Skip to main content

Establishment profile

ROCKY MOUNTAIN CONSTRUCTION LLC

HIGHWAY 97, KLAMATH FALLS, OR, 97603
238990All Other Specialty Trade Contractors
EIN 911839551

Download as PDF →

OSHA inspections
8
over 21 years
Violations
10
$2,183 in penalties
Penalties
$2,183
$218 avg
Violations across 2 federal agencies
Enforcement actions from multiple agencies may indicate systemic compliance issues across functions.
Accident investigations on record
1 fatality · 1 hospitalizations · 1 National Emphasis Program inspections · 1 OSHA follow-up

Summary

ROCKY MOUNTAIN CONSTRUCTION LLC has accumulated 10 OSHA violations across 8 inspections over 21 years of recorded history, with $2,183 in total assessed penalties.

The establishment sits in the 97th percentile for violations within its industry-state peer group of 1,773 employers. Inspection frequency runs at the 99th percentile. The most recent enforcement activity was recorded 7 years ago.

Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

ROCKY MOUNTAIN CONSTRUCTION LLC appears in OSHA workplace safety, MSHA mine safety, FMCSA motor carrier registration, and UVA Corporate Prosecution Registry records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

Inspections
8
0.4 / yr · last 21 yrs
Violations
10
0.5 / yr
Penalties
$2,183
$218 avg / violation
20% serious80% other
Inspection trigger · planned
6 of 8
Inspection trigger · accident
1 of 8

50% of inspections at this establishment produced violations,

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 10 distinct standards shown · 10 citations in this view · $2,183 in penalties.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
29 CFR 1926.0028 A11$2,083May 2013May 2013
29 CFR 1926.0100 A11$100Apr 2005Apr 2005
OAR 437-002-0227(5)(B)11Jun 2015Jun 2015
29 CFR 1910.0178 P0111Jun 2015Jun 2015
OAR 437-001-0765(13)-111Jun 2015Jun 2015
29 CFR 1926.0021 B0211May 2013May 2013
29 CFR 1910.0132 D0211Nov 2004Nov 2004
29 CFR 1910.1200 E01 I11Nov 2004Nov 2004
29 CFR 1910.1200 E0111Nov 2004Nov 2004
29 CFR 1910.0157 E0311Nov 2004Nov 2004

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

97th

Worse on violations than nearly every other employer in NAICS 2389 within OR. Peer group: 1,773 employers. This establishment has 10 OSHA violations; peer median is 1.

Fewer violationsMore violations
Penalty percentile
93rd
peer median: $100
Inspection frequency
99th
peer median: 1

Safety self-report (OSHA 300A)

Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.

DART rate
2.0
vs industry
+1.1
TRIR
2.0
vs industry
+0.4

Reported for 90 average annual employees at this establishment.

Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.

Industry benchmark

Industry avg TRIR
1.6
BLS SOII 2024
Industry avg DART
0.9
BLS SOII 2024
Self-reported TRIR
2.0
OSHA ITA Form 300A (employer self-reported)

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Planned
6
Accident
1

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for ROCKY MOUNTAIN CONSTRUCTION LLC. Verify directly with Occupational Safety and Health Administration

OSHA accident events

Accidents, fatalities, and catastrophes documented during OSHA inspections at this employer. Each entry links to the inspection that recorded it.

DateEventInjuriesHospitalizedFatalities
Jul 2, 2019Construction,Fall,Fall Protection,Flagger,Fracture,Highway work zone,Hip,Jump,Motor Vehicle,Struck Against,Traffic Control11
Jun 18, 2019Construction,Flagger,Highway,Lighting,Motor Vehicle,Protective Clothing,Run Over,Struck ByFatality11

Source: OSHA accident investigations. Narratives are recorded by the inspecting officer and may be truncated.

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
7 years ago

No federal enforcement activity has been recorded against this establishment in 7+ years. Most recent activity: 7 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for ROCKY MOUNTAIN CONSTRUCTION LLC. Verify directly with Wage and Hour Division

Mine safety (MSHA)

Company-level in OR — for ROCKY MOUNTAIN CONSTRUCTION LLC, not this location alone

Violations
181
Assessed penalties
$193,737

Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other ROCKY MOUNTAIN CONSTRUCTION LLC operations in the same state.

MSHA citations

Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 42S&S · $184,642 proposed / $155,094 paid.

