Establishment profile
PIONEER CONCRETE & FUEL, INC
843 MARYLAND AVE, BUTTE, MT, 59701
327320 — Ready-Mix Concrete Manufacturing
Summary
PIONEER CONCRETE & FUEL, INC has accumulated 27 OSHA violations across 3 inspections over 52 years of recorded history, with $1,963 in total assessed penalties.
The establishment sits in the 99th percentile for violations within its industry-state peer group of 73 employers. Inspection frequency runs at the 90th percentile. The most recent enforcement activity was recorded 22 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
PIONEER CONCRETE & FUEL, INC appears in OSHA workplace safety, MSHA mine safety, and FMCSA motor carrier registration records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
100% of inspections at this establishment produced violations, with 2 inspections producing serious-or-greater violations.
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 20 distinct standards shown · 20 citations in this view · $1,963 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1910.0212 A01 | 1 | 1 | $375 | Jan 2004 | Jan 2004 |
| 29 CFR 1910.0147 C01 | 1 | 1 | $375 | Jan 2004 | Jan 2004 |
| 29 CFR 1910.0146 C01 | 1 | 1 | $375 | Jan 2004 | Jan 2004 |
| 29 CFR 1910.0215 B09 | 1 | 1 | $225 | Jan 2004 | Jan 2004 |
| 29 CFR 1910.0023 C01 | 1 | 1 | $225 | Jan 2004 | Jan 2004 |
| 29 CFR 1910.0134 C01 | 1 | 1 | $188 | Dec 2003 | Dec 2003 |
| 29 CFR 1904.0029 A | 1 | 1 | $150 | Jan 2004 | Jan 2004 |
| 29 CFR 1903.0016 B | 1 | 1 | $50 | Feb 1974 | Feb 1974 |
| 29 CFR 1910.0147 C05 I | 1 | 1 | — | Jan 2004 | Jan 2004 |
| 29 CFR 1910.0147 D03 | 1 | 1 | — | Jan 2004 | Jan 2004 |
| 29 CFR 1910.0147 D04 I | 1 | 1 | — | Jan 2004 | Jan 2004 |
| 29 CFR 1910.0146 E01 | 1 | 1 | — | Jan 2004 | Jan 2004 |
| 29 CFR 1910.0022 D01 | 1 | 1 | — | Jan 2004 | Jan 2004 |
| 29 CFR 1910.0023 D01 II | 1 | 1 | — | Jan 2004 | Jan 2004 |
| 29 CFR 1910.0037 Q01 | 1 | 1 | — | Jan 2004 | Jan 2004 |
| 29 CFR 1910.0146 C04 | 1 | 1 | — | Jan 2004 | Jan 2004 |
| 29 CFR 1910.0146 C05 IIC | 1 | 1 | — | Jan 2004 | Jan 2004 |
| 29 CFR 1910.0146 D06 | 1 | 1 | — | Jan 2004 | Jan 2004 |
| 29 CFR 1910.0146 G01 | 1 | 1 | — | Jan 2004 | Jan 2004 |
| 29 CFR 1910.0157 G01 | 1 | 1 | — | Jan 2004 | Jan 2004 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Worse on violations than nearly every other employer in NAICS 3273 within MT. Peer group: 73 employers. This establishment has 27 OSHA violations; peer median is 2.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for PIONEER CONCRETE & FUEL, INC. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for PIONEER CONCRETE & FUEL, INC. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 22+ years. Most recent activity: 22 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for PIONEER CONCRETE & FUEL, INC. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in MT — for PIONEER CONCRETE & FUEL, INC, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other PIONEER CONCRETE & FUEL, INC operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 30S&S · 17 contractor · $16,634 proposed / $16,634 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 6450797 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Nov 2009 | — | Yes | HighNegligence | $2,000 | $2,000 |
| 9306281 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2017 | — | Yes | ModNegligence | $1,010 | $1,010 |
| 8935579 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Apr 2017 | — | Yes | ModNegligence | $1,010 | $1,010 |
| 8935578 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Apr 2017 | — | Yes | ModNegligence | $1,010 | $1,010 |
| 9306282 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2017 | — | Yes | ModNegligence | $677 | $677 |
| 6450800 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Nov 2009 | — | Yes | ModNegligence | $334 | $334 |
| 6450796 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Nov 2009 | — | Yes | ModNegligence | $285 | $285 |
| 8935403 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Dec 2015 | — | Yes | ModNegligence | $243 | $243 |
| 9306283 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2017 | — | No | ModNegligence | $204 | $204 |
| 6457401 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Nov 2009 | — | Yes | ModNegligence | $150 | $150 |
| 6450794 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Nov 2009 | — | Yes | ModNegligence | $150 | $150 |
| 9653972 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Dec 2023 | — | No | ModNegligence | $147 | $147 |
| 9653964 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Dec 2023 | — | No | ModNegligence | $147 | $147 |
| 9308734 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2020 | — | Yes | ModNegligence | $144 | $144 |
| 9308733 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2020 | — | Yes | ModNegligence | $144 | $144 |
