OSHA inspections
10
over 33 years
Violations
7
Penalties
$0
$0 avg

Summary

PORT OF BELLINGHAM has accumulated 7 OSHA violations across 10 inspections over 33 years of recorded history.

The establishment sits in the 75th percentile for violations within its industry-state peer group of 183 employers. Inspection frequency runs at the 87th percentile. The most recent enforcement activity was recorded 4 years ago.

Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

PORT OF BELLINGHAM appears in OSHA workplace safety record only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls. Single-agency enforcement records typically indicate either a discrete incident-based inspection or a low-risk operational profile.

OSHA workplace safety

Inspections
10
0.3 / yr · last 33 yrs
Violations
7
0.2 / yr
Penalties
$0
Inspection trigger · planned
8 of 10
Inspection trigger · referral
2 of 10

30% of inspections at this establishment produced violations,

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 6 distinct standards shown · 7 citations in this view.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
29 CFR 0566.00590721Jan 1993Jan 1993
296-863-60005(1)11Aug 2022Aug 2022
29 CFR 8001.604511Apr 2010Apr 2010
29 CFR 8003.002511Apr 2010Apr 2010
29 CFR 8636.000511Apr 2010Apr 2010
29 CFR 0566.01170211Jan 1993Jan 1993

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

75th

Above average violations in NAICS 4883 within WA. Peer group: 183 employers. This establishment has 7 OSHA violations; peer median is 2.

Fewer violationsMore violations
Penalty percentile
0th
peer median: $100
Inspection frequency
87th
peer median: 2

Safety self-report (OSHA 300A)

Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.

DART rate
0.0
vs industry
−1.6
TRIR
0.0
vs industry
−2.2

Reported for 48 average annual employees at this establishment.

Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.

Industry benchmark

Industry avg TRIR
2.2
BLS SOII 2024
Industry avg DART
1.6
BLS SOII 2024
Self-reported TRIR
0.0
OSHA ITA Form 300A (employer self-reported)

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Planned
8
Referral
2

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for PORT OF BELLINGHAM. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
4 years ago

No federal enforcement activity has been recorded against this establishment in 4+ years. Most recent activity: 4 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for PORT OF BELLINGHAM. Verify directly with Wage and Hour Division

Mine safety (MSHA)

No MSHA mine safety violations on file for PORT OF BELLINGHAM. Verify directly with Mine Safety and Health Administration

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for PORT OF BELLINGHAM. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for PORT OF BELLINGHAM. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for PORT OF BELLINGHAM. Verify directly with Environmental Protection Agency

