Establishment profile
LEGRAND JOHNSON CONSTRUCTION CO.
4500 S 100 E, NIBLEY, UT, 84321
237310 — Highway, Street, and Bridge Construction
Summary
LEGRAND JOHNSON CONSTRUCTION CO. has accumulated 1 OSHA violation across 2 inspections over 42 years of recorded history, with $500 in total assessed penalties.
The establishment sits in the 58th percentile for violations within its industry-state peer group of 126 employers. Inspection frequency runs at the 85th percentile. The most recent enforcement activity was recorded 15 years ago.
Federal records were found in 3 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
LEGRAND JOHNSON CONSTRUCTION CO. appears in OSHA workplace safety, MSHA mine safety, NLRB labor relations, and FMCSA motor carrier registration records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
50% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 1 distinct standard shown · 1 citation in this view · $500 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1000.5 D03 | 1 | 1 | $500 | Mar 2011 | Mar 2011 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Above average violations in NAICS 2373 within UT. Peer group: 126 employers. This establishment has 1 OSHA violation; peer median is 0.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for LEGRAND JOHNSON CONSTRUCTION CO.. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for LEGRAND JOHNSON CONSTRUCTION CO.. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 15+ years. Most recent activity: 15 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for LEGRAND JOHNSON CONSTRUCTION CO.. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in UT — for LEGRAND JOHNSON CONSTRUCTION CO., not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other LEGRAND JOHNSON CONSTRUCTION CO. operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 36S&S · 75 contractor · $33,869 proposed / $33,869 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 8593576 | Brigham Pit Box Elder, UT contractor: LeGrand Johnson Construction Co | Oct 2014 | — | No | HighNegligence | $4,000 | $4,000 |
| 8593574 | Brigham Pit Box Elder, UT contractor: LeGrand Johnson Construction Co | Oct 2014 | — | No | HighNegligence | $4,000 | $4,000 |
| 8594094 | Brigham Pit Box Elder, UT contractor: LeGrand Johnson Construction Co | Nov 2013 | — | Yes | HighNegligence | $2,000 | $2,000 |
| 8594093 | Brigham Pit Box Elder, UT contractor: LeGrand Johnson Construction Co | Nov 2013 | — | Yes | HighNegligence | $2,000 | $2,000 |
| 6483991 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Mar 2010 | — | Yes | HighNegligence | $946 | $946 |
| 6483987 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Mar 2010 | — | Yes | HighNegligence | $946 | $946 |
| 6483986 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Mar 2010 | — | Yes | HighNegligence | $946 | $946 |
| 6483983 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Mar 2010 | — | Yes | HighNegligence | $946 | $946 |
| 6483982 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Mar 2010 | — | Yes | HighNegligence | $946 | $946 |
| 6483978 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Mar 2010 | — | Yes | HighNegligence | $946 | $946 |
| 6581238 | Brigham Pit Box Elder, UT contractor: LeGrand Johnson Construction Co | Dec 2010 | — | Yes | ModNegligence | $725 | $725 |
| 6580560 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Apr 2011 | — | No | HighNegligence | $634 | $634 |
| 6483984 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Mar 2010 | — | Yes | ModNegligence | $634 | $634 |
| 8825746 | WASHPLANT 5 Grand, UT | Aug 2016 | — | Yes | ModNegligence | $632 | $632 |
| 6580562 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Apr 2011 | — | No | ModNegligence | $425 | $425 |
| 6483981 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Mar 2010 | — | Yes | HighNegligence | $425 | $425 |
| 6483975 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Mar 2010 | — | Yes | HighNegligence | $425 | $425 |
| 6483974 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Mar 2010 | — | Yes | HighNegligence | $425 | $425 |
| 6483973 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Mar 2010 | — | Yes | HighNegligence | $425 | $425 |
| 6275682 | Kolberg Portable Belt & Grizzly Uintah, UT | Jun 2004 | — | Yes | ModNegligence | $425 | $425 |
| 6580991 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Mar 2012 | — | Yes | ModNegligence | $285 | $285 |
