Skip to main content

Establishment profile

GRANO REFORESTATION

HWY 28 WEST, 1-1/2 MILES OFF OF HWY 71, WALDRON, AR, 72958
115310Support Activities for Forestry

Download as PDF →

OSHA inspections
1
over 24 years
Violations
25
$13,000 in penalties
Penalties
$13,000
$520 avg
Violations across 2 federal agencies
Enforcement actions from multiple agencies may indicate systemic compliance issues across functions.

Summary

GRANO REFORESTATION has accumulated 25 OSHA violations across 1 inspection over 24 years of recorded history, with $13,000 in total assessed penalties.

The establishment sits in the 97th percentile for violations within its industry-state peer group of 17,224 employers. The most recent enforcement activity was recorded 7 years ago.

Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

GRANO REFORESTATION appears in OSHA workplace safety and WHD wage enforcement records only. No matching records were found in MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

Inspections
1
0.0 / yr · last 24 yrs
Violations
25
1.0 / yr
Penalties
$13,000
$520 avg / violation
76% serious24% other
Inspection trigger · complaint
1 of 1

100% of inspections at this establishment produced violations,

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 20 distinct standards shown · 20 citations in this view · $13,000 in penalties.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
29 CFR 1910.0266 H02 I11$2,000Jul 2002Jul 2002
29 CFR 1910.0266 D01 VIIA11$2,000Jul 2002Jul 2002
29 CFR 1910.0266 D07 I11$2,000Jul 2002Jul 2002
29 CFR 1910.0266 D01 I11$2,000Jul 2002Jul 2002
29 CFR 1910.0266 D0511$1,000Jul 2002Jul 2002
29 CFR 1910.0266 D01 VI11$1,000Jul 2002Jul 2002
29 CFR 1910.0266 I0111$1,000Jul 2002Jul 2002
29 CFR 1910.0266 D06 II11$1,000Jul 2002Jul 2002
29 CFR 1910.0266 D02 I11$1,000Jul 2002Jul 2002
29 CFR 1910.0266 H02 VII11Jul 2002Jul 2002
29 CFR 1910.0266 I07 I11Jul 2002Jul 2002
29 CFR 1910.0266 I10 I11Jul 2002Jul 2002
29 CFR 1910.0266 I1111Jul 2002Jul 2002
29 CFR 1910.1200 E0111Jul 2002Jul 2002
29 CFR 1910.1200 F05 I11Jul 2002Jul 2002
29 CFR 1910.1200 G0111Jul 2002Jul 2002
29 CFR 1910.1200 H11Jul 2002Jul 2002
29 CFR 1910.0266 D01 II11Jul 2002Jul 2002
29 CFR 1910.0266 D01 IV11Jul 2002Jul 2002
29 CFR 1910.0266 D01 V11Jul 2002Jul 2002

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

97th

Worse on violations than nearly every other employer in NAICS 1153 within AR. Peer group: 17,224 employers. This establishment has 25 OSHA violations; peer median is 1.

Fewer violationsMore violations
Penalty percentile
99th
peer median: $0
Inspection frequency
0th
peer median: 1

Safety self-report (OSHA 300A)

No self-reported injury rates filed with OSHA's Injury Tracking Application for GRANO REFORESTATION. Verify directly with OSHA Injury Tracking Application

Industry benchmark

Industry avg TRIR
4.1
BLS SOII 2024
Industry avg DART
2.5
BLS SOII 2024
Self-reported TRIR
Not in OSHA ITA

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Complaint
1

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for GRANO REFORESTATION. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
7 years ago

No federal enforcement activity has been recorded against this establishment in 7+ years. Most recent activity: 7 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

Cases
3
Back wages owed
$49,750
Employees affected
48

Department of Labor Wage & Hour Division — minimum-wage, overtime, child-labor, FMLA, and prevailing-wage enforcement.

Wage and hour breakdown by law

Per-statute totals across all closed DOL Wage & Hour cases against this employer. Backwages reflect amounts the agency assessed; civil penalty is the separate fine where applicable. Some acts (Davis-Bacon, SCA, CWHSSA, H-2B, CCPA) don't carry a civil penalty field in DOL's data. 5 statutes · 155 violations · $49,750 in backwages · $5,498 in civil penalties

StatutePeriodCasesViolationsWorkersBackwagesCivil penalty
H-2B non-ag temp visaFeb 2013 – Jun 201934027$31,385
Service Contract Act (federal services)Feb 2013 – Jun 201939830$17,027
FLSA — minimum wage & overtimeFeb 2013 – Jun 2019242$940
CWHSSA (federal-contract overtime)Oct 2015111$397
MSPA (migrant farmworker protection)Feb 2013 – Jun 2019312$5,498

Source: DOL WHD enforcement database, aggregated per statute. Lifetime totals. A case can cite multiple statutes — so the total here may exceed the case count in the table above.

