Summary
JAMES DEAN CONSTRUCTION has no OSHA inspection history on file. Federal records covering wage, environmental, labor relations, and other agencies are noted below where present.
The most recent federal enforcement activity was recorded 0 days ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
JAMES DEAN CONSTRUCTION appears in MSHA mine safety record only. No matching records were found in OSHA workplace safety, WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification, FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls. Single-agency enforcement records typically indicate either a discrete incident-based inspection or a low-risk operational profile.
OSHA workplace safety
No OSHA inspections, citations, or accidents on file for JAMES DEAN CONSTRUCTION. Verify directly with Occupational Safety and Health Administration →
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 20 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for JAMES DEAN CONSTRUCTION. Verify directly with Occupational Safety and Health Administration →
Activity timeline
Most recent federal enforcement activity recorded 0 days ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for JAMES DEAN CONSTRUCTION. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in WA — for JAMES DEAN CONSTRUCTION, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other JAMES DEAN CONSTRUCTION operations in the same state.
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for JAMES DEAN CONSTRUCTION. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC)
No H-1B, H-2A, or H-2B labor condition applications on file for JAMES DEAN CONSTRUCTION. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for JAMES DEAN CONSTRUCTION. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for JAMES DEAN CONSTRUCTION. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- Department of TransportationAK PFH 40-1(1), KAKE TO SEAL PT ROADcontract · Last action 2014-04-23$12,918,836
- Department of AgricultureHEMLOCK DAM REMOVALcontract · Last action 2011-03-09$2,184,093
- Department of TransportationIGF::CT::IGF OR PFH 102(4)*, CODY ROAD - WAMIC MARKET GRADE RECONSTRUCTION&OR PFH 102(4), CODY ROAD - WAMIC MARKET GRADE RECONSTRUCTION&OR WASCO 104(1), RAIL HOLLOW OVERLAYcontract · Last action 2016-07-14$1,915,377
- Department of the InteriorROADWAY CONSTRUCITON INCLUDING GRADE, DRAIN, AND SURFACE PREPARATION IN OKANOGAN COUNTY, WAcontract · Last action 2011-09-01$1,195,828
- Department of the InteriorROADWAY CONSTRUCITON INCLUDING GRADE, DRAIN, AND SURFACE PREPARATION IN FERRY COUNTY, WAcontract · Last action 2014-03-27$1,149,331
- Department of TransportationIGF::CT::IGF WA NPS NOCA 101(4), CASCADE RIVER ROAD MP 21.8 BOSTON CREEKcontract · Last action 2016-07-26$804,229
- Department of AgricultureLUCK LAKE RECREATION ENHANCEMENTS&EAGLE CREEK ROAD IMPROVEMENTS. IGF::OT::IGFcontract · Last action 2015-08-05$708,503
- Department of AgricultureTAS:: 12 1102:: TAS - RECOVERY - RESURFACING MT. ADAMS ROAD 60. THIS PROJECT INCLUDES SCARIFICATION, SUB-GRADE PREPARATION, DITCH MAINTENANCE, TRAFFIC CONTROL, HAZARD TREE REMOVAL, QUARRY DEVELOPMENT, PRODUCTION OF AGGREGATE, AND HAULING, PLACING, WATERING AND COMPACTION OF AGGREGATEcontract · Last action 2010-09-20$316,032
- Department of AgricultureROAD NOS. 2300 AND 2353 FILLSLOPE REPAIRcontract · Last action 2010-05-12$289,756
- Department of AgricultureRECONSTRUCTION OF STORM DAMAGED FOREST SERVICE ROAD (FSR) 2270.contract · Last action 2010-09-07$143,195
- Department of AgricultureIGF::OT::IGF KAKE ROAD RECONDITIONING 2013 THIS PROJECT INVOLVES ROADWAY RECONDITIONING, INCLUDING BRUSHING AND DITCHING AND SHAPING THE EXISTING ROADWAY; CULVERT INSTALLATIONS; CLEANING CULVERT INLETS; REPLACING UNTREATED WOOD WEAR SURFACING ON A MODULAR BRIDGE; AND PRODUCING, LOADING, HAULING, AND PLACING UNCLASSIFIED ROCK BORROW AND 12 MINUS ROCK BORROW ON SINGLE LANE FOREST ROADS NEAR KAKE, ALASKA.contract · Last action 2013-11-04$118,630
- Department of AgricultureRECONSTRUCTION OF STORM DAMAGED FOREST SERVICE ROAD (FSR) 2281 M.P. 0.43.contract · Last action 2010-09-07$116,160
- Department of AgricultureIGF::OT::IGF SWIFT CREEK BRIDGE MAINTENANCEcontract · Last action 2014-10-20$88,820
- Department of AgricultureRECONSTRUCTION OF STORM DAMAGED FOREST SERVICE ROAD (FSR) 2281000 M.P. 4.9.contract · Last action 2011-09-19$73,425
- Department of AgricultureRD 4300 MP 0.0 - 1.0 CULVERTScontract · Last action 2010-06-30$25,314
- Department of the InteriorIGF::OT::IGF MID COLUMBIA RVR-3/4 MINUS GRAVELcontract · Last action 2018-08-01$2,919
- Department of AgricultureROAD MAINTENANCE BASE INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) SOLICITATION.contract · Last action 2012-05-09$0
- Department of Agriculture20 ROAD REPAIR CONTRACTcontract · Last action 2008-10-20$-1,318
- Department of AgricultureBLM CAMP CREEK FISH PASSAGE.CULVERT REPLACEMENTcontract · Last action 2008-05-01$-3,167
Federal contract dollars to this establishment. Primary NAICS: 237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Last action: 2018-08-01. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
In the news
Related searches
- Employers in WAState-wide enforcement data
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →About this data
This profile aggregates federal enforcement records on JAMES DEAN CONSTRUCTION from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Frequently asked
- What is JAMES DEAN CONSTRUCTION's OSHA violation history?
- JAMES DEAN CONSTRUCTION has no OSHA inspections on record.