Establishment profile
PIONEER CONCRETE & FUEL, INC.
825 MARYLAND AVENUE, BUTTE, MT, 59702
327320 — Ready-Mix Concrete Manufacturing
Summary
PIONEER CONCRETE & FUEL, INC. has accumulated 2 OSHA violations across 1 inspection over 9 years of recorded history, with $3,042 in total assessed penalties.
The establishment sits in the 46th percentile for violations within its industry-state peer group of 73 employers. The most recent enforcement activity was recorded 9 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
PIONEER CONCRETE & FUEL, INC. appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
100% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 2 distinct standards shown · 2 citations in this view · $3,042 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1910.0253 B04 III | 1 | 1 | $1,738 | Jul 2017 | Jul 2017 |
| 29 CFR 1910.0303 B02 | 1 | 1 | $1,304 | Jul 2017 | Jul 2017 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Below average violations in NAICS 3273 within MT. Peer group: 73 employers. This establishment has 2 OSHA violations; peer median is 2.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for PIONEER CONCRETE & FUEL, INC.. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for PIONEER CONCRETE & FUEL, INC.. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 9+ years. Most recent activity: 9 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for PIONEER CONCRETE & FUEL, INC.. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in MT — for PIONEER CONCRETE & FUEL, INC., not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other PIONEER CONCRETE & FUEL, INC. operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 30S&S · 17 contractor · $16,634 proposed / $16,634 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 6450797 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Nov 2009 | — | Yes | HighNegligence | $2,000 | $2,000 |
| 9306281 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2017 | — | Yes | ModNegligence | $1,010 | $1,010 |
| 8935579 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Apr 2017 | — | Yes | ModNegligence | $1,010 | $1,010 |
| 8935578 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Apr 2017 | — | Yes | ModNegligence | $1,010 | $1,010 |
| 9306282 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2017 | — | Yes | ModNegligence | $677 | $677 |
| 6450800 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Nov 2009 | — | Yes | ModNegligence | $334 | $334 |
| 6450796 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Nov 2009 | — | Yes | ModNegligence | $285 | $285 |
| 8935403 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Dec 2015 | — | Yes | ModNegligence | $243 | $243 |
| 9306283 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2017 | — | No | ModNegligence | $204 | $204 |
| 6457401 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Nov 2009 | — | Yes | ModNegligence | $150 | $150 |
| 6450794 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Nov 2009 | — | Yes | ModNegligence | $150 | $150 |
| 9653972 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Dec 2023 | — | No | ModNegligence | $147 | $147 |
| 9653964 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Dec 2023 | — | No | ModNegligence | $147 | $147 |
| 9308734 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2020 | — | Yes | ModNegligence | $144 | $144 |
| 9308733 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2020 | — | Yes | ModNegligence | $144 | $144 |
| 9653937 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Jun 2023 | — | No | ModNegligence | $143 | $143 |
| 9306280 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2017 | — | No | ModNegligence | $135 | $135 |
| 8943446 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2016 | — | Yes | ModNegligence | $134 | $134 |
| 9652722 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2021 | — | No | ModNegligence | $125 | $125 |
| 9308735 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2020 | — | No | ModNegligence | $123 | $123 |
| 9308732 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2020 | — | No | ModNegligence | $123 | $123 |
| 9308731 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2020 | — | No | ModNegligence | $123 | $123 |
| 9308730 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2020 | — | No | ModNegligence | $123 | $123 |
| 9307304 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2018 | — | No | ModNegligence | $118 | $118 |
| 8935457 | Pioneer Concrete-Spangler Pit Silver Bow, MT | May 2016 | — | Yes | ModNegligence | $117 | $117 |
| 8935456 | Pioneer Concrete-Spangler Pit Silver Bow, MT | May 2016 | — | Yes | ModNegligence | $117 | $117 |
| 6457906 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2011 | — | Yes | ModNegligence | $117 | $117 |
