |
| 8780559 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Apr 2014 | — | No | ModNegligence | $100 | $100 |
| 8611803 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Jan 2014 | — | No | ModNegligence | $100 | $100 |
| 8696555 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Apr 2013 | — | No | ModNegligence | $100 | $100 |
| 8563674 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Oct 2012 | — | No | ModNegligence | $100 | $100 |
| 8563640 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Jun 2012 | — | No | ModNegligence | $100 | $100 |
| 8556324 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Oct 2011 | — | No | LowNegligence | $100 | $100 |
| 8605191 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Aug 2011 | — | No | ModNegligence | $100 | $100 |
| 8556485 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Apr 2011 | — | Yes | ModNegligence | $100 | $100 |
| 8556484 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Apr 2011 | — | No | LowNegligence | $100 | $100 |
| 8556483 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Apr 2011 | — | No | ModNegligence | $100 | $100 |
| 8563294 | Havana Quarry Spokane, WA | Mar 2011 | — | No | ModNegligence | $100 | $100 |
| 8563293 | Havana Quarry Spokane, WA | Mar 2011 | — | No | ModNegligence | $100 | $100 |
| 8563292 | Havana Quarry Spokane, WA | Mar 2011 | — | No | ModNegligence | $100 | $100 |
| 8563291 | Havana Quarry Spokane, WA | Mar 2011 | — | No | ModNegligence | $100 | $100 |
| 8563390 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Jun 2010 | — | No | ModNegligence | $100 | $100 |
| 8563389 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Jun 2010 | — | No | ModNegligence | $100 | $100 |
| 8563388 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Jun 2010 | — | No | ModNegligence | $100 | $100 |
| 8556129 | Havana Quarry Spokane, WA | May 2010 | — | No | HighNegligence | $100 | $100 |
| 8563337 | Havana Quarry Spokane, WA | Apr 2010 | — | No | ModNegligence | $100 | $100 |
| 8563335 | Havana Quarry Spokane, WA | Apr 2010 | — | No | LowNegligence | $100 | $100 |
| 8563334 | Havana Quarry Spokane, WA | Apr 2010 | — | No | LowNegligence | $100 | $100 |
| 6478894 | Havana Quarry Spokane, WA | Jan 2010 | — | No | ModNegligence | $100 | $100 |
| 6480518 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Nov 2009 | — | No | LowNegligence | $100 | $100 |
| 6480516 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Nov 2009 | — | No | ModNegligence | $100 | $100 |
| 7954210 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Jun 2009 | — | No | ModNegligence | $100 | $100 |
| 7954209 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Jun 2009 | — | No | ModNegligence | $100 | $100 |
| 6399662 | Havana Quarry Spokane, WA | Feb 2009 | — | No | ModNegligence | $100 | $100 |
| 6399661 | Havana Quarry Spokane, WA | Feb 2009 | — | No | ModNegligence | $100 | $100 |
| 6399660 | Havana Quarry Spokane, WA | Feb 2009 | — | No | ModNegligence | $100 | $100 |
| 6399659 | Havana Quarry Spokane, WA | Feb 2009 | — | No | ModNegligence | $100 | $100 |
| 6399603 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Oct 2008 | — | No | ModNegligence | $100 | $100 |
| 6399602 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Oct 2008 | — | No | LowNegligence | $100 | $100 |
| 6399601 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Oct 2008 | — | No | ModNegligence | $100 | $100 |
| 6399537 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Aug 2008 | — | No | ModNegligence | $100 | $100 |
| 7981482 | Havana Quarry Spokane, WA | May 2008 | — | No | ModNegligence | $100 | $100 |
| 7981481 | Havana Quarry Spokane, WA | May 2008 | — | Yes | LowNegligence | $100 | $100 |
| 7981480 | Havana Quarry Spokane, WA | May 2008 | — | No | ModNegligence | $100 | $100 |
| 7981478 | Havana Quarry Spokane, WA | May 2008 | — | No | ModNegligence | $100 | $100 |
| 7963794 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | May 2008 | — | No | ModNegligence | $100 | $100 |
| 7963787 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Apr 2008 | — | No | LowNegligence | $100 | $100 |
| 7963786 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Apr 2008 | — | No | ModNegligence | $100 | $100 |
| 7981323 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Sep 2007 | — | No | ModNegligence | $100 | $100 |
| 6396398 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | May 2007 | — | No | ModNegligence | $100 | $100 |
| 6341814 | Barker Pit Spokane, WA | Sep 2002 | — | Yes | ModNegligence | $69 | $69 |
| 6396352 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Mar 2007 | — | No | ModNegligence | $60 | $60 |
| 6396351 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Mar 2007 | — | No | ModNegligence | $60 | $60 |
