Establishment profile
HK CONTRACTORS, INC
1795 PEDERSEN ST, IDAHO FALLS, ID, 83402
237310 — Highway, Street, and Bridge Construction
Summary
HK CONTRACTORS, INC has accumulated 2 OSHA violations across 3 inspections over 18 years of recorded history, with $5,336 in total assessed penalties.
The establishment sits in the 82nd percentile for violations within its industry-state peer group of 278 employers. Inspection frequency runs at the 91st percentile. The most recent enforcement activity was recorded 3 years ago.
Federal records were found in 3 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
HK CONTRACTORS, INC appears in OSHA workplace safety, WHD wage enforcement, and MSHA mine safety records only. No matching records were found in EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
67% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 2 distinct standards shown · 2 citations in this view · $5,336 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1926.0028 A | 1 | 1 | $3,836 | Jul 2019 | Jul 2019 |
| 29 CFR 1926.0652 A01 | 1 | 1 | $1,500 | Dec 2007 | Dec 2007 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Worse on violations than most other employers in NAICS 2373 within ID. Peer group: 278 employers. This establishment has 2 OSHA violations; peer median is 0.
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 212 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for HK CONTRACTORS, INC. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 3+ years. Most recent activity: 3 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
Department of Labor Wage & Hour Division — minimum-wage, overtime, child-labor, FMLA, and prevailing-wage enforcement.
Wage and hour breakdown by law
Per-statute totals across all closed DOL Wage & Hour cases against this employer. Backwages reflect amounts the agency assessed; civil penalty is the separate fine where applicable. Some acts (Davis-Bacon, SCA, CWHSSA, H-2B, CCPA) don't carry a civil penalty field in DOL's data. 1 statute · 1 violation · $0 in backwages
| Statute | Period | Cases | Violations | Workers | Backwages | Civil penalty |
|---|---|---|---|---|---|---|
| FLSA — minimum wage & overtime | Nov 2022 | 1 | 1 | — | — | — |
Source: DOL WHD enforcement database, aggregated per statute. Lifetime totals. A case can cite multiple statutes — so the total here may exceed the case count in the table above.
Wage and hour cases
Closed DOL Wage & Hour Division cases (FLSA, FMLA, H-2B, MSPA, and related statutes). Backwages reflect amounts the agency assessed; civil penalty (CMP) is a separate fine levied on top, where the statute provides for one (FLSA / H-1B / H-2A / MSPA / FMLA / EPPA / FLSA Child Labor; other acts have no CMP column in DOL’s data). The Statutes column lists which laws each case cited. 1 case · 1 violations · $0 in backwages
| Case period | Industry | Statutes | Violations | Workers | Backwages | Civil penalty |
|---|---|---|---|---|---|---|
| Nov 2019 – Nov 2022 | Highway, Street, and Bridge Construction | FLSA | 1 | 0 | — | — |
Source: DOL WHD enforcement database. Cases shown reflect those the agency has closed and made public. A violation count is the agency’s tally of cited violations (one violation can affect many workers); the workers column counts distinct employees the agency found to be affected.