| 9653937 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Jun 2023 | — | No | ModNegligence | $143 | $143 |
| 9306280 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2017 | — | No | ModNegligence | $135 | $135 |
| 8943446 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2016 | — | Yes | ModNegligence | $134 | $134 |
| 9652722 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2021 | — | No | ModNegligence | $125 | $125 |
| 9308735 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2020 | — | No | ModNegligence | $123 | $123 |
| 9308732 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2020 | — | No | ModNegligence | $123 | $123 |
| 9308731 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2020 | — | No | ModNegligence | $123 | $123 |
| 9308730 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2020 | — | No | ModNegligence | $123 | $123 |
| 9307304 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2018 | — | No | ModNegligence | $118 | $118 |
| 8935457 | Pioneer Concrete-Spangler Pit Silver Bow, MT | May 2016 | — | Yes | ModNegligence | $117 | $117 |
| 8935456 | Pioneer Concrete-Spangler Pit Silver Bow, MT | May 2016 | — | Yes | ModNegligence | $117 | $117 |
| 6457906 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2011 | — | Yes | ModNegligence | $117 | $117 |
| 6325475 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Apr 2008 | — | Yes | ModNegligence | $117 | $117 |
| 8943450 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 8943449 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 8943448 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 8943447 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 8943445 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2016 | — | No | LowNegligence | $114 | $114 |
| 8943444 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2016 | — | No | LowNegligence | $114 | $114 |
| 8943443 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 8943442 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 8943441 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 8943440 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2016 | — | Yes | ModNegligence | $114 | $114 |
| 8935402 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Dec 2015 | — | Yes | ModNegligence | $108 | $108 |
| 6451245 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Jul 2009 | — | Yes | LowNegligence | $108 | $108 |
| 6451244 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Jul 2009 | — | Yes | LowNegligence | $108 | $108 |
| 8935459 | Pioneer Concrete-Spangler Pit Silver Bow, MT | May 2016 | — | No | ModNegligence | $100 | $100 |
| 8935458 | Pioneer Concrete-Spangler Pit Silver Bow, MT | May 2016 | — | No | ModNegligence | $100 | $100 |
| 8935401 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Dec 2015 | — | No | ModNegligence | $100 | $100 |
| 8763200 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Dec 2015 | — | No | ModNegligence | $100 | $100 |
| 8762950 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2014 | — | Yes | LowNegligence | $100 | $100 |
| 8762949 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2014 | — | Yes | ModNegligence | $100 | $100 |
| 8762948 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2014 | — | Yes | ModNegligence | $100 | $100 |
| 8762947 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2014 | — | No | ModNegligence | $100 | $100 |
| 8762946 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2014 | — | No | ModNegligence | $100 | $100 |
| 8762945 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2014 | — | No | ModNegligence | $100 | $100 |
| 8762794 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Jun 2014 | — | No | ModNegligence | $100 | $100 |
| 8762793 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Jun 2014 | — | No | ModNegligence | $100 | $100 |
| 8762792 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Jun 2014 | — | No | ModNegligence | $100 | $100 |
| 8749598 | Pioneer Concrete-Spangler Pit Silver Bow, MT | May 2013 | — | No | ModNegligence | $100 | $100 |
| 8749597 | Pioneer Concrete-Spangler Pit Silver Bow, MT | May 2013 | — | No | ModNegligence | $100 | $100 |
| 8749596 | Pioneer Concrete-Spangler Pit Silver Bow, MT | May 2013 | — | No | ModNegligence | $100 | $100 |
| 8749595 | Pioneer Concrete-Spangler Pit Silver Bow, MT | May 2013 | — | No | ModNegligence | $100 | $100 |
| 8749594 | Pioneer Concrete-Spangler Pit Silver Bow, MT | May 2013 | — | No | ModNegligence | $100 | $100 |
| 8749593 | Pioneer Concrete-Spangler Pit Silver Bow, MT | May 2013 | — | No | ModNegligence | $100 | $100 |
| 6592508 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2011 | — | No | ModNegligence | $100 | $100 |
| 6592507 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2011 | — | No | ModNegligence | $100 | $100 |
| 6457911 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2011 | — | No | ModNegligence | $100 | $100 |