CitationMineDateSectionS&SNegligenceProposedPaid
9439476
Rocky Mountain Plants
Klamath, OR
Dec 2019YesHighNegligence$27,089$12,315
9439475
Rocky Mountain Plants
Klamath, OR
Dec 2019YesHighNegligence$27,089$12,315
8559821
Rocky Mountain Plants
Klamath, OR
Nov 2010YesHighNegligence$19,300$19,300
9376913
Rocky Mountain Plants
Klamath, OR
Jun 2019YesHighNegligence$18,846$18,846
9376924
Rocky Mountain Plants
Klamath, OR
Jul 2019YesHighNegligence$9,409$9,409
9376923
Rocky Mountain Plants
Klamath, OR
Jul 2019YesHighNegligence$9,409$9,409
8993910
Rocky Mountain Plants
Klamath, OR
Aug 2018YesHighNegligence$9,178$9,178
8559829
Rocky Mountain Plants
Klamath, OR
Nov 2010YesHighNegligence$6,624$6,624
9504414
Rocky Mountain Plants
Klamath, OR
Apr 2020YesHighNegligence$5,925$5,925
9504420
Rocky Mountain Plants
Klamath, OR
Apr 2020YesHighNegligence$4,194$4,194
8559823
Rocky Mountain Plants
Klamath, OR
Nov 2010YesHighNegligence$2,976$2,976
8559827
Rocky Mountain Plants
Klamath, OR
Nov 2010YesHighNegligence$2,678$2,678
9376509
Rocky Mountain Plants
Klamath, OR
Feb 2019YesModNegligence$2,550$2,550
9376508
Rocky Mountain Plants
Klamath, OR
Feb 2019YesModNegligence$2,550$2,550
9376506
Rocky Mountain Plants
Klamath, OR
Feb 2019YesModNegligence$2,550$2,550
8993918
Rocky Mountain Plants
Klamath, OR
Aug 2018YesModNegligence$2,487$2,487
8993917
Rocky Mountain Plants
Klamath, OR
Aug 2018YesModNegligence$2,487$2,487
8872059
Rocky Mountain Plants
Klamath, OR
Mar 2015YesHighNegligence$2,000$2,000
8559822
Rocky Mountain Plants
Klamath, OR
Nov 2010NoHighNegligence$2,000$2,000
9439484
Rocky Mountain Plants
Klamath, OR
Dec 2019NoHighNegligence$1,932$1,932
8993161
Rocky Mountain Plants
Klamath, OR
Mar 2018YesHighNegligence$1,118$1,118
8872055
Rocky Mountain Plants
Klamath, OR
Mar 2015YesHighNegligence$946$946
8993923
Rocky Mountain Plants
Klamath, OR
Aug 2018YesModNegligence$880$880
8559826
Rocky Mountain Plants
Klamath, OR
Nov 2010YesModNegligence$807$807
6486470
Rocky Mountain Plants
Klamath, OR
Aug 2010YesHighNegligence$807$807
6486468
Rocky Mountain Plants
Klamath, OR
Aug 2010YesHighNegligence$807$807
8993919
Rocky Mountain Plants
Klamath, OR
Aug 2018YesModNegligence$749$749
9891811
Portable #2
Klamath, OR
Nov 2024YesHighNegligence$576$576
9504417
Rocky Mountain Plants
Klamath, OR
Apr 2020YesModNegligence$567$567
8559824
Rocky Mountain Plants
Klamath, OR
Nov 2010YesModNegligence$540$540
9376912
Rocky Mountain Plants
Klamath, OR
Jun 2019NoHighNegligence$514$514
9376908
Rocky Mountain Plants
Klamath, OR
Jun 2019NoModNegligence$514$514
9376907
Rocky Mountain Plants
Klamath, OR
Jun 2019NoModNegligence$514$514
9376512
Rocky Mountain Plants
Klamath, OR
Feb 2019NoModNegligence$514$514
9376510
Rocky Mountain Plants
Klamath, OR
Feb 2019NoModNegligence$514$514
8993913
Rocky Mountain Plants
Klamath, OR
Aug 2018NoModNegligence$502$502
9504413
Rocky Mountain Plants
Klamath, OR
Apr 2020YesModNegligence$482$482
9504412
Rocky Mountain Plants
Klamath, OR
Apr 2020YesModNegligence$482$482
8599168
Rocky Mountain Plants
Klamath, OR
Mar 2012YesHighNegligence$425$425
9891235
Rocky Mountain Plants
Klamath, OR
May 2024YesModNegligence$421$421
8559828
Rocky Mountain Plants
Klamath, OR
Nov 2010NoModNegligence$362$362
8559825
Rocky Mountain Plants
Klamath, OR
Nov 2010NoModNegligence$362$362
6486476
Rocky Mountain Plants
Klamath, OR
Aug 2010YesHighNegligence$362$362
8993158
Rocky Mountain Plants
Klamath, OR
Mar 2018YesModNegligence$336$336
8992898
Portable #3
Klamath, OR
Mar 2018YesModNegligence$286$286
9539498
Rocky Mountain Plants
Klamath, OR
Aug 2022NoModNegligence$273$273
9539497
Rocky Mountain Plants
Klamath, OR
Aug 2022NoModNegligence$273$273
6486473
Rocky Mountain Plants
Klamath, OR
Aug 2010YesModNegligence$243$243
