Skip to main content

Establishment profile

NIELSON CONSTRUCTION CO

HOMESTEAD RESTAURANT ROAD, Huntington, UT, 84528
237310Highway, Street, and Bridge Construction
EIN 953298140

Download as PDF →

OSHA inspections
1
over 44 years
Violations
4
Penalties
$0
$0 avg
Violations across 4 federal agencies
Enforcement actions from multiple agencies may indicate systemic compliance issues across functions.

Summary

NIELSON CONSTRUCTION CO has accumulated 4 OSHA violations across 1 inspection over 44 years of recorded history.

The establishment sits in the 69th percentile for violations within its industry-state peer group of 17,876 employers. The most recent enforcement activity was recorded 8 years ago.

Federal records were found in 4 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

NIELSON CONSTRUCTION CO appears in OSHA workplace safety, WHD wage enforcement, MSHA mine safety, NLRB labor relations, and FMCSA motor carrier registration records only. No matching records were found in EPA environmental compliance, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

Inspections
1
0.0 / yr · last 44 yrs
Violations
4
0.1 / yr
Penalties
$0
Inspection trigger · planned
1 of 1

100% of inspections at this establishment produced violations,

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 4 distinct standards shown · 4 citations in this view.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
GEN010807060000111Apr 1982Apr 1982
GEN0215020911Apr 1982Apr 1982
GEN0243030311Apr 1982Apr 1982
GEN030307020000111Apr 1982Apr 1982

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

69th

Above average violations in NAICS 2373 within UT. Peer group: 17,876 employers. This establishment has 4 OSHA violations; peer median is 2.

Fewer violationsMore violations
Penalty percentile
0th
peer median: $0
Inspection frequency
0th
peer median: 1

Safety self-report (OSHA 300A)

Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.

DART rate
0.0
vs industry
−1.0
TRIR
0.8
vs industry
−1.0

Reported for 116 average annual employees at this establishment.

Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.

Industry benchmark

Industry avg TRIR
1.8
BLS SOII 2024
Industry avg DART
1.0
BLS SOII 2024
Self-reported TRIR
0.8
OSHA ITA Form 300A (employer self-reported)

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Planned
1

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for NIELSON CONSTRUCTION CO. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
8 years ago

No federal enforcement activity has been recorded against this establishment in 8+ years. Most recent activity: 8 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

Cases
2
Back wages owed
$7,436
Employees affected
7

Department of Labor Wage & Hour Division — minimum-wage, overtime, child-labor, FMLA, and prevailing-wage enforcement.

Wage and hour breakdown by law

Per-statute totals across all closed DOL Wage & Hour cases against this employer. Backwages reflect amounts the agency assessed; civil penalty is the separate fine where applicable. Some acts (Davis-Bacon, SCA, CWHSSA, H-2B, CCPA) don't carry a civil penalty field in DOL's data. 2 statutes · 22 violations · $7,436 in backwages

StatutePeriodCasesViolationsWorkersBackwagesCivil penalty
Davis-Bacon (federal construction)Jun 20182167$7,004
CWHSSA (federal-contract overtime)Jun 2018266$432

Source: DOL WHD enforcement database, aggregated per statute. Lifetime totals. A case can cite multiple statutes — so the total here may exceed the case count in the table above.

Wage and hour cases

Closed DOL Wage & Hour Division cases (FLSA, FMLA, H-2B, MSPA, and related statutes). Backwages reflect amounts the agency assessed; civil penalty (CMP) is a separate fine levied on top, where the statute provides for one (FLSA / H-1B / H-2A / MSPA / FMLA / EPPA / FLSA Child Labor; other acts have no CMP column in DOL’s data). The Statutes column lists which laws each case cited. 2 cases · 22 violations · $7,436 in backwages · 7 workers affected

Case periodIndustryStatutesViolationsWorkersBackwagesCivil penalty
Sep 2017 – Jun 2018Highway, Street, and Bridge ConstructionCWHSSADavis-Bacon165$4,940
Sep 2017 – Jun 2018Highway, Street, and Bridge ConstructionCWHSSADavis-Bacon62$2,496

Source: DOL WHD enforcement database. Cases shown reflect those the agency has closed and made public. A violation count is the agency’s tally of cited violations (one violation can affect many workers); the workers column counts distinct employees the agency found to be affected.

Mine safety (MSHA)

Company-level in UT — for NIELSON CONSTRUCTION CO, not this location alone

Violations
349
Assessed penalties
$54,080

Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other NIELSON CONSTRUCTION CO operations in the same state.