Mine safety (MSHA)
Company-level in ID — for HK CONTRACTORS, INC, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other HK CONTRACTORS, INC operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 28S&S · $23,741 proposed / $22,325 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 7977585 | 134 Crusher H-K Portable Plant Bear Lake, ID | May 2000 | — | Yes | HighNegligence | $3,000 | $2,400 |
| 7977586 | 134 Crusher H-K Portable Plant Bear Lake, ID | May 2000 | — | Yes | HighNegligence | $2,000 | $1,600 |
| 9654255 | 134 Crusher H-K Portable Plant Bear Lake, ID | Mar 2022 | — | Yes | ModNegligence | $840 | $840 |
| 9470265 | 133 Portable Crusher Bonneville, ID | Apr 2020 | — | Yes | ModNegligence | $782 | $782 |
| 9470248 | 133 Portable Crusher Bonneville, ID | Jan 2020 | — | Yes | ModNegligence | $782 | $782 |
| 6483927 | 133 Portable Crusher Bonneville, ID | Jan 2010 | — | Yes | LowNegligence | $634 | $285 |
| 6374251 | 133 Portable Crusher Bonneville, ID | Nov 2005 | — | Yes | ModNegligence | $614 | $614 |
| 6374250 | 133 Portable Crusher Bonneville, ID | Nov 2005 | — | Yes | ModNegligence | $614 | $614 |
| 6581380 | 132 Portable Crusher Bonneville, ID | Jul 2012 | — | Yes | ModNegligence | $540 | $540 |
| 5052938 | 134 Crusher H-K Portable Plant Bear Lake, ID | Jun 2025 | — | Yes | ModNegligence | $432 | $432 |
| 5052937 | 134 Crusher H-K Portable Plant Bear Lake, ID | Jun 2025 | — | Yes | ModNegligence | $432 | $432 |
| 6360496 | 133 Portable Crusher Bonneville, ID | Mar 2005 | — | Yes | ModNegligence | $324 | $324 |
| 8825241 | 133 Portable Crusher Bonneville, ID | Sep 2014 | — | Yes | ModNegligence | $263 | $263 |
| 8593917 | 133 Portable Crusher Bonneville, ID | Feb 2014 | — | Yes | ModNegligence | $263 | $263 |
| 6581379 | 132 Portable Crusher Bonneville, ID | Jul 2012 | — | Yes | ModNegligence | $243 | $243 |
| 5055452 | 134 Crusher H-K Portable Plant Bear Lake, ID | Feb 2026 | — | No | ModNegligence | $209 | $209 |
| 5058308 | 133 Portable Crusher Bonneville, ID | Dec 2025 | — | No | ModNegligence | $193 | $193 |
| 5052924 | 134 Crusher H-K Portable Plant Bear Lake, ID | Jun 2025 | — | No | ModNegligence | $193 | $193 |
| 5052923 | 134 Crusher H-K Portable Plant Bear Lake, ID | Jun 2025 | — | No | ModNegligence | $193 | $193 |
| 9907476 | 134 Crusher H-K Portable Plant Bear Lake, ID | Mar 2025 | — | No | ModNegligence | $193 | $193 |
| 9907455 | 133 Portable Crusher Bonneville, ID | Jan 2025 | — | No | ModNegligence | $193 | $193 |
| 9901750 | 133 Portable Crusher Bonneville, ID | Sep 2023 | — | No | ModNegligence | $182 | $182 |
| 8757077 | 1700 Trac Screening Plant Bonneville, ID | Apr 2014 | — | No | HighNegligence | $181 | $181 |
| 9370811 | 132 Portable Crusher Bonneville, ID | Apr 2018 | — | Yes | ModNegligence | $177 | $177 |
| 6347584 | 133 Portable Crusher Bonneville, ID | Apr 2004 | — | No | LowNegligence | $177 | $140 |
| 6347094 | 133 Portable Crusher Bonneville, ID | Mar 2003 | — | Yes | ModNegligence | $173 | $173 |
| 6347090 | 133 Portable Crusher Bonneville, ID | Mar 2003 | — | Yes | ModNegligence | $173 | $173 |
| 6347089 | 133 Portable Crusher Bonneville, ID | Mar 2003 | — | Yes | ModNegligence | $173 | $173 |
| 9654254 | 134 Crusher H-K Portable Plant Bear Lake, ID | Mar 2022 | — | No | ModNegligence | $169 | $169 |
| 9654253 | 134 Crusher H-K Portable Plant Bear Lake, ID | Mar 2022 | — | No | ModNegligence | $169 | $169 |
| 5051535 | 132 Portable Crusher Bonneville, ID | Jul 2025 | — | No | ModNegligence | $165 | $165 |
| 6302428 | 134 Crusher H-K Portable Plant Bear Lake, ID | Aug 2005 | — | Yes | ModNegligence | $165 | $165 |
| 9826226 | 132 Portable Crusher Bonneville, ID | Sep 2024 | — | No | ModNegligence | $161 | $161 |