6398581
Rocky Mountain Plants
Klamath, OR
Jun 2008YesModNegligence$243$243
9439482
Rocky Mountain Plants
Klamath, OR
Dec 2019NoLowNegligence$234$234
9439480
Rocky Mountain Plants
Klamath, OR
Dec 2019NoModNegligence$234$234
9439477
Rocky Mountain Plants
Klamath, OR
Dec 2019NoModNegligence$234$234
8693961
Rocky Mountain Plants
Klamath, OR
Jul 2013NoModNegligence$190$190
8993922
Rocky Mountain Plants
Klamath, OR
Aug 2018NoModNegligence$177$177
8993912
Rocky Mountain Plants
Klamath, OR
Aug 2018NoModNegligence$163$163
9612519
Rocky Mountain Plants
Klamath, OR
Jul 2021NoModNegligence$159$159
9612518
Rocky Mountain Plants
Klamath, OR
Jul 2021NoModNegligence$159$159
9612517
Rocky Mountain Plants
Klamath, OR
Jul 2021NoModNegligence$159$159
8872536
Portable #3
Klamath, OR
Nov 2023YesModNegligence$155$155
9376911
Rocky Mountain Plants
Klamath, OR
Jun 2019NoModNegligence$154$154
9376910
Rocky Mountain Plants
Klamath, OR
Jun 2019NoModNegligence$154$154
9376511
Rocky Mountain Plants
Klamath, OR
Feb 2019NoModNegligence$154$154
9376507
Rocky Mountain Plants
Klamath, OR
Feb 2019NoModNegligence$154$154
5160304
Portable #3
Klamath, OR
Feb 2026NoModNegligence$151$151
5160303
Portable #3
Klamath, OR
Feb 2026NoModNegligence$151$151
5160302
Portable #3
Klamath, OR
Feb 2026NoModNegligence$151$151
5160300
Rocky Mountain Plants
Klamath, OR
Feb 2026NoModNegligence$151$151
5160299
Rocky Mountain Plants
Klamath, OR
Feb 2026NoModNegligence$151$151
5160298
Rocky Mountain Plants
Klamath, OR
Feb 2026NoModNegligence$151$151
9891894
Rocky Mountain Plants
Klamath, OR
Apr 2025NoModNegligence$151$151
9891893
Rocky Mountain Plants
Klamath, OR
Apr 2025YesModNegligence$151$151
9891892
Rocky Mountain Plants
Klamath, OR
Apr 2025NoModNegligence$151$151
9891891
Rocky Mountain Plants
Klamath, OR
Apr 2025NoModNegligence$151$151
9891890
Portable #2
Klamath, OR
Apr 2025YesModNegligence$151$151
8993921
Rocky Mountain Plants
Klamath, OR
Aug 2018NoModNegligence$151$151
8993920
Rocky Mountain Plants
Klamath, OR
Aug 2018NoModNegligence$151$151
8993916
Rocky Mountain Plants
Klamath, OR
Aug 2018NoModNegligence$151$151
8993915
Rocky Mountain Plants
Klamath, OR
Aug 2018NoModNegligence$151$151
8993914
Rocky Mountain Plants
Klamath, OR
Aug 2018NoModNegligence$151$151
8877940
Rocky Mountain Plants
Klamath, OR
Jan 2017YesModNegligence$148$148
9891812
Portable #2
Klamath, OR
Nov 2024NoModNegligence$147$147
9891810
Portable #3
Klamath, OR
Oct 2024NoModNegligence$147$147
9891243
Portable #2
Klamath, OR
May 2024NoModNegligence$147$147
9891242
Portable #2
Klamath, OR
May 2024NoModNegligence$147$147
9891241
Portable #2
Klamath, OR
May 2024NoModNegligence$147$147
9891240
Portable #2
Klamath, OR
May 2024NoModNegligence$147$147
9891239
Rocky Mountain Plants
Klamath, OR
May 2024NoModNegligence$147$147
9891238
Rocky Mountain Plants
Klamath, OR
May 2024NoModNegligence$147$147
9891237
Rocky Mountain Plants
Klamath, OR
May 2024NoModNegligence$147$147
9891236
Rocky Mountain Plants
Klamath, OR
May 2024YesModNegligence$147$147
9504415
Rocky Mountain Plants
Klamath, OR
Apr 2020NoModNegligence$144$144
9504411
Rocky Mountain Plants
Klamath, OR
Apr 2020NoModNegligence$144$144
9504410
Rocky Mountain Plants
Klamath, OR
Apr 2020NoModNegligence$144$144
9504407
Rocky Mountain Plants
Klamath, OR
Apr 2020NoModNegligence$144$144
9504406
Rocky Mountain Plants
Klamath, OR
Apr 2020NoModNegligence$144$144
9439479
Rocky Mountain Plants
Klamath, OR
Dec 2019NoHighNegligence$144$144
8872535
Portable #3
Klamath, OR
Nov 2023NoModNegligence$143$143
8872534
Rocky Mountain Plants
Klamath, OR
Nov 2023NoModNegligence$143$143
8872533
Rocky Mountain Plants
Klamath, OR
Nov 2023NoLowNegligence$143$143
8872532
Rocky Mountain Plants
Klamath, OR
Nov 2023NoModNegligence$143$143

Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for ROCKY MOUNTAIN CONSTRUCTION LLC. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for ROCKY MOUNTAIN CONSTRUCTION LLC. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for ROCKY MOUNTAIN CONSTRUCTION LLC. Verify directly with Environmental Protection Agency

Motor carrier safety (FMCSA)

DOT number
834063
Operation
A

Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.

Federal criminal prosecution record

Prosecutions
1
Total payments
$1.4M
Disposition
Guilty Plea
Crime type
Money Laundering

First case: 2009-01-30. Most recent: 2009-01-30. Source: UVA Corporate Prosecution Registry — federal pleas, DPAs, and NPAs.

Federal contracts

This location

Obligated (5-yr)
$26.3M
Obligated (all-time)
$31.0M
Awards
22
Top agency
Department of Transportation
$29.4M
Company-wide — ROCKY MOUNTAIN CONSTRUCTION, LLC (across 1 entity)
Obligated (5-yr)
$26.8M
Obligated (all-time)
$26.8M
Awards (all-time)
1

Consolidated across all USAspending recipient entities under this corporate parent — not attributable to this single location.

Top agencies by obligation (this location)
Department of Transportation$29.4M
Department of the Interior$923K
Department of Defense$712K
Department of Agriculture$6K
Largest awards
  • Department of Transportation
    OR DOT 140(1), OR 140 - KLAMATH COUNTY BOAT MARINA TO LAKESHORE DRIVE
    contract · Last action 2025-08-19
    $26,827,548
  • Department of Transportation
    OR LAKE 4-12(1), EAST BAY ROAD REHABILITATION
    contract · Last action 2022-03-11
    $2,553,103
  • Department of the Interior
    MEDFORD - RESURFACE MIO PARKING LOTS CORRECT UPC: Z2246600
    contract · Last action 2012-07-20
    $600,553
  • Department of Defense
    IGF::OT::IGF BASE BID, 404 PARKING LOT AND GATE RPR.
    contract · Last action 2017-05-15
    $540,009
  • Department of the Interior
    IGF::CT::IGF KLAMATH PROJECT GRAVEL
    contract · Last action 2015-07-23
    $260,639
  • Department of the Interior
    ROCK CRUSHING AND SCREENING, CRLA
    contract · Last action 2021-02-17
    $232,030
  • Department of the Interior
    CONSTRUCT A CONCRETE LAUNCH RAMP AND GRAVEL PARKING LOT, PLUS MISCELLANEOU WORK.
    contract · Last action 2009-02-17
    $126,694
  • Department of Defense
    REPAIR BASE PAVEMENTS AND BUILDING 500
    contract · Last action 2011-06-14
    $96,002
  • Department of Defense
    REPAIR BY SEALCOATING ROADWAYS
    contract · Last action 2014-07-03
    $76,300
  • Department of the Interior
    PWR LABE PMIS NO. 149422 - ROAD SURFACING AGGREGATE
    contract · Last action 2010-06-17
    $72,900
  • Department of the Interior
    PAVING REPAIRS OF OFFICE PARKING LOT AT KLAMATH FALLS FISH & WILDLIFE OFFICE, OREGON.
    contract · Last action 2010-08-11
    $34,252
  • Department of the Interior
    IGF::CT::IGF BPA FOR AGGREGATE MATERIALS
    contract · Last action 2016-05-10
    $17,000
  • Department of the Interior