| 6484015 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | May 2010 | — | Yes | ModNegligence | $285 | $285 |
| 6484014 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | May 2010 | — | Yes | ModNegligence | $285 | $285 |
| 6483990 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Mar 2010 | — | Yes | HighNegligence | $285 | $285 |
| 6483979 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Mar 2010 | — | Yes | ModNegligence | $285 | $285 |
| 8824658 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Aug 2014 | — | Yes | ModNegligence | $263 | $263 |
| 8824655 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Aug 2014 | — | Yes | ModNegligence | $263 | $263 |
| 8824654 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Aug 2014 | — | Yes | ModNegligence | $263 | $263 |
| 9470355 | WASHPLANT 5 Grand, UT | Jun 2020 | — | Yes | ModNegligence | $254 | $254 |
| 8593575 | Brigham Pit Box Elder, UT contractor: LeGrand Johnson Construction Co | Oct 2014 | — | Yes | ModNegligence | $243 | $243 |
| 8593573 | Brigham Pit Box Elder, UT contractor: LeGrand Johnson Construction Co | Oct 2014 | — | Yes | ModNegligence | $243 | $243 |
| 8593073 | Brigham Pit Box Elder, UT contractor: LeGrand Johnson Construction Co | Jun 2012 | — | Yes | ModNegligence | $243 | $243 |
| 6581237 | Brigham Pit Box Elder, UT contractor: LeGrand Johnson Construction Co | Dec 2010 | — | Yes | ModNegligence | $243 | $243 |
| 6581044 | Brigham Pit Box Elder, UT contractor: LeGrand Johnson Construction Co | Jun 2010 | — | Yes | ModNegligence | $243 | $243 |
| 6317171 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Jul 2005 | — | Yes | ModNegligence | $217 | $217 |
| 6580564 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Apr 2011 | — | No | ModNegligence | $190 | $190 |
| 6580561 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Apr 2011 | — | No | LowNegligence | $190 | $190 |
| 9733662 | WASHPLANT 5 Grand, UT | Sep 2024 | — | No | LowNegligence | $147 | $147 |
| 6483985 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Mar 2010 | — | Yes | ModNegligence | $127 | $127 |
| 6425418 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Apr 2009 | — | Yes | ModNegligence | $127 | $127 |
| 6275700 | Kolberg Portable Belt & Grizzly Uintah, UT | Jul 2004 | — | Yes | ModNegligence | $124 | $124 |
| 9470354 | WASHPLANT 5 Grand, UT | Jun 2020 | — | No | ModNegligence | $123 | $123 |
| 9470353 | WASHPLANT 5 Grand, UT | Jun 2020 | — | No | ModNegligence | $123 | $123 |
| 9470352 | WASHPLANT 5 Grand, UT | Jun 2020 | — | No | ModNegligence | $123 | $123 |
| 9309575 | WASHPLANT 5 Grand, UT | Nov 2018 | — | No | ModNegligence | $118 | $118 |
| 9309574 | WASHPLANT 5 Grand, UT | Nov 2018 | — | No | ModNegligence | $118 | $118 |
| 9309573 | WASHPLANT 5 Grand, UT | Nov 2018 | — | No | ModNegligence | $118 | $118 |
| 8837342 | WASHPLANT 5 Grand, UT | Jan 2018 | — | No | HighNegligence | $118 | $118 |
| 8837341 | WASHPLANT 5 Grand, UT | Jan 2018 | — | No | HighNegligence | $118 | $118 |
| 8837340 | WASHPLANT 5 Grand, UT | Jan 2018 | — | No | HighNegligence | $118 | $118 |
| 8837339 | WASHPLANT 5 Grand, UT | Jan 2018 | — | No | HighNegligence | $118 | $118 |
| 8837338 | WASHPLANT 5 Grand, UT | Jan 2018 | — | No | HighNegligence | $118 | $118 |
| 8837337 | WASHPLANT 5 Grand, UT | Jan 2018 | — | No | HighNegligence | $118 | $118 |
| 8837336 | WASHPLANT 5 Grand, UT | Jan 2018 | — | No | HighNegligence | $118 | $118 |
| 8837331 | WASHPLANT 5 Grand, UT | Dec 2017 | — | No | ModNegligence | $118 | $118 |
| 8837330 | WASHPLANT 5 Grand, UT | Dec 2017 | — | No | ModNegligence | $118 | $118 |
| 8825745 | WASHPLANT 5 Grand, UT | Aug 2016 | — | No | ModNegligence | $114 | $114 |
| 8825744 | WASHPLANT 5 Grand, UT | Aug 2016 | — | No | ModNegligence | $114 | $114 |
| 8825678 | WASHPLANT 5 Grand, UT | Dec 2015 | — | No | ModNegligence | $100 | $100 |
| 8757372 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Aug 2015 | — | No | ModNegligence | $100 | $100 |
| 8757371 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Aug 2015 | — | No | ModNegligence | $100 | $100 |
| 8757370 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Aug 2015 | — | No | ModNegligence | $100 | $100 |
| 8757369 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Aug 2015 | — | No | ModNegligence | $100 | $100 |
| 8824657 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Aug 2014 | — | No | ModNegligence | $100 | $100 |
| 8824656 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Aug 2014 | — | No | ModNegligence | $100 | $100 |