| 6457910 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2011 | — | No | ModNegligence | $100 | $100 |
| 6457909 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2011 | — | No | ModNegligence | $100 | $100 |
| 6457908 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2011 | — | Yes | ModNegligence | $100 | $100 |
| 6457907 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2011 | — | Yes | ModNegligence | $100 | $100 |
| 6457905 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2011 | — | No | ModNegligence | $100 | $100 |
| 6457404 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Nov 2009 | — | No | ModNegligence | $100 | $100 |
| 6457403 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Nov 2009 | — | No | ModNegligence | $100 | $100 |
| 6457402 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Nov 2009 | — | No | ModNegligence | $100 | $100 |
| 6450799 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Nov 2009 | — | No | ModNegligence | $100 | $100 |
| 6450798 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Nov 2009 | — | No | ModNegligence | $100 | $100 |
| 6450795 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Nov 2009 | — | No | ModNegligence | $100 | $100 |
| 6457090 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Oct 2009 | — | No | ModNegligence | $100 | $100 |
| 6457089 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Oct 2009 | — | No | HighNegligence | $100 | $100 |
| 6457088 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Oct 2009 | — | Yes | ModNegligence | $100 | $100 |
| 6457087 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Oct 2009 | — | No | ModNegligence | $100 | $100 |
| 6457086 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Oct 2009 | — | No | ModNegligence | $100 | $100 |
| 6457085 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Oct 2009 | — | Yes | ModNegligence | $100 | $100 |
| 6457084 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Oct 2009 | — | No | ModNegligence | $100 | $100 |
| 6457083 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Oct 2009 | — | No | ModNegligence | $100 | $100 |
| 6457082 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Oct 2009 | — | No | ModNegligence | $100 | $100 |
| 6457081 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Oct 2009 | — | No | ModNegligence | $100 | $100 |
| 6457080 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Oct 2009 | — | Yes | ModNegligence | $100 | $100 |
| 6457079 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Oct 2009 | — | No | ModNegligence | $100 | $100 |
| 6451243 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Jul 2009 | — | No | ModNegligence | $100 | $100 |
| 6451242 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Jul 2009 | — | No | ModNegligence | $100 | $100 |
| 6451002 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2009 | — | No | ModNegligence | $100 | $100 |
| 6451001 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2009 | — | No | LowNegligence | $100 | $100 |
| 6418400 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2009 | — | No | LowNegligence | $100 | $100 |
| 6418399 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2009 | — | No | ModNegligence | $100 | $100 |
| 6418398 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2009 | — | No | LowNegligence | $100 | $100 |
| 6418397 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2009 | — | No | ModNegligence | $100 | $100 |
| 6418396 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2009 | — | Yes | ModNegligence | $100 | $100 |
| 6418395 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2009 | — | No | ModNegligence | $100 | $100 |
| 6418394 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2009 | — | No | ModNegligence | $100 | $100 |
| 6418407 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | May 2008 | — | No | ModNegligence | $100 | $100 |
| 6325477 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Apr 2008 | — | No | HighNegligence | $100 | $100 |
| 6325476 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Apr 2008 | — | No | ModNegligence | $100 | $100 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for PIONEER CONCRETE & FUEL, INC. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for PIONEER CONCRETE & FUEL, INC. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for PIONEER CONCRETE & FUEL, INC. Verify directly with Environmental Protection Agency →
EPA-registered facilities
Every EPA ECHO facility associated with this employer, sorted most-significant first. Each row links to EPA’s Detailed Facility Report for the source-of-truth record. Permits column lists active programs (Air = Clean Air Act, Water = Clean Water Act, RCRA = hazardous waste, TRI = Toxics Release Inventory reporting). 1 facility · 1 marked inactive.
