Establishment profile
MICKELSEN CONSTRUCTION, INC.
CORNER OF PHILBIN & CHUBBUCK, POCATELLO, ID, 83202
Operated by MICKELSEN CONSTRUCTION, INC · 1 of 4 establishments
238910 — Site Preparation Contractors
EIN 820510976
Summary
MICKELSEN CONSTRUCTION, INC. has accumulated 0 OSHA violations across 1 inspection over 19 years of recorded history.
The most recent federal enforcement activity was recorded 19 years ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
MICKELSEN CONSTRUCTION, INC. appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
Peer comparison
Fewer violations than most other employers in NAICS 2389 within ID. Peer group: 458 employers. This establishment has 0 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 46 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for MICKELSEN CONSTRUCTION, INC.. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 19+ years. Most recent activity: 19 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for MICKELSEN CONSTRUCTION, INC.. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in ID — for MICKELSEN CONSTRUCTION, INC, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other MICKELSEN CONSTRUCTION, INC operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 17S&S · $13,750 proposed / $12,589 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 9901963 | Plant 4 Bonneville, ID | Aug 2023 | — | No | ModNegligence | $376 | $143 |
| 5055207 | Plant 4 Bonneville, ID | Jul 2025 | — | Yes | ModNegligence | $366 | $366 |
| 6374307 | Plant 1 Bannock, ID | Mar 2006 | — | No | ModNegligence | $291 | $60 |
| 6475883 | Plant 2 Bingham, ID | Apr 2009 | — | Yes | ModNegligence | $263 | $263 |
| 6475877 | Plant 2 Bingham, ID | Apr 2009 | — | Yes | ModNegligence | $263 | $263 |
| 8593705 | Plant 4 Bonneville, ID | Mar 2013 | — | Yes | ModNegligence | $243 | $243 |
| 8593703 | Plant 4 Bonneville, ID | Mar 2013 | — | Yes | ModNegligence | $243 | $243 |
| 6484000 | Plant 4 Bonneville, ID | Apr 2010 | — | Yes | ModNegligence | $243 | $243 |
| 6374308 | Plant 1 Bannock, ID | Mar 2006 | — | No | ModNegligence | $237 | $60 |
| 9901744 | Plant 1 Bannock, ID | Sep 2023 | — | Yes | ModNegligence | $182 | $182 |
| 9727910 | Plant 1 Bannock, ID | Sep 2022 | — | Yes | ModNegligence | $169 | $169 |
| 9901960 | Plant 4 Bonneville, ID | Aug 2023 | — | Yes | ModNegligence | $167 | $167 |
| 6374305 | Plant 1 Bannock, ID | Mar 2006 | — | No | ModNegligence | $165 | $60 |
| 6374303 | Plant 1 Bannock, ID | Mar 2006 | — | No | ModNegligence | $165 | $60 |
| 9309795 | Plant 1 Bannock, ID | Sep 2019 | — | Yes | ModNegligence | $154 | $154 |
| 9309790 | Plant 1 Bannock, ID | Sep 2019 | — | Yes | ModNegligence | $154 | $154 |
| 5055860 | Plant 1 Bannock, ID | May 2026 | — | No | ModNegligence | $151 | — |
| 5055859 | Plant 1 Bannock, ID | May 2026 | — | No | ModNegligence | $151 | — |
| 5055208 | Plant 4 Bonneville, ID | Jul 2025 | — | No | ModNegligence | $151 | $151 |
| 5052907 | Plant 1 Bannock, ID | Apr 2025 | — | No | ModNegligence | $151 | $151 |
| 5052906 | Plant 1 Bannock, ID | Apr 2025 | — | No | ModNegligence | $151 | $151 |
| 9907692 | Plant 4 Bonneville, ID | Sep 2024 | — | No | HighNegligence | $147 | $147 |
