Skip to main content

Establishment profile

SEABREEZE ALUMINUM CULVERT, INC.

3836 TEXAS 124, STOWELL, TX, 77661
332996Fabricated Pipe and Pipe Fitting Manufacturing

Download as PDF →

OSHA inspections
2
over 2 years
Violations
9
$30,142 in penalties
Penalties
$30,142
$3,349 avg
Accident investigations on record
1 National Emphasis Program inspections · 1 OSHA follow-up

Summary

SEABREEZE ALUMINUM CULVERT, INC. has accumulated 9 OSHA violations across 2 inspections over 2 years of recorded history, with $30,142 in total assessed penalties.

The establishment sits in the 77th percentile for violations within its industry-state peer group of 618 employers. Inspection frequency runs at the 65th percentile. The most recent enforcement activity was recorded 2 years ago.

Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

SEABREEZE ALUMINUM CULVERT, INC. appears in OSHA workplace safety record only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls. Single-agency enforcement records typically indicate either a discrete incident-based inspection or a low-risk operational profile.

OSHA workplace safety

Inspections
2
1.0 / yr · last 2 yrs
Violations
9
4.5 / yr
Penalties
$30,142
$3,349 avg / violation
100% serious0% other
Inspection trigger · planned
1 of 2
Inspection trigger · follow-up
1 of 2

100% of inspections at this establishment produced violations, with 2 inspections producing serious-or-greater violations.

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 9 distinct standards shown · 9 citations in this view · $30,142 in penalties.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
29 CFR 1910.0212 A0111$6,452Feb 2024Feb 2024
29 CFR 1910.0252 B02 III11$4,610Feb 2024Feb 2024
29 CFR 1910.0029 B0211$4,056Jul 2024Jul 2024
29 CFR 1910.0023 C0111$3,687Feb 2024Feb 2024
29 CFR 1910.0101 B11$3,042Jul 2024Jul 2024
29 CFR 1910.0305 B02 I11$2,765Feb 2024Feb 2024
29 CFR 1910.0157 C0411$2,765Feb 2024Feb 2024
29 CFR 1910.0253 B02 II11$2,765Feb 2024Feb 2024
29 CFR 1910.0157 E0311Feb 2024Feb 2024

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

77th

Above average violations in NAICS 3329 within TX. Peer group: 618 employers. This establishment has 9 OSHA violations; peer median is 3.

Fewer violationsMore violations
Penalty percentile
93rd
peer median: $3,718
Inspection frequency
65th
peer median: 1

Safety self-report (OSHA 300A)

No self-reported injury rates filed with OSHA's Injury Tracking Application for SEABREEZE ALUMINUM CULVERT, INC.. Verify directly with OSHA Injury Tracking Application

Industry benchmark

Industry avg TRIR
2.1
BLS SOII 2024
Industry avg DART
1.1
BLS SOII 2024
Self-reported TRIR
Not in OSHA ITA

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Planned
1
Follow-up
1

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for SEABREEZE ALUMINUM CULVERT, INC.. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
2 years ago

No federal enforcement activity has been recorded against this establishment in 2+ years. Most recent activity: 2 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for SEABREEZE ALUMINUM CULVERT, INC.. Verify directly with Wage and Hour Division

Mine safety (MSHA)

No MSHA mine safety violations on file for SEABREEZE ALUMINUM CULVERT, INC.. Verify directly with Mine Safety and Health Administration

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for SEABREEZE ALUMINUM CULVERT, INC.. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for SEABREEZE ALUMINUM CULVERT, INC.. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for SEABREEZE ALUMINUM CULVERT, INC.. Verify directly with Environmental Protection Agency