| 9478611 | 133 Portable Crusher Bonneville, ID | Jan 2021 | — | No | ModNegligence | $159 | $159 |
| 9470249 | 133 Portable Crusher Bonneville, ID | Jan 2020 | — | No | ModNegligence | $157 | $157 |
| 9901734 | Portable Wash Plant #1 Bonneville, ID | Aug 2023 | — | No | ModNegligence | $155 | $155 |
| 9901732 | Portable Wash Plant #1 Bonneville, ID | Aug 2023 | — | No | ModNegligence | $155 | $155 |
| 6347587 | 133 Portable Crusher Bonneville, ID | Apr 2004 | — | Yes | ModNegligence | $154 | $154 |
| 5055453 | 134 Crusher H-K Portable Plant Bear Lake, ID | Feb 2026 | — | No | ModNegligence | $151 | $151 |
| 5058307 | 133 Portable Crusher Bonneville, ID | Dec 2025 | — | No | ModNegligence | $151 | $151 |
| 5052968 | 133 Portable Crusher Bonneville, ID | Aug 2025 | — | No | ModNegligence | $151 | $151 |
| 5052967 | 133 Portable Crusher Bonneville, ID | Aug 2025 | — | No | ModNegligence | $151 | $151 |
| 5052966 | 133 Portable Crusher Bonneville, ID | Aug 2025 | — | No | ModNegligence | $151 | $151 |
| 5052926 | 134 Crusher H-K Portable Plant Bear Lake, ID | Jun 2025 | — | No | ModNegligence | $151 | $151 |
| 5052925 | 134 Crusher H-K Portable Plant Bear Lake, ID | Jun 2025 | — | No | ModNegligence | $151 | $151 |
| 5052922 | 134 Crusher H-K Portable Plant Bear Lake, ID | Jun 2025 | — | No | ModNegligence | $151 | $151 |
| 9907454 | 133 Portable Crusher Bonneville, ID | Jan 2025 | — | No | ModNegligence | $151 | $151 |
| 9907453 | 133 Portable Crusher Bonneville, ID | Jan 2025 | — | No | ModNegligence | $151 | $151 |
| 7993153 | 133 Portable Crusher Bonneville, ID | Jan 2002 | — | Yes | ModNegligence | $150 | $120 |
| 9826225 | 132 Portable Crusher Bonneville, ID | Sep 2024 | — | No | ModNegligence | $147 | $147 |
| 9907682 | 133 Portable Crusher Bonneville, ID | Aug 2024 | — | No | ModNegligence | $147 | $147 |
| 9306786 | 134 Crusher H-K Portable Plant Bear Lake, ID | Mar 2024 | — | No | ModNegligence | $147 | $147 |
| 9306783 | 133 Portable Crusher Bonneville, ID | Mar 2024 | — | No | ModNegligence | $147 | $147 |
| 9306782 | 133 Portable Crusher Bonneville, ID | Mar 2024 | — | No | ModNegligence | $147 | $147 |
| 9901749 | 133 Portable Crusher Bonneville, ID | Sep 2023 | — | No | ModNegligence | $143 | $143 |
| 9901742 | 134 Crusher H-K Portable Plant Bear Lake, ID | Sep 2023 | — | No | ModNegligence | $143 | $143 |
| 9901741 | 134 Crusher H-K Portable Plant Bear Lake, ID | Sep 2023 | — | No | ModNegligence | $143 | $143 |
| 9901740 | 134 Crusher H-K Portable Plant Bear Lake, ID | Sep 2023 | — | No | LowNegligence | $143 | $143 |
| 9901733 | Portable Wash Plant #1 Bonneville, ID | Aug 2023 | — | No | ModNegligence | $143 | $143 |
| 7977563 | 134 Crusher H-K Portable Plant Bear Lake, ID | Jan 2000 | — | Yes | ModNegligence | $140 | $140 |
| 7977562 | 134 Crusher H-K Portable Plant Bear Lake, ID | Jan 2000 | — | Yes | ModNegligence | $140 | $140 |
| 7977550 | 134 Crusher H-K Portable Plant Bear Lake, ID | Jan 2000 | — | Yes | ModNegligence | $140 | $140 |
| 7977549 | 134 Crusher H-K Portable Plant Bear Lake, ID | Jan 2000 | — | Yes | ModNegligence | $140 | $140 |
| 8825570 | 133 Portable Crusher Bonneville, ID | Sep 2016 | — | No | ModNegligence | $134 | $134 |
| 9727864 | 133 Portable Crusher Bonneville, ID | Sep 2022 | — | No | ModNegligence | $133 | $133 |
| 9727863 | 133 Portable Crusher Bonneville, ID | Sep 2022 | — | No | ModNegligence | $133 | $133 |
| 9727802 | 134 Crusher H-K Portable Plant Bear Lake, ID | Jul 2022 | — | No | ModNegligence | $133 | $133 |
| 9654256 | 134 Crusher H-K Portable Plant Bear Lake, ID | Mar 2022 | — | No | ModNegligence | $133 | $133 |
| 9654457 | 133 Portable Crusher Bonneville, ID | Mar 2022 | — | No | ModNegligence | $133 | $133 |