| 8824653 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Aug 2014 | — | No | ModNegligence | $100 | $100 |
| 8594092 | Brigham Pit Box Elder, UT contractor: LeGrand Johnson Construction Co | Nov 2013 | — | No | ModNegligence | $100 | $100 |
| 6591396 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | May 2013 | — | Yes | LowNegligence | $100 | $100 |
| 6591356 | Brigham Pit Box Elder, UT contractor: LeGrand Johnson Construction Co | Nov 2012 | — | No | ModNegligence | $100 | $100 |
| 6580990 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Mar 2012 | — | No | ModNegligence | $100 | $100 |
| 6580989 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Mar 2012 | — | No | ModNegligence | $100 | $100 |
| 6580563 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Apr 2011 | — | No | LowNegligence | $100 | $100 |
| 6581239 | Brigham Pit Box Elder, UT contractor: LeGrand Johnson Construction Co | Dec 2010 | — | No | ModNegligence | $100 | $100 |
| 6581046 | Brigham Pit Box Elder, UT contractor: LeGrand Johnson Construction Co | Jun 2010 | — | No | ModNegligence | $100 | $100 |
| 6581042 | Brigham Pit Box Elder, UT contractor: LeGrand Johnson Construction Co | Jun 2010 | 109(a) | No | ModNegligence | $100 | $100 |
| 6581041 | Brigham Pit Box Elder, UT contractor: LeGrand Johnson Construction Co | Jun 2010 | — | No | ModNegligence | $100 | $100 |
| 8562101 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | May 2010 | — | No | ModNegligence | $100 | $100 |
| 6484018 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | May 2010 | — | No | ModNegligence | $100 | $100 |
| 6484017 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | May 2010 | — | No | ModNegligence | $100 | $100 |
| 6484016 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | May 2010 | — | No | ModNegligence | $100 | $100 |
| 6484013 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | May 2010 | — | No | ModNegligence | $100 | $100 |
| 6484012 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | May 2010 | — | No | ModNegligence | $100 | $100 |
| 6484011 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | May 2010 | — | No | ModNegligence | $100 | $100 |
| 6484010 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | May 2010 | — | No | ModNegligence | $100 | $100 |
| 6484009 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | May 2010 | — | Yes | ModNegligence | $100 | $100 |
| 6484008 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | May 2010 | — | No | ModNegligence | $100 | $100 |
| 6484007 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | May 2010 | — | No | ModNegligence | $100 | $100 |
| 6483989 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Mar 2010 | — | No | ModNegligence | $100 | $100 |
| 6483988 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Mar 2010 | — | No | ModNegligence | $100 | $100 |
| 6483980 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Mar 2010 | — | No | ModNegligence | $100 | $100 |
| 6483977 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Mar 2010 | — | No | ModNegligence | $100 | $100 |
| 6483976 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Mar 2010 | — | No | ModNegligence | $100 | $100 |
| 6483972 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Mar 2010 | — | No | ModNegligence | $100 | $100 |
| 6425421 | Brigham Pit Box Elder, UT contractor: LeGrand Johnson Construction Co | Apr 2009 | — | No | ModNegligence | $100 | $100 |
| 6425420 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Apr 2009 | — | No | LowNegligence | $100 | $100 |
| 6425419 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Apr 2009 | — | No | HighNegligence | $100 | $100 |
| 6425417 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Apr 2009 | — | No | ModNegligence | $100 | $100 |
| 6425416 | Hyrum Pit Cache, UT contractor: LeGrand Johnson Construction Co. | Apr 2009 | — | No | ModNegligence | $100 | $100 |
| 6303765 | Portable Wash Plant Cache, UT | Apr 2008 | — | No | ModNegligence | $100 | $100 |
| 6303764 | Portable Wash Plant Cache, UT | Apr 2008 | — | No | ModNegligence | $100 | $100 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
Company-level in UT — for LEGRAND JOHNSON CONSTRUCTION CO., not this location alone
National Labor Relations Board — unfair labor practice charges and union representation cases. The NLRB records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other LEGRAND JOHNSON CONSTRUCTION CO. locations in the same state.
