Skip to main content

Establishment profile

PORT OF SEATTLE

2711 ALASKAN WAY PIER 69, SEATTLE, WA, 98121
488320Marine Cargo Handling

Download as PDF →

OSHA inspections
7
over 36 years
Violations
6
$2,100 in penalties
Penalties
$2,100
$350 avg

Summary

PORT OF SEATTLE has accumulated 6 OSHA violations across 7 inspections over 36 years of recorded history, with $2,100 in total assessed penalties.

The establishment sits in the 73rd percentile for violations within its industry-state peer group of 181 employers. Inspection frequency runs at the 80th percentile. The most recent enforcement activity was recorded 2 years ago.

Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

PORT OF SEATTLE appears in OSHA workplace safety and OFLC visa and labor certification (historical) records only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

Inspections
7
0.2 / yr · last 36 yrs
Violations
6
0.2 / yr
Penalties
$2,100
$350 avg / violation
17% serious83% other
Inspection trigger · planned
3 of 7
Inspection trigger · referral
2 of 7

43% of inspections at this establishment produced violations,

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 5 distinct standards shown · 6 citations in this view · $2,100 in penalties.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
29 CFR 0566.00590721Jun 1993Jun 1993
29 CFR 8001.604011$2,100Jul 2013Jul 2013
29 CFR 0566.008307 J 0111Feb 1998Feb 1998
29 CFR 0566.00590811Jun 1993Jun 1993
29 CFR 0566.01170211Jun 1993Jun 1993

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

73rd

Above average violations in NAICS 4883 within WA. Peer group: 181 employers. This establishment has 6 OSHA violations; peer median is 2.

Fewer violationsMore violations
Penalty percentile
80th
peer median: $100
Inspection frequency
80th
peer median: 2

Safety self-report (OSHA 300A)

No self-reported injury rates filed with OSHA's Injury Tracking Application for PORT OF SEATTLE. Verify directly with OSHA Injury Tracking Application

Industry benchmark

Industry avg TRIR
2.4
BLS SOII 2024
Industry avg DART
1.8
BLS SOII 2024
Self-reported TRIR
Not in OSHA ITA

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Planned
3
Complaint
1
Referral
2

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for PORT OF SEATTLE. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
2 years ago

No federal enforcement activity has been recorded against this establishment in 2+ years. Most recent activity: 2 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for PORT OF SEATTLE. Verify directly with Wage and Hour Division

Mine safety (MSHA)

No MSHA mine safety violations on file for PORT OF SEATTLE. Verify directly with Mine Safety and Health Administration

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for PORT OF SEATTLE. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

Total applications
2
Certified
2
Avg wage ratio
1.16x
H-1B

Office of Foreign Labor Certification — labor condition applications for H-1B, H-2A, H-2B visa programs. Wage ratio = offered / prevailing wage. Historical data only: DOL ended OFLC Performance Data Disclosure publication in 2026, so the figures above reflect filings through the last ingested cycle and are not being refreshed. Treat as a historical snapshot, not a current signal.

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for PORT OF SEATTLE. Verify directly with Environmental Protection Agency