Wage and hour cases

Closed DOL Wage & Hour Division cases (FLSA, FMLA, H-2B, MSPA, and related statutes). Backwages reflect amounts the agency assessed; civil penalty (CMP) is a separate fine levied on top, where the statute provides for one (FLSA / H-1B / H-2A / MSPA / FMLA / EPPA / FLSA Child Labor; other acts have no CMP column in DOL’s data). The Statutes column lists which laws each case cited. 3 cases · 155 violations · $49,750 in backwages · $5,498 in civil penalties · 48 workers affected

Case periodIndustryStatutesViolationsWorkersBackwagesCivil penalty
Jun 2017 – Jun 2019Support Activities for ForestryFLSAH-2BMSPASCA154$662$5,098
Oct 2013 – Oct 2015Support Activities for ForestryCWHSSAH-2BMSPASCA2614$17,524
Feb 2011 – Feb 2013Support Activities for ForestryFLSAH-2BMSPASCA11430$31,564$400

Source: DOL WHD enforcement database. Cases shown reflect those the agency has closed and made public. A violation count is the agency’s tally of cited violations (one violation can affect many workers); the workers column counts distinct employees the agency found to be affected.

Mine safety (MSHA)

No MSHA mine safety violations on file for GRANO REFORESTATION. Verify directly with Mine Safety and Health Administration

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for GRANO REFORESTATION. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for GRANO REFORESTATION. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for GRANO REFORESTATION. Verify directly with Environmental Protection Agency