MSHA citations

Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 83S&S · 81 contractor · $35,487 proposed / $33,512 paid.

CitationMineDateSectionS&SNegligenceProposedPaid
6580019
Crusher #1
Emery, UT
Oct 2009YesModNegligence$2,282$764
8930117
Crusher #5 Fast Pack
Tooele, UT
contractor: Nielson Construction
Sep 2015YesHighNegligence$2,000$2,000
8483980
SUFCO
Sevier, UT
contractor: Nielson Construction Co
Sep 2015YesHighNegligence$1,412$1,412
6590816
Crusher #1
Emery, UT
Nov 2010YesHighNegligence$1,111$1,111
6590814
Crusher #1
Emery, UT
Nov 2010YesHighNegligence$1,111$1,111
6590813
Crusher #1
Emery, UT
Nov 2010YesHighNegligence$1,111$1,111
6425377
Crusher #1
Emery, UT
Oct 2009YesModNegligence$1,026$1,026
8593790
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Jul 2013YesModNegligence$807$807
8593788
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Jul 2013YesModNegligence$807$807
8593786
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Jul 2013NoHighNegligence$745$745
6580018
Crusher #1
Emery, UT
Oct 2009NoModNegligence$687$230
7612946
Princess Mine
Emery, UT
contractor: Nielson Construction Co
Oct 2003YesHighNegligence$625$625
6273853
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Mar 2003YesModNegligence$557$557
7613886
DUGOUT
Carbon, UT
contractor: Nielson Construction Co
Jan 2005YesHighNegligence$475$475
6273848
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Mar 2003NoModNegligence$475$475
8930146
Portable #2
Beaver, UT
contractor: Nielson Construction Co
Oct 2015YesModNegligence$436$436
8824722
Amrize Devil's Slide Plant
Morgan, UT
contractor: Nielson Construction Co
Feb 2015YesModNegligence$436$436
6317651
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Jun 2006YesModNegligence$409$409
6273823
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Jul 2002YesModNegligence$399$399
6273822
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Jul 2002YesModNegligence$399$399
6273821
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Jul 2002YesModNegligence$399$399
6273820
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Jul 2002YesModNegligence$399$399
6273667
Crusher #1
Emery, UT
Dec 2002YesModNegligence$371$371
8593789
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Jul 2013YesModNegligence$362$362
6273668
Crusher #1
Emery, UT
Dec 2002YesModNegligence$347$347
6273852
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Mar 2003YesModNegligence$340$340
6273851
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Mar 2003YesModNegligence$340$340
6320091
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Sep 2007NoModNegligence$334$334
6320090
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Sep 2007NoModNegligence$334$334
6320089
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Sep 2007NoModNegligence$334$334
6320088
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Sep 2007NoModNegligence$334$334
6320087
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Sep 2007NoModNegligence$334$334
6320086
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Sep 2007NoModNegligence$334$334
6591522
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Feb 2012YesModNegligence$308$308
6591519
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Feb 2012YesModNegligence$308$308
6581184
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Mar 2011YesModNegligence$308$308
6581183
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Mar 2011YesModNegligence$308$308
6581151
Crusher #4 Track Impactor
Emery, UT
contractor: Nielson Construction Corp
Jan 2011YesModNegligence$308$308
6581149
Crusher #4 Track Impactor
Emery, UT
contractor: Nielson Construction Corp
Jan 2011YesModNegligence$308$308
6276440
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Apr 2005YesModNegligence$305$305
6275051
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Apr 2004YesModNegligence$305$305
6273797
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Jul 2002YesModNegligence$294$294
6273796
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Jul 2002YesModNegligence$294$294
6273795
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Jul 2002YesModNegligence$294$294
6273794
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Jul 2002YesModNegligence$294$294
8756698
Crusher #5 Fast Pack
Tooele, UT
contractor: Nielson Construction
Nov 2014YesModNegligence$270$270
6318652
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Feb 2007YesModNegligence$268$268
6318651
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Feb 2007YesModNegligence$268$268
6275057
Crusher #1
Emery, UT
Apr 2004NoModNegligence$254$254
6276167
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Sep 2004YesModNegligence$247$247
