Establishment profile
INTEGRATED PRO SERVICES LLC
400 RUSSELL, BLDG 502, BELLE CHASSE, LA, 70037
238910 — Site Preparation Contractors
Summary
INTEGRATED PRO SERVICES LLC has accumulated 0 OSHA violations across 1 inspection over 16 years of recorded history.
The most recent federal enforcement activity was recorded 16 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
INTEGRATED PRO SERVICES LLC appears in OSHA workplace safety and FMCSA motor carrier registration records only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
Peer comparison
Fewer violations than most other employers in NAICS 2389 within LA. Peer group: 466 employers. This establishment has 0 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for INTEGRATED PRO SERVICES LLC. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for INTEGRATED PRO SERVICES LLC. Verify directly with Occupational Safety and Health Administration →
OSHA accident events
Accidents, fatalities, and catastrophes documented during OSHA inspections at this employer. Each entry links to the inspection that recorded it.
| Date | Event | Injuries | Hospitalized | Fatalities | |
|---|---|---|---|---|---|
| Aug 16, 2009 | STACKER CRANE,EQUIPMENT OPERATOR,CONSTRUCTION,STRUCK BY,BACKING UPFatality | 2 | — | 1 |
Source: OSHA accident investigations. Narratives are recorded by the inspecting officer and may be truncated.
Activity timeline
No federal enforcement activity has been recorded against this establishment in 16+ years. Most recent activity: 16 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for INTEGRATED PRO SERVICES LLC. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
No MSHA mine safety violations on file for INTEGRATED PRO SERVICES LLC. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for INTEGRATED PRO SERVICES LLC. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC)
No H-1B, H-2A, or H-2B labor condition applications on file for INTEGRATED PRO SERVICES LLC. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for INTEGRATED PRO SERVICES LLC. Verify directly with Environmental Protection Agency →
Motor carrier safety (FMCSA)
Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for INTEGRATED PRO SERVICES LLC. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- Department of AgricultureCONSTRUCTION OF THE NEW SUGARCANE RESEARCH UNIT, PHASE 1A, HOUMA, LOUISIANAcontract · Last action 2010-07-16$5,590,353
- Department of DefensePORT ARTHUR HURRICANE FLOOD PROTECTION, FCCEcontract · Last action 2010-05-05$3,736,128
- General Services AdministrationIGF::OT::IGF TEST NG FOR OPTION ENTRYcontract · Last action 2013-05-20$533,000
- Department of DefenseWEST BANK AND VICINITY, MISSISSIPPI RIVER LEVEE, MISSISSIPI RIVER AND TRIBUTARIES PROJECT (MRL), ALGIERS LEVEE (PHASE 2)contract · Last action 2016-03-31$485,551
- General Services AdministrationTHE SCOPE OF THIS PROJECT INCLUDES MITIGATION AND REMEDIATION OF MOLD ON MULTIPLE FLOORS AND MULTIPLE LOCATIONS AS SPECIFIED IN THE MOLD REMEDIATION PROTOCOL PREPARED BY US PHS FOH EHS FOH AND GSA ENVIRONMENTAL OFFICE.contract · Last action 2012-09-20$203,154
