Establishment profile
OREGON WOODS INC
EUGENE BIKE PATH OFF ED CONE, EUGENE, OR, 97402
115310 — Support Activities for Forestry
Summary
OREGON WOODS INC has accumulated 6 OSHA violations across 2 inspections over 15 years of recorded history, with $2,280 in total assessed penalties.
The establishment sits in the 89th percentile for violations within its industry-state peer group of 308 employers. Inspection frequency runs at the 72nd percentile. The most recent enforcement activity was recorded 12 years ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
OREGON WOODS INC appears in OSHA workplace safety and FMCSA motor carrier registration records only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
100% of inspections at this establishment produced violations, with 2 inspections producing serious-or-greater violations.
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 6 distinct standards shown · 6 citations in this view · $2,280 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 7030.04702 | 1 | 1 | $2,100 | Oct 2013 | Oct 2013 |
| 29 CFR 1910.0215 A02 | 1 | 1 | $180 | Dec 2010 | Dec 2010 |
| 29 CFR 7030.04704 B B | 1 | 1 | — | Oct 2013 | Oct 2013 |
| 29 CFR 1910.0178 L01 I | 1 | 1 | — | Dec 2010 | Dec 2010 |
| 29 CFR 7010.76003 A | 1 | 1 | — | Dec 2010 | Dec 2010 |
| 29 CFR 7030.50302 A | 1 | 1 | — | Dec 2010 | Dec 2010 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Worse on violations than most other employers in NAICS 1153 within OR. Peer group: 308 employers. This establishment has 6 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for OREGON WOODS INC. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for OREGON WOODS INC. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 12+ years. Most recent activity: 12 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for OREGON WOODS INC. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
No MSHA mine safety violations on file for OREGON WOODS INC. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for OREGON WOODS INC. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for OREGON WOODS INC. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for OREGON WOODS INC. Verify directly with Environmental Protection Agency →
Motor carrier safety (FMCSA)
Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for OREGON WOODS INC. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- Department of AgricultureTRAIL OF BLUE ICE PHASE IIIcontract · Last action 2009-11-03$1,498,356
- Department of AgricultureTAS::12 1102::TAS - RECOVERY - ARRA - IDITAROD NATIONAL HISTORIC TRAIL IMPROVEMENTS - CHUGACH NATIONAL FORESTcontract · Last action 2013-03-20$1,280,052
- Department of Agriculture11 - CON - DISASTER, FEATHER FALLS TRAIL RECONSTRUCTIONcontract · Last action 2024-08-01$1,081,070
- Department of AgricultureRAVEN TRAIL RECONSTRUCTIONcontract · Last action 2022-02-08$882,046
- Department of AgricultureTAS::12 1102::TAS RECOVERY LAKE EVA TRAIL REHABILITATION INVOLVING STONE WORK, TRAIL CONSTRUCTION, LOG BRIDGES, BOARWALK, REST AREAS,AGGREGATE SURFAXING, STONE STEPS, ETC. TONGASS NATIONAL FOREST, ALASKAcontract · Last action 2012-03-05$861,392
- Department of AgricultureGAOA PROJECT - PERFORM TRAIL BRIDGE MAINTENANCE ON 3 BRIDGES IN THE SALMON-CHALLIS NATIONAL FOREST'S FRANK CHURCH RIVER OF NO RETURN WILDERNESS TRAIL SYSTEM. TRAIL BRIDGE NAMES: MIDDLE FK @ INDIAN CR, LITTLE CREEK, AND BERNARD PACK BRIDGE, ALL Bcontract · Last action 2024-04-10$579,300
- Department of AgricultureGAOA UPPER WEST FK FISH CREEK TRAIL BRIDGE: CONSTRUCTION, FABRICATION, AND ASSEMBLY OF A NEW STOCK BRIDGE TO REPLACE THE CURRENT DETERIORATING BRIDGE.contract · Last action 2025-08-18$575,450
- Department of AgricultureFALLS BEACH DAY USE AREA RECONSTRUCTIONcontract · Last action 2011-03-07$563,170
- Department of AgricultureNORTH FORK BLACKFOOT TRAIL BRIDGES REPLACEMENTcontract · Last action 2018-08-13$544,800