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for PORT OF BELLINGHAM. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$-275
Obligated (all-time)
$314K
Awards
89
Top agency
General Services Administration
$299K
Top agencies by obligation (this location)
General Services Administration$299K
Department of Homeland Security$10K
Department of Commerce$5K
Largest awards (top 50 of 89)
  • Department of Transportation
    AWARD PURPOSE THIS PROJECT WILL FUND THE FINAL DESIGN AND CONSTRUCTION OF IMPROVEMENTS THAT WILL REINSTATE ON DOCK AND NEAR DOCK RAIL CONNECTIONS TO THE PORT OF BELLINGHAMS SHIPPING TERMINAL. THE PROJECT WILL ALSO CONNECT THE TERMINAL TO THE BNSF MAINLINE TO PROVIDE DIRECT RAIL SERVICE IN AND OUT OF THE PORT. ACTIVITIES TO BE PERFORMED THE PROJECT CONSISTS OF THE FOLLOWING THREE COMPONENTS. COMPONENT 1 ENGINEERING DESIGN AND PERMITTING. ENGINEERING AND DESIGN FROM PRELIMINARY THROUGH FINAL FIELD STUDIES SURVEYS AND INVESTIGATIONS ALTERNATIVES ANALYSIS INCLUDING SITE LAYOUT EVALUATION LOCAL PERMITS CITY STATE. PROPERTY AGREEMENTS IE WASHINGTON DEPARTMENT OF NATURAL RESOURCES. CONTRACT BID DOCUMENT ADVERTISEMENT EVALUATION AND AWARD. COMPONENT 2 CONSTRUCTION PROJECT MANAGEMENT. PURCHASE RAIL CONSTRUCTION MATERIALS AGGREGATES TIES RAILS SPIKES ETC USED OR NEW UNDER THE ADVICE OF CONSULTANTS AND CONTRACTORS. MOBILIZATION DEMOLITION SITE PREPARATION SUBGRADE STRUCTURAL IMPROVEMENT UTILITY RELOCATION AND/OR INSTALLATION INSTALL SUBBALLAST BOTTOM BALLAST AND TOP BALLAST. UNLOAD AND STOCKPILE RAIL AND TIES. WELD RAIL LTD CONTINUOUS WELDED RAIL CWR TO GRADE. GRADING MATERIALS MANAGEMENT DISTRIBUTE TIES BED CROSSTIES SET CWR ON TIES AND CLIP SURFACE LINE DRESS TRACK. STRESS AND RECLIP TRACK. FURNISH AND INSTALL BUMPERS. ASPHALT PAVEMENT AND OR CONCRETE. DRIVABLE RAIL CROSSING SURFACES FENCING RELOCATION OF SHIPPING TERMINAL ACCESS GUARD SHACK REPLACEMENT GATE RELOCATION. DEVELOP RECORD DRAWINGS COMPONENT 3 CONSTRUCTION MANAGEMENT PROJECT MANAGEMENT ENGINEERING SUPPORT DURING CONSTRUCTION. INSPECTION TESTING RESOLVE PUNCH LIST ITEMS PROJECT CLOSEOUT. DELIVERABLES EXPECTED OUTCOMES FROM SCHEDULE G PAGE 11 OF THE GRANT AGREEMENT. PERFORMANCE MEASURE CARGO. UNIT REPORTED ECONOMIC COMPETITIVENESS AND OPPORTUNITY. TOTAL GROSS TONS OF FREIGHT MOVED PER YEAR. GROSS TONS ARE DEFINED AS FREIGHT CARGO MINUS TARE WEIGHT OF THE RAIL CARS. WHEN APPLICABLE REPORT THE GROSS TONNAGE DISAGGREGATED BY TYPE OF INTERMODAL TRANSPORT TRANSLOAD TO TRUCK OR MARITIME FACILITY. PERFORMANCE MEASURE REPORTABLE EVENTS. UNIT REPORTED TOTAL NUMBER OF REPORTABLE EVENTS PER YEAR. A REPORTABLE EVENT IS DEFINED AS A SAFETY OR SECURITY EVENT OCCURRING IN THE PROJECT STUDY AREA SUCH AS RAILYARD FACILITY THAT RESULTS IN ONE OR MORE OF THE FOLLOWING CONDITIONS. A FATALITY CONFIRMED WITHIN 30 DAYS OF THE EVENT. AN INJURY REQUIRING IMMEDIATE MEDICAL ATTENTION AWAY FROM THE SCENE FOR ONE OR MORE PERSON. PROPERTY DAMAGE EQUAL TO OR EXCEEDING 25000. COLLISIONS INVOLVING VEHICLES OR DERAILMENTS OF LOCOMOTIVES. AN EVACUATION FOR THE LIFE SAFETY REASONS. INTENDED BENEFICIARY PORT OF BELLINGHAM SUBRECIPIENT ACTIVITIES NONE.
    assistance · Last action 2025-09-25
    $17,931,000
  • Department of Transportation
    AWARD PURPOSE THE PROJECT WILL FUND REPAIRS OF AND UPGRADES TO THE PIER AT THE BELLINGHAM SHIPPING TERMINAL BST. THE UPGRADES WILL ENABLE THE FACILITY TO HANDLE HEAVY AND OVERSIZED CARGOES AND PERMIT THE FUTURE USE OF MOBILE CRANES. THE PROJECT WILL ALSO FUND REMOVAL OF ROCK OUTCROPPINGS ADJACENT TO THE PIER THAT LIMIT THE NAVIGATIONAL DRAFT AT THE FACILITY TO 26 FEET. ACTIVITIES TO BE PERFORMED THE PORT OF BELLINGHAMS SHIPPING TERMINAL REHABILITATION PROJECT CONSISTS OF REPAIRS TO SUBSTRUCTURE ELEMENTS AND DECK AREAS OF THE PORTS DOCK COMPRISING BERTH 1 AND 2 AND THE REMOVAL OF MOORING OBSTRUCTIONS IN THE BERTHSIDE CHANNEL. THE PROJECT INCLUDES THE FOLLOWING TWO ELEMENTS PIER REHABILITATION AND DREDGING THE PIER REHABILITATION IS EXPECTED TO REPAIR STRUCTURAL COMPONENTS OF 140 LINEAR FEET LF OF THE EXISTING WHARF AT THE CENTRAL TERMINAL