| 9907691 | Plant 4 Bonneville, ID | Sep 2024 | — | No | ModNegligence | $147 | $147 |
| 9907690 | Plant 4 Bonneville, ID | Sep 2024 | — | No | ModNegligence | $147 | $147 |
| 9907681 | Plant 1 Bannock, ID | Aug 2024 | — | No | HighNegligence | $147 | $147 |
| 9907680 | Plant 1 Bannock, ID | Aug 2024 | — | No | ModNegligence | $147 | $147 |
| 9907679 | Plant 1 Bannock, ID | Aug 2024 | — | No | ModNegligence | $147 | $147 |
| 9907678 | Plant 1 Bannock, ID | Aug 2024 | — | No | ModNegligence | $147 | $147 |
| 9907677 | Plant 1 Bannock, ID | Aug 2024 | — | No | ModNegligence | $147 | $147 |
| 9901870 | Plant 1 Bannock, ID | Mar 2024 | — | No | ModNegligence | $147 | $147 |
| 9901869 | Plant 1 Bannock, ID | Mar 2024 | — | No | ModNegligence | $147 | $147 |
| 9901743 | Plant 1 Bannock, ID | Sep 2023 | — | No | ModNegligence | $143 | $143 |
| 9901962 | Plant 4 Bonneville, ID | Aug 2023 | — | No | ModNegligence | $143 | $143 |
| 9901961 | Plant 4 Bonneville, ID | Aug 2023 | — | No | ModNegligence | $143 | $143 |
| 9370369 | Plant 1 Bannock, ID | Feb 2018 | — | Yes | ModNegligence | $138 | $138 |
| 9727909 | Plant 1 Bannock, ID | Sep 2022 | — | No | ModNegligence | $133 | $133 |
| 9654857 | Plant 4 Bonneville, ID | May 2022 | — | No | ModNegligence | $133 | $133 |
| 9654856 | Plant 4 Bonneville, ID | May 2022 | — | No | ModNegligence | $133 | $133 |
| 9654830 | Plant 1 Bannock, ID | Mar 2022 | — | No | ModNegligence | $133 | $133 |
| 9654829 | Plant 1 Bannock, ID | Mar 2022 | — | No | ModNegligence | $133 | $133 |
| 9654828 | Plant 1 Bannock, ID | Mar 2022 | — | No | ModNegligence | $133 | $133 |
| 9654827 | Plant 1 Bannock, ID | Mar 2022 | — | No | ModNegligence | $133 | $133 |
| 8593638 | Plant 1 Bannock, ID | Oct 2012 | — | Yes | LowNegligence | $127 | $127 |
| 9478647 | Plant 1 Bannock, ID | Jun 2021 | — | No | ModNegligence | $125 | $125 |
| 9478644 | Plant 1 Bannock, ID | Jun 2021 | — | No | ModNegligence | $125 | $125 |
| 9478602 | Plant 4 Bonneville, ID | Dec 2020 | — | No | ModNegligence | $123 | $123 |
| 9470295 | Plant 1 Bannock, ID | Aug 2020 | — | No | ModNegligence | $123 | $123 |
| 9470294 | Plant 1 Bannock, ID | Aug 2020 | — | No | ModNegligence | $123 | $123 |
| 9470293 | Plant 1 Bannock, ID | Aug 2020 | — | No | ModNegligence | $123 | $123 |
| 9470292 | Plant 1 Bannock, ID | Aug 2020 | — | No | ModNegligence | $123 | $123 |
| 9470291 | Plant 1 Bannock, ID | Aug 2020 | — | No | ModNegligence | $123 | $123 |
| 9309776 | Plant 1 Bannock, ID | Aug 2019 | — | No | ModNegligence | $121 | $121 |
| 9309775 | Plant 1 Bannock, ID | Aug 2019 | — | No | ModNegligence | $121 | $121 |
| 9309744 | Plant 4 Bonneville, ID | Apr 2019 | — | No | ModNegligence | $121 | $121 |
| 9309743 | Plant 4 Bonneville, ID | Apr 2019 | — | No | ModNegligence | $121 | $121 |
| 9431356 | Plant 1 Bannock, ID | Feb 2019 | — | No | ModNegligence | $121 | $121 |
| 9431357 | Plant 1 Bannock, ID | Apr 2018 | — | No | ModNegligence | $121 | $121 |
| 9370308 | Plant 1 Bannock, ID | Nov 2017 | — | No | ModNegligence | $118 | $118 |
| 6475878 | Plant 2 Bingham, ID | Apr 2009 | — | No | ModNegligence | $117 | $117 |
| 9370215 | Plant 4 Bonneville, ID | Nov 2017 | — | No | ModNegligence | $116 | $116 |