- Department of the InteriorIGF::OT::IGF X:NOGRN, CONSTRUCT ACCESSIBLE OVERLOOK TRAIL FROM WEST PINNACLES VISITOR CONTACT STATION, PINNACLES NATIONAL PARK, SAN BENITO COUNTY, CALIFORNIA.contract · Last action 2018-07-18$510,655
- Department of the InteriorTAS::14 1041::TAS RECOVERY THIS TASK ORDER EFFECTIVE ORDERS LINE ITEMS 0008, 0009, 0010, 0012 AND 0013 OF THE FENCE REPLACEMENT IDIQ CONTRACT. THE CONTRACTOR WILL BE REQUIRED TO REPLACE INTERIOR AND BOUNDARY FENCE THROUGHOUT HALEAKALA NATIONAL PARK. THIS ORDER IS FOR A TOTAL OF 36,100 LINEAR FEET OF FENCE REPLACEMENT IN VARIOUS AREAS AND SOIL CONDITIONS.contract · Last action 2009-08-31$502,900
- Department of AgricultureGAOA ONE DUCK TRAIL RECONSTRUCTION AND SHELTER REPAIR IS FOR THE RECONSTRUCTION OF APPROXIMATELY 2300 LINEAR FEET OF THE ONE DUCK TRAIL, (5) REST AREAS AND REPAIRS TO THE EXISTING ALPINE SHELTER.contract · Last action 2026-03-12$499,900
- Department of AgricultureGAOA 6BS SUIATTLE AND PCT TRAIL BRIDGE REHABILITATIONcontract · Last action 2024-10-24$494,350
- Department of AgricultureTAS::12 1102::TAS RECOVERY UPPER SILVIS TRAIL RECONSTRUCTION, INVOLVING STONE PITCHING, STONE STEPS, FULL BENCH TRAIL CONSTRUCTION, BLASTING, AGGREGATE SURFACING, AND LABORER WORK.contract · Last action 2012-08-21$488,450
- Department of AgricultureIGF::OT::IGF SUNNAHAE TRAIL RECONSTRUCTION - RECONSTRUCTION OF A PORTION OF THE SUNNAHAE TRAIL. MAJOR WORK ITEMS INCLUDE TRAIL PIONEERING AND CLEARING, DRAINAGE IMPROVEMENTS, STAIRCASES INSTALLATION, AGGREGATE SURFACING, AND BOARDWALK.contract · Last action 2018-06-27$471,200
- Department of AgricultureWINDFALL LAKE TRAIL BRIDGE REPLACEMENTS - CONSTRUCTIONcontract · Last action 2018-09-26$390,220
- Department of the InteriorTITLE: SHIPMAN UNIT FENCE CONSTRUCTION FOR HAKALAU FOREST NWRcontract · Last action 2013-04-24$381,406
- Department of AgricultureHARBOR MOUNTAIN/GAVIN HILL TRAIL RECONSTRUCTION, PHASE 3contract · Last action 2011-02-28$360,181
- Department of AgricultureWHITE SULPHUR SPRINGS BATHHOUSE REPLACEMENT PROJECTcontract · Last action 2013-08-14$355,105
- Department of AgricultureBEAVER LAKE TRAIL EXTENSIONcontract · Last action 2009-09-15$339,050
- Department of the InteriorDESIGN & BUILD A 60 FOOT TURN KEY BRIDGE ON THE UPPER KALAUPAPA PALI TRAIL CABABLE OF SUPPORTING BOTH PEDESTRIAN AND POACK ANAIMAL TRAFFIC. EMERGENCY REPLACEMENT OF WASHED OUT BRIDGE BY LAND SLIDE.contract · Last action 2010-07-19$338,655
- Department of AgricultureWINDFALL LAKE TRAIL BRIDGE REPLACEMENT - MP 2.286contract · Last action 2020-09-23$303,246
- Department of AgricultureOREGON WOODS, INC. ORWIF240210 C7contract · Last action 2024-08-08$291,470
- Department of the InteriorINSTALLATION OF A FRP BRIDGE AT HASTINGS CREEK.contract · Last action 2018-06-21$276,200
- Department of AgricultureOREGON WOODS, INC. WASES000173 C76contract · Last action 2024-07-23$272,395
- Department of AgricultureTRAIL MAINTENANCE POST MOSQUITO FIRE. AAP-691802 MOSQUITO FIRE CRITICAL TRAIL REPAIR AND STORMPROOFING AS PART OF CALIFORNIA TRAIL AND MAINTENANCE BPA-12363N23Q4131-363N STEWARDSHIPcontract · Last action 2024-12-20$269,300
- Department of AgricultureLA JUNTA TRAIL BRIDGEcontract · Last action 2020-08-07$268,000
- Department of AgricultureHARBOR MOUNTAIN/GAVIN HILL TRAIL PHASE 2 - BASE BIDcontract · Last action 2010-07-20$266,238
- Department of AgricultureLITTLE ROCK CREEK TRAIL BRIDGE REPLACEMENTcontract · Last action 2024-09-24$259,670
- Department of AgricultureOREGON WOODS, INC. CABTU013761 C30077contract · Last action 2024-08-13$254,505
- Department of the InteriorCONSTRUCTION SERVICES TO REPAIR WAIHANAU BRDIGE AT KALAUPAPA NATIONAL HISTORICAL PARK.contract · Last action 2009-07-13$235,412
- Department of AgricultureOREGON WOODS, INC. ORWIF240210 C10contract · Last action 2024-08-09$222,973
- Department of AgricultureTAS::12 1102::TAS RECOVERY KUNK TRAIL BOARDWALK AND BRIDGE DEFERRED MAINTENENCE.contract · Last action 2011-07-06$218,635
- Department of AgriculturePROVIDE AND INSTALL 7,150 FEET OF WELDED IRON PIPE FENCING AROUND RESTRICTEDED AREA OF THE POZO / LA ANZA OHV AREAcontract · Last action 2009-06-30$210,141