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for PORT OF SEATTLE. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$140K
Obligated (all-time)
$8.0M
Awards
189
Top agency
General Services Administration
$6.8M
Top agencies by obligation (this location)
General Services Administration$6.8M
Department of Homeland Security$672K
Department of Commerce$543K
Department of the Treasury$27K
Department of Defense$4K
Largest awards (top 50 of 189)
  • Department of Transportation
    PURPOSE: IMPROVE/MODIFY/REHABILITATE TERMINAL BUILDING. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT REHABILITATES THE EXISTING TERMINAL BUILDING CONCOURSE S TO EXTEND THE USEFUL LIFE OF THE SOUTH CONCOURSE AND MEET CURRENT CODE REQUIREMENTS INCLUDING STRUCTURAL, SEISMIC, AND BUILDING SYSTEM UPGRADES. . THIS GRANT FUNDS THE FIRST PHASE, WHICH CONSISTS OF DESIGN AND PRE-CONSTRUCTION. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SEATTLE, WASHINGTON.
    assistance · Last action 2023-09-12
    $31,500,000
  • Department of Transportation
    PURPOSE: RECONSTRUCT TERMINAL. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT RECONSTRUCTS THE EXISTING TERMINAL BUILDING CONCOURSE S. THIS GRANT FUNDS STRUCTURAL, SEISMIC AND BUILDING SYSTEM UPGRADES TO THE TERMINAL BUILDING THAT HAS REACHED THE END OF ITS USEFUL LIFE. THIS GRANT FUNDS A PORTION OF PHASE 3, WHICH CONSISTS OF CONSTRUCTION TO UPGRADE THE EXISTING STRUCTURE. THIS GRANT IS ASSOCIATED WITH AN AIRPORT IMPROVEMENT PROGRAM GRANT THAT FUNDS THE REMAINING ELIGIBLE PORTION OF THE PROJECT. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SEATTLE, WASHINGTON.
    assistance · Last action 2025-08-04
    $17,500,000
  • Department of Transportation
    PURPOSE: RECONSTRUCT TAXILANE. THIS GRANT IS FUNDED BY THE AMERICAN RESCUE PLAN ACT OF 2021 TO INCREASE THE FEDERAL SHARE TO 100 PERCENT FOR THE AIRPORT IMPROVEMENT PROGRAM (AIP). ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT RECONSTRUCTS 1,300 FEET OF THE EXISTING SOUTH SATELLITE TAXILANE AREA PAVEMENT, INCLUDING DRAINAGE, THAT HAS REACHED THE END OF ITS USEFUL LIFE. . THIS PROJECT RECONSTRUCTS 1,600 FEET OF THE EXISTING NORTH SATELLITE TAXILANE AREA PAVEMENT, INCLUDING DRAINAGE, THAT HAS REACHED THE END OF ITS USEFUL LIFE. . THIS PROJECT RECONSTRUCTS 150 FEET OF THE EXISTING CARGO 2 TAXILANE AREA PAVEMENT THAT HAS REACHED THE END OF ITS USEFUL LIFE. . THIS PROJECT FUNDS THE FINAL PHASE, WHICH CONSISTS OF CONSTRUCTION. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SEATTLE, WASHINGTON.
    assistance · Last action 2022-05-10
    $16,773,933
  • Department of Transportation
    PURPOSE: IMPROVE/MODIFY/REHABILITATE TERMINAL BUILDING. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT IMPROVES THE EXISTING TERMINAL BUILDING CHECKPOINT 1 TO INCREASE PASSENGER CAPACITY. . INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SEATTLE, WASHINGTON.
    assistance · Last action 2023-06-20
    $13,826,538
  • Department of Transportation
    PURPOSE: RECONSTRUCT RUNWAY LIGHTING; RECONSTRUCT TAXIWAY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT RECONSTRUCTS 3,760 FEET OF THE EXISTING CONCRETE TAXIWAYS E, F, K, M, P & Q PAVEMENT THAT HAS REACHED THE END OF ITS USEFUL LIFE. THIS PROJECT RECONSTRUCTS INDIVIDUAL 20 FT X 20 FT PANELS NEAR THE TAXIWAY CENTERLINES. THIS PROJECT RECONSTRUCTS EXISTING RUNWAY 16C/34C LIGHTING THAT HAS REACHED THE END OF ITS USEFUL LIFE. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SEATTLE, WASHINGTON.
    assistance · Last action 2026-05-29
    $11,991,708
  • Department of Transportation
    PURPOSE: EXPAND/EXTEND TERMINAL ACCESS ROAD. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT EXPANDS AN EXISTING TERMINAL ACCESS ROAD BY ADDING TWO TRAFFIC LANES TO ACCOMMODATE MORE VEHICULAR TRAFFIC EXCLUSIVELY SERVING THE AIRPORT. THIS GRANT FUNDS PHASE 2, WHICH CONSISTS OF CONSTRUCTING TWO ADDITIONAL ARRIVALS LANES AND INCLUDES RETAINING WALLS, STORM DRAINAGE, PAVEMENT, ILLUMINATION, SIGNAGE, TRANSIT STOPS, AND ADA IMPROVEMENTS TO BUS CURBS. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SEATTLE, WASHINGTON.
    assistance · Last action 2025-02-10
    $10,825,307
  • Department of Transportation
    PURPOSE: TERMINAL (PFC ONLY: GATES AND RELATED AREAS). ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT IMPROVES THE EXISTING TERMINAL BUILDING TO INCLUDE FIVE RESTROOM SETS UNDER THE EXPANDED ELIGIBILITY OF THE BIPARTISAN INFRASTRUCTURE LAW. THIS GRANT FUNDS THE FINAL PHASE, WHICH CONSISTS OF RESTROOM CONSTRUCTION ON CONCOURSE 1B, 1C AND 3D. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SEATTLE, WASHINGTON.