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for SEABREEZE ALUMINUM CULVERT, INC.. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$172K
Obligated (all-time)
$1.6M
Awards
85
Top agency
Department of the Interior
$1.6M
Top agencies by obligation (this location)
Department of the Interior$1.6M
Department of Agriculture$65K
Largest awards (top 50 of 85)
  • Department of the Interior
    PIPE ORDER
    contract · Last action 2009-06-18
    $72,721
  • Department of the Interior
    WATER CONTROL STRUCTURES (OVERFLOW NWR)
    contract · Last action 2015-12-11
    $57,670
  • Department of the Interior
    WATER CONTROL STRUCTURES "IGF::OT::IGF"
    contract · Last action 2017-09-05
    $53,539
  • Department of the Interior
    WATER CONTROL STRUCTURES - TN NWR/CROSS CREEKS NWR
    contract · Last action 2018-08-19
    $53,155
  • Department of the Interior
    PURCHASE OF CULVERTS AND ASSOCIATED PARTS INLCUDING DELIVERY FOR TENNESSEE NATIONAL WILDLIFE REFUGE, JOHNSONVILLE, TN
    contract · Last action 2011-06-15
    $53,014
  • Department of the Interior
    CULVERT SUPPLIES
    contract · Last action 2008-09-18
    $52,162
  • Department of the Interior
    LAKE OPHELIA NWR REQUEST TO FABRICATE AND DELIVER FIVE WATER CONTROL STRUCTURES
    contract · Last action 2020-09-25
    $50,920
  • Department of the Interior
    LA-ATCHAFALAYA-CULVERTS-WEIR BOXES
    contract · Last action 2024-03-07
    $46,956
  • Department of the Interior
    LA GRAND COTE NWR PURCHASE OF ALUMINUM CULVERTS
    contract · Last action 2023-06-06
    $42,383
  • Department of the Interior
    14 GAUGE ALUMINUM PIPES FOR WATER CONTROL STRUCTURES
    contract · Last action 2014-08-07
    $36,385
  • Department of the Interior
    WATERMAN, PIPES, CATWALK, HANDRAILS, FLANGES
    contract · Last action 2013-08-16
    $34,322
  • Department of the Interior
    PIPE AND CULVERT WATER CONTROL STUCTURE
    contract · Last action 2009-05-15
    $33,685
  • Department of the Interior
    PIPES FOR FWS WHITE RIVER NWR
    contract · Last action 2014-10-23
    $31,494
  • Department of the Interior
    IFG::OT::IGF--WATER CONTROL STRUCTURES
    contract · Last action 2013-08-01
    $29,146
  • Department of the Interior
    ALUMINUM PIPE, RISERS AND CANAL GATES FOR BALD KNOB NWR
    contract · Last action 2015-06-03
    $28,232
  • Department of the Interior
    WCS/FLASHBOARD RISER "IGF::OT::IGF"
    contract · Last action 2016-09-08
    $27,800
  • Department of the Interior
    SCREW VALVE AND STOP LOG WATER CONTROL STRUCTURES - GRAND COTE NWR, LA
    contract · Last action 2019-07-26
    $27,365
  • Department of the Interior
    FLAP GATES AND HALFROUND RISERS
    contract · Last action 2012-10-24
    $26,096
  • Department of the Interior
    DELIVERY OF FOUR (4) ALUMINUM CULVERTS TO WAPANOCCA NWR
    contract · Last action 2024-09-17
    $26,070
  • Department of the Interior
    AR-HOLLA BEND NWR-CULVERT PIPE
    contract · Last action 2025-06-30
    $25,070
  • Department of the Interior
    CANAL GATES
    contract · Last action 2013-08-30
    $24,384
  • Department of the Interior
    PIPE @ BK NWR
    contract · Last action 2016-08-12
    $23,453
  • Department of the Interior
    ALUMINUM CULVERTS.
    contract · Last action 2008-06-20
    $22,878
  • Department of the Interior
    REPLACEMENT WCS FOR POOL 8/9, GTR&BTU
    contract · Last action 2012-08-29
    $22,346
  • Department of Agriculture
    CULVERTS
    contract · Last action 2019-03-01
    $22,188
  • Department of the Interior
    FLASHBOARD RISERS - SALT PLAINS NWR, OK
    contract · Last action 2021-09-17
    $22,155
  • Department of the Interior
    IGF::OT::IGF--NECHES RIVER CULVERTS
    contract · Last action 2016-09-08