| 6325475 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Apr 2008 | — | Yes | ModNegligence | $117 | $117 |
| 8943450 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 8943449 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 8943448 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 8943447 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 8943445 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2016 | — | No | LowNegligence | $114 | $114 |
| 8943444 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2016 | — | No | LowNegligence | $114 | $114 |
| 8943443 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 8943442 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 8943441 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 8943440 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2016 | — | Yes | ModNegligence | $114 | $114 |
| 8935402 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Dec 2015 | — | Yes | ModNegligence | $108 | $108 |
| 6451245 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Jul 2009 | — | Yes | LowNegligence | $108 | $108 |
| 6451244 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Jul 2009 | — | Yes | LowNegligence | $108 | $108 |
| 8935459 | Pioneer Concrete-Spangler Pit Silver Bow, MT | May 2016 | — | No | ModNegligence | $100 | $100 |
| 8935458 | Pioneer Concrete-Spangler Pit Silver Bow, MT | May 2016 | — | No | ModNegligence | $100 | $100 |
| 8935401 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Dec 2015 | — | No | ModNegligence | $100 | $100 |
| 8763200 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Dec 2015 | — | No | ModNegligence | $100 | $100 |
| 8762950 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2014 | — | Yes | LowNegligence | $100 | $100 |
| 8762949 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2014 | — | Yes | ModNegligence | $100 | $100 |
| 8762948 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2014 | — | Yes | ModNegligence | $100 | $100 |
| 8762947 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2014 | — | No | ModNegligence | $100 | $100 |
| 8762946 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2014 | — | No | ModNegligence | $100 | $100 |
| 8762945 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2014 | — | No | ModNegligence | $100 | $100 |
| 8762794 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Jun 2014 | — | No | ModNegligence | $100 | $100 |
| 8762793 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Jun 2014 | — | No | ModNegligence | $100 | $100 |
| 8762792 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Jun 2014 | — | No | ModNegligence | $100 | $100 |
| 8749598 | Pioneer Concrete-Spangler Pit Silver Bow, MT | May 2013 | — | No | ModNegligence | $100 | $100 |
| 8749597 | Pioneer Concrete-Spangler Pit Silver Bow, MT | May 2013 | — | No | ModNegligence | $100 | $100 |
| 8749596 | Pioneer Concrete-Spangler Pit Silver Bow, MT | May 2013 | — | No | ModNegligence | $100 | $100 |
| 8749595 | Pioneer Concrete-Spangler Pit Silver Bow, MT | May 2013 | — | No | ModNegligence | $100 | $100 |
| 8749594 | Pioneer Concrete-Spangler Pit Silver Bow, MT | May 2013 | — | No | ModNegligence | $100 | $100 |
| 8749593 | Pioneer Concrete-Spangler Pit Silver Bow, MT | May 2013 | — | No | ModNegligence | $100 | $100 |
| 6592508 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2011 | — | No | ModNegligence | $100 | $100 |
| 6592507 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Oct 2011 | — | No | ModNegligence | $100 | $100 |
| 6457911 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2011 | — | No | ModNegligence | $100 | $100 |
| 6457910 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2011 | — | No | ModNegligence | $100 | $100 |
| 6457909 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2011 | — | No | ModNegligence | $100 | $100 |
| 6457908 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2011 | — | Yes | ModNegligence | $100 | $100 |
| 6457907 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2011 | — | Yes | ModNegligence | $100 | $100 |
| 6457905 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2011 | — | No | ModNegligence | $100 | $100 |
| 6457404 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Nov 2009 | — | No | ModNegligence | $100 | $100 |
| 6457403 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Nov 2009 | — | No | ModNegligence | $100 | $100 |
| 6457402 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Nov 2009 | — | No | ModNegligence | $100 | $100 |
| 6450799 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Nov 2009 | — | No | ModNegligence | $100 | $100 |
| 6450798 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Nov 2009 | — | No | ModNegligence | $100 | $100 |
| 6450795 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Nov 2009 | — | No | ModNegligence | $100 | $100 |
