Establishment profile
JTL GROUP INC
4800 WILKIE STREET, MISSOULA, MT, 59808
Operated by Knife River Corp · 1 of 192 establishments
327320 — Ready-Mix Concrete Manufacturing
Summary
JTL GROUP INC has accumulated 0 OSHA violations across 1 inspection over 1 year of recorded history.
The most recent federal enforcement activity was recorded 1 year ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
JTL GROUP INC appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
Peer comparison
Fewer violations than most other employers in NAICS 3273 within MT. Peer group: 73 employers. This establishment has 0 OSHA violations; peer median is 2.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for JTL GROUP INC. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for JTL GROUP INC. Verify directly with Occupational Safety and Health Administration →
Activity timeline
Most recent federal enforcement activity recorded 1 year ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for JTL GROUP INC. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in MT — for Knife River Corp, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other Knife River Corp operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 58 citations · 13S&S · 26 contractor · $5,735 proposed / $5,622 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 6267957 | KALISPELL CRUSHER Yellowstone, MT | Sep 2001 | — | Yes | HighNegligence | $1,500 | $1,500 |
| 6269976 | KALISPELL CRUSHER Yellowstone, MT | Mar 2003 | — | No | ModNegligence | $184 | $184 |
| 6269330 | MRM MOBILE CRUSHER #176 Lake, MT | Oct 2002 | — | Yes | ModNegligence | $161 | $161 |
| 6269327 | MRM MOBILE CRUSHER #176 Lake, MT | Oct 2002 | — | Yes | ModNegligence | $161 | $161 |
| 6269170 | MRM WASH PLANT #170 Missoula, MT | May 2002 | — | Yes | ModNegligence | $150 | $150 |
| 6269333 | MRM MOBILE CRUSHER #176 Lake, MT | Oct 2002 | — | Yes | LowNegligence | $140 | $140 |
| 7904970 | Belgrade Pit Gallatin, MT contractor: Jtl Group Inc | Oct 2000 | — | Yes | ModNegligence | $140 | $140 |
| 7904967 | Belgrade Pit Gallatin, MT contractor: Jtl Group Inc | Oct 2000 | — | Yes | ModNegligence | $140 | $140 |
| 6269332 | MRM MOBILE CRUSHER #176 Lake, MT | Oct 2002 | — | Yes | ModNegligence | $122 | $122 |
| 6266965 | KALISPELL CRUSHER Yellowstone, MT | Jan 2001 | — | Yes | ModNegligence | $113 | $113 |
| 7904969 | Belgrade Pit Gallatin, MT contractor: Jtl Group Inc | Oct 2000 | — | No | ModNegligence | $113 | $55 |
| 6269326 | MRM MOBILE CRUSHER #176 Lake, MT | Oct 2002 | — | Yes | ModNegligence | $104 | $104 |
| 6269173 | MRM WASH PLANT #170 Missoula, MT | May 2002 | — | Yes | LowNegligence | $104 | $104 |
| 6269169 | MRM WASH PLANT #170 Missoula, MT | May 2002 | — | Yes | LowNegligence | $104 | $104 |
| 6269168 | MRM WASH PLANT #170 Missoula, MT | May 2002 | — | Yes | LowNegligence | $104 | $104 |
| 6323151 | MRM WASH PLANT #170 Missoula, MT | Jan 2006 | — | No | LowNegligence | $60 | $60 |
| 6322720 | MRM WASH PLANT #170 Missoula, MT | Apr 2005 | — | No | ModNegligence | $60 | $60 |
| 6322719 | MRM WASH PLANT #170 Missoula, MT | Apr 2005 | — | No | ModNegligence | $60 | $60 |
| 6270885 | Polson Wash Plant Lake, MT contractor: JTL Group | Apr 2004 | — | No | LowNegligence | $60 | $60 |
| 6270516 | KALISPELL CRUSHER Yellowstone, MT | Oct 2003 | — | No | ModNegligence | $60 | $60 |
| 6270515 | KALISPELL CRUSHER Yellowstone, MT | Oct 2003 | — | No | ModNegligence | $60 | $60 |
| 6270001 | KALISPELL CRUSHER Yellowstone, MT | Mar 2003 | — | No | ModNegligence | $55 | $55 |
| 6269979 | KALISPELL CRUSHER Yellowstone, MT | Mar 2003 | — | No | ModNegligence | $55 | $55 |
| 6269978 | KALISPELL CRUSHER Yellowstone, MT | Mar 2003 | — | No | ModNegligence | $55 | $55 |
| 6269977 | KALISPELL CRUSHER Yellowstone, MT | Mar 2003 | — | No | ModNegligence | $55 | $55 |
| 6269975 | KALISPELL CRUSHER Yellowstone, MT | Mar 2003 | — | No | ModNegligence | $55 | $55 |
| 6269974 | KALISPELL CRUSHER Yellowstone, MT | Mar 2003 | — | No | ModNegligence | $55 | $55 |
