Establishment profile
FANN CONTRACTING, INC.
PONDEROSA PLAZA DRIVE, PRESCOTT, AZ, 86301
238910 — Site Preparation Contractors
EIN 860213861
Summary
FANN CONTRACTING, INC. has accumulated 2 OSHA violations across 3 inspections over 32 years of recorded history, with $4,925 in total assessed penalties.
The establishment sits in the 67th percentile for violations within its industry-state peer group of 1,166 employers. Inspection frequency runs at the 98th percentile. The most recent enforcement activity was recorded 14 years ago.
Federal records were found in 3 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
FANN CONTRACTING, INC. appears in OSHA workplace safety, WHD wage enforcement, MSHA mine safety, and FMCSA motor carrier registration records only. No matching records were found in EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
67% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 2 distinct standards shown · 2 citations in this view · $4,925 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1926.0652 A01 | 1 | 1 | $3,000 | Aug 2004 | Aug 2004 |
| 29 CFR 1926.0651 K01 | 1 | 1 | $1,925 | Oct 1994 | Oct 1994 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Above average violations in NAICS 2389 within AZ. Peer group: 1,166 employers. This establishment has 2 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 236 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for FANN CONTRACTING, INC.. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 14+ years. Most recent activity: 14 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
Department of Labor Wage & Hour Division — minimum-wage, overtime, child-labor, FMLA, and prevailing-wage enforcement.
Wage and hour cases
Closed DOL Wage & Hour Division cases (FLSA, FMLA, H-2B, MSPA, and related statutes). Backwages reflect amounts the agency assessed; civil penalty (CMP) is a separate fine levied on top, where the statute provides for one (FLSA / H-1B / H-2A / MSPA / FMLA / EPPA / FLSA Child Labor; other acts have no CMP column in DOL’s data). The Statutes column lists which laws each case cited. 1 case · $0 in backwages
| Case period | Industry | Statutes | Violations | Workers | Backwages | Civil penalty |
|---|---|---|---|---|---|---|
| May 2011 – Nov 2011 | Highway, Street, and Bridge Construction | — | — | 0 | — | — |
Source: DOL WHD enforcement database. Cases shown reflect those the agency has closed and made public. A violation count is the agency’s tally of cited violations (one violation can affect many workers); the workers column counts distinct employees the agency found to be affected.
Mine safety (MSHA)
Company-level in AZ — for FANN CONTRACTING, INC., not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other FANN CONTRACTING, INC. operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 54S&S · 15 contractor · $65,991 proposed / $58,229 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 9343363 | Portable Plant #1 Yavapai, AZ | Aug 2018 | — | Yes | HighNegligence | $4,721 | $4,721 |
| 9343359 | Portable Plant #1 Yavapai, AZ | Aug 2018 | — | No | HighNegligence | $4,721 | $3,500 |
| 9343358 | Portable Plant #1 Yavapai, AZ | Aug 2018 | — | No | HighNegligence | $4,721 | $4,721 |
| 9343354 | Portable Plant #1 Yavapai, AZ | Aug 2018 | — | Yes | HighNegligence | $4,721 | $3,500 |
| 9343353 | Portable Plant #1 Yavapai, AZ | Aug 2018 | — | Yes | HighNegligence | $4,721 | $3,500 |
| 9343352 | Portable Plant #1 Yavapai, AZ | Aug 2018 | — | Yes | HighNegligence | $4,721 | $4,721 |
| 9430658 | Portable Plant #1 Yavapai, AZ | Mar 2020 | — | Yes | ModNegligence | $3,124 | $1,000 |
| 9343059 | Portable Plant #1 Yavapai, AZ | Jun 2018 | — | Yes | HighNegligence | $2,361 | $2,361 |
| 9343328 | Portable Plant #1 Yavapai, AZ | Jun 2018 | — | Yes | HighNegligence | $2,361 | $2,361 |
| 6454958 | Portable Plant #1 Yavapai, AZ | Jun 2010 | — | Yes | ModNegligence | $1,795 | $1,795 |
| 9343334 | Portable Plant #1 Yavapai, AZ | Jun 2018 | — | Yes | HighNegligence | $1,211 | $1,211 |
| 9343347 | Portable Plant #1 Yavapai, AZ | Jul 2018 | — | Yes | HighNegligence | $1,118 | $1,118 |
| 9343343 | Portable Plant #1 Yavapai, AZ | Jun 2018 | — | Yes | HighNegligence | $1,118 | $1,118 |
| 9343342 | Portable Plant #1 Yavapai, AZ | Jun 2018 | — | Yes | HighNegligence | $1,118 | $1,118 |
| 9343333 | Portable Plant #1 Yavapai, AZ | Jun 2018 | — | Yes | HighNegligence | $1,118 | $1,118 |