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for GRANO REFORESTATION. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$2.7M
Obligated (all-time)
$8.6M
Awards
224
Top agency
Department of Agriculture
$8.6M
Largest awards (top 50 of 224)
  • Department of Agriculture
    VEGETATIVE MANAGEMENT/WILDLIFE PROTECTION SERVICES
    contract · Last action 2022-01-24
    $315,810
  • Department of Agriculture
    PERFORMANCE BASED SERVICE CONTRACT FOR VEGETATIVE MANAGEMENT PRACTICES ON THE OUACHITA NATIONAL FOREST
    contract · Last action 2013-02-13
    $189,306
  • Department of Agriculture
    IGF::OT::IGF VEGETATIVE MANAGEMENT SERVICES IDIQ TASK ORDER
    contract · Last action 2019-07-30
    $185,823
  • Department of Agriculture
    COMBINED FOLIAR&HACK&SQUIRT
    contract · Last action 2021-01-08
    $182,770
  • Department of Agriculture
    5.4.3 PRECOMMERCIAL THINNING
    contract · Last action 2024-07-04
    $178,504
  • Department of Agriculture
    VEGETATIVE MANAGEMENT, BP FOLIAR SPRAY CFLN BIG PINEY RANGER DISTRICT
    contract · Last action 2019-09-30
    $178,295
  • Department of Agriculture
    081001 SYL-CON-TSI/NNIS 662336
    contract · Last action 2024-11-14
    $160,604
  • Department of Agriculture
    PCS CON WILDLIFE-NON STRUCTURAL WSI
    contract · Last action 2022-08-26
    $144,675
  • Department of Agriculture
    5.2.2.3 MIDSTORY REDUCTION CUT SURFACE ONLY
    contract · Last action 2026-04-14
    $143,712
  • Department of Agriculture
    RELEASE CUT-SURFACE/FOLIAR SPRAY LOCATED ON THE JESSIEVILLE RANGER DISTRICT.
    contract · Last action 2023-10-25
    $131,376
  • Department of Agriculture
    IGF::OT::IGF CFLRP 5.3.1.2 FOLIAR RELEASE TO BE PERFORMED ON THE BIG PINEY RANGER DISTRICT IN ACCORDANCE WITH CONTRACT SPECIFICATIONS. WORK PERIOD JUNE 26, 2017 TO SEPTEMBER 30, 2017 COR: DWAYNE RAMBO, 479-284-3150
    contract · Last action 2018-09-13
    $130,195
  • Department of Agriculture
    IGF::OT::IGF COLD SPRINGS/POTEAU RD VEGETATIVE MANAGEMENT SERVICES
    contract · Last action 2018-03-08
    $129,996
  • Department of Agriculture
    NNIS RESTORATION THE OZARKS HIGHLANDS 732385
    contract · Last action 2026-06-25
    $128,960
  • Department of Agriculture
    OUACHITA NATIONAL FOREST VEGETATIVE MANAGEMENT/WILDLIFE PROTECTION SERVICES LOCATED ON THE JESSIEVILLE RANGER DISTRICT. 5.3.3.2 MIDSTORY REDUCTION REDUCTION 886 AC
    contract · Last action 2020-07-06
    $128,305
  • Department of Agriculture
    WPAP #571086 CONTRACT FOR SILVICULTURE SERVICES PER WORK PLAN ITEM 080905 JWF CON RELEASE CHEMICAL AND MANUAL-S881 ACRES - 571086
    contract · Last action 2021-09-08
    $111,379
  • Department of Agriculture
    5.3.2.1 CUT SURFACE, SITE PREPERATION 5.3.2.2 CUT SURFACE, RELEASE TO BE INCLUDED IN REQUEST FOR BIDS: FINAL QUANTITIES MAY VARY +/- DEPENDING ON FINAL BID PRICES PER AC. 081003 BP-CON-RELEASE/SITE PREP 662337 END POP DATE: 1 YR. FROM AWARD
    contract · Last action 2024-07-30
    $110,922
  • Department of Agriculture
    IGF::OT::IGF OTHER FUNCTIONS PERFORMANCE BASED SERVICE CONTRACT FOR VEGETATIVE MANAGEMENT PRACTICES ON THE COLD SPRINGS RANGER DISTRICT, OUACHITA NATIONAL FOREST. ITEM 5.3.1.1 SITE PREP 399 ACRES @ $65.00 = $25,935.00 ITEM 5.3.2.1 RELEASE 895 ACRES @ $89.00 = $79,655.00
    contract · Last action 2013-05-24
    $105,590
  • Department of Agriculture
    BP SILV SITE PREP HWD NAT REGEN CHEM - RT 5.3.5.1 COMBINED FOLIAR CUT SURFACE SITE PREPARATION
    contract · Last action 2020-09-01
    $102,742
  • Department of Agriculture
    660 ACRES OF MIDSTORY REDUCTION
    contract · Last action 2019-09-18
    $100,260
  • Department of Agriculture
    VEG. MGMT. CONTRACT AG-447U-C-12-0003 ITEM 5.3.3.2 MIDSTORY REDUCTION
    contract · Last action 2012-01-25
    $93,800
  • Department of Agriculture
    CONTRACTOR SHALL PERFORM THE FOLLOWING TASK IN ACCORDANCE WITH THE CONTRACT: 5.3.4.1 COMBINED FOLIAR&SQUIRT SITE PREP, 455 ACRES @ $80 PER ACRE 5.3.4.2 COMBINED FOLIAR&HACK&SQUIRT RELEASE, 397 ACRES @ $78 PER ACRE 5.4.6 MANUAL TREATMENT MIDSTORY REMOVAL, 902 ACRES @ $75 PER ACRE COR: BRENT SNELLING, 479-754-2864