6276514
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Jun 2004YesModNegligence$247$247
8756746
Crusher #4 Track Impactor
Emery, UT
contractor: Nielson Construction Corp
Jun 2015YesModNegligence$243$243
6591754
Crusher #6
Emery, UT
contractor: Nielson Construction
Nov 2013YesModNegligence$243$243
6591753
Crusher #6
Emery, UT
contractor: Nielson Construction
Nov 2013YesModNegligence$243$243
7909114
Crusher #1
Emery, UT
May 2000YesModNegligence$242$242
7909079
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Mar 2000YesModNegligence$242$242
8480731
Deer Creek Mine
Emery, UT
contractor: Nielson Construction Co
Sep 2014YesModNegligence$224$224
8593784
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Jul 2013NoModNegligence$224$224
6273798
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Jul 2002YesModNegligence$224$224
6317650
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Jun 2006NoModNegligence$221$221
7282380
SUFCO
Sevier, UT
contractor: Nielson Construction Co
Sep 2005YesModNegligence$217$217
6276437
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Apr 2005YesModNegligence$217$217
6276482
Crusher #1
Emery, UT
Apr 2004YesModNegligence$217$217
6317301
Crusher #1
Emery, UT
Jun 2005YesModNegligence$203$203
6317300
Crusher #1
Emery, UT
Jun 2005YesModNegligence$203$203
6272311
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Jun 2001YesModNegligence$196$196
6272306
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Jun 2001YesModNegligence$196$196
6272305
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Jun 2001YesModNegligence$196$196
6272304
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Jun 2001YesModNegligence$196$196
6272301
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Jun 2001YesModNegligence$196$196
8483909
Savage Coal Terminal
Carbon, UT
contractor: Nielson Construction Co
Dec 2015YesModNegligence$190$190
8756877
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Jan 2014NoHighNegligence$190$190
6319556
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Mar 2008NoLowNegligence$190$190
6274616
Crusher #1
Emery, UT
May 2003YesModNegligence$189$189
6274615
Crusher #1
Emery, UT
May 2003YesModNegligence$189$189
6274572
Crusher #1
Emery, UT
May 2003YesModNegligence$189$189
6273716
Crusher #1
Emery, UT
May 2002YesModNegligence$184$184
6273790
Crusher #4 Track Impactor
Emery, UT
contractor: Nielson Construction Corp
Jul 2002YesModNegligence$161$161
7613883
DUGOUT
Carbon, UT
contractor: Nielson Construction Co
Jan 2005YesModNegligence$154$154
6273717
Crusher #1
Emery, UT
May 2002YesModNegligence$150$150
6581523
Crusher #4 Track Impactor
Emery, UT
contractor: Nielson Construction Corp
Oct 2011YesModNegligence$138$138
6581156
Crusher #2
Emery, UT
contractor: Nielson Construction Corp
Jan 2011YesModNegligence$138$138
7286728
DUGOUT
Carbon, UT
contractor: Nielson Construction Co
Sep 2006YesModNegligence$135$135
7286727
DUGOUT
Carbon, UT
contractor: Nielson Construction Co
Sep 2006YesModNegligence$135$135
7286726
DUGOUT
Carbon, UT
contractor: Nielson Construction Co
Sep 2006YesModNegligence$135$135
7613407
Crandall Canyon Mine
Emery, UT
contractor: Nielson Construction Co
Mar 2004YesModNegligence$135$135
6272518
Crusher #4 Track Impactor
Emery, UT
contractor: Nielson Construction Corp
Sep 2001YesModNegligence$131$131
6272517
Crusher #4 Track Impactor
Emery, UT
contractor: Nielson Construction Corp
Sep 2001YesModNegligence$131$131
6272516
Crusher #4 Track Impactor
Emery, UT
contractor: Nielson Construction Corp
Sep 2001YesModNegligence$131$131
8459191
DUGOUT
Carbon, UT
contractor: Nielson Construction Co
Sep 2011NoHighNegligence$127$127
8459190
DUGOUT
Carbon, UT
contractor: Nielson Construction Co
Sep 2011NoHighNegligence$127$127
7613067
DUGOUT
Carbon, UT
contractor: Nielson Construction Co
Sep 2003YesModNegligence$124$124
6319496
Crusher #1
Emery, UT
Jul 2007YesLowNegligence$117$117
7607447
SUFCO
Sevier, UT
contractor: Nielson Construction Co
Oct 2005YesModNegligence$114$114
7613884
DUGOUT
Carbon, UT
contractor: Nielson Construction Co
Jan 2005YesModNegligence$114$114
7613880
DUGOUT
Carbon, UT
contractor: Nielson Construction Co
Jan 2005YesModNegligence$114$114
7613879
DUGOUT
Carbon, UT
contractor: Nielson Construction Co
Jan 2005YesModNegligence$114$114
6272743
Crusher #4 Track Impactor
Emery, UT
contractor: Nielson Construction Corp
Jan 2002YesModNegligence$113$113
6272741
Crusher #4 Track Impactor
Emery, UT
contractor: Nielson Construction Corp
Jan 2002YesModNegligence$113$113
6591756
Crusher #6
Emery, UT
contractor: Nielson Construction
Nov 2013NoModNegligence$112$112

Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).