| 8593667 | 133 Portable Crusher Bonneville, ID | Nov 2012 | — | No | ModNegligence | $127 | $127 |
| 8558987 | 133 Portable Crusher Bonneville, ID | Aug 2010 | — | No | ModNegligence | $127 | $127 |
| 6303805 | 133 Portable Crusher Bonneville, ID | Aug 2008 | — | No | ModNegligence | $127 | $127 |
| 9478668 | 134 Crusher H-K Portable Plant Bear Lake, ID | Aug 2021 | — | No | ModNegligence | $125 | $125 |
| 9474872 | 133 Portable Crusher Bonneville, ID | May 2021 | — | No | LowNegligence | $125 | $125 |
| 9478612 | 133 Portable Crusher Bonneville, ID | Jan 2021 | — | No | ModNegligence | $125 | $125 |
| 9478610 | 134 Crusher H-K Portable Plant Bear Lake, ID | Jan 2021 | — | No | ModNegligence | $125 | $125 |
| 7993887 | 134 Crusher H-K Portable Plant Bear Lake, ID | Nov 2001 | — | Yes | ModNegligence | $122 | $122 |
| 9431139 | 133 Portable Crusher Bonneville, ID | Oct 2018 | — | No | ModNegligence | $118 | $118 |
| 9431131 | 134 Crusher H-K Portable Plant Bear Lake, ID | Oct 2018 | — | No | ModNegligence | $118 | $118 |
| 9370810 | 132 Portable Crusher Bonneville, ID | Apr 2018 | — | No | ModNegligence | $118 | $118 |
| 8825339 | 134 Crusher H-K Portable Plant Bear Lake, ID | Mar 2015 | — | No | ModNegligence | $117 | $117 |
| 8825338 | 134 Crusher H-K Portable Plant Bear Lake, ID | Mar 2015 | — | No | ModNegligence | $117 | $117 |
| 8825240 | 133 Portable Crusher Bonneville, ID | Sep 2014 | — | No | ModNegligence | $117 | $117 |
| 8757196 | 134 Crusher H-K Portable Plant Bear Lake, ID | Sep 2014 | — | No | ModNegligence | $117 | $117 |
| 8593916 | 133 Portable Crusher Bonneville, ID | Feb 2014 | — | No | ModNegligence | $117 | $117 |
| 9370225 | 133 Portable Crusher Bonneville, ID | Nov 2017 | — | No | ModNegligence | $116 | $116 |
| 9370224 | 133 Portable Crusher Bonneville, ID | Nov 2017 | — | No | ModNegligence | $116 | $116 |
| 8836910 | 133 Portable Crusher Bonneville, ID | Sep 2017 | — | No | LowNegligence | $116 | $116 |
| 8757382 | Portable Wash Plant #1 Bonneville, ID | Sep 2015 | — | No | ModNegligence | $100 | $100 |
| 8757373 | 133 Portable Crusher Bonneville, ID | Aug 2015 | — | No | ModNegligence | $100 | $100 |
| 8757198 | 134 Crusher H-K Portable Plant Bear Lake, ID | Sep 2014 | — | No | ModNegligence | $100 | $100 |
| 8757197 | 134 Crusher H-K Portable Plant Bear Lake, ID | Sep 2014 | — | No | ModNegligence | $100 | $100 |
| 8757081 | 1700 Trac Screening Plant Bonneville, ID | Apr 2014 | — | No | ModNegligence | $100 | $100 |
| 8757080 | 1700 Trac Screening Plant Bonneville, ID | Apr 2014 | — | No | ModNegligence | $100 | $100 |
| 8756364 | Portable Wash Plant #1 Bonneville, ID | Nov 2013 | — | No | HighNegligence | $100 | $100 |
| 8756363 | Portable Plant 130 Bonneville, ID | Nov 2013 | — | No | HighNegligence | $100 | $100 |
| 8756362 | 1700 Trac Screening Plant Bonneville, ID | Nov 2013 | — | No | HighNegligence | $100 | $100 |
| 8593248 | Portable Wash Plant #1 Bonneville, ID | Jul 2012 | — | No | LowNegligence | $100 | $100 |
| 8593247 | Portable Wash Plant #1 Bonneville, ID | Jul 2012 | — | No | LowNegligence | $100 | $100 |
| 8593246 | Portable Wash Plant #1 Bonneville, ID | Jul 2012 | — | Yes | LowNegligence | $100 | $100 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for HK CONTRACTORS, INC. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for HK CONTRACTORS, INC. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for HK CONTRACTORS, INC. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for HK CONTRACTORS, INC. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
Consolidated across all USAspending recipient entities under this corporate parent — not attributable to this single location.