- Department of AgricultureTRAIL MAINTENANCE, BOULDER RIVER TRAIL #734 MT. BAKER-SNOQUALMIE NATIONAL FORESTcontract · Last action 2024-07-17$209,575
- Department of AgricultureOREGON WOODS, INC. CA-KNF-006177 C-80contract · Last action 2022-08-06$208,517
- Department of AgricultureOREGON WOODS, INC. OR-WIF-220180 C-62contract · Last action 2022-09-04$204,454
- Department of AgricultureTAS::12 1102::TAS RECOVERY PERSEVERANCE TRAIL CONSTRUCTION SUPPLIES DELIVERY, DELIVERY VIA AIRLIFT OF SUPPLIES TO PERSERVERANCE TRAIL FOR TRAIL CONSTRUCTION.contract · Last action 2010-08-05$202,500
- Department of AgricultureWORK ON THE SNOW LAKE TRAIL INCLUDES, CONSTRUCTION & EXCAVATION, DRAIN DIPS, ROCK RETAINING WALLS, SWITCHBACK MAINTENANCE, CRIB LADDER STAIRWAYS AND STEPS AND OPTION ITEM ROCK & ROOT REMOVALcontract · Last action 2022-08-22$201,526
- Department of AgricultureOREGON WOODS, INC. OR-WIF-220180 C-61contract · Last action 2022-09-04$198,119
- Department of AgricultureGAOA HEATHER MEADOWS FRONT COUNTRY TRAILScontract · Last action 2023-03-24$196,197
- Department of AgricultureF-2020-OR-MHF-000859-0479C, RIVERSIDE, OR-MHF-000859, C-19contract · Last action 2021-03-08$194,999
- Department of AgricultureRCA - DAN MOLLER CABIN REPLACEMENTcontract · Last action 2010-09-21$194,600
- Department of AgricultureTAS::12 1102::TAS RECOVERY GEORGE ISLAND TRAIL RECONSTRUCTION. CONSTRUCTION OF APPROXIMATELY 2,900 FEET OF TRAIL.contract · Last action 2011-05-11$189,300
- Department of AgricultureSTICKPIN FIRE TRAIL RESTORATIONcontract · Last action 2023-09-21$183,425
- Department of AgricultureGAOA DESCHUTES NATIONAL FOREST - FOREST WIDE TRAIL BRIDGE RECONSTRUCTIONcontract · Last action 2025-09-04$180,000
- Department of the InteriorREPLACEMENT AND INSTALLATION OF NEW FENCING AND GATES AT JAMES CAMPBELL NATIONAL WILDLIFE REFUGEcontract · Last action 2020-03-05$178,300
- Department of AgricultureBPA CREW, TYPE 2contract · Last action 2018-08-01$178,016
- Department of AgricultureIGF::OT::IGF CONTROL LAKE DOCK AND BOARDWALKcontract · Last action 2017-11-28$173,100
- Department of the InteriorIGF::OT::IGF TITLE: OAHU FOREST NWR FENCE CONSTRUCTIONcontract · Last action 2015-04-30$172,458
Federal contract dollars to this establishment. Primary NAICS: 237990 - OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION. Last action: 2026-03-12. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2013-09-18 | Referral | 2 | 1 | $2,100 | |
| 2010-11-19 | Planned | 4 | 1 | $180 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in support activities for forestry within OR, ordered by federal enforcement volume:
- GRASS GROWERS INCBAKER CITY — 2 federal enforcement records
- GRAYBACK FORESTRY INCMERLIN — 2 federal enforcement records
- SOUTHWEST FORESTRY LLCMEDFORD — 2 federal enforcement records
- PACIFIC COAST CONTRACTING INCCENTRAL POINT — 2 federal enforcement records
- ATKINSON REFORESTATION INCHERMISTON — 2 federal enforcement records
- 3B'S FORESTRY INCORPORATEDMEDFORD — 2 federal enforcement records
- SIERRA GRANDE REFORESTATION INCREEDSPORT — 2 federal enforcement records
- HIGHLANDERS FOREST LLCCENTRAL POINT — 2 federal enforcement records
- SENECA SAWMILL COMPANYEUGENE — 2 federal enforcement records
- EAGLE PASS REFORESTATION INCJACKSONVILLE — 2 federal enforcement records
Related searches
- Support Activities for ForestryAll employers in this industry
- Employers in ORState-wide enforcement data
- Support Activities for in ORIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on OREGON WOODS INC from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is OREGON WOODS INC's OSHA violation history?
- OREGON WOODS INC has 2 OSHA inspections on record with 6 violations and $2,280 in total penalties.
- How does OREGON WOODS INC's safety record compare to its industry?
- OREGON WOODS INC operates in the support activities for forestry industry. The industry average Total Recordable Incident Rate (TRIR) is 0.9.