Labor relations (NLRB)

Company-level in UT — for NIELSON CONSTRUCTION CO, not this location alone

Total cases
5
Unfair labor practice
2
Representation (union)
3

National Labor Relations Board — unfair labor practice charges and union representation cases. The NLRB records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other NIELSON CONSTRUCTION CO locations in the same state.

NLRB cases

National Labor Relations Board cases involving this employer. Includes unfair labor practice (ULP) filings and representation election proceedings. NLRB enforcement is process-driven; no per-case monetary penalty is assessed (remedies are case-by-case backpay orders, posting requirements, election re-runs, etc.). 5 cases · 2 ULP · 3 representation

Case numberTypeFiledClosedStatusRegion
27-CA-113273Unfair labor practiceSep 2013Nov 2013ClosedRegion 27, Denver, Colorado
27-CA-112432Unfair labor practiceAug 2013Mar 2014ClosedRegion 27, Denver, Colorado
27-RM-111584Representation electionAug 2013Dec 2013ClosedRegion 27, Denver, Colorado
27-RD-111472Representation electionAug 2013Dec 2013ClosedRegion 27, Denver, Colorado
27-RD-092548Representation electionNov 2012Jan 2013ClosedRegion 27, Denver, Colorado

Source: NLRB case files. Rows shown are those the agency has published. Region numbers (1–31) correspond to NLRB's geographic offices.

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for NIELSON CONSTRUCTION CO. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for NIELSON CONSTRUCTION CO. Verify directly with Environmental Protection Agency

Motor carrier safety (FMCSA)

DOT number
678738
Operation
A

Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for NIELSON CONSTRUCTION CO. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$0
Obligated (all-time)
$51K
Awards
7
Top agency
Department of the Interior
$43K
Top agencies by obligation (this location)
Department of the Interior$43K
Department of Agriculture$8K
Largest awards
  • Department of the Interior
    ROAD BASE
    contract · Last action 2009-11-18
    $23,745
  • Department of the Interior
    EQUIPMENT RENTAL WITH OPERATOR
    contract · Last action 2011-08-05
    $11,900
  • Department of the Interior
    PURCHASE OF 90 CUBIC YARDS OF 4,000 PSI READY MIX CONCRETE FOR HUNTINGTON RESERVOIR, HUNTINGTON, UT.
    contract · Last action 2011-09-30
    $6,550
  • Department of Agriculture
    CRANE SERVICES TO INSTALL TRAIL BRIDGE.
    contract · Last action 2009-11-10
    $4,258
  • Department of Agriculture
    LITTLE BEAR ROAD DECOMMISIONING AND STREAM CROSSING
    contract · Last action 2009-08-27
    $3,375
  • Department of the Interior
    ROAD BASE
    contract · Last action 2008-07-21
    $766
  • Department of Agriculture
    IMPROVEMENTS TO APPROXIMATELY 2.5 MILES OF NATIONAL FOREST SYSTEM ROADS, SPURS AND PARKING AREAS. IMPROVEMENTS INCLUDE ROAD SUBGRADE, DRAINAGE STRUCTURES AND PLACEMENT OF A 4-INCH THICK AGGREGATE SURFACE LAYER.
    contract · Last action 2009-08-08
    $0

Federal contract dollars to this establishment. Primary NAICS: 212321 - CONSTRUCTION SAND AND GRAVEL MINING. Last action: 2011-09-30. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
1982-03-29Planned4$0

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Other employers in this industry and state

Other employers in highway, street, and bridge construction within UT, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on NIELSON CONSTRUCTION CO from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is NIELSON CONSTRUCTION CO's OSHA violation history?
NIELSON CONSTRUCTION CO has 1 OSHA inspection on record with 4 violations and $0 in total penalties.
How does NIELSON CONSTRUCTION CO's safety record compare to its industry?
NIELSON CONSTRUCTION CO operates in the highway, street, and bridge construction industry. The industry average Total Recordable Incident Rate (TRIR) is 1.8. NIELSON CONSTRUCTION CO's self-reported DART rate is 0 compared to an industry average of 1.