| 6396350 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Mar 2007 | — | No | ModNegligence | $60 | $60 |
| 6396349 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Mar 2007 | — | No | LowNegligence | $60 | $60 |
| 6396348 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Mar 2007 | — | No | ModNegligence | $60 | $60 |
| 6396276 | Havana Quarry Spokane, WA | Nov 2006 | — | No | ModNegligence | $60 | $60 |
| 6371398 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Oct 2005 | — | No | LowNegligence | $60 | $60 |
| 6371397 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Oct 2005 | — | No | ModNegligence | $60 | $60 |
| 6371396 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Oct 2005 | — | No | ModNegligence | $60 | $60 |
| 6371395 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Oct 2005 | — | No | ModNegligence | $60 | $60 |
| 6363748 | Havana Quarry Spokane, WA | Jul 2005 | — | No | ModNegligence | $60 | $60 |
| 6363728 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Jun 2005 | — | No | ModNegligence | $60 | $60 |
| 6363727 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Jan 2005 | — | No | HighNegligence | $60 | $60 |
| 6363660 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Jan 2005 | — | No | ModNegligence | $60 | $60 |
| 6363659 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Jan 2005 | — | No | ModNegligence | $60 | $60 |
| 6363658 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Jan 2005 | — | No | ModNegligence | $60 | $60 |
| 6363644 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Nov 2004 | — | No | HighNegligence | $60 | $60 |
| 6363643 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Nov 2004 | — | No | ModNegligence | $60 | $60 |
| 6363642 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Nov 2004 | — | No | ModNegligence | $60 | $60 |
| 6363637 | Havana Quarry Spokane, WA | Oct 2004 | — | No | ModNegligence | $60 | $60 |
| 6363636 | Havana Quarry Spokane, WA | Oct 2004 | — | No | LowNegligence | $60 | $60 |
| 6363634 | Havana Quarry Spokane, WA | Oct 2004 | — | No | ModNegligence | $60 | $60 |
| 6363633 | Havana Quarry Spokane, WA | Oct 2004 | — | No | HighNegligence | $60 | $60 |
| 6363632 | Havana Quarry Spokane, WA | Oct 2004 | — | No | HighNegligence | $60 | $60 |
| 6355229 | Havana Quarry Spokane, WA | Feb 2004 | — | No | ModNegligence | $60 | $60 |
| 6355228 | Havana Quarry Spokane, WA | Feb 2004 | — | No | LowNegligence | $60 | $60 |
| 6355203 | Elk Pit Spokane, WA contractor: Spokane Rock Products Inc | Nov 2003 | — | No | LowNegligence | $60 | $60 |
| 7999200 | Airway Sand & Gravel Spokane, WA contractor: Spokane Rock Products Inc | Oct 2003 | — | No | LowNegligence | $60 | $60 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for SPOKANE ROCK PRODUCTS. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for SPOKANE ROCK PRODUCTS. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for SPOKANE ROCK PRODUCTS. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for SPOKANE ROCK PRODUCTS. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- Department of Defense5/8 BASE COURSEcontract · Last action 2010-07-08$54,255
- Department of TransportationEW SSC MAINTENANCE FACILITY WATER DRAINAGE CONTROL TAS::69 1301::TAScontract · Last action 2010-06-24$53,685
- Department of TransportationGRAVEL - JCN# 800676 REPAIR SITE ACCESS ROAD AT SPOKANE VOR NAP LOG NUMBER #2008-0676 TAS::69 1301::TAScontract · Last action 2008-09-02$26,100
- Department of DefenseIGF::OT::IGF 1,000 TONS 6" QUARRY SPALL ROCK DELIVERYcontract · Last action 2017-05-19$24,500
- Department of DefenseCONCRETE FOR CEScontract · Last action 2014-08-19$13,418
- Department of Defense1,000 TONS OF 5/8" BASE COURSEcontract · Last action 2014-04-30$11,424
- Department of DefenseCONCRETEcontract · Last action 2015-12-15$7,333
- Department of DefenseCONCRETE AND CONCRETE PRODUCTScontract · Last action 2011-09-20$6,840
- Department of DefensePURCHASE AND DELIVERY OF 49 CUBIC YARDS (CY) OF READY-MIX CONCRETEcontract · Last action 2016-07-23$4,827
- Department of DefensePURCHASE 350 TON OF 5/8 BASE COURSE DELIVERED TO BLDG 2451 AT FAIRCHILD AFBcontract · Last action 2010-04-19$4,025
- Department of DefensePROVIDE AND DELIVER CONCRETE AND CONCRETE PRODUCTScontract · Last action 2014-04-30$0
Federal contract dollars to this establishment. Primary NAICS: 327320 - READY-MIX CONCRETE MANUFACTURING. Last action: 2017-05-19. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
In the news
Related searches
- Employers in WAState-wide enforcement data
About this data
This profile aggregates federal enforcement records on SPOKANE ROCK PRODUCTS from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is SPOKANE ROCK PRODUCTS's OSHA violation history?
- SPOKANE ROCK PRODUCTS has no OSHA inspections on record.