Establishment profile
COOK & SONS CONSTRUCTION LLC
ZUMWALT RD., GRANGEVILLE, ID, 83530
237310 — Highway, Street, and Bridge Construction
Summary
COOK & SONS CONSTRUCTION LLC has accumulated 0 OSHA violations across 2 inspections over 11 years of recorded history.
The most recent federal enforcement activity was recorded 2 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
COOK & SONS CONSTRUCTION LLC appears in OSHA workplace safety, WHD wage enforcement, MSHA mine safety, and FMCSA motor carrier registration records only. No matching records were found in EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
Peer comparison
Fewer violations than most other employers in NAICS 2373 within ID. Peer group: 278 employers. This establishment has 0 OSHA violations; peer median is 0.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for COOK & SONS CONSTRUCTION LLC. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
Self-reported events under 29 CFR 1904.39 (24-hour notification of hospitalization, amputation, or loss of an eye) · Jun 2022 – Jan 2025
Most frequent event: Fall on same level due to slip or trip
Source: OSHA Severe Injury Reports (federal OSHA only; state-plan states like California, Oregon, and Washington maintain their own programs and do not consistently report into this feed).
Severe injury reports — events
Each row is a hospitalization, amputation, or eye-loss event the employer self-reported to OSHA under 29 CFR 1904.39. Narratives are written by the reporting employer.
| Date | Event | Body part | Outcome | |
|---|---|---|---|---|
| Jan 8, 2025 | Fall on same level due to slip or trip | Hip joint(s) | Hospitalized | |
| Jun 10, 2022 | Other fall to lower level 21 to 25 feet | Multiple body parts, n.e.c. | Hospitalized |
Source: OSHA Severe Injury Reports. Federal-OSHA jurisdiction only by default; some state-plan programs report voluntarily.
Activity timeline
No federal enforcement activity has been recorded against this establishment in 2+ years. Most recent activity: 2 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
Department of Labor Wage & Hour Division — minimum-wage, overtime, child-labor, FMLA, and prevailing-wage enforcement.
Wage and hour breakdown by law
Per-statute totals across all closed DOL Wage & Hour cases against this employer. Backwages reflect amounts the agency assessed; civil penalty is the separate fine where applicable. Some acts (Davis-Bacon, SCA, CWHSSA, H-2B, CCPA) don't carry a civil penalty field in DOL's data. 2 statutes · 59 violations · $31,567 in backwages · $7,040 in civil penalties
| Statute | Period | Cases | Violations | Workers | Backwages | Civil penalty |
|---|---|---|---|---|---|---|
| FLSA — minimum wage & overtime | Dec 2023 | 1 | 30 | 17 | $26,292 | $7,040 |
| Davis-Bacon (federal construction) | Dec 2023 | 1 | 29 | 17 | $5,275 | — |
Source: DOL WHD enforcement database, aggregated per statute. Lifetime totals. A case can cite multiple statutes — so the total here may exceed the case count in the table above.
Wage and hour cases
Closed DOL Wage & Hour Division cases (FLSA, FMLA, H-2B, MSPA, and related statutes). Backwages reflect amounts the agency assessed; civil penalty (CMP) is a separate fine levied on top, where the statute provides for one (FLSA / H-1B / H-2A / MSPA / FMLA / EPPA / FLSA Child Labor; other acts have no CMP column in DOL’s data). The Statutes column lists which laws each case cited. 1 case · 59 violations · $31,567 in backwages · $7,040 in civil penalties · 17 workers affected
| Case period | Industry | Statutes | Violations | Workers | Backwages | Civil penalty |
|---|---|---|---|---|---|---|
| Dec 2020 – Dec 2023 | Highway, Street, and Bridge Construction | Davis-BaconFLSA | 59 | 17 | $31,567 | $7,040 |
Source: DOL WHD enforcement database. Cases shown reflect those the agency has closed and made public. A violation count is the agency’s tally of cited violations (one violation can affect many workers); the workers column counts distinct employees the agency found to be affected.
