Skip to main content

Establishment profile

SOUTER CONSTRUCTION

117 CANAL ROAD, MENIFEE, AR, 72107
811111General Automotive Repair

Download as PDF →

OSHA inspections
1
over 16 years
Violations
1
$1,000 in penalties
Penalties
$1,000
$1,000 avg
Violations across 2 federal agencies
Enforcement actions from multiple agencies may indicate systemic compliance issues across functions.
Accident investigations on record
1 fatality

Summary

SOUTER CONSTRUCTION has accumulated 1 OSHA violation across 1 inspection over 16 years of recorded history, with $1,000 in total assessed penalties.

The establishment sits in the 36th percentile for violations within its industry-state peer group of 43 employers. The most recent enforcement activity was recorded 16 years ago.

Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

SOUTER CONSTRUCTION appears in OSHA workplace safety, MSHA mine safety, and FMCSA motor carrier registration records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

Inspections
1
0.1 / yr · last 16 yrs
Violations
1
0.1 / yr
Penalties
$1,000
$1,000 avg / violation
100% serious0% other
Inspection trigger · accident
1 of 1

100% of inspections at this establishment produced violations,

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 1 distinct standard shown · 1 citation in this view · $1,000 in penalties.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
29 CFR 1910.0023 C0211$1,000Nov 2009Nov 2009

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

36th

Below average violations in NAICS 8111 within AR. Peer group: 43 employers. This establishment has 1 OSHA violation; peer median is 3.

Fewer violationsMore violations
Penalty percentile
50th
peer median: $1,000
Inspection frequency
0th
peer median: 1

Safety self-report (OSHA 300A)

No self-reported injury rates filed with OSHA's Injury Tracking Application for SOUTER CONSTRUCTION. Verify directly with OSHA Injury Tracking Application

Industry benchmark

Industry avg TRIR
1.9
BLS SOII 2024
Industry avg DART
1.1
BLS SOII 2024
Self-reported TRIR
Not in OSHA ITA

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Accident
1

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for SOUTER CONSTRUCTION. Verify directly with Occupational Safety and Health Administration

OSHA accident events

Accidents, fatalities, and catastrophes documented during OSHA inspections at this employer. Each entry links to the inspection that recorded it.

DateEventInjuriesHospitalizedFatalities
Oct 16, 2009BARGE,LUNG,SLIP,PLANK,DROWN,WATERFatality11

Source: OSHA accident investigations. Narratives are recorded by the inspecting officer and may be truncated.

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
16 years ago

No federal enforcement activity has been recorded against this establishment in 16+ years. Most recent activity: 16 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for SOUTER CONSTRUCTION. Verify directly with Wage and Hour Division

Mine safety (MSHA)

Company-level in AR — for SOUTER CONSTRUCTION, not this location alone

Violations
30
Assessed penalties
$2,373

Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other SOUTER CONSTRUCTION operations in the same state.

MSHA citations

Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 30 citations · 10S&S · 1 contractor · $2,373 proposed / $2,373 paid.

CitationMineDateSectionS&SNegligenceProposedPaid
7893075
3M Quarry
Pulaski, AR
May 2000YesModNegligence$196$196
7893069
3M Quarry
Pulaski, AR
May 2000YesModNegligence$196$196
6225550
HOLLYWOOD QUARRY
Clark, AR
Feb 2003YesHighNegligence$173$173
7893070
3M Quarry
Pulaski, AR
May 2000YesModNegligence$140$140
6225556
HOLLYWOOD QUARRY
Clark, AR
Feb 2003YesModNegligence$122$122
6223761
HOLLYWOOD QUARRY
Clark, AR
Aug 2002YesModNegligence$113$113
6223760
HOLLYWOOD QUARRY
Clark, AR
Aug 2002YesModNegligence$113$113
6223755
HOLLYWOOD QUARRY
Clark, AR
Aug 2002YesModNegligence$113$113
6223753
HOLLYWOOD QUARRY
Clark, AR
Aug 2002YesModNegligence$113$113
7893068
3M Quarry
Pulaski, AR
May 2000YesModNegligence$104$104
6225554
HOLLYWOOD QUARRY
Clark, AR
Feb 2003NoModNegligence$55$55
6225552
HOLLYWOOD QUARRY
Clark, AR
Feb 2003NoModNegligence$55$55
6225551
HOLLYWOOD QUARRY
Clark, AR
Feb 2003NoModNegligence$55$55
6225549
HOLLYWOOD QUARRY
Clark, AR
Feb 2003NoModNegligence$55$55
6223759
HOLLYWOOD QUARRY
Clark, AR
Aug 2002NoModNegligence$55$55
6223758
HOLLYWOOD QUARRY
Clark, AR
Aug 2002NoModNegligence$55$55
6223757
HOLLYWOOD QUARRY
Clark, AR
Aug 2002NoModNegligence$55$55
6223756
HOLLYWOOD QUARRY
Clark, AR
Aug 2002NoModNegligence$55$55
6223754
HOLLYWOOD QUARRY
Clark, AR
Aug 2002NoModNegligence$55$55
6223752
HOLLYWOOD QUARRY
Clark, AR
Aug 2002NoModNegligence$55$55
6223751
HOLLYWOOD QUARRY
Clark, AR
Aug 2002NoModNegligence$55$55
6223750
HOLLYWOOD QUARRY
Clark, AR
Aug 2002NoModNegligence$55$55
6205919
Black Rock Quarry
Lawrence, AR
contractor: Souter Construction Co Inc
Oct 2001NoModNegligence$55$55
7893074
3M Quarry
Pulaski, AR
May 2000NoModNegligence$55$55
7893073
3M Quarry
Pulaski, AR
May 2000NoModNegligence$55$55
7893072
3M Quarry
Pulaski, AR
May 2000NoModNegligence$55$55
7893071
3M Quarry
Pulaski, AR
May 2000NoModNegligence$55$55
7893067
3M Quarry
Pulaski, AR
May 2000NoModNegligence$55$55
6225555
HOLLYWOOD QUARRY
Clark, AR
Feb 2003NoModNegligence
6225553
HOLLYWOOD QUARRY
Clark, AR
Feb 2003NoModNegligence

Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for SOUTER CONSTRUCTION. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for SOUTER CONSTRUCTION. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for SOUTER CONSTRUCTION. Verify directly with Environmental Protection Agency

Motor carrier safety (FMCSA)

DOT number
190323
Operation
A

Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for SOUTER CONSTRUCTION. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$0
Obligated (all-time)
$24.5M
Awards
38
Top agency
Department of Defense
$24.5M
Largest awards
  • Department of Defense
    GRADED STONE B WITH DIRECT ACCESS BY
    contract · Last action 2009-09-25
    $3,079,864
  • Department of Defense
    B4L1420 RED RIVER EMERGENCY BANK PROTECTION, BOIS D'ARC, PH II
    contract · Last action 2009-06-29
    $2,901,854
  • Department of Defense
    GRADED STONE B WITH DIRECT ACCESS
    contract · Last action 2012-02-07
    $1,817,503
  • Department of Defense
    GRADED STONE B WITH DIRECT ACCESS BY
    contract · Last action 2009-09-29
    $1,514,530
  • Department of Defense
    B4L1440 RED RIVER EMERGENCY BANK PROTECTION, BOIS D' ARC REVEMENT PHASE III, MILE 387.6 TO MILE 389.0 (1967 MILEAGE), HEMPSTEAD AND MILLER COUNTIES, AR
    contract · Last action 2010-09-23
    $1,308,180
  • Department of Defense
    GRADED STONE B WITH DIRECT ACCESS
    contract · Last action 2015-03-19
    $1,222,990
  • Department of Defense
    TAS::96 3135::TAS ARRA BANK STABILIZIATION STRUCTURE REPAIRS & CHANNEL IMPROVEMENTS (ARKANSAS RIVER) ARRA::YES::ARRA
    contract · Last action 2009-06-08
    $1,161,800
  • Department of Defense
    GRADED STONE B WITH DIRECT ACCESS
    contract · Last action 2012-02-29
    $1,130,979
  • Department of Defense
    GRADED STONE B WITH DIRECT ACCESS BY
    contract · Last action 2009-05-15
    $942,500
  • Department of Defense
    TAS::96 3135::TAS ARRA BANK STABILIZATION STRUCTURE REPAIRS & CHANNEL IMPROVEMENTS ARKANSAS RIVER ARRA::YES::ARRA
    contract · Last action 2009-06-08
    $822,200
  • Department of Defense
    GRADED STONE B WITH DIRECT ACCESS BY
    contract · Last action 2010-02-06
    $779,415
  • Department of Defense
    GRADED STONE B WITH DIRECT ACCESS BY
    contract · Last action 2010-09-30
    $750,385
  • Department of Defense
    GRADED STONE B WITH DIRECT ACCESS BY
    contract · Last action 2009-05-15
    $618,800
  • Department of Defense
    TAS::96 3135::TAS GRADED STONEB W/DIRECT ACCESS FROM RIVER
    contract · Last action 2010-06-25
    $600,000
  • Department of Defense
    GRADED B STONE WITH DIRECT ACCESS BY
    contract · Last action 2009-02-03
    $542,973
  • Department of Defense
    GRADED STONE B WITH DIRECT ACCESS
    contract · Last action 2012-06-19
    $519,977
  • Department of Defense
    GRADED STONE B WITH DIRECT ACCESS BY
    contract · Last action 2009-05-21
    $489,820
  • Department of Defense
    GRADED STONE B WITH DIRECT ACCESS BY
    contract · Last action 2008-12-19
    $399,100
  • Department of Defense
    GRADED STONE B WITH DIRECT ACCESS BY
    contract · Last action 2008-06-27
    $399,100
  • Department of Defense
    TAS::96 3135::TAS ARRA BANK STABILIZATION STRUCTURE REPAIRS & CHANNEL IMPROVEMENTS (ARKANSAS RIVER) ARRA::YES::ARRA
    contract · Last action 2009-06-08
    $391,500
  • Department of Defense
    TAS::96 3135::TAS ARRA BANK STABILIZATION STRUCTURE REPAIRS & CHANNELS IMPROVEMENTS ARKANSAS RIVER ARRA::YES::ARRA
    contract · Last action 2009-06-08
    $365,600