NLRB cases
National Labor Relations Board cases involving this employer. Includes unfair labor practice (ULP) filings and representation election proceedings. NLRB enforcement is process-driven; no per-case monetary penalty is assessed (remedies are case-by-case backpay orders, posting requirements, election re-runs, etc.). 2 cases · 2 representation
| Case number | Type | Filed | Closed | Status | Region |
|---|---|---|---|---|---|
| 27-RC-285642 | Representation election | Nov 2021 | Nov 2021 | Closed | Region 27, Denver, Colorado |
| 27-RC-284764 | Representation election | Oct 2021 | Nov 2021 | Closed | Region 27, Denver, Colorado |
Source: NLRB case files. Rows shown are those the agency has published. Region numbers (1–31) correspond to NLRB's geographic offices.
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for LEGRAND JOHNSON CONSTRUCTION CO.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for LEGRAND JOHNSON CONSTRUCTION CO.. Verify directly with Environmental Protection Agency →
EPA-registered facilities
Every EPA ECHO facility associated with this employer, sorted most-significant first. Each row links to EPA’s Detailed Facility Report for the source-of-truth record. Permits column lists active programs (Air = Clean Air Act, Water = Clean Water Act, RCRA = hazardous waste, TRI = Toxics Release Inventory reporting). 1 facility.
| Facility | Permits | Status | Inspections | Formal actions | Penalties | Last inspected | ECHO |
|---|---|---|---|---|---|---|---|
LEGRAND JOHNSON CONSTRUCTION CO 00054 1000 S MAIN ST · LOGAN, UT, 84321 | Air | No Violation Identified | 0 | 0 | — | — | View → |
Source: EPA ECHO (Enforcement and Compliance History Online). Compliance status follows EPA’s own labels (“Sig Violation” = significant noncompliance; QNCR = quarters of noncompliance over the recent reporting window). Inactive facilities (struck through) retain historical enforcement records even after operations ceased.
Motor carrier safety (FMCSA)
Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for LEGRAND JOHNSON CONSTRUCTION CO.. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2011-03-15 | Referral | 1 | — | $500 | |
| 1984-04-25 | Follow-up | 0 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in highway, street, and bridge construction within UT, ordered by federal enforcement volume:
- NIELSON CONSTRUCTION COHuntington — 4 federal enforcement records
- W W CLYDE & COCEDAR CITY — 3 federal enforcement records
- GENEVA ROCK PRODUCTS, INCWANSHIP — 3 federal enforcement records
- GENEVA ROCK PRODUCTS INC.BRIGHAM CITY — 3 federal enforcement records
- WW CLYDE & COWASHINGTON — 3 federal enforcement records
- W.W. CLYDE & CO.SPANISH FORK — 2 federal enforcement records
- Mel Clark Inc.Cedar City — 2 federal enforcement records
- LEGRAND JOHNSON CONSTRUCTIONMOAB — 2 federal enforcement records
- GRANITE CONSTRUCTION COMPANYSALT LAKE CITY — 2 federal enforcement records
- MEADOW VALLEY CONTRACTORS INCMURRAY — 2 federal enforcement records
Related searches
- Highway, Street, and Bridge ConstructionAll employers in this industry
- Employers in UTState-wide enforcement data
- Highway, Street, and in UTIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on LEGRAND JOHNSON CONSTRUCTION CO. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is LEGRAND JOHNSON CONSTRUCTION CO.'s OSHA violation history?
- LEGRAND JOHNSON CONSTRUCTION CO. has 2 OSHA inspections on record with 1 violation and $500 in total penalties.
- How does LEGRAND JOHNSON CONSTRUCTION CO.'s safety record compare to its industry?
- LEGRAND JOHNSON CONSTRUCTION CO. operates in the highway, street, and bridge construction industry. The industry average Total Recordable Incident Rate (TRIR) is 2.5.