Mine safety (MSHA)
Company-level in ID — for COOK & SONS CONSTRUCTION LLC, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other COOK & SONS CONSTRUCTION LLC operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 10 citations · $1,286 proposed / $1,286 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 9501639 | Portable Operation Idaho, ID | Aug 2024 | — | No | LowNegligence | $147 | $147 |
| 9618967 | Portable Operation Idaho, ID | Jul 2023 | — | No | ModNegligence | $143 | $143 |
| 9611599 | Portable Operation Idaho, ID | Aug 2022 | — | No | LowNegligence | $133 | $133 |
| 9611281 | Portable Operation Idaho, ID | Jul 2021 | — | No | ModNegligence | $125 | $125 |
| 9501442 | Portable Operation Idaho, ID | May 2020 | — | No | ModNegligence | $123 | $123 |
| 9501441 | Portable Operation Idaho, ID | May 2020 | — | No | ModNegligence | $123 | $123 |
| 9501440 | Portable Operation Idaho, ID | May 2020 | — | No | ModNegligence | $123 | $123 |
| 9501439 | Portable Operation Idaho, ID | May 2020 | — | No | ModNegligence | $123 | $123 |
| 9501438 | Portable Operation Idaho, ID | May 2020 | — | No | ModNegligence | $123 | $123 |
| 9501437 | Portable Operation Idaho, ID | May 2020 | — | No | ModNegligence | $123 | $123 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for COOK & SONS CONSTRUCTION LLC. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for COOK & SONS CONSTRUCTION LLC. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for COOK & SONS CONSTRUCTION LLC. Verify directly with Environmental Protection Agency →
Motor carrier safety (FMCSA)
Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for COOK & SONS CONSTRUCTION LLC. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- Department of AgricultureS FK SALMON RIVER ROAD REHABILITATIONcontract · Last action 2023-02-15$3,446,833
- Department of AgricultureGAOA - DELMOE LAKE AND HIGHLAND ROADS IMPROVEMENTS - BEAVERHEAD DEERLODGE NATIONAL FOREST. THE INTENT OF THIS PROJECT IS TO IMPROVE ROAD DRAINAGE AND REPLACE AGGREGATE SURFACING ON DELMOE LAKE ROAD #222 & 9371 AND HIGHLAND ROAD #84 WHICH ARE LOCAcontract · Last action 2024-08-14$2,622,857
- Department of AgricultureROCK CREEK ROAD RECONSTRUCTION AND GRAVEL - GAOAcontract · Last action 2024-08-29$2,454,673
- Department of AgricultureSCATTER CREEK ROAD HOT ASPHALT CONCRETE AND SLIDE REPAIR ON THE REPUBLIC RANGER DISTRICTcontract · Last action 2018-07-17$1,297,073
- Department of the InteriorEAGLE CREEK ROAD RECONSTRUCTIONcontract · Last action 2024-06-17$1,224,472
- Department of AgricultureNATIONAL FOREST SYSTEM ROAD 384 IMPROVEMENTScontract · Last action 2023-03-08$1,142,517
- Department of AgricultureGAOA ROUTE OF THE HIAWATHA RAIL TRAIL RESURFACING PROJECT SHOSHONE (1AQ) PLACING SURFACE AGGREGATE AND OTHER MAINTENANCE WORK ON THE ROUTE OF HIAWATHA BIKE TRAIL. OTHER WORK ITEMS INCLUDE TRAILSIDE SPECIAL CLEARING, SELECTIVE CLEARING, TRAIL AND ROAcontract · Last action 2023-12-09$971,486
- Department of AgricultureSALMON RIVER RANGER DISTRICT ROAD MAINTENANCE AND RESURFACING NPCNFcontract · Last action 2025-07-23$965,542
- Department of AgricultureTHIS PROJECT REPLACES 3 AGING AND STRUCTURALLY DEFICIENT TIMBER BRIDGES ON THE MADISON RANGER DISTRICT (BDNF). THE CROSSINGS ARE LOCATED ON NFSR 111 AT MILEPOST 6.8, 7.4, AND 11.5 RESPECTIVELY.contract · Last action 2025-09-02$871,609
- Department of AgricultureBLONDE TIMBER ROAD RECONSTRUCTION PROJECTcontract · Last action 2025-08-19$653,540
- Department of AgricultureFAWN CREEK AOPcontract · Last action 2020-08-06$527,110
- Department of the InteriorLOWER SALMON RIVER BOAT RAMP IMPROVEMENTS PHASE 2contract · Last action 2022-02-14$468,413