  • Department of Defense
    TAS::96 3135::TAS BANK STABILIZATION STRUCTURE REPAIRS & CHANNELS IMPROVEMENTS ARKANSAS RIVER ARRA::YES::ARRA
    contract · Last action 2009-06-30
    $352,500
  • Department of Defense
    GRADED STONE B WITH DIRECT ACCESS BY
    contract · Last action 2009-11-05
    $312,000
  • Department of Defense
    GRADED STONE C WITH DIRECT ACCESS BY
    contract · Last action 2010-04-19
    $298,400
  • Department of Defense
    GRADED STONE C WITH DIRECT ACCESS BY
    contract · Last action 2009-05-21
    $279,800
  • Department of Defense
    TAS::96 3135::TAS BANK STABILIZATION STRUCTURE REPAIRS & CHANNELS IMPROVEMENTS ARKANSAS RIVER ARRA::YES::ARRA
    contract · Last action 2009-06-30
    $255,800
  • Department of Defense
    TAS::96 3135::TAS ARRA BANK STABILIZATION STRUCTURE REPAIRS & CHANNEL IMPROVEMENTS (ARKANSAS RIVER) ARRA::YES::ARRA
    contract · Last action 2009-06-09
    $248,000
  • Department of Defense
    TAS::96 3135::TAS ARRA BANK STABILIZATION STRUCTURE REPAIRS & CHANNEL IMPROVEMENTS ARKANSAS RIVER ARRA::YES::ARRA
    contract · Last action 2009-06-08
    $248,000
  • Department of Defense
    TAS::96 3135::TAS ARRA BANK STABILIZATION STRUCTURE REPAIRS & CHANNEL IMPROVEMENTS (ARKANSAS RIVER) ARRA::YES::ARRA
    contract · Last action 2009-06-08
    $214,240
  • Department of Defense
    GRADED STONE C WITH DIRECT ACCESS BY
    contract · Last action 2009-05-21
    $205,400
  • Department of Defense
    GRADED STONE B WITH DIRECT ACCESS BY
    contract · Last action 2008-12-18
    $150,290
  • Department of Defense
    GRADED STONE B WITH DIRECT ACCESS
    contract · Last action 2012-02-29
    $97,920
  • Department of Defense
    TAS::96 3135::TAS BANK STABILIZATION STRUCTURE REPAIRS & CHANNELS IMPROVEMENTS ARKANSAS RIVER ARRA::YES::ARRA
    contract · Last action 2009-06-30
    $52,000
  • Department of Defense
    TAS::96 3135::TAS BANK STABILIZATION STRUCTURE REPAIRS & CHANNELS IMPROVEMENTS ARKANSAS RIVER ARRA::YES::ARRA
    contract · Last action 2009-06-30
    $7,800
  • Department of Defense
    GRADED STONE B WITH DIRECT ACCESS BY
    contract · Last action 2012-07-13
    $0
  • Department of Defense
    GRADED STONE B WITH DIRECT ACCESS BY
    contract · Last action 2010-06-24
    $0
  • Department of Defense
    GRADED STONE B WITH DIRECT ACCESS BY
    contract · Last action 2008-12-05
    $0
  • Department of Defense
    3/4 INCH MINUS GRAVEL DELIVERED TO TENKILLER LAKE, OKLAHOMA
    contract · Last action 2011-06-09
    $-42

Federal contract dollars to this establishment. Primary NAICS: 237990 - OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION. Last action: 2015-03-19. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
2009-10-21Accident11$1,000

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Other employers in this industry and state

Other employers in general automotive repair within AR, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on SOUTER CONSTRUCTION from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is SOUTER CONSTRUCTION's OSHA violation history?
SOUTER CONSTRUCTION has 1 OSHA inspection on record with 1 violation and $1,000 in total penalties.
How does SOUTER CONSTRUCTION's safety record compare to its industry?
SOUTER CONSTRUCTION operates in the general automotive repair industry. The industry average Total Recordable Incident Rate (TRIR) is 1.9.
Has SOUTER CONSTRUCTION had any workplace fatalities?
Yes. Federal records show 1 fatality investigation involving SOUTER CONSTRUCTION.