AS THE EXISTING STRUCTURE HAS EITHER DETERIORATED OR BEEN DAMAGED BY BULK LOADING UNLOADING ACROSS THE DECK. THE NEW CONCRETE OR STEEL DECK PANELS WILL BE REMOVABLE, WITH NO PERMANENT TOPPING SLAB. DECK REPLACEMENT WILL REQUIRE PILE REPLACEMENT AND MINOR BULKHEAD DISTURBANCE AS DESCRIBED BELOW UP TO 36 EXISTING 24 INCH DIAMETER PILE WILL BE REMOVED AND REPLACED WITH UP TO 56 24 INCH STEEL PIPE PILES WATERWARD OF THE EXISTING STRUCTURAL STEEL PILES BENEATH THE 140 LF DECK AREA ADJACENT TO THE BULKHEAD AND UP TO 14 NEW 24 INCH DIAMETER STEEL PIPE PILES WILL BE INSTALLED BEHIND THE EXISTING BULKHEAD WALL AND HIGH TIDE LINE HTL ORDINARY HIGH WATER MARK OHWM. EXISTING TIMBER FENDER PILES WILL ALSO BE REPLACED WITH A NEW FENDERING SYSTEM ALONG THE LENGTH OF THE REHABILITATED CENTRAL TERMINAL AREA. EXISTING RIPRAP LOCATED IMMEDIATELY AROUND THE PILES WILL BE REWORKED PLACED TO THE SIDE AND REPLACED FOLLOWING PILE REMOVAL AND INSTALLATION. EXISTING CONCRETE REVETMENT MAT LOCATED BELOW THE RIPRAP AND AROUND THE EXISTING PILES WILL BE CUT AND REWORKED TO ACCOMMODATE PILE REMOVAL AND INSTALLATION. A 6 INCH SAND RESIDUAL MANAGEMENT COVER RMC IS REQUIRED AND WILL BE PLACED IN DREDGED AREAS. NO NEW RIPRAP FILL MATERIAL IS PROPOSED WATERWARD OF THE HTL OHWM. THE EXISTING CONCRETE BULKHEAD WALL WILL REMAIN IN PLACE. UP TO 140 LF OF THE TOP 5 FEET FT OF THE WALL WILL BE REMOVED TO ACCOMMODATE DECKING REPAIRS AND PILE REPLACEMENT. THE AREA ADJACENT TO THE NEW REPLACED DECK PANELS WILL BE REPAVED. ADJACENT UPLAND REPAIRS INCLUDE UPDATING THE ELECTRICAL STORMWATER AND FIRE SYSTEM TO MEET CURRENT STANDARDS. THIS WILL REQUIRE SOME MINOR TRENCHING WITHIN THE ADJACENT BST UPLANDS. PAVEMENT DAMAGE INCLUDING SINK HOLES AND POTHOLES ADJACENT TO THE WHARF WILL ALSO BE REPAIRED. THE PROPOSED DREDGING TARGETS BERTH 1 AND 2 AREAS TO MAINTAIN THE FACILITY IN OPERATING CONDITION FOR THE OPERATORS AND VESSELS THAT USE THE TERMINAL. THE PROPOSED DREDGING TARGETS UNDER PIER SEDIMENT SLOUGHING IN FRONT OF BERTH 1 THAT CURRENTLY REQUIRES 15 FT STANDOFF FENDERS TO ENSURE ADEQUATE WATER DEPTH FOR VESSELS TO AVOID VESSEL DAMAGE. MAINTENANCE DREDGING IN FRONT OF BERTH 2 IS ALSO PROPOSED TO RETURN SAFE VESSEL ACCESS TO THE BERTH. THE PROPOSED DREDGE PRISM WILL HAVE A FINISHED DREDGE ELEVATION OF 35 5 FEET MEAN LOW LOW WATER MLLW PLUS 1 FOOT ALLOWABLE OVER DREDGE TO ACCOMMODATE THE PLACEMENT OF THE 6 INCH RMC LAYER AND ALLOW FOR A FINAL DESIGN ELEVATION OF NEGATIVE 35 FEET MLLW FOR SAFE VESSEL ACCESS. DREDGE AND RMC LAYER VOLUMES ESTIMATED TO BE UP TO 22000 CUBIC YARDS CY AND 3100 CY RESPECTIVELY. SOUTH TERMINAL MINOR REPAIRS IN KEY AREAS ARE PROPOSED AT THE SOUTH TERMINAL AS FOLLOWS REPLACEMENT OF UP TO TWO CREOSOTE TREATED TIMBER PILES WITH UP TO TWO WRAPPED ACZA TREATED TIMBER PILES OF SIMILAR SIZE AT THE SOUTH TERMINAL ALONG WITH REPLACEMENT OR REPAIR OF DAMAGED ACZA TREATED CROSS MEMBERS SUPPORTS BENEATH THE WHARF AND PILE CAPS, AND REPAIRS TO TOP SPLIT PILES AND DECKING. DELIVERABLES BOTH WITHIN ECONOMIC COMPETITIVENESS MEASURE GROSS TONS THE MOVEMENT OF GROSS TONNAGE OF FREIGHT IN THE PROJECT STUDY AREA VESSEL CALLS VESSEL TYPE AND OR FREIGHT CAPACITY OF THE VESSELS CALLING TO THE PROJECT STUDY AREA. INTENDED BENEFICIARY PORT OF BELLINGHAM. SUBRECIPIENT ACTIVITIES NONE.
    assistance · Last action 2024-12-18
    $6,854,770
  • Department of Homeland Security
    INSTALLATION OF SECURITY ROLL UP DOOR AND GRILL AT BELLINGHAM INTERNATIONAL AIRPORT (BLI)
    contract · Last action 2023-08-24
    $9,536
  • General Services Administration
    LEASE
    contract · Last action 2007-11-01
    $6,450
  • General Services Administration
    LEASE
    contract · Last action 2011-04-01
    $3,870
  • General Services Administration
    LEASE
    contract · Last action 2011-04-01
    $3,870
  • General Services Administration
    LEASE
    contract · Last action 2011-01-01
    $3,870
  • General Services Administration
    LEASE
    contract · Last action 2011-01-01
    $3,870
  • General Services Administration
    LEASE
    contract · Last action 2011-01-01