- Department of AgricultureBOULDER CREEK BRIDGE REPLACEMENT - (677-0.1) TASK ORDER ON THE PINTLER RD OF THE BEAVERHEAD-DEERLODGE NATIONAL FOREST THIS PROJECT REPLACES AN AGING TIMBER BRIDGE WITH NEW STEEL GIRDER BRIDGE FOUNDED ON REINFORCED CONCRETE GRADE BEAMS. THIS BRIDGcontract · Last action 2026-03-02$350,236
- Department of the InteriorGAOA COEUR D'ALENE SITE FURNISHINGScontract · Last action 2025-11-18$348,249
- Department of the InteriorLSR BOAT RAMP IMPROVEMENTS PHASE Icontract · Last action 2020-09-14$347,974
- Department of AgricultureCONSTRUCTION, MAGRUDER CORRIDOR ROAD RECONDITIONING, NEZ PERCE-CLEARWATER NATIONAL FORESTS.contract · Last action 2022-11-02$345,139
- Department of AgricultureSERVICE, FY 22 BRUSHING OF PAYETTE AND BOISE NATIONAL FOREST ROADS. AWARD IS FOR BASE ITEMS AND OPTIONAL ITEMS APPROVED BY THE AWARDED CONTRACTOR.contract · Last action 2024-09-10$340,535
- Department of AgricultureSWAN LAKE CAMPGROUND WATER SYSTEM REPLACEMENT, REPUBLIC RANGER DISTRICTcontract · Last action 2019-08-19$337,908
- Department of AgricultureJEFFERSON AOP - THE PROJECT CONSISTS OF THE REPLACEMENT OF TWO EXISTING CULVERTS AND CONSTRUCTION OF NEW OPEN BOTTOM CULVERTS FACILITATING AQUATIC ORGANISM PASSAGE (AOP). SPECIFIC IMPROVEMENTS TO FOREST ROAD 3328, M.P. 6.7 AND 6.3 INCLUDE, BUT ARcontract · Last action 2022-08-30$305,583
- Department of AgricultureROADSIDE BRUSHING - PAYETTE NATIONAL FOREST, IDcontract · Last action 2023-06-06$296,415
- Department of AgricultureWORK CONSISTS OF UPSIZING CULVERT TO A MULTI-PLATE AOP CULVERT STRUCTURE. THIS INCLUDES EARTHWORK, STREAM SIMULATION, DEWATERING, AND INSTALLING AN OVERFLOW CULVERT.contract · Last action 2022-09-12$293,470
- Department of AgricultureSEED PROJECT #3 SHERMAN CREEK BRIDGEcontract · Last action 2021-10-14$278,484
- Department of AgricultureTHIS REQUISITION IS FOR A CONSTRUCTION CONTRACT TO REPLACE THE BIG HOLE BRIDGE 918-0.1 ON THE BEAVERHEAD-DEERLODGE NFcontract · Last action 2022-09-13$276,325
- Department of AgricultureRAMSHORN CREEK BRIDGE CONSTRUCTION UNDER THE REGION 1 ROAD & BRIDGE MATOC THIS PROJECT CONSISTS OF THE REMOVAL OF EXISTING 48 INCH DIAMETER X 43FT LONG CULVERT AND REPLACING IT WITH A NEW 18FT-WIDE X 40FT-SPAN STEEL MODULAR BRIDGE ON PRECAST CONcontract · Last action 2024-02-20$250,301
- Department of AgricultureTHE PROJECT CONSISTS OF BEST MANAGEMENT PRACTICE (BMP) UPGRADES, ROAD IMPROVEMENT WORK, DRAIN DIP CONSTRUCTION, AND GRAVEL SURFACING PLACEMENT AND/OR REFURBISHING.contract · Last action 2022-08-26$245,789
- Department of AgricultureTHE OBJECTIVE OF THE NFSR 444 ROAD SURFACING PROJECT IS TO PREP THE EXITING FOREST ROAD AND APPLY A 4 LIFT OF GRADATION F AGGREGATE ALONG THE IDENTIFIED SECTIONS OF THE ROAD. THE GOAL IS TO PERFORM DEFERRED MAINTENANCE AND PROVIDE DRIVABILITY. THEcontract · Last action 2025-09-29$233,980
- Department of AgricultureWALDE CULVERT REPLACEMENT MOD 1, LOCHSA/POWELL RD,NEZ PERCE-CLEARWATER NATIONAL FORESTS.contract · Last action 2025-06-26$232,847
- Department of AgricultureJUNGLE CREEK AAP# 597111contract · Last action 2022-10-26$226,208
- Department of Agriculture0412 CONST HOO HOO GULCH AOP UTILIZES RETAINED RECEIPTS, AWARD UNDER R1-R4 FERM BPAcontract · Last action 2024-09-05$185,277
- Department of AgricultureREGION 1 ROAD&BRIDGE MATOC; SEED PROJECT #4, CHICKEN CREEK BRIDGE REPAIRcontract · Last action 2020-04-15$179,070
- Department of AgricultureWINDY SHINGLE NORTH ROAD RECONSTRUCTIONcontract · Last action 2018-07-03$168,683
- Department of AgricultureBORDER CROSSING BRUSHING/CLEARING AAP# 590912contract · Last action 2021-09-28$163,145
- Department of the InteriorSHORTS BAR PARKING AREAcontract · Last action 2019-05-16$159,459
- Department of AgricultureRUSSIAN CREEK CULVERT REPLACEMENT TASK ORDER ON THE JUDITH-MUSSELSHELL RANGER DISTRICTcontract · Last action 2024-03-15$145,573
- Department of AgricultureGRANGEVILLE AIRFIELD PAVEMENT MAINTENANCEcontract · Last action 2025-09-11$140,489