    contract · Last action 2019-07-19
    $90,421
  • Department of Agriculture
    BP CF RELEASE/WEED CHEM - RT 5.3.6.3 BASAL SPRAY FOREST VEGETATION CONTRACT: AG-447U-C-16-0093 START DATE: JUNE 2019 COR: LAURA ARCHDALE 1493 ACRES @ 60.00 PER ACRE
    contract · Last action 2020-09-29
    $89,580
  • Department of Agriculture
    IGF::OT::IGF THE FOLLOWING WORK IS TO BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS OF CONTRACT #AG-447U-C-12-0021: 5.3.4.1 COMBINED FOLIAR&SITE PREP 5.4.6 MANUAL TREATMENT MIDSTORY REMOVAL 5.3.2.1 CUT SURFACE SITE PREP CONTRACT
    contract · Last action 2014-01-21
    $89,512
  • Department of Agriculture
    IGF::OT::IGF PHILL FY 17 MANUAL TREATMENT MIDSTORY REMOVAL, PHILL RANGER DISTRICT 2591 HWY 21 CLARKSVILLE AR 72839. 1172 ACRES @ $75/ACRE.
    contract · Last action 2017-03-23
    $87,900
  • Department of Agriculture
    VEG. MGMT. CONTRACT AG-447U-C-12-0003 ITEM 5.3.3.2 MIDSTORY REDUCTION MEDIUM 500-1000 STEMS/AC
    contract · Last action 2012-01-03
    $86,430
  • Department of Agriculture
    IGF::OT::IGF OTHER FUNCTIONS DELIVERY ORDER ON THE PERFORMANCE BASED SERVICE CONTRACT FOR VEGETATIVE MANAGEMENT PRACTICES ON THE COLD SPRINGS RANGER DISTRICT, OUACHITA NATIONAL FOREST. 5.3.3.3 MIDSTORY REDUCTION, HEAVY 742 ACRES @ $70.00 = $51,940.00 5.3.2.2. RELEASE, MORE THAN 1,600 STEMS PER ACRE 359 ACRES @ $92.00 = $33,028.00
    contract · Last action 2014-04-30
    $84,968
  • Department of Agriculture
    BOS FY20 MIDSTORY REMOVAL CONTRACTING OFFICER REPRESENTATIVE: CHRIS DALL, 479-667-2191, CONTACT: COY LONGSHORE, 479-667-2191
    contract · Last action 2021-03-23
    $82,935
  • Department of Agriculture
    IGF::OT::IGF FOLIAR SPRAY 1451 ACRES ON BIG PINEY RD, AG447U-C-120021. BEAR CAT BAILY COLE, PRIVATELINE AND MULBERRY 5.3.1.4 FOLIAR SPRAY 1451 ACRES @$56/ACRE
    contract · Last action 2014-07-10
    $81,256
  • Department of Agriculture
    PRECOMMERCIAL THINNING (5.3.5.2) 1600 OR MORE STEMS PER ACRE (853 ACRES)
    contract · Last action 2026-04-18
    $80,899
  • Department of Agriculture
    PCT 758 ACRES MT IDA
    contract · Last action 2020-04-02
    $79,590
  • Department of Agriculture
    CHEMICAL SITE PREP AND HERBICIDE APPLICATION ON THE PLEASANT HILL RANGER DISTRICT, OZARK-ST. FRANCIS NATIONAL FOREST
    contract · Last action 2026-01-23
    $78,668
  • Department of Agriculture
    5.1.1 PINE CONTAINERIZED - FULL PLANTING IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS. PERFORMANCE PERIOD: FEB. 15, 2020 THROUGH MARCH 30, 2020. 5.1.3 HARDWOOD BAREROOT - AUGER PLANT IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS. PERFORMANCE
    contract · Last action 2020-01-29
    $76,969
  • Department of Agriculture
    IGF::OT::IGF OTHER FUNCTIONS PERFORMANCE BASED SERVICE CONTRACT FOR VEGETATIVE MANAGEMENT PRACTICES ON THE COLD SPRINGS RANGER DISTRICT, OUACHITA NATIONAL FOREST 5.3.1.2 FELLING
    contract · Last action 2015-06-29
    $72,800
  • Department of Agriculture
    IGF::CL::IGF TO PERFORM THE FOLLOWING TASK ON THE PLEASANT HILL RANGER DISTRICT IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS: SITE PREP 5.3.4.1 - 398 ACRES AND MANUAL MIDSTORY REMOVAL - 5.4.6 - 599 ACRES AND 127 ACRES
    contract · Last action 2013-01-28
    $71,210
  • Department of Agriculture
    FOLIAR, CUT STUMP SITE PREPARATION AND PRECOMMERCIAL THINNING. THE WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THE CONTRACT. ACCEPTED BID PRICES ARE AS FOLLOWS: 5.4.3 PRECOMMERCIAL THINNING: $105 PER ACRE; 5.3.1.4 FOLIA
    contract · Last action 2023-09-25
    $70,620
  • Department of Agriculture
    CUT-SURFACE/FOLIAR SPRAY & RELEASE
    contract · Last action 2022-05-18
    $65,856
  • Department of Agriculture
    OUACHITA NATIONAL FOREST VEGETATIVE MANAGEMENT/WILDLIFE PROTECTION SERVICES SILV-PCT CONTRACT
