Skip to main content

Establishment profile

RAFTER H CONSTRUCTION L.L.C.

661 DELL DRIVE, REXBURG, ID, 83440
238130Framing Contractors

Download as PDF →

OSHA inspections
1
over 15 years
Violations
4
$2,700 in penalties
Penalties
$2,700
$675 avg

Summary

RAFTER H CONSTRUCTION L.L.C. has accumulated 4 OSHA violations across 1 inspection over 15 years of recorded history, with $2,700 in total assessed penalties.

The establishment sits in the 78th percentile for violations within its industry-state peer group of 2,166 employers. The most recent enforcement activity was recorded 15 years ago.

Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

RAFTER H CONSTRUCTION L.L.C. appears in OSHA workplace safety record only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls. Single-agency enforcement records typically indicate either a discrete incident-based inspection or a low-risk operational profile.

OSHA workplace safety

Inspections
1
0.1 / yr · last 15 yrs
Violations
4
0.3 / yr
Penalties
$2,700
$675 avg / violation
100% serious0% other
Inspection trigger · referral
1 of 1

100% of inspections at this establishment produced violations,

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 4 distinct standards shown · 4 citations in this view · $2,700 in penalties.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
29 CFR 1926.0100 A11$900Jun 2011Jun 2011
29 CFR 1926.0102 A0111$900Jun 2011Jun 2011
29 CFR 1926.0501 B1311$900Jun 2011Jun 2011
29 CFR 1926.0503 A0111Jun 2011Jun 2011

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

78th

Above average violations in NAICS 2381 within ID. Peer group: 2,166 employers. This establishment has 4 OSHA violations; peer median is 2.

Fewer violationsMore violations
Penalty percentile
75th
peer median: $1,000
Inspection frequency
0th
peer median: 1

Safety self-report (OSHA 300A)

No self-reported injury rates filed with OSHA's Injury Tracking Application for RAFTER H CONSTRUCTION L.L.C.. Verify directly with OSHA Injury Tracking Application

Industry benchmark

Industry avg TRIR
4.6
BLS SOII 2024
Industry avg DART
3.4
BLS SOII 2024
Self-reported TRIR
Not in OSHA ITA

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Referral
1

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for RAFTER H CONSTRUCTION L.L.C.. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
15 years ago

No federal enforcement activity has been recorded against this establishment in 15+ years. Most recent activity: 15 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for RAFTER H CONSTRUCTION L.L.C.. Verify directly with Wage and Hour Division

Mine safety (MSHA)

No MSHA mine safety violations on file for RAFTER H CONSTRUCTION L.L.C.. Verify directly with Mine Safety and Health Administration

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for RAFTER H CONSTRUCTION L.L.C.. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for RAFTER H CONSTRUCTION L.L.C.. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for RAFTER H CONSTRUCTION L.L.C.. Verify directly with Environmental Protection Agency