    G:OTHER, CONCRETE FOR SIDEWALKS, FOR THE ECO-CONSCIOUS BUILDER, CONCRETE IS LOCALLY-SOURCED, REDUCING CO2 EMISSIONS FROM TRANSPORTATION. MOST CONCRETE IN URBAN AREAS IS RECYCLED AS FILL OR ROAD BASE AND NOT PLACED IN LANDFILLS, FOR LAVA BEDS NATIONAL MONUMENT, TULELAKE, CA
    contract · Last action 2015-11-12
    $15,491
  • Department of Agriculture
    IGF::OT::IGF THIS IS TO REINSTATE THE PREVIOUS PAVEMENT PATCHING AND ROAD GRADING AT ANNIE CREEK SNOW PARK. THIS WORK IS TO REPAIR DAMAGE CAUSED DURING A FIRE CAMPS USE OF THE AREA. ERICA TARBOX IS THE THE ENGINEERING CONTACT 541-883-6815
    contract · Last action 2015-09-14
    $6,392
  • Department of the Interior
    3/8 INCH CHIP ROCK FOR MO
    contract · Last action 2009-09-17
    $5,100
  • Department of the Interior
    IGF::CT::IGF - BPA CALLS FOR AGGREGATE MATERIALS
    contract · Last action 2015-07-14
    $2,882
  • Department of the Interior
    IGF::CT::IGF - BPA CALLS FOR AGGREGATE MATERIALS
    contract · Last action 2015-07-14
    $2,704
  • Department of the Interior
    IGF::CT::IGF - BPA CALLS FOR AGGREGATE MATERIALS
    contract · Last action 2015-07-14
    $1,732
  • Department of the Interior
    IGF::CT::IGF - BPA CALLS FOR AGGREGATE MATERIALS
    contract · Last action 2015-07-14
    $677
  • Department of Agriculture
    IGF::OT::IGF
    contract · Last action 2019-05-30
    $0
  • Department of the Interior
    OTHER FUNCTION - BPA FOR AGGREGATE MATERIALS - KBAO
    contract · Last action 2014-04-04
    $0
  • Department of the Interior
    PIT RUN ROCK
    contract · Last action 2013-03-26
    $-449,258

Federal contract dollars to this establishment. Primary NAICS: 237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Last action: 2025-08-19. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
2019-07-16Accident0$0
2019-06-19Fatality/Catastrophe0$0
2015-05-19Planned0$0
2015-05-11Planned3$0
2013-04-18Planned22$2,083
2005-02-28Planned1$100
2004-09-27Planned4$0
2004-09-27Planned0$0

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Other employers in this industry and state

Other employers in all other specialty trade contractors within OR, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on ROCKY MOUNTAIN CONSTRUCTION LLC from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is ROCKY MOUNTAIN CONSTRUCTION LLC's OSHA violation history?
ROCKY MOUNTAIN CONSTRUCTION LLC has 8 OSHA inspections on record with 10 violations and $2,182.5 in total penalties.
How does ROCKY MOUNTAIN CONSTRUCTION LLC's safety record compare to its industry?
ROCKY MOUNTAIN CONSTRUCTION LLC operates in the all other specialty trade contractors industry. The industry average Total Recordable Incident Rate (TRIR) is 1.6. ROCKY MOUNTAIN CONSTRUCTION LLC's self-reported DART rate is 2.02 compared to an industry average of 0.9.
Has ROCKY MOUNTAIN CONSTRUCTION LLC had any workplace fatalities?
Yes. Federal records show 1 fatality investigation involving ROCKY MOUNTAIN CONSTRUCTION LLC.
ROCKY MOUNTAIN CONSTRUCTION LLC — OSHA Violations & Safety Record | FastDOL