| 6269973 | KALISPELL CRUSHER Yellowstone, MT | Mar 2003 | — | No | ModNegligence | $55 | $55 |
| 6269972 | KALISPELL CRUSHER Yellowstone, MT | Mar 2003 | — | No | ModNegligence | $55 | $55 |
| 6269334 | MRM MOBILE CRUSHER #176 Lake, MT | Oct 2002 | — | No | ModNegligence | $55 | $55 |
| 6269331 | MRM MOBILE CRUSHER #176 Lake, MT | Oct 2002 | — | No | LowNegligence | $55 | $55 |
| 6269329 | MRM MOBILE CRUSHER #176 Lake, MT | Oct 2002 | — | No | ModNegligence | $55 | $55 |
| 6269328 | MRM MOBILE CRUSHER #176 Lake, MT | Oct 2002 | — | No | ModNegligence | $55 | $55 |
| 6268367 | KALISPELL CRUSHER Yellowstone, MT | Jul 2002 | — | No | ModNegligence | $55 | $55 |
| 6269167 | Mullan Road Wash Plant Missoula, MT contractor: Jtl Group Inc | May 2002 | — | No | ModNegligence | $55 | $55 |
| 6269166 | Mullan Road Wash Plant Missoula, MT contractor: Jtl Group Inc | May 2002 | — | No | ModNegligence | $55 | $55 |
| 6269165 | Mullan Road Wash Plant Missoula, MT contractor: Jtl Group Inc | May 2002 | — | No | ModNegligence | $55 | $55 |
| 6269164 | Mullan Road Wash Plant Missoula, MT contractor: Jtl Group Inc | May 2002 | — | No | ModNegligence | $55 | $55 |
| 6269163 | Mullan Road Wash Plant Missoula, MT contractor: Jtl Group Inc | May 2002 | — | No | ModNegligence | $55 | $55 |
| 6269162 | Mullan Road Wash Plant Missoula, MT contractor: Jtl Group Inc | May 2002 | — | No | LowNegligence | $55 | $55 |
| 6269161 | Mullan Road Wash Plant Missoula, MT contractor: Jtl Group Inc | May 2002 | — | No | LowNegligence | $55 | $55 |
| 6269160 | Mullan Road Wash Plant Missoula, MT contractor: Jtl Group Inc | May 2002 | — | No | LowNegligence | $55 | $55 |
| 6269159 | Mullan Road Wash Plant Missoula, MT contractor: Jtl Group Inc | May 2002 | — | No | LowNegligence | $55 | $55 |
| 6269158 | Mullan Road Wash Plant Missoula, MT contractor: Jtl Group Inc | May 2002 | — | No | ModNegligence | $55 | $55 |
| 6268317 | Billings Pit Yellowstone, MT contractor: Jtl Group Inc | May 2002 | — | No | ModNegligence | $55 | $55 |
| 6268278 | KALISPELL CRUSHER Yellowstone, MT | Mar 2002 | — | No | ModNegligence | $55 | $55 |
| 6268270 | Billings Pit Yellowstone, MT contractor: Jtl Group Inc | Jan 2002 | — | No | ModNegligence | $55 | $55 |
| 6268188 | Portable Crusher #1 Missoula, MT contractor: Jtl Group Inc | Nov 2001 | — | No | ModNegligence | $55 | $55 |
| 6267778 | Belgrade Pit Gallatin, MT contractor: Jtl Group Inc | Nov 2001 | — | No | ModNegligence | $55 | $55 |
| 6267777 | Belgrade Pit Gallatin, MT contractor: Jtl Group Inc | Nov 2001 | — | No | ModNegligence | $55 | $55 |
| 6267312 | Billings Pit Yellowstone, MT contractor: Jtl Group Inc | Aug 2001 | — | No | ModNegligence | $55 | $55 |
| 6267311 | Billings Pit Yellowstone, MT contractor: Jtl Group Inc | Aug 2001 | — | No | ModNegligence | $55 | $55 |
| 6266914 | KALISPELL CRUSHER Yellowstone, MT | Jan 2001 | — | No | LowNegligence | $55 | $55 |
| 7904974 | Belgrade Pit Gallatin, MT contractor: Jtl Group Inc | Oct 2000 | — | No | ModNegligence | $55 | $55 |
| 7904973 | Belgrade Pit Gallatin, MT contractor: Jtl Group Inc | Oct 2000 | — | No | ModNegligence | $55 | $55 |
| 7904972 | Belgrade Pit Gallatin, MT contractor: Jtl Group Inc | Oct 2000 | — | No | ModNegligence | $55 | $55 |
| 7904971 | Belgrade Pit Gallatin, MT contractor: Jtl Group Inc | Oct 2000 | — | No | ModNegligence | $55 | — |
| 7904968 | Belgrade Pit Gallatin, MT contractor: Jtl Group Inc | Oct 2000 | — | No | ModNegligence | $55 | $55 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for JTL GROUP INC. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for JTL GROUP INC. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for JTL GROUP INC. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for JTL GROUP INC. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
Consolidated across all USAspending recipient entities under this corporate parent — not attributable to this single location.