- Department of TransportationWY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGEcontract · Last action 2025-09-09$120,228,420
- Department of TransportationWY NPS YELL 10(23), GRAND LOOP ROAD-OLD FAITHFUL TO WEST THUMBcontract · Last action 2026-03-06$44,450,173
- Department of TransportationRECOVERY, TAS::69 0504::TAS, MT PRA GLAC 10(23), GTSR REHABILITATION BIG BEND TO LOGAN PASS, PHASE VIIIcontract · Last action 2013-04-08$42,581,647
- Department of TransportationIGF::CT::IGF WY PRA YELL 10(19) GRAND LOOP ROAD, NORRIS TO GOLDEN GATE, PHASE 2 COMPLETION CONTRACTcontract · Last action 2022-04-06$37,689,773
- Department of TransportationCONSTRUCTION SERVICES FOR WFL PROJECT ID CLARK 6805(1), YALE-KILGORE ROAD, MP 9 TO 16.9 & ID FREMONT 6805(1), YALE-KILGORE ROAD, MP 16.9 TO 30.8. WORK CONSISTS OF GRADING, DRAINAGE, FISH PASSAGE CULVERT, BASE, PAVING, BRIDGE DECK REPLACEMENT ANDcontract · Last action 2025-09-03$29,340,817
- Department of TransportationWY PRA-YELL 10(15) GRAND LOOP ROAD (MADISON TO NORRIS, SEGMENT B)contract · Last action 2011-09-22$28,972,363
- Department of TransportationWY NPS YELL 10(22), CANYON TO TOWER, PHASE 3contract · Last action 2023-01-17$25,798,083
- Department of TransportationIGF::CT::IGF MT PRA GLAC 10(39) GTSR REHABILITATION, SIYEH BEND TO RISING SUN, PHASE XIIcontract · Last action 2016-04-29$22,178,133
- Department of TransportationIGF::CT::IGF CRITICAL FUNCTIONS WY PRA YELL 10(16) GRAND LOOP ROAD, CANYON TO TOWER, PHASE 2contract · Last action 2014-08-13$19,369,576
- Department of TransportationMT ERFO NP YELL 2022-1(1), YELLOWSTONE NP OLD GARDINER ROAD EMERGENCY REPAIRScontract · Last action 2024-11-05$19,059,298
- Department of TransportationIGF::CT::IGF WY PRA YELL 10(17) GRAND LOOP ROAD NORRIS TO GOLDEN GATE - PHASE 1contract · Last action 2016-08-09$18,758,861
- Department of TransportationWY PRA GRTE 13(4)-WY PRA GRTE 13(8)-WY PLD GRTE 710(1), NORTH PARK ROAD, PHASE II - NORTH PARK ROAD, SNAKE RIVER BRIDGE - GRAND TETON PARK PATHWAYS, PHASE Icontract · Last action 2011-07-22$17,818,759
- Department of TransportationROAD CONSTRUCTION ON WY HPP 4-1(5), BEARTOOTH HIGHWAYcontract · Last action 2012-05-04$12,983,432
- Department of TransportationMT PRA GLAC 10(33) GTSR CRYSTAL POINT TO HAYSTACKcontract · Last action 2011-09-21$12,449,165
- Department of TransportationMT NPS YELL 11(2), NORTH ENTRANCEcontract · Last action 2023-01-24$12,377,336
- Department of TransportationMT PRA GLAC 10(31) GTSR REHAB, LOGEN TO SIYEH BEND, PHASE XIcontract · Last action 2012-06-19$11,015,363
- Department of TransportationIGF::CT::IGF CRITICAL FUNCTIONS WY PRA GRTE 13(7 NORTH PARK ROAD, JACKSON LAKE LODGE TO LEEKS MARINAcontract · Last action 2014-01-31$10,675,707
- Department of TransportationIGF::CT::IGF MT PRA GLAC 10(30) WEST ENTRANCE TO AVALANCHE, PHASE Xcontract · Last action 2019-07-24$10,009,678
- Department of TransportationIGF::CT::IGF MT PRA GLAC 10(40), GTSR RISING SUN TO ST. MARY'S - PHASE 13contract · Last action 2021-01-25$8,717,220
- Department of TransportationMT PRA GLAC 10(22) GTSR REHABILITATION, AVALANCHE TO WEST TUNNEL, PHASE VIIcontract · Last action 2014-02-24$6,463,688