    $3,870
  • General Services Administration
    TAS::47 4542 001::TAS LEASE
    contract · Last action 2010-10-01
    $3,870
  • General Services Administration
    TAS::47 4542 001::TAS LEASE
    contract · Last action 2010-10-01
    $3,870
  • General Services Administration
    TAS::47 4542 001::TAS LEASE
    contract · Last action 2010-07-01
    $3,870
  • General Services Administration
    TAS::47 4542 001::TAS LEASE
    contract · Last action 2010-07-01
    $3,870
  • General Services Administration
    TAS::47 4542 001::TAS LEASE
    contract · Last action 2010-07-01
    $3,870
  • General Services Administration
    TAS::47 4542::TAS LEASE
    contract · Last action 2010-04-01
    $3,870
  • General Services Administration
    TAS::47 4542::TAS LEASE
    contract · Last action 2010-04-01
    $3,756
  • General Services Administration
    TAS::47 4542::TAS LEASE
    contract · Last action 2010-04-01
    $3,756
  • General Services Administration
    LEASE
    contract · Last action 2010-01-01
    $3,756
  • General Services Administration
    TAS::47 4542::TAS LEASE
    contract · Last action 2010-01-01
    $3,756
  • General Services Administration
    LEASE
    contract · Last action 2010-01-01
    $3,756
  • General Services Administration
    LEASE
    contract · Last action 2009-10-01
    $3,756
  • General Services Administration
    LEASE
    contract · Last action 2009-10-01
    $3,756
  • General Services Administration
    LEASE
    contract · Last action 2009-10-01
    $3,756
  • General Services Administration
    LEASE
    contract · Last action 2009-07-01
    $3,756
  • General Services Administration
    LEASE
    contract · Last action 2009-07-01
    $3,756
  • General Services Administration
    LEASE
    contract · Last action 2009-07-01
    $3,756
  • General Services Administration
    LEASE
    contract · Last action 2009-04-01
    $3,756
  • General Services Administration
    LEASE
    contract · Last action 2009-01-01
    $3,756
  • General Services Administration
    LEASE
    contract · Last action 2009-01-01
    $3,756
  • General Services Administration
    LEASE
    contract · Last action 2008-01-01
    $3,756
  • General Services Administration
    LEASE
    contract · Last action 2008-01-01
    $3,756
  • General Services Administration
    LEASE
    contract · Last action 2009-04-01
    $3,647
  • General Services Administration
    LEASE
    contract · Last action 2009-04-01
    $3,647
  • General Services Administration
    LEASE
    contract · Last action 2009-01-01
    $3,647
  • General Services Administration
    LEASE
    contract · Last action 2008-10-01
    $3,647
  • General Services Administration
    LEASE
    contract · Last action 2008-10-01
    $3,647
  • General Services Administration
    LEASE
    contract · Last action 2008-10-01
    $3,647
  • General Services Administration
    LEASE
    contract · Last action 2008-07-01
    $3,647
  • General Services Administration
    LEASE
    contract · Last action 2008-07-01
    $3,647
  • General Services Administration
    LEASE
    contract · Last action 2008-07-01
    $3,647
  • General Services Administration
    LEASE
    contract · Last action 2008-04-01
    $3,647
  • General Services Administration
    LEASE
    contract · Last action 2008-04-01
    $3,647
  • General Services Administration
    LEASE
    contract · Last action 2008-04-01
    $3,647
  • General Services Administration
    LEASE
    contract · Last action 2008-01-01
    $3,647
  • General Services Administration
    LEASE
    contract · Last action 2008-01-01
    $3,541
  • General Services Administration
    LEASE
    contract · Last action 2008-01-01
    $3,541
  • General Services Administration
    LEASE
    contract · Last action 2007-10-01
    $3,541
  • General Services Administration
    LEASE
    contract · Last action 2007-10-01
    $3,541
  • General Services Administration
    LEASE
    contract · Last action 2007-10-01
    $3,541
  • General Services Administration
    LEASE
    contract · Last action 2011-04-01
    $3,225

