Skip to main content

Establishment profile

PRICE CONSTRUCTION, INC.

LOOP 20, LAREDO AIRPORT, RUNWAY 14-32, LAREDO, TX, 78041
238110Poured Concrete Foundation and Structure Contractors

Download as PDF →

OSHA inspections
11
over 32 years
Violations
2
$585 in penalties
Penalties
$585
$293 avg
Violations across 2 federal agencies
Enforcement actions from multiple agencies may indicate systemic compliance issues across functions.
Accident investigations on record
1 fatality

Summary

PRICE CONSTRUCTION, INC. has accumulated 2 OSHA violations across 11 inspections over 32 years of recorded history, with $585 in total assessed penalties.

The establishment sits in the 42nd percentile for violations within its industry-state peer group of 25,129 employers. Inspection frequency runs at the 100th percentile. The most recent enforcement activity was recorded 17 years ago.

Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

PRICE CONSTRUCTION, INC. appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

Inspections
11
0.3 / yr · last 32 yrs
Violations
2
0.1 / yr
Penalties
$585
$293 avg / violation
50% serious50% other
Inspection trigger · planned
10 of 11
Inspection trigger · accident
1 of 11

18% of inspections at this establishment produced violations,

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 2 distinct standards shown · 2 citations in this view · $585 in penalties.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
29 CFR 1926.0503 A0111$585Nov 1996Nov 1996
29 CFR 1926.1051 A11Dec 1993Dec 1993

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

42nd

Below average violations in NAICS 2381 within TX. Peer group: 25,129 employers. This establishment has 2 OSHA violations; peer median is 2.

Fewer violationsMore violations
Penalty percentile
20th
peer median: $2,700
Inspection frequency
100th
peer median: 1

Safety self-report (OSHA 300A)

No self-reported injury rates filed with OSHA's Injury Tracking Application for PRICE CONSTRUCTION, INC.. Verify directly with OSHA Injury Tracking Application

Industry benchmark

Industry avg TRIR
2.8
BLS SOII 2024
Industry avg DART
2.0
BLS SOII 2024
Self-reported TRIR
Not in OSHA ITA

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Planned
10
Accident
1

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for PRICE CONSTRUCTION, INC.. Verify directly with Occupational Safety and Health Administration

OSHA accident events

Accidents, fatalities, and catastrophes documented during OSHA inspections at this employer. Each entry links to the inspection that recorded it.

DateEventInjuriesHospitalizedFatalities
Feb 14, 2003TRAFFIC ACCIDENT,VEHICLE,CONSTRUCTION,TRAFFIC CONTROL,STRUCK BYFatality11

Source: OSHA accident investigations. Narratives are recorded by the inspecting officer and may be truncated.

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
17 years ago

No federal enforcement activity has been recorded against this establishment in 17+ years. Most recent activity: 17 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for PRICE CONSTRUCTION, INC.. Verify directly with Wage and Hour Division

Mine safety (MSHA)

Company-level in TX — for PRICE CONSTRUCTION, INC., not this location alone

Violations
36
Assessed penalties
$2,659

Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other PRICE CONSTRUCTION, INC. operations in the same state.

MSHA citations

Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 36 citations · 9S&S · 36 contractor · $2,659 proposed / $2,526 paid.