- Department of TransportationWY NPS GRTE 700(4), IMPROVE SAFETY AT GROS VENTRE JUNCTION WITH A MODERN ROUNDABOUTcontract · Last action 2019-07-24$5,652,502
- Department of TransportationMT NPS ERFO 2007(1)-45(3) GTSR MP33 PERMANENT ERFO REPAIRS PHASE IIcontract · Last action 2010-02-10$4,174,167
- Department of TransportationWY PRA GRTE 11(4) TETON PARK ROAD (SPALDING BAY - JACKSON LK JCT) RECOVERY, TAS::69 0504::TAScontract · Last action 2011-02-17$3,705,109
- Department of TransportationMT PRA GLAC 10(32) QUARRY STONE PRODUCTION FOR PHASES VI&VIIcontract · Last action 2009-06-05$3,355,769
- Department of TransportationMT PRA GLAC PW(1) PARK WIDE TRAFFIC AND QUALITY CONTROLcontract · Last action 2011-12-09$2,608,785
- Department of TransportationMT PRA GLAC 10(28) ST. MARY VISITOR CENTER REHABILITATIONcontract · Last action 2009-04-02$2,224,826
- Department of TransportationMT PRA GLAC PW(2), PARK-WIDE TRAFFIC AND QUALITY CONTROL CONTRACT NO. DTFH70-07-D-00009 TASK ORDER NO. T-11-001 TAS NO. 69-8083contract · Last action 2013-04-08$1,797,265
- Department of TransportationMT NPS ERFO 2007(1)-45(5) GTSR MP 23.3 SLOPE REPAIRcontract · Last action 2009-06-04$997,351
- Department of the InteriorRECOVERY YELL PMIS#20445 THE CONTRACTOR SHALL MILL AND REPAVE AN EXISTING SECTION OF ASPHALT ROADWAY.contract · Last action 2010-04-19$992,969
- Department of TransportationMT PRA GLAC 10(27) REHABILITATE WEST ENTRANCE STATIONcontract · Last action 2009-06-10$763,529
- Department of TransportationWY PRA GRTE 13(9) NORTH PARK ROAD, UTILITIES AND SLOPE STABILIZATIONcontract · Last action 2012-05-21$677,262
- Department of TransportationIGF::CT::IGF MT PRA GLAC 1041(1), CONSTRUCT ADDITIONAL PARKING MODULE AT THE APGAR TRANSIT CENTERcontract · Last action 2014-11-10$630,452
- Department of TransportationIGF::CT::IGF MT GLAC 1430(1), WINDY AND APIKUNI CREEK BRIDGE REPAIRScontract · Last action 2016-04-29$617,236
- Department of TransportationMT PRA GLAC 10(36) ROCKFALL MITIGATION AND STONE RESOURCINGcontract · Last action 2011-06-20$304,922
- Department of TransportationMT NPS ERFO 2007(1)-45(4) GTSR MP 19.25 SLOPE REPAIRcontract · Last action 2010-07-26$298,683
- Department of TransportationBASE PERIOD TRAFFIC CONTROLcontract · Last action 2010-03-31$254,053
- Department of TransportationWY PRA YELL 10(20) REPAIR ISA LAKE BRIDGEcontract · Last action 2010-01-21$149,070
- Department of the InteriorDUBOIS FIRE STATION PAVINGcontract · Last action 2009-01-13$72,681
- Department of TransportationWY PRA-YELL 103(1)&108(1) NORTH RIM DRIVE & CANYON AREA ROADS/SOUTH RIM DRIVEcontract · Last action 2009-11-03$38,408
- Department of TransportationWY NPS YELL 10(24), NORRIS TO GOLDEN GATE, PHASE 3 CONSTRUCTABILITY REVIEWcontract · Last action 2021-07-13$30,000
- Department of TransportationWESTERN REGION PAVEMENT PRESERVATION MULTIPLE AWARD TASK ORDER CONTRACTS (MATOC) COVERING A 5-YEAR PERIOD FOR HIGHWAY/BRIDGE/ROAD PROJECTS FOR PAVEMENT PRESERVATION WORK IN THE WESTERN UNITED STATEScontract · Last action 2025-10-10$25,000