| Facility | Permits | Status | Inspections | Formal actions | Penalties | Last inspected | ECHO |
|---|---|---|---|---|---|---|---|
PIONEER CONCRETE & FUEL INC 825 MARYLAND AVENUE/P.O. BOX 3207 · BUTTE, MT, 59701 | — | — | 0 | 0 | — | — | View → |
Source: EPA ECHO (Enforcement and Compliance History Online). Compliance status follows EPA’s own labels (“Sig Violation” = significant noncompliance; QNCR = quarters of noncompliance over the recent reporting window). Inactive facilities (struck through) retain historical enforcement records even after operations ceased.
Motor carrier safety (FMCSA)
Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for PIONEER CONCRETE & FUEL, INC. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- Department of the InteriorGRAVEL ROAD MIX FOR CANYON FERRYcontract · Last action 2011-10-18$60,315
- Department of the InteriorGRAVEL - CFcontract · Last action 2008-11-07$-18,516
Federal contract dollars to this establishment. Primary NAICS: 212321 - CONSTRUCTION SAND AND GRAVEL MINING. Last action: 2011-10-18. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2003-12-16 | Planned | 3 | 2 | $188 | |
| 2003-11-13 | Planned | 19 | 13 | $1,725 | |
| 1974-02-06 | Follow-up | 5 | — | $50 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in ready-mix concrete manufacturing within MT, ordered by federal enforcement volume:
- TIMBERLINE READY MIX, INC.EUREKA — 3 federal enforcement records
- S & N CONCRETEANACONDA — 3 federal enforcement records
- JTL GROUP INC.BELGRADE — 2 federal enforcement records
- Knife River CorporationMISSOULA — 2 federal enforcement records
- MALTA READY MIX INCMALTA — 2 federal enforcement records
- CONCRETE MATERIALS OF MONTANABILLINGS — 2 federal enforcement records
- PIONEER CONCRETE & FUEL, INC.BUTTE — 2 federal enforcement records
- CENTENNIAL CONCRETEBUTTE — 2 federal enforcement records
- KENYON NOBLE READY MIX COBOZEMAN — 2 federal enforcement records
- MASTODON SAND & GRAVEL COMPANYDEER LODGE — 2 federal enforcement records
Related searches
- Ready-Mix Concrete ManufacturingAll employers in this industry
- Employers in MTState-wide enforcement data
- Ready-Mix Concrete Manufacturing in MTIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on PIONEER CONCRETE & FUEL, INC from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is PIONEER CONCRETE & FUEL, INC's OSHA violation history?
- PIONEER CONCRETE & FUEL, INC has 3 OSHA inspections on record with 27 violations and $1,962.5 in total penalties.
- How does PIONEER CONCRETE & FUEL, INC's safety record compare to its industry?
- PIONEER CONCRETE & FUEL, INC operates in the ready-mix concrete manufacturing industry. The industry average Total Recordable Incident Rate (TRIR) is 2.5.