CitationMineDateSectionS&SNegligenceProposedPaid
6228821
Crusher - LU200
Glasscock, TX
contractor: Price Construction
Jul 2003YesModNegligence$302$302
6228819
Crusher - LU200
Glasscock, TX
contractor: Price Construction
Jul 2003YesModNegligence$302$302
7875990
Crusher - LU200
Glasscock, TX
contractor: Price Construction
May 2000YesModNegligence$277$222
7875991
Crusher - LU200
Glasscock, TX
contractor: Price Construction
May 2000YesModNegligence$224$179
6207600
Crusher LU300-LU400
Glasscock, TX
contractor: Price Construction
Jul 2001YesModNegligence$184$184
6228600
Crusher - LU200
Glasscock, TX
contractor: Price Construction
Aug 2004NoModNegligence$60$60
6228590
Crusher LU300-LU400
Glasscock, TX
contractor: Price Construction
Jul 2004NoModNegligence$60$60
6228561
Crusher LU300-LU400
Glasscock, TX
contractor: Price Construction
Mar 2004NoModNegligence$60$60
6228560
Crusher LU300-LU400
Glasscock, TX
contractor: Price Construction
Mar 2004NoLowNegligence$60$60
6228510
Crusher - LU200
Glasscock, TX
contractor: Price Construction
Oct 2003NoModNegligence$60$60
6228509
Crusher - LU200
Glasscock, TX
contractor: Price Construction
Oct 2003NoModNegligence$60$60
6228508
Crusher - LU200
Glasscock, TX
contractor: Price Construction
Oct 2003NoModNegligence$60$60
6228834
Crusher LU300-LU400
Glasscock, TX
contractor: Price Construction
Aug 2003NoModNegligence$60$60
6228833
Crusher LU300-LU400
Glasscock, TX
contractor: Price Construction
Aug 2003NoModNegligence$60$60
6228820
Crusher - LU200
Glasscock, TX
contractor: Price Construction
Jul 2003NoLowNegligence$60$60
6205552
Crusher LU300-LU400
Glasscock, TX
contractor: Price Construction
Aug 2002NoModNegligence$55$55
6205527
Crusher - LU200
Glasscock, TX
contractor: Price Construction
Apr 2002NoLowNegligence$55$55
6205526
Crusher - LU200
Glasscock, TX
contractor: Price Construction
Apr 2002NoLowNegligence$55$55
6205525
Crusher - LU200
Glasscock, TX
contractor: Price Construction
Apr 2002NoModNegligence$55$55
6205524
Crusher - LU200
Glasscock, TX
contractor: Price Construction
Apr 2002NoModNegligence$55$55
6206924
Crusher - LU200
Glasscock, TX
contractor: Price Construction
Aug 2001NoModNegligence$55$55
7894723
Crusher - LU200
Glasscock, TX
contractor: Price Construction
Mar 2001NoModNegligence$55$55
7891302
Crusher LU300-LU400
Glasscock, TX
contractor: Price Construction
Jun 2000NoModNegligence$55$55
7891301
Crusher LU300-LU400
Glasscock, TX
contractor: Price Construction
Jun 2000NoModNegligence$55$55
7896067
LU160 PORTABLE CRUSHER
Webb, TX
contractor: Price Construction
Jun 2000NoModNegligence$55$55
7875993
Crusher - LU200
Glasscock, TX
contractor: Price Construction
May 2000NoModNegligence$55$44
7875992
Crusher - LU200
Glasscock, TX
contractor: Price Construction
May 2000NoModNegligence$55$44
7875989
Crusher - LU200
Glasscock, TX
contractor: Price Construction
May 2000NoModNegligence$55$44
7875952
Crusher - LU200
Glasscock, TX
contractor: Price Construction
Jan 2000NoModNegligence$55$55
7896099
LU160 PORTABLE CRUSHER
Webb, TX
contractor: Price Construction
Aug 2000YesHighNegligence
7896098
LU160 PORTABLE CRUSHER
Webb, TX
contractor: Price Construction
Aug 2000NoModNegligence
7896097
LU160 PORTABLE CRUSHER
Webb, TX
contractor: Price Construction
Aug 2000YesModNegligence
7896096
LU160 PORTABLE CRUSHER
Webb, TX
contractor: Price Construction
Aug 2000YesHighNegligence
7896095
LU160 PORTABLE CRUSHER
Webb, TX
contractor: Price Construction
Aug 2000No
7896068
LU160 PORTABLE CRUSHER
Webb, TX
contractor: Price Construction
Jun 2000NoModNegligence
7875994
Crusher - LU200
Glasscock, TX
contractor: Price Construction
May 2000YesModNegligence

Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for PRICE CONSTRUCTION, INC.. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for PRICE CONSTRUCTION, INC.. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for PRICE CONSTRUCTION, INC.. Verify directly with Environmental Protection Agency

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for PRICE CONSTRUCTION, INC.. Verify directly with UVA Corporate Prosecution Registry

Inspection history

DateTriggerViolationsSeriousPenalty
2009-02-27Planned0$0
2003-02-14Accident0$0
2001-11-06Planned0$0
2001-03-08Programmed Related0$0
2000-03-29Planned0$0
1999-04-07Planned0$0
1998-02-26Planned0$0
1996-12-12Planned0$0
1996-08-14Planned11$585
1994-11-16Planned0$0
1993-10-28Planned1$0

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Other employers in this industry and state

Other employers in poured concrete foundation and structure contractors within TX, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on PRICE CONSTRUCTION, INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is PRICE CONSTRUCTION, INC.'s OSHA violation history?
PRICE CONSTRUCTION, INC. has 11 OSHA inspections on record with 2 violations and $585 in total penalties.
How does PRICE CONSTRUCTION, INC.'s safety record compare to its industry?
PRICE CONSTRUCTION, INC. operates in the poured concrete foundation and structure contractors industry. The industry average Total Recordable Incident Rate (TRIR) is 2.8.
Has PRICE CONSTRUCTION, INC. had any workplace fatalities?
Yes. Federal records show 1 fatality investigation involving PRICE CONSTRUCTION, INC..