    assistance · Last action 2022-12-27
    $10,000,000
  • Department of Transportation
    PURPOSE: NOISE MITIGATION MEASURES FOR RESIDENCES WITHIN 65-69 DNL. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT INSTALLS WINDOWS AND DOORS FOR NOISE MITIGATION MEASURES FOR APPROXIMATELY 210 RESIDENCES IN THE CITY OF DES MOINES AND 5 RESIDENCES IN THE CITY OF SEATTLE AFFECTED BY AIRPORT NOISE EXPOSURE IN DES MOINES AND SEATTLE, WASHINGTON. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SEATTLE, WASHINGTON.
    assistance · Last action 2022-08-22
    $8,800,000
  • Department of Transportation
    PURPOSE: RECONSTRUCT TAXILANE; RECONSTRUCT APRON. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT RECONSTRUCTS 1,275 FEET OF THE EXISTING TAXILANE W CONCRETE PAVEMENT THAT HAS REACHED THE END OF ITS USEFUL LIFE. THIS PROJECT RECONSTRUCTS 6,300 SQUARE YARDS OF THE EXISTING CENTRAL TERMINAL APRON CONCRETE PAVEMENT AND 1,700 SQUARE YARDS OF THE EXISTING CONCOURSE D APRON THAT HAVE REACHED THE END OF THEIR USEFUL LIVES. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SEATTLE, WASHINGTON.
    assistance · Last action 2024-09-07
    $7,929,769
  • Department of Transportation
    PURPOSE: EXPAND ACCESS ROAD. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT EXPANDS THE EXISTING TERMINAL ARRIVALS ACCESS ROAD AN ADDITIONAL VEHICLE LANE TO ALLOW A HIGHER VOLUME OF VEHICLES TO THE ACCESS THE AIRPORT. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SEATTLE, WASHINGTON.
    assistance · Last action 2023-09-12
    $7,598,075
  • Department of Transportation
    PURPOSE: NOISE MITIGATION MEASURES FOR PUBLIC BUILDINGS WITHIN 65 - 69 DNL. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT INSTALLS NOISE MITIGATION SOUND INSULATION TREATMENTS IN FOUR PUBLIC BUILDINGS IN ACCORDANCE WITH AN APPROVED 14 CFR PART 150 PROGRAM. . INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SEATTLE, WASHINGTON.
    assistance · Last action 2023-09-12
    $6,312,500
  • Department of Transportation
    PURPOSE: ACQUIRE SNOW REMOVAL EQUIPMENT. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT ACQUIRES NEW DEICER, BROOM, AND PLOW EQUIPMENT TO ENHANCE THE AIRPORT'S ABILITY TO CLEAR THE AIRFIELD DURING ADVERSE WEATHER CONDITIONS. . INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SEATTLE, WASHINGTON.
    assistance · Last action 2026-04-15
    $4,623,000
  • Department of Transportation
    PURPOSE: NOISE COMPATIBILITY PLANNING. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT CONDUCTS A STUDY OF AIRPORT NOISE EXPOSURE AT THE AIRPORT AND SURROUNDING AREAS TO IDENTIFY INCOMPATIBLE LAND USES. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SEATTLE, WASHINGTON.
    assistance · Last action 2024-09-07
    $4,584,379
  • Department of Transportation
    PURPOSE: RECONSTRUCT APRON. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT RECONSTRUCTS 4,200 SQUARE YARDS OF THE EXISTING CARGO 2 APRON PAVEMENT THAT HAS REACHED THE END OF ITS USEFUL LIFE. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SEATTLE, WASHINGTON.
    assistance · Last action 2026-03-18
    $2,781,201
  • Department of Transportation
    PURPOSE: RECONSTRUCT TAXILANE. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT RECONSTRUCTS 800 FEET OF THE EXISTING SOUTH SATELLITE TAXILANE PAVEMENT THAT HAS REACHED THE END OF ITS USEFUL LIFE. . THIS GRANT FUNDS THE THIRD PHASE, WHICH CONSISTS OF CONSTRUCTION. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SEATTLE, WASHINGTON.
    assistance · Last action 2023-06-23
    $1,472,287
  • Department of Transportation
    PURPOSE: NOISE MITIGATION MEASURES FOR RESIDENCES WITHIN 65-69 DNL. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT INSTALLS SOUND INSULTATION NOISE MITIGATION MEASURES FOR 10 RESIDENCES AFFECTED BY AIRPORT NOISE EXPOSURE IN DES MOINES, WASHINGTON IN ACCORDANCE WITH AN APPROVED 14 CFR PART 150 PROGRAM. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SEATTLE, WASHINGTON.
    assistance · Last action 2023-09-12
    $1,200,000
  • Department of Transportation
    PURPOSE: CONDUCT ENERGY EFFICIENCY ASSESSMENT. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT CONDUCTS AN AIRPORT ENERGY EFFICIENCY ASSESSMENT. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SEATTLE, WASHINGTON.
    assistance · Last action 2024-07-30
    $900,000
  • Department of Transportation