| 9370214 | Plant 4 Bonneville, ID | Nov 2017 | — | No | ModNegligence | $116 | $116 |
| 9370213 | Plant 4 Bonneville, ID | Nov 2017 | — | No | ModNegligence | $116 | $116 |
| 9370212 | Plant 4 Bonneville, ID | Nov 2017 | — | No | ModNegligence | $116 | $116 |
| 9370211 | Plant 4 Bonneville, ID | Nov 2017 | — | No | ModNegligence | $116 | $116 |
| 9370210 | Plant 4 Bonneville, ID | Nov 2017 | — | No | ModNegligence | $116 | $116 |
| 8825590 | Plant 4 Bonneville, ID | Nov 2016 | — | No | ModNegligence | $114 | $114 |
| 8825589 | Plant 4 Bonneville, ID | Nov 2016 | — | No | ModNegligence | $114 | $114 |
| 8825568 | Plant 4 Bonneville, ID | Aug 2016 | — | No | ModNegligence | $114 | $114 |
| 8757099 | Plant 4 Bonneville, ID | May 2014 | — | Yes | LowNegligence | $108 | $108 |
| 8593704 | Plant 4 Bonneville, ID | Mar 2013 | — | Yes | ModNegligence | $108 | $108 |
| 8562104 | Plant 4 Bonneville, ID | Apr 2010 | — | Yes | ModNegligence | $108 | $100 |
| 8562103 | Plant 4 Bonneville, ID | Apr 2010 | — | Yes | ModNegligence | $108 | $108 |
| 8825515 | Plant 1 Bannock, ID | Dec 2015 | — | No | ModNegligence | $100 | $100 |
| 8757340 | Plant 4 Bonneville, ID | Jul 2015 | — | No | ModNegligence | $100 | $100 |
| 8757241 | Plant 1 Bannock, ID | Oct 2014 | — | No | ModNegligence | $100 | $100 |
| 8757100 | Plant 4 Bonneville, ID | May 2014 | — | No | ModNegligence | $100 | $100 |
| 8757070 | Plant 1 Bannock, ID | Apr 2014 | — | No | ModNegligence | $100 | $100 |
| 8757062 | Plant 1 Bannock, ID | Apr 2014 | — | No | ModNegligence | $100 | $100 |
| 8757069 | Plant 1 Bannock, ID | Apr 2014 | — | No | ModNegligence | $100 | $100 |
| 8757068 | Plant 1 Bannock, ID | Apr 2014 | — | No | ModNegligence | $100 | $100 |
| 8757067 | Plant 1 Bannock, ID | Apr 2014 | — | No | ModNegligence | $100 | $100 |
| 8757066 | Plant 1 Bannock, ID | Apr 2014 | — | No | ModNegligence | $100 | $100 |
| 8756447 | Plant 1 Bannock, ID | Nov 2013 | — | No | LowNegligence | $100 | $100 |
| 8593706 | Plant 4 Bonneville, ID | Mar 2013 | — | No | ModNegligence | $100 | $100 |
| 8593637 | Plant 1 Bannock, ID | Oct 2012 | — | No | ModNegligence | $100 | $100 |
| 6581363 | Plant 4 Bonneville, ID | May 2012 | — | No | ModNegligence | $100 | $100 |
| 6581357 | Plant 1 Bannock, ID | Apr 2012 | — | No | ModNegligence | $100 | $100 |
| 6581325 | Plant 1 Bannock, ID | Nov 2011 | — | No | ModNegligence | $100 | $100 |
| 6580505 | Plant 3 Bingham, ID | Nov 2010 | — | No | ModNegligence | $100 | $100 |
| 8562102 | Plant 3 Bingham, ID | May 2010 | — | No | ModNegligence | $100 | $100 |
| 6484001 | Plant 4 Bonneville, ID | Apr 2010 | — | No | ModNegligence | $100 | $100 |
| 6475886 | Plant 2 Bingham, ID | Apr 2009 | — | No | ModNegligence | $100 | $100 |
| 6475885 | Plant 2 Bingham, ID | Apr 2009 | — | No | ModNegligence | $100 | $100 |
| 6475884 | Plant 2 Bingham, ID | Apr 2009 | — | No | ModNegligence | $100 | $100 |
| 6475882 | Plant 2 Bingham, ID | Apr 2009 | — | No | ModNegligence | $100 | $100 |
| 6475881 | Plant 2 Bingham, ID | Apr 2009 | — | No | ModNegligence | $100 | $100 |
| 6475880 | Plant 2 Bingham, ID | Apr 2009 | — | No | ModNegligence | $100 | $100 |
| 6475879 | Plant 2 Bingham, ID | Apr 2009 | — | No | ModNegligence | $100 | $100 |