- General Services AdministrationREMOVAL OF APPROXIMATELY 7,258 SQUARE FEET OF ASBESTOS-CONTAINING CEILING TEXTURE FROM THE THIRD FLOOR CORRIDOR AT THE JM WISDOM COURT OF APPEALS.contract · Last action 2011-05-09$92,708
- General Services AdministrationASBESTOS ABATEMENT FOR 10TH FLOOR OF EARLE CABELL FEDERAL BUILDING.contract · Last action 2012-03-01$61,453
- General Services AdministrationPERFORM ASBESTOS ABATEMENT ON WINDOW IN THE FOB LITTLE ROCK, AR.contract · Last action 2010-08-02$60,354
- General Services AdministrationASBESTOS ABATEMENT ON 1ST AND 4TH FLOOR OF HISTORIC U.S. COURTHOUSEcontract · Last action 2012-08-27$45,649
- General Services AdministrationABATEMENT OF OLD EXISITING LAND PORT OF ENTRY IN DEL RIO, TX.contract · Last action 2009-07-09$43,863
- General Services AdministrationASBESTOS ABATEMENT LAREDO, TX0177contract · Last action 2010-12-28$43,503
- General Services AdministrationASBESTOS ABATEMENT AND MOLD REMEDIATION PROJECTcontract · Last action 2012-03-12$40,714
- General Services AdministrationREMOVAL OF ASBESTOS-CONTAINING VINYL FLOOR TILE AND MASTIC FROM EARLE CABELL FB, DALLAS.contract · Last action 2010-12-28$35,761
- General Services AdministrationASBESTOS ABATEMENT ON THE 6TH FLOOR ARE OCCUPIED BY THE U.S. MARSHAL SERVICE. ABATEMENT NEEDED DUE TO ON-GOING REMODELING PROJECT.contract · Last action 2011-10-13$31,386
- General Services Administration"RECOVERY" ASBESTOS ABATEMENT IN PREPARATION OF NEW EQUIPMENT INSTALLATION AT ELDON MAHON COURTHOUSE, FORT WORTH, TEXAS.contract · Last action 2011-10-03$27,806
- General Services AdministrationMOLD REMEDIATION, ALLIANCE TOWER, HOUSTON, TXcontract · Last action 2010-02-09$26,216
- General Services AdministrationASBESTOS ABATEMENT FOR U.S. MARSHALS SERVICE 6TH FLOOR SPECIAL CLEAN, BOGGS FB, NEW ORLEANS, LAcontract · Last action 2012-06-11$24,725
- General Services AdministrationABATEMENT OF INSULATION DURING UNIT REPLACEMENT PROJECTcontract · Last action 2011-03-21$24,605
- General Services AdministrationASBESTOS ABATEMENT FOR THE US MARSHALS SERVICE TASK FORCE AREA OF THE 6TH FLOOR OF THE HALE BOGGS FB. REMODELING PROJECT ON-GOING. REMOVAL OF CARPET IS PULLING OF PULLING OFF THE TILE AND ASBESTOS CONTAINING MASTIC, REQUIRING ABATEMENT.contract · Last action 2011-10-05$23,112
- General Services AdministrationASBESTOS ABATEMENT OF FLOORING IN THE HOUMA ELLENDER FEDERAL BUILDING. 2ND FLOOR FLOOR TILE, CARPET AND ALL RESIDUAL MASTIC.contract · Last action 2012-06-20$21,827
- General Services AdministrationASBESTOS ABATEMENT OF BLACK MASTICcontract · Last action 2010-06-02$20,623
- General Services AdministrationREMOVAL OF ASBESTOS CONTAINING VINYL FLOOR TILE AND MASTIC FROM DESGNATED AREAS IN THE TYLER FEDERAL BUILDING AND COURTHOUSE.contract · Last action 2011-01-04$19,928
- General Services AdministrationTHE SCOPE OF THIS PROJECT INCLUDES THE REMOVAL OF ASBESTOS-CONTAINING VINYL FLOOR TILE, MASTIC, STEAM LINE INSULATION AND CEMENT BACKER BOARD FROM THE TYLER POST OFFICE AND FEDERAL COURTHOUSE.contract · Last action 2010-07-01$15,853
- General Services AdministrationLEAD REMOVAL AND SELECTIVE DEMOLITION OF HOLDING CELL, BOGGS FB/DC, NEW ORLEANScontract · Last action 2012-06-14$14,070