    contract · Last action 2019-10-31
    $64,785
  • Department of Agriculture
    PLEASANT HILL HACK AND SQUIRT RELEASE HERBICIDE AND MECHANICAL MIDSTORY REMOVAL
    contract · Last action 2021-06-02
    $63,285
  • Department of Agriculture
    OUACHITA NATIONAL FOREST VEGETATIVE MANAGEMENT/WILDLIFE PROTECTION SERVICES MATOC, 5.3.2.1 RELEASE, LESS THAN 1,600 STEMS PER ACRE, 423 ACRES, $135.00/ACRE, ITEM PRICE $57,105.00; AND 5.3.5.2 PRE-COMMERCIAL THINNING, MORE THAN 1,600 STEMS PER ACRE, 40 ACRES, $120.00/ACRE, ITEM PRICE $5,600.00; TOTAL CONTRACT PRICE $62,705.00, LOCATED ON THE COLD SPRINGS RANGER DISTRICT, OUACHITA NATIONAL FOREST.
    contract · Last action 2020-06-22
    $62,705
  • Department of Agriculture
    JESSIEVILLE RANGER DISTRICT 5.2.2.1 SITE PREPARATION CUT-SURFACE ONLY (STUMP SPRAY) 414 ACRES AND 5.3.1.2 MANUAL FELLING (MORE THAN 1,600 STEMS PER ACRE) 90 ACRES
    contract · Last action 2020-11-17
    $62,370
  • Department of Agriculture
    IGF::OT::IGF OTHER FUNCTIONS PERFORMANCE BASED SERVICE CONTRACT FOR VEGETATIVE MANAGEMENT PRACTICES ON THE COLD SPRINGS RANGER DISTRICT, OUACHITA NATIONAL FOREST. 5.3.3.2 MIDSTORY REDUCTION (MEDIUM 500-1000 STEMS PER ACRE) 917 @ $68.00 = $62,356.00
    contract · Last action 2013-05-09
    $62,356
  • Department of Agriculture
    080902 CW CON SILVI PRE COMMERCIAL THINNING 593 AC 667514
    contract · Last action 2024-02-28
    $62,229
  • Department of Agriculture
    MIDSTORY VEGETATION FOLIAR SPRAY ON THE BOSTON MOUNTAIN RANGER DISTRICT
    contract · Last action 2025-09-29
    $61,388
  • Department of Agriculture
    JWF CON RELEASE MANUAL AND/OR CHEM
    contract · Last action 2022-07-27
    $61,115
  • Department of Agriculture
    5.1.1 PERFORM PINE SEEDLINGS CONTAINERIZED--FULL PLANTING IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS ON THE BIG PINEY IN HECTOR ARKANSAS. COR: JEFF FOUTS, 479-284-3150
    contract · Last action 2018-02-22
    $59,840
  • Department of Agriculture
    081003 BP-CON-PINE-HWD PLANTING 5.1.1 PINE SEEDLINGS CONTAINERIZED-FULL PLANTING 5.1.3 HARDWOOD BAREROOT WITH AUGER 619 ACRES PENDING FINAL MATOC BIDS COR: MARK HELLEN
    contract · Last action 2024-11-25
    $59,090
  • Department of Agriculture
    FY23 CHEMICAL SITE PREP CONTRACT# IDIQ 12444222D0001 KV042F20 FOLIAR/HACK-N-SQUIRT: 5.3.4.1 SITE PREPARATION CONTRACTOR PROVIDING HERBICIDE 423 STANDS 4, 13, 27 = 147 ACRES 422 STANDS 8,9,16 = 41 ACRES 424 STANDS 37 = 53 ACRES CUT SURFACE: 5.
    contract · Last action 2023-03-15
    $58,468
  • Department of Agriculture
    080906 OK CON MIDSTORY REDUCTION 482 ACRES AND 229 ACRES 582019
    contract · Last action 2021-10-06
    $57,506
  • Department of Agriculture
    RELEASE CUT-SURFACE/FOLIAR SPRAY LOCATED ON THE CADDO/WOMBLE RANGER DISTRICT.
    contract · Last action 2023-06-08
    $57,456
  • Department of Agriculture
    IGF::OT::IGF OTHER FUNCTIONS VEGETATIVE MANAGEMENT PERFORMANCE BASED SERVICE CONTRACT ON THE COLD SPRINGS RANGER DISTRICT, OUACHITA NATIONAL FOREST. 5.3.3.3 HEAVY MIDSTORY REDUCTION 804 ACRES @ $70.00 = $56,280.00
    contract · Last action 2013-06-26
    $56,280

Federal contract dollars to this establishment. Primary NAICS: 115310 - SUPPORT ACTIVITIES FOR FORESTRY. Last action: 2026-06-25. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
2002-07-02Complaint2519$13,000

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Other employers in this industry and state

Other employers in support activities for forestry within AR, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on GRANO REFORESTATION from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is GRANO REFORESTATION's OSHA violation history?
GRANO REFORESTATION has 1 OSHA inspection on record with 25 violations and $13,000 in total penalties.
How does GRANO REFORESTATION's safety record compare to its industry?
GRANO REFORESTATION operates in the support activities for forestry industry. The industry average Total Recordable Incident Rate (TRIR) is 4.1.