- Department of TransportationMT PFH 2009(2) MT STATEWIDE 2009 PAVEMENT PRESERVATION PROJECTS SCH D - LITTLE JOE ROADcontract · Last action 2010-12-14$376,411
- Department of the InteriorLEE METCALF FILL FOR IRRIGATION PROJECTcontract · Last action 2019-11-14$19,942
- Department of the InteriorASPHALT, WINTER MIX, GLACIER NATIONAL PARKcontract · Last action 2012-12-07$7,200
- Department of the InteriorGLACIER NATIONAL PARK - WINTER ASPHALTcontract · Last action 2012-01-13$7,065
- Department of AgricultureIGF::OT::IGF THIS PURCHASE ORDER IS FOR 30 TONS BULK COLD MIX ASPHALT (UPM) AND DELIVERY TO THE THREE RIVERS RANGER DISTRICT IN TROY, MT.contract · Last action 2016-08-03$4,260
Federal contract dollars to this establishment. Primary NAICS: 237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Last action: 2019-11-14. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2024-07-23 | Referral | 0 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Part of a larger organization
JTL GROUP INC is one of 192 establishments rolled up under the parent organization Knife River Corp.
Federal enforcement records on this page represent activity at this specific establishment only. The full enforcement footprint of Knife River Corp across all 192 of its tracked locations is viewable on the parent profile.
Other employers in this industry and state
Other employers in ready-mix concrete manufacturing within MT, ordered by federal enforcement volume:
- TIMBERLINE READY MIX, INC.EUREKA — 3 federal enforcement records
- S & N CONCRETEANACONDA — 3 federal enforcement records
- MALTA READY MIX INCMALTA — 2 federal enforcement records
- PIONEER CONCRETE & FUEL, INCBUTTE — 2 federal enforcement records
- MASTODON SAND & GRAVEL COMPANYDEER LODGE — 2 federal enforcement records
- CONCRETE MATERIALS OF MONTANABILLINGS — 2 federal enforcement records
- PIONEER CONCRETE & FUEL, INC.BUTTE — 2 federal enforcement records
- CENTENNIAL CONCRETEBUTTE — 2 federal enforcement records
- KENYON NOBLE READY MIX COBOZEMAN — 2 federal enforcement records
- Knife River CorporationMISSOULA — 2 federal enforcement records
Other locations under this parent
Other establishments operated by Knife River Corp, ordered by federal enforcement volume:
- HAWAIIAN CEMENTAIEA, HI — 4 federal enforcement records
- KNIFE RIVER CORPORATIONBILLINGS, MT — 3 federal enforcement records
- CONNOLLY-PACIFIC COAVALON, CA — 3 federal enforcement records
- KNIFE RIVER CORPORATIONLODI, CA — 3 federal enforcement records
- KNIFE RIVER CORPORATION - NORTH CENTRALHARRIS, MN — 3 federal enforcement records
- KNIFE RIVER CORPORATION - NORTH CENTRALSAUK RAPIDS, MN — 3 federal enforcement records
- HAWAIIAN CEMENTHONOLULU, HI — 3 federal enforcement records
- KNIFE RIVER CORPORATION - NORTH CENTRALLITTLE FALLS, MN — 3 federal enforcement records
- KNIFE RIVER CORPORATION - NORTH CENTRALELK RIVER, MN — 3 federal enforcement records
- HAWAIIAN CEMENTKAPOLEI, HI — 3 federal enforcement records
Related searches
- All Knife River Corp locationsParent rollup
- Ready-Mix Concrete ManufacturingAll employers in this industry
- Employers in MTState-wide enforcement data
- Ready-Mix Concrete Manufacturing in MTIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on JTL GROUP INC from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code. This establishment resolves to the parent rollup Knife River Corp, which operates 192 establishments in our dataset.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is JTL GROUP INC's OSHA violation history?
- JTL GROUP INC has 1 OSHA inspection on record with 0 violations and $0 in total penalties.
- How does JTL GROUP INC's safety record compare to its industry?
- JTL GROUP INC operates in the ready-mix concrete manufacturing industry. The industry average Total Recordable Incident Rate (TRIR) is 2.5.