- Department of AgricultureALBION HILL AGGREGATE STOCKPILING, COLVILLE NATIONAL FORESTcontract · Last action 2021-11-04$132,672
- Department of AgricultureIGF::OT::IGF HUME CREEK AOPcontract · Last action 2020-01-23$119,303
- Department of the InteriorPINE BAR BOAT RAMP IMPROVEMENTScontract · Last action 2019-12-04$100,066
- Department of AgricultureGAOA MT B-D: RECREATION AND ROAD SIGNS CONTRACT (1CU)contract · Last action 2022-09-08$89,901
- Department of AgricultureVASSAR MEADOWS CATTLEGUARD REPLACEMENT, PALOUSE RANGER DISTRICT, NEZ PERCE-CLEARWATER NATIONAL FORESTS.contract · Last action 2022-08-29$85,980
- Department of AgricultureWALDE CULVERT REPLACEMENTcontract · Last action 2022-06-29$82,551
- Department of Agriculture0412 CONSTRUCTION CORRAL TIMBER SALE ROAD, TO BE AWARDED AS A TASK ORDER AGAINST THE USFS REGION 4 ROAD AND BRIDGE CONSTRUCTION MATOCcontract · Last action 2025-08-12$77,261
- Department of AgricultureGOLD HILL TRAILHEAD IMPROVEMENT-CONSTRUCTION OF PARKING AREAS, INSTALLATION OF CONCRETE VAULT TOILET AND CONSTRUCTION OF ATV LOADING RAMP, PALOUSE RANGER DISTRICT, NEZ PERCE-CLEARWATER NF.contract · Last action 2022-05-10$75,304
- Department of AgricultureSUPPLY 16' X 43' PRE-FABRICATED STEEL BRIDGE WITH CONCRETE GRADE BEAMScontract · Last action 2020-06-15$48,386
- Department of AgricultureDEER CREEK AOP SUPPLY CONTRACTcontract · Last action 2018-05-03$47,071
- Department of AgricultureLOCHSA GATES (GATE REMOVAL, FURNISH & INSTALL), LOCHSA RANGER DISTRICT, NEZ PERCE-CLEARWATER NATIONAL FORESTS.contract · Last action 2022-01-28$45,898
- Department of AgricultureCOOK & SONS CONSTRUCTION, LLC IDNCF000678 E13contract · Last action 2024-08-15$45,680
- Department of AgriculturePITTSBURGH LANDING WATER SYSTEMcontract · Last action 2020-03-17$44,220
- Department of AgricultureCOLVILLE NATIONAL FOREST - GAOA NOISY CREEK BRIDGE RETROFIT & BRIDGE DECK RESURFACING.contract · Last action 2024-10-15$41,093
- Department of AgricultureCOOK & SONS CONSTRUCTION, LLC IDPAF005791 E93contract · Last action 2024-10-16$33,700
Federal contract dollars to this establishment. Primary NAICS: 237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Last action: 2026-04-23. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2018-08-13 | Planned | 0 | — | $0 | |
| 2014-07-07 | Planned | 0 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in highway, street, and bridge construction within ID, ordered by federal enforcement volume:
- HK CONTRACTORS, INCIDAHO FALLS — 3 federal enforcement records
- H-K CONTRACTORS, INC.TWIN FALLS — 2 federal enforcement records
- KLOEPFER, INC.SHOSHONE — 2 federal enforcement records
- BECO CONSTRUCTION COMPANY, INC.IDAHO FALLS — 2 federal enforcement records
- H-K CONTRACTORS, INC.2 federal enforcement records
- CANNON BUILDERS, INC.BLACKFOOT — 2 federal enforcement records
- COOK & SONS CONSTRUCTION LLCPLUMMER — 2 federal enforcement records
- WESTERN CONSTRUCTION, INCBLISS — 2 federal enforcement records
- H-K CONTRACTORS, INCARCO — 2 federal enforcement records
- GRANITE EXCAVATION, INC.RUPERT — 2 federal enforcement records
Related searches
- Highway, Street, and Bridge ConstructionAll employers in this industry
- Employers in IDState-wide enforcement data
- Highway, Street, and in IDIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on COOK & SONS CONSTRUCTION LLC from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is COOK & SONS CONSTRUCTION LLC's OSHA violation history?
- COOK & SONS CONSTRUCTION LLC has 2 OSHA inspections on record with 0 violations and $0 in total penalties.
- How does COOK & SONS CONSTRUCTION LLC's safety record compare to its industry?
- COOK & SONS CONSTRUCTION LLC operates in the highway, street, and bridge construction industry. The industry average Total Recordable Incident Rate (TRIR) is 2.5.