| 6457090 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Oct 2009 | — | No | ModNegligence | $100 | $100 |
| 6457089 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Oct 2009 | — | No | HighNegligence | $100 | $100 |
| 6457088 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Oct 2009 | — | Yes | ModNegligence | $100 | $100 |
| 6457087 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Oct 2009 | — | No | ModNegligence | $100 | $100 |
| 6457086 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Oct 2009 | — | No | ModNegligence | $100 | $100 |
| 6457085 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Oct 2009 | — | Yes | ModNegligence | $100 | $100 |
| 6457084 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Oct 2009 | — | No | ModNegligence | $100 | $100 |
| 6457083 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Oct 2009 | — | No | ModNegligence | $100 | $100 |
| 6457082 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Oct 2009 | — | No | ModNegligence | $100 | $100 |
| 6457081 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Oct 2009 | — | No | ModNegligence | $100 | $100 |
| 6457080 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Oct 2009 | — | Yes | ModNegligence | $100 | $100 |
| 6457079 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Oct 2009 | — | No | ModNegligence | $100 | $100 |
| 6451243 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Jul 2009 | — | No | ModNegligence | $100 | $100 |
| 6451242 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | Jul 2009 | — | No | ModNegligence | $100 | $100 |
| 6451002 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2009 | — | No | ModNegligence | $100 | $100 |
| 6451001 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2009 | — | No | LowNegligence | $100 | $100 |
| 6418400 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2009 | — | No | LowNegligence | $100 | $100 |
| 6418399 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2009 | — | No | ModNegligence | $100 | $100 |
| 6418398 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2009 | — | No | LowNegligence | $100 | $100 |
| 6418397 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2009 | — | No | ModNegligence | $100 | $100 |
| 6418396 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2009 | — | Yes | ModNegligence | $100 | $100 |
| 6418395 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2009 | — | No | ModNegligence | $100 | $100 |
| 6418394 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Mar 2009 | — | No | ModNegligence | $100 | $100 |
| 6418407 | Capital Concrete - Diehl Pit Broadwater, MT contractor: Pioneer Concrete and Fuel Inc | May 2008 | — | No | ModNegligence | $100 | $100 |
| 6325477 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Apr 2008 | — | No | HighNegligence | $100 | $100 |
| 6325476 | Pioneer Concrete-Spangler Pit Silver Bow, MT | Apr 2008 | — | No | ModNegligence | $100 | $100 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for PIONEER CONCRETE & FUEL, INC.. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for PIONEER CONCRETE & FUEL, INC.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for PIONEER CONCRETE & FUEL, INC.. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for PIONEER CONCRETE & FUEL, INC.. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2017-04-05 | Planned | 2 | 2 | $3,042 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in ready-mix concrete manufacturing within MT, ordered by federal enforcement volume:
- S & N CONCRETEANACONDA — 3 federal enforcement records
- TIMBERLINE READY MIX, INC.EUREKA — 3 federal enforcement records
- JTL GROUP INC.BELGRADE — 2 federal enforcement records
- Knife River CorporationMISSOULA — 2 federal enforcement records
- CONCRETE MATERIALS OF MONTANABILLINGS — 2 federal enforcement records
- MALTA READY MIX INCMALTA — 2 federal enforcement records
- KENYON NOBLE READY MIX COBOZEMAN — 2 federal enforcement records
- CENTENNIAL CONCRETEBUTTE — 2 federal enforcement records
- PIONEER CONCRETE & FUEL, INCBUTTE — 2 federal enforcement records
- MASTODON SAND & GRAVEL COMPANYDEER LODGE — 2 federal enforcement records
Related searches
- Ready-Mix Concrete ManufacturingAll employers in this industry
- Employers in MTState-wide enforcement data
- Ready-Mix Concrete Manufacturing in MTIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on PIONEER CONCRETE & FUEL, INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is PIONEER CONCRETE & FUEL, INC.'s OSHA violation history?
- PIONEER CONCRETE & FUEL, INC. has 1 OSHA inspection on record with 2 violations and $3,042 in total penalties.
- How does PIONEER CONCRETE & FUEL, INC.'s safety record compare to its industry?
- PIONEER CONCRETE & FUEL, INC. operates in the ready-mix concrete manufacturing industry. The industry average Total Recordable Incident Rate (TRIR) is 2.5.