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for RAFTER H CONSTRUCTION L.L.C.. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$0
Obligated (all-time)
$50.4M
Awards
41
Top agency
Department of Labor
$42.4M
Top agencies by obligation (this location)
Department of Labor$42.4M
Department of Transportation$4.3M
Department of the Interior$2.6M
Department of Agriculture$634K
Department of Defense$556K
Largest awards
  • Department of Labor
    IGF::OT::IGF NEW WIND RIVER JOB CORPS CENTER
    contract · Last action 2015-08-31
    $42,376,564
  • Department of Transportation
    IGF::CT::IGF SD FLAP CR223801(1) NORRIS PEAK ROAD SD FLAP CR297(1) LACREEK ACCESS ROAD DTFH68-15-B-00031 ROADWAY REALIGNMENT, RECONSTRUCTION, GRADING, DRAINAGE, AGGREGATE BASE, AND ASPHALT CONCRETE PAVEMENT. ROADWAY RECONDITIONING AND AGGREGATE SURFACING
    contract · Last action 2018-11-08
    $4,189,668
  • Department of the Interior
    IGF::OT::IGF G:OTHER (GRINDING AND RECYCLING ASPHALT, CRMO); THIS WORK CONSISTS OF REHABILITATION OF THE LAVA FLOW CAMPGROUND AND KIOSK, IN ACCORDANCE WITH SOLICITATION P15PS01222, THE INCLUDED SCOPE, WAGE RATES, SPECIFICATIONS, AND DRAWINGS, AT CRATERS OF THE MOON NATIONAL MONUMENT AND PRESERVE, NEAR ARCO, IDAHO.
    contract · Last action 2015-09-22
    $858,472
  • Department of the Interior
    IGF::OT::IGF ADAPTIVE RENOVATION OF THE HISTORIC HERRMANN HOUSE AT MINIDOKA NATIONAL HISTORIC SITE IN HUNT, IDAHO.
    contract · Last action 2019-02-26
    $488,162
  • Department of Defense
    IGF::OT::IGF LUCKY PEAK DAM, BOISE ID, VIEWPOINT PAVING
    contract · Last action 2018-08-06
    $469,562
  • Department of the Interior
    IGF::OT::IGF AFS BARRACKS WINDOW REPLACEMENT IDIQ
    contract · Last action 2015-07-29
    $244,687
  • Department of the Interior
    IGF::OT::IGF X:NOGRN; FALL PROTECTION SYSTEM DESIGN AND INSTALLATION, CRMO.
    contract · Last action 2016-04-05
    $242,750
  • Department of the Interior
    IGF::CL::IGF CRMO POTABLE WATER RESERVOIR REPAIR, INSTALLATION OF INTERIOR LINING SYSTEM AND RELATED WORK.
    contract · Last action 2014-08-14
    $180,256
  • Department of the Interior
    IGF::OT::IGF - REPLACE DOORS AND WINDOWS, LOVELL VISITOR CENTER -- BIGHORN CANYON NATIONAL RECREATION AREA
    contract · Last action 2017-05-22
    $113,500
  • Department of the Interior
    GENERATOR, ENGINE BAY DOORS, RHYOLITE SITE, TFO LOBBY REMODEL, CARD READER/FIRE SYSTEM INTERFACE - BMDO IGF::OT::IGF
    contract · Last action 2015-01-16
    $107,945
  • Department of Agriculture
    IGF::OT::IGF (1) CLEAN, MINOR REPAIRS&PAINTING - BLDG.# 8 (2) CLEAN, MINOR REPAIR&SIDING REPLACMENT BLDG.# 7N (3) PAINT INTERIOR, NEW FLOORS, WINDOWS&KITCHEN COUNTERTOPS - BLDG.# 60 AND (4) INSTALL 11 DEADBOLT LOCKS, REPAINT EXTERIOR DOOR AND FRAMES&WEATHER STRIPPING. SCOPE OF WORK FOR ALL PER ENCLOSED SEPERATE STATEMENTS OF WORK (SOWS).
    contract · Last action 2016-09-27
    $90,857
  • Department of Defense
    JACKSON HOLE FY 12 PRE-HIGH-WATER LEVEE REPAIR
    contract · Last action 2012-07-10
    $86,010
  • Department of Agriculture
    IGF::OT::IGF COMPLETE THE NECESSARY WORK TO PREP PAVEMENT FOR REPAIRING THE EXISTING CRACKS AND THEN CHIP AND SEAL SHALL BE APPLIED TO ESTIMATED 1.3 MILES (EAST OF RAILROAD TRACKS UP TO THE ENTRANCE GATE ON SHEEP STATION ROAD).
    contract · Last action 2016-08-24
    $84,192
  • Department of Agriculture
    IGF::OT::IGF COTTONWOOD DAM SPILLWAY MODIFICATION
    contract · Last action 2015-09-29
    $83,519
  • Department of Transportation
    POCATELLO ATCT CAB GLASS WINDOWS REPLACEMENT IN ACCORDANCE WITH RFQ# DTFAWN-15-R-00040 IGF::OT::IGF
    contract · Last action 2015-03-09
    $74,500
  • Department of the Interior
    IGF::CT::IGF EMERGENCY POTABLE WATER SUPPLY REPAIR
    contract · Last action 2016-02-10
    $67,819
  • Department of the Interior
    IGF::OT::IGF
    contract · Last action 2016-06-09
    $66,878
  • Department of Agriculture
    IGF::OT::IGF REMODEL AND UPDATE ROOM 122 SO IT CAN BE USED AS A WORKING SCIENTIFIC LABORATORY. ROOM 122 WAS ORIGINALLY BUILT AS A WORKING SCIENTIFIC LAB, SINCE THEN IT HAS BEEN MODIFIED AND USED AS COMPUTER LAB. ROOM 122 STILL HAS MOST OF THE ORIGINAL INFRASTRUCTURE AVAILABLE, WATER, DRAINS, AIR, GAS, VACUUM, ETC.
    contract · Last action 2016-12-21
    $66,529
  • Department of the Interior
    INSTALLATION OF ADDITIONAL SECURITY ITEMS AND FIRE ALARM UPGRADE BUILDING 606 FORT HALL AGENCY
    contract · Last action 2019-09-20