- General Services AdministrationASBESTOS ABATEMENT IN BASEMENT AREA, TEXARKANA FOBcontract · Last action 2009-12-21$13,462
- General Services Administration3RD FLOOR HALLWAY, FB/CTHS, TYLER, TEXAScontract · Last action 2011-09-02$13,009
- General Services AdministrationASBESTOS ABATEMENT FOR FBI RA SPACE, FEDERAL BUILDING, PINE BLUFF, ARcontract · Last action 2010-08-26$12,625
- General Services AdministrationASBESTOS ABATEMENT IN ROOM 12B2 ON THE 12TH FLOOR OF THE EARLE CABELL FB IN DALLAS, TX.contract · Last action 2012-06-07$11,895
- General Services AdministrationASBESTOS ABATEMENTcontract · Last action 2009-11-04$11,784
- General Services AdministrationMOLD REMEDIATION ON THE 3RD FLOOR: JUDGE'S LIBRARY AND TWO LAW CLERK OFFICES. REMODEL OF AGENCY SPACE.contract · Last action 2011-09-21$11,484
- General Services AdministrationASBESTOS ABATEMENT FOR DHS-CBP AIR MARINE UNIT GALVESTON OFFICE EXPANSION BUILDOUT @ GALVESTON COURTHOUSE, 601 ROSENBERG STREET, HOUSTON, TXcontract · Last action 2011-01-19$10,733
- General Services AdministrationASBESTOS ABATEMENT FOR 3 AREAS IN THE JACK BROOKS FEDERAL BUILDING IN BEAUMONT, TXcontract · Last action 2011-06-15$10,333
- General Services AdministrationMOLD ABATEMENTcontract · Last action 2009-12-22$10,038
- Department of DefenseMINIMUM GUARANTEE - CONTRACTcontract · Last action 2013-11-26$10,000
- General Services AdministrationASBESTOS ABATEMENT FOR JUDGE DAVIS' CHAMBERS ON THE 3RD FLOOR OF THE TYLER FEDERAL BUILDING&COURTHOUSE IN TYLER, TX. THE CARPET IS BEING REPLACED EXPOSING THE ASBESTOS-CONTAINING TILE.contract · Last action 2011-11-30$9,909
- General Services AdministrationMOLD ABATEMENT AND PIPE AND FITTING INSULATION REPLACEMENT IN TWO ROOMS IN THE BASEMENT OF THE FEDERAL BUILDING, POST OFFICE AND COURTHOUSE IN PINE BLUFF, ARcontract · Last action 2011-12-12$9,724
- General Services AdministrationASBESTOS ABATEMENT IN BLDG. TX0292ZZ IN DALLAS, TEXAS FOR THE DEPARTMENT OF LABOR.contract · Last action 2011-03-02$9,543
- General Services AdministrationREMOVAL OF EST. 1,800 SQUARE FEET OF VINYL FLOOR TILEcontract · Last action 2011-03-30$9,536
- General Services AdministrationGLOVE BAGGING PIPE INSULATION FROM HVAC UNITS IN THE BASEMENT OF BLDG TX0220ZZ MIDLAND, TX.contract · Last action 2010-11-19$9,401
- General Services AdministrationREMOVAL OF VINYL FLOOR TILE, ASBESTOS CONTAINING MASTIC AND UNDERLYING PARQUET WOOD FLOORING.contract · Last action 2010-03-09$9,352
- General Services AdministrationMOLD REMEDIATION OF BUILDING MATERIALS FROM THE 19TH FLOOR OF THE GT LELAND FEDERAL BUILDING.contract · Last action 2011-02-07$9,017
- General Services AdministrationMOLD REMEDIATION IN THE BASEMENT AREA OF THE FORT SMITH COURTHOUSE, AR.contract · Last action 2010-08-12$8,955
- General Services AdministrationASBESTOS ABATEMENT FOR DHS-ICE GALVESTON OFFICE EXPANSION BUILDOUT, GALVESTON, TXcontract · Last action 2011-05-20$8,918
- General Services AdministrationREMOVAL OF MOLD IMPACTED BUILDING MATERIALS FROM THE 2ND AND 3RD FLOORS OF THE CORPUS CHRISTI COURTHOUSE.contract · Last action 2011-09-07$8,673