Federal contract dollars to this establishment. Primary NAICS: 531120 - LESSORS OF NONRESIDENTIAL BUILDINGS (EXCEPT MINIWAREHOUSES). Last action: 2023-08-24. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
2022-07-14Referral1$0
2019-02-26Planned0$0
2012-11-06Referral0$0
2010-03-10Planned0$0
2010-03-09Planned0$0
2010-03-08Planned3$0
2010-03-08Planned0$0
2006-06-12Planned0$0
2006-06-12Planned0$0
1992-12-08Planned3$0

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Part of a larger organization

PORT OF BELLINGHAM is one of 5 establishments rolled up under the parent organization Port of Bellingham.

Federal enforcement records on this page represent activity at this specific establishment only. The full enforcement footprint of Port of Bellingham across all 5 of its tracked locations is viewable on the parent profile.

Other employers in this industry and state

Other employers in port and harbor operations within WA, ordered by federal enforcement volume:

Other locations under this parent

Other establishments operated by Port of Bellingham, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on PORT OF BELLINGHAM from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code. This establishment resolves to the parent rollup Port of Bellingham, which operates 5 establishments in our dataset.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is PORT OF BELLINGHAM's OSHA violation history?
PORT OF BELLINGHAM has 10 OSHA inspections on record with 7 violations and $0 in total penalties.
How does PORT OF BELLINGHAM's safety record compare to its industry?
PORT OF BELLINGHAM operates in the port and harbor operations industry. The industry average Total Recordable Incident Rate (TRIR) is 2.2. PORT OF BELLINGHAM's self-reported DART rate is 0 compared to an industry average of 1.6.