    $63,016
  • Department of the Interior
    EGIN LAKES CG ELECTRICAL PHASE IV
    contract · Last action 2011-05-09
    $58,151
  • Department of Agriculture
    IGF::OT::IGF BLDG. 71 ROOF REPLACEMENT&BLDG. #71, #21 AND DERRICK PAINTING
    contract · Last action 2016-05-27
    $48,492
  • Department of the Interior
    PURCHASE/REPLACEMENT OF WINDOWS - BMDO
    contract · Last action 2012-09-25
    $48,000
  • Department of Agriculture
    IGF::OT::IGF
    contract · Last action 2013-11-25
    $35,855
  • Department of the Interior
    CONCRETE AT WATT STREET HOUSING - BMDO IGF::OT::IGF
    contract · Last action 2014-08-06
    $34,975
  • Department of the Interior
    IGF::OT::IGF NER CALKINS WINDOWS
    contract · Last action 2016-03-01
    $30,184
  • Department of Agriculture
    MULTIPLE PROJECTS AT U.S. SHEEP EXPERIMENT STATION: WINDOW REPAIR/REPLACEMENT, PLUMBING, CHIMNEY REPAIR, FLOOR REPAIR, AND ROOF REPAIRS.
    contract · Last action 2018-09-24
    $28,953
  • Department of Agriculture
    IGF::OT::IGF JENSEN CREEK CABIN ROOF&PORCH REPLACEMENT PROJECT PALISADES RANGER DISTRICT CARIBOU-TARGHEE NATIONAL FOREST BONNEVILLE COUNTY, IDAHO
    contract · Last action 2015-11-10
    $28,776
  • Department of Agriculture
    IGF::OT::IGF REMOVAL OF THE EXISTING CARPET ON THE MAIN FLOOR AND LIBRARY FLOOR OF BUILDING #19 (OFFICE BUILDING) AND REPLACE THE CARPET WITH A NEW LAMINATED FLOORING.
    contract · Last action 2017-09-26
    $28,386
  • Department of Agriculture
    IGF::OT::IGF CARPENTER-SNOW CREEK NPL SITE - DITCH LINER REPAIRS
    contract · Last action 2015-03-13
    $26,536
  • Department of Agriculture
    IGF::OT::IGF REPAIR, CLEAN AND INSTALL HORIZONTAL METAL SIDING TO THE EXTERIOR OF BLDG. 26&61 SIDING LOCATED AT PWA-DUBOIS, ID
    contract · Last action 2018-06-20
    $25,780
  • Department of Agriculture
    IGF::OT::IGF FOR OTHER FUNCTIONS SERVICES FOR FOREST SERVICE CONTRACT; DPG; MCKENZIE RD TRAILER DAMAGE REPAIR
    contract · Last action 2015-05-05
    $21,750
  • Department of Agriculture
    IGF::OT::IGF SALMON DWELLING ROOF REPLACEMENT SALMON-CHALLIS NATIONAL FOREST LEMHI COUNTY, IDAHO
    contract · Last action 2014-09-23
    $20,144
  • Department of Agriculture
    IGF::OT::IGF PHASE 2 REMODEL OF LAB 118, FUME HOOD INSTALL AND DOOR.
    contract · Last action 2018-04-25
    $19,948
  • Department of Agriculture
    IGF::OT::IGF GREYS RIVER RANGER HOUSE ROOFING PROJECT GREYS RIVER RANGER DISTRICT BRIDGER-TETON NATIONAL FOREST
    contract · Last action 2013-08-07
    $14,000
  • Department of Agriculture
    IGF::OT::IGF OFFICE AND RESTROOM PAINTING
    contract · Last action 2017-07-25
    $10,073
  • Department of the Interior
    IGF::CT::IGF WATER LINE REPAIRS AT CRATERS OF THE MOON NATIONAL MONUMENT AND PRESERVE, ARCO, IDAHO.
    contract · Last action 2016-02-09
    $6,100
  • Department of Agriculture
    TONGASS FACILITY MAINTENANCE IDIQ IGF::OT::IGF
    contract · Last action 2017-09-22
    $500
  • Department of Agriculture
    INSTALLATION OF PREFABRICATED DOG KENNEL WITH CONCRETE FOUNDATION
    contract · Last action 2019-05-20
    $0
  • Department of the Interior
    IGF::OT::IGF, REPLACE WASTE WATER SYSTEM FOR HQ AREA - CRMO
    contract · Last action 2019-04-16
    $0
  • Department of Homeland Security
    DELIVERY OF CONCRETE FOR MAINTENANCE AND REPAIR ACTIVITIES ON THE SOUTH WEST BORDER, SPECIFICALLY SAN DIEGO SECTOR.
    contract · Last action 2017-08-29
    $0
  • Department of the Interior
    IGF::OT::IGF
    contract · Last action 2016-10-26
    $0

Federal contract dollars to this establishment. Primary NAICS: 236220 - COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION. Last action: 2019-09-20. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
2011-06-08Referral44$2,700

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Other employers in this industry and state

Other employers in framing contractors within ID, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on RAFTER H CONSTRUCTION L.L.C. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is RAFTER H CONSTRUCTION L.L.C.'s OSHA violation history?
RAFTER H CONSTRUCTION L.L.C. has 1 OSHA inspection on record with 4 violations and $2,700 in total penalties.
How does RAFTER H CONSTRUCTION L.L.C.'s safety record compare to its industry?
RAFTER H CONSTRUCTION L.L.C. operates in the framing contractors industry. The industry average Total Recordable Incident Rate (TRIR) is 4.6.