    $21,719
  • Department of the Interior
    CULVERTS - GRAND COTE NWR, LA
    contract · Last action 2017-07-06
    $21,258
  • Department of the Interior
    WATER CONTROL STRUCTURES
    contract · Last action 2010-07-26
    $20,237
  • Department of the Interior
    WATER CONTROL STRUCTURES
    contract · Last action 2012-08-09
    $20,099
  • Department of the Interior
    IGF::OT::IGF-LITTLE RIVER CULVETRS
    contract · Last action 2017-03-23
    $19,892
  • Department of the Interior
    PIPES FOR FWS FELSENTHAL NWR
    contract · Last action 2014-08-13
    $19,594
  • Department of the Interior
    VARIOUS PIPES AND RISERS AT CACHE RIVER NWR, AR
    contract · Last action 2016-09-09
    $18,675
  • Department of the Interior
    NM, BITTER LAKE NWR, WATER CONTROL STRUC
    contract · Last action 2020-09-08
    $18,364
  • Department of the Interior
    IGF::OTIGF--NECHES RIVER CMP CULVERTS
    contract · Last action 2014-09-09
    $17,418
  • Department of the Interior
    TRINITY RIVER - PAGE CULVERT REPAIR
    contract · Last action 2020-02-24
    $17,390
  • Department of the Interior
    AL-EUFAULA NWR-A4EF0-WATER CONTROL STRUC
    contract · Last action 2024-09-26
    $17,332
  • Department of the Interior
    ALUMINUM STOP LOGS
    contract · Last action 2014-06-16
    $17,184
  • Department of the Interior
    WATER CONTROL STRUCTURES/CULVERTS - TENNESSEE NWR (DRU)
    contract · Last action 2018-09-17
    $16,920
  • Department of the Interior
    ""IGF::CL::IGF"" WATER CONTROL STRUCTURES AND PIPES FABRICATED
    contract · Last action 2013-08-26
    $16,635
  • Department of the Interior
    CULVERTS AND ALUMINIZED STEEL BANDS - DAHOMEY NWR, MS
    contract · Last action 2019-07-19
    $16,352
  • Department of the Interior
    WATER CONTROL STRUCTURES
    contract · Last action 2011-05-19
    $15,205
  • Department of the Interior
    VARIOUS ALUMINUM PIPES&RISERS - WHITE RIVER NWR, AR
    contract · Last action 2016-09-23
    $15,016
  • Department of the Interior
    IGF::CT::IGF WCS AND PIPES
    contract · Last action 2016-09-19
    $14,950
  • Department of the Interior
    CULVERTS PURCHASE
    contract · Last action 2009-02-13
    $14,824
  • Department of the Interior
    CULVERTS
    contract · Last action 2010-08-27
    $14,720
  • Department of the Interior
    AR BALD KNOB NWR DMPIPE DR100
    contract · Last action 2025-08-08
    $14,142
  • Department of the Interior
    PVC PIPING
    contract · Last action 2009-05-15
    $13,966
  • Department of the Interior
    IGF::OT::IGF--ANAHAUC METAL CULVERTS
    contract · Last action 2016-06-21
    $13,860
  • Department of the Interior
    ALUMINUM PIPES
    contract · Last action 2008-09-17
    $13,814

Federal contract dollars to this establishment. Primary NAICS: 332996 - FABRICATED PIPE AND PIPE FITTING MANUFACTURING. Last action: 2025-08-08. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
2024-05-30Follow-up22$7,098
2024-01-25Planned77$23,044

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Other employers in this industry and state

Other employers in fabricated pipe and pipe fitting manufacturing within TX, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on SEABREEZE ALUMINUM CULVERT, INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is SEABREEZE ALUMINUM CULVERT, INC.'s OSHA violation history?
SEABREEZE ALUMINUM CULVERT, INC. has 2 OSHA inspections on record with 9 violations and $30,142 in total penalties.
How does SEABREEZE ALUMINUM CULVERT, INC.'s safety record compare to its industry?
SEABREEZE ALUMINUM CULVERT, INC. operates in the fabricated pipe and pipe fitting manufacturing industry. The industry average Total Recordable Incident Rate (TRIR) is 2.1.