- General Services AdministrationTHE SCOPE OF THIS PROJECT INCLUDES REMOVAL OF ASBESTOS-CONTAINING VINYL FLOOR TILE AND MASTIC, WATER STRAIGHTS AND FITTING INSULATION AND DEMOLITION OF ABANDONED STEAM LINE STRAIGHTS AND FITTINGS FROM BUILDINGS 1 AND 3 AT THE BORDER PATROL SECTOR HEADQUARTERS.contract · Last action 2012-04-25$8,654
- General Services AdministrationMOLD REMEDIATION, FLOORS 8 AND 12, BOB CASEY FEDERAL COURTHOUSE, HOUSTON, TXcontract · Last action 2011-11-03$7,928
- General Services AdministrationREMOVAL OF ASBESTOS CONTAINING VINYL FLOOR TILE, MASTIC AND CARPET.contract · Last action 2010-09-22$7,924
- General Services AdministrationLEAD PAINT ABATEMENT OF 3RD FLOOR HALLWAY CROWN MOLDING AT THE TYLER P.O. AND COURTHOUSE BUILDING, TYLER, TX.contract · Last action 2012-05-02$7,908
- General Services AdministrationASBESTOS ABATEMENT, GALVESTON POST OFFICE AND COURTHOUSE.contract · Last action 2011-07-20$7,656
- General Services AdministrationASBESTOS ABATEMENT IN FEDERAL BUILDING, FRITZ G. LANHAM, FORT WORTH, TX.contract · Last action 2010-05-03$7,510
Federal contract dollars to this establishment. Primary NAICS: 236220 - COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION. Last action: 2016-03-31. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2009-08-17 | Unprogrammed Related | 0 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in site preparation contractors within LA, ordered by federal enforcement volume:
- BO-MAC CONTRACTORS, LTDBATON ROUGE — 2 federal enforcement records
- REPUBLIC CONTRACTORS, INC.SHREVEPORT — 2 federal enforcement records
- GLENN LEGE CONSTRUCTION, INC.LAFAYETTE — 2 federal enforcement records
- GLENN LEGE CONSTRUCTION, INC.YOUNGSVILLE — 2 federal enforcement records
- A & A ENTERPRISES, INCKENNER — 2 federal enforcement records
- JAMES CONSTRUCTION GROUPGEISMAR — 2 federal enforcement records
- DURR HEAVY CONSTRUCTION, LLCCOVINGTON — 2 federal enforcement records
- GLENN LEGE CONSTRUCTION, INC.LAFAYETTE — 2 federal enforcement records
- J & J MECHANICAL CONTRACTORSBATON ROUGE — 1 federal enforcement record
- LIVE OAK EARTH WORKS, LLCBROUSSARD — 1 federal enforcement record
Related searches
- Site Preparation ContractorsAll employers in this industry
- Employers in LAState-wide enforcement data
- Site Preparation Contractors in LAIndustry × state cross-filter
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →About this data
This profile aggregates federal enforcement records on INTEGRATED PRO SERVICES LLC from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Frequently asked
- What is INTEGRATED PRO SERVICES LLC's OSHA violation history?
- INTEGRATED PRO SERVICES LLC has 1 OSHA inspection on record with 0 violations and $0 in total penalties.
- How does INTEGRATED PRO SERVICES LLC's safety record compare to its industry?
- INTEGRATED PRO SERVICES LLC operates in the site preparation contractors industry. The industry average Total Recordable Incident Rate (TRIR) is 1.5.
- Has INTEGRATED PRO SERVICES LLC had any workplace fatalities?
- Yes. Federal records show 1 fatality investigation involving INTEGRATED PRO SERVICES LLC.