    PURPOSE: AIRFIELD ENVIRONMENTAL MITIGATION. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT FUNDS THE FIELD TESTING AND MEASURING OF LAB-PROVEN INNOVATIVE DESTRUCTION TECHNOLOGIES IN ORDER TO MEASURABLY REDUCE AND MITIGATE THE AVIATION IMPACTS OF AQUEOUS FILM FORMING FOAM AND OTHER PER- AND POLYFLUOROALKYL SUBSTANCES ON SURFACE AND GROUNDWATER QUALITY AT THE AIRPORT OR WITHIN FIVE MILES OF THE AIRPORT. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SEATTLE, WASHINGTON.
    assistance · Last action 2024-09-07
    $450,000
  • General Services Administration
    LEASE
    contract · Last action 2009-01-22
    $175,072
  • General Services Administration
    LEASE
    contract · Last action 2008-09-03
    $91,996
  • Department of Commerce
    MOORAGE FOR THE NOAA SHIP RAINIER IN SEATTLE WA
    contract · Last action 2021-08-10
    $89,057
  • General Services Administration
    LEASE
    contract · Last action 2011-04-01
    $87,536
  • General Services Administration
    LEASE
    contract · Last action 2011-04-01
    $87,536
  • General Services Administration
    LEASE
    contract · Last action 2011-01-01
    $87,536
  • General Services Administration
    LEASE
    contract · Last action 2011-01-01
    $87,536
  • General Services Administration
    LEASE
    contract · Last action 2011-01-01
    $87,536
  • General Services Administration
    TAS::47 4542 001::TAS LEASE
    contract · Last action 2010-10-01
    $87,536
  • General Services Administration
    TAS::47 4542 001::TAS LEASE
    contract · Last action 2010-10-01
    $87,536
  • General Services Administration
    TAS::47 4542 001::TAS LEASE
    contract · Last action 2010-07-01
    $87,536
  • General Services Administration
    TAS::47 4542 001::TAS LEASE
    contract · Last action 2010-07-01
    $87,536
  • General Services Administration
    TAS::47 4542 001::TAS LEASE
    contract · Last action 2010-07-01
    $87,536
  • General Services Administration
    TAS::47 4542::TAS LEASE
    contract · Last action 2010-04-01
    $87,536
  • General Services Administration
    TAS::47 4542::TAS LEASE
    contract · Last action 2010-04-01
    $87,536
  • General Services Administration
    TAS::47 4542::TAS LEASE
    contract · Last action 2010-04-01
    $87,536
  • General Services Administration
    LEASE
    contract · Last action 2010-01-01
    $87,536
  • General Services Administration
    LEASE
    contract · Last action 2010-01-01
    $87,536
  • General Services Administration
    TAS::47 4542::TAS LEASE
    contract · Last action 2010-01-01
    $87,536
  • General Services Administration
    LEASE
    contract · Last action 2009-10-01
    $87,536
  • General Services Administration
    LEASE
    contract · Last action 2009-10-01
    $87,536
  • General Services Administration
    LEASE
    contract · Last action 2009-10-01
    $87,536
  • General Services Administration
    LEASE
    contract · Last action 2009-07-01
    $87,536
  • General Services Administration
    LEASE
    contract · Last action 2009-07-01
    $87,536
  • General Services Administration
    LEASE
    contract · Last action 2009-07-01
    $87,536
  • General Services Administration
    LEASE
    contract · Last action 2009-04-01
    $87,536
  • General Services Administration
    LEASE
    contract · Last action 2009-04-01
    $87,536
  • General Services Administration
    LEASE
    contract · Last action 2009-04-01
    $87,536
  • General Services Administration
    LEASE
    contract · Last action 2009-01-01
    $87,536
  • General Services Administration
    LEASE
    contract · Last action 2009-01-01
    $87,536
  • General Services Administration
    LEASE
    contract · Last action 2009-01-01
    $87,536
  • General Services Administration
    LEASE
    contract · Last action 2011-04-01
    $80,179

Federal contract dollars to this establishment. Primary NAICS: 531120 - LESSORS OF NONRESIDENTIAL BUILDINGS (EXCEPT MINIWAREHOUSES). Last action: 2026-02-05. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
2023-09-06Referral0$0
2022-04-11Unprogrammed Related0$0
2013-06-17Referral11$2,100
1999-01-06Planned0$0
1997-11-10Complaint1$0
1993-05-25Planned4$0
1990-06-07Planned0$0

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Other employers in this industry and state

Other employers in marine cargo handling within WA, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on PORT OF SEATTLE from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is PORT OF SEATTLE's OSHA violation history?
PORT OF SEATTLE has 7 OSHA inspections on record with 6 violations and $2,100 in total penalties.
How does PORT OF SEATTLE's safety record compare to its industry?
PORT OF SEATTLE operates in the marine cargo handling industry. The industry average Total Recordable Incident Rate (TRIR) is 2.4.