| 6475876 | Plant 2 Bingham, ID | Apr 2009 | — | No | ModNegligence | $100 | $100 |
| 6475254 | Plant 1 Bannock, ID | Oct 2008 | — | No | ModNegligence | $100 | $100 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for MICKELSEN CONSTRUCTION, INC.. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for MICKELSEN CONSTRUCTION, INC.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for MICKELSEN CONSTRUCTION, INC.. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for MICKELSEN CONSTRUCTION, INC.. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2007-04-16 | Complaint | 0 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Part of a larger organization
MICKELSEN CONSTRUCTION, INC. is one of 4 establishments rolled up under the parent organization MICKELSEN CONSTRUCTION, INC.
Federal enforcement records on this page represent activity at this specific establishment only. The full enforcement footprint of MICKELSEN CONSTRUCTION, INC across all 4 of its tracked locations is viewable on the parent profile.
Other employers in this industry and state
Other employers in site preparation contractors within ID, ordered by federal enforcement volume:
- GRANITE EXCAVATION, INC.NAMPA — 2 federal enforcement records
- THUESON CONSTRUCTION, INCWILDER — 2 federal enforcement records
- KNIFE RIVER CORPORATION - MOUNTAIN WESTBOISE — 2 federal enforcement records
- SUNROC CORPORATIONDRIGGS — 2 federal enforcement records
- SUPERIOR CONSTRUCTION & EXCAVATING, INC.MERIDIAN — 2 federal enforcement records
- GORDON PAVING CO., INCBURLEY — 2 federal enforcement records
- LURRE CONSTRUCTION, INC.BOISE — 2 federal enforcement records
- LANDON EXCAVATING, INC.IDAHO FALLS — 2 federal enforcement records
- GRANITE EXCAVATION, INC.CASCADE — 2 federal enforcement records
- GRANITE EXCAVATION, INC.BOISE — 2 federal enforcement records
Other locations under this parent
Other establishments operated by MICKELSEN CONSTRUCTION, INC, ordered by federal enforcement volume:
- MICKELSEN CONSTRUCTION, INC.POCATELLO, ID — 2 federal enforcement records
- MICKELSEN CONSTRUCTION, INC.BLACKFOOT, ID — 2 federal enforcement records
- MICKELSEN CONSTRUCTION, INC.POCATELLO, ID — 1 federal enforcement record
Related searches
- All MICKELSEN CONSTRUCTION, INC locationsParent rollup
- Site Preparation ContractorsAll employers in this industry
- Employers in IDState-wide enforcement data
- Site Preparation Contractors in IDIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on MICKELSEN CONSTRUCTION, INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code. This establishment resolves to the parent rollup MICKELSEN CONSTRUCTION, INC, which operates 4 establishments in our dataset.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is MICKELSEN CONSTRUCTION, INC.'s OSHA violation history?
- MICKELSEN CONSTRUCTION, INC. has 1 OSHA inspection on record with 0 violations and $0 in total penalties.
- How does MICKELSEN CONSTRUCTION, INC.'s safety record compare to its industry?
- MICKELSEN CONSTRUCTION, INC. operates in the site preparation contractors industry. The industry average Total Recordable Incident Rate (TRIR) is 1.5. MICKELSEN CONSTRUCTION, INC.'s self-reported DART rate is 0 compared to an industry average of 1.