- Department of TransportationYELLOWSTONE GRTE MATOC 2024: CONSTRUCTION, MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) COVERING A 5-YEAR PERIOD FOR HIGHWAY/BRIDGE/ROAD PROJECTS IN YELLOWSTONE NATIONAL PARK, GRAND TETON NATIONAL PARK, AND PROJECTS IN THE SURROUNDING AREA.contract · Last action 2025-10-10$25,000
- Department of TransportationMT PRA-GLAC 10(21) GOING TO THE SUN ROAD REHABILITATION, WEST TUNNEL TO HAYSTACK, PHASE VIcontract · Last action 2009-12-09$15,378
- Department of the InteriorCHIPSEAL & STRIPING OF ROADWAYS IN GRTE NPcontract · Last action 2009-03-04$12,395
- Department of the InteriorTACK OIL TO BE USED IN ROADWAY MAINTENANCEcontract · Last action 2010-09-14$5,748
- Department of the InteriorTACK OIL FOR SIGNAL MOUNTAIN ROAD PROJECT.contract · Last action 2009-06-10$3,000
- Department of TransportationIGF::CT::IGF YELLOWSTONE, GRAND TETON,&SURROUNDING AREA MATOCcontract · Last action 2023-07-31$0
- Department of TransportationGOING TO THE SUN ROAD REHABILITATION CONTRACTcontract · Last action 2023-07-24$0
- Department of TransportationHK CONTRACTORS - 2019 YELLOWSTONE_GRAND TETON MATOCcontract · Last action 2023-07-05$0
- Department of TransportationYELLOWSTONE/GRAND TETON MATOCcontract · Last action 2015-12-14$0
Federal contract dollars to this establishment. Primary NAICS: 237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Last action: 2026-03-06. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2019-04-23 | Planned | 1 | — | $3,836 | |
| 2012-09-11 | Planned | 0 | — | $0 | |
| 2007-10-23 | Referral | 1 | 1 | $1,500 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in highway, street, and bridge construction within ID, ordered by federal enforcement volume:
- GRANITE EXCAVATION, INC.RUPERT — 2 federal enforcement records
- H-K CONTRACTORS, INC.TWIN FALLS — 2 federal enforcement records
- COOK & SONS CONSTRUCTION LLCPLUMMER — 2 federal enforcement records
- BECO CONSTRUCTION COMPANY, INC.IDAHO FALLS — 2 federal enforcement records
- H-K CONTRACTORS, INC.2 federal enforcement records
- CANNON BUILDERS, INC.BLACKFOOT — 2 federal enforcement records
- KLOEPFER, INC.SHOSHONE — 2 federal enforcement records
- WESTERN CONSTRUCTION, INCBLISS — 2 federal enforcement records
- H-K CONTRACTORS, INCARCO — 2 federal enforcement records
- COOK & SONS CONSTRUCTION LLCGRANGEVILLE — 2 federal enforcement records
Related searches
- Highway, Street, and Bridge ConstructionAll employers in this industry
- Employers in IDState-wide enforcement data
- Highway, Street, and in IDIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on HK CONTRACTORS, INC from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is HK CONTRACTORS, INC's OSHA violation history?
- HK CONTRACTORS, INC has 3 OSHA inspections on record with 2 violations and $5,336 in total penalties.
- How does HK CONTRACTORS, INC's safety record compare to its industry?
- HK CONTRACTORS, INC operates in the highway, street, and bridge construction industry. The industry average Total Recordable Incident Rate (TRIR) is 2.5. HK CONTRACTORS, INC's self-reported DART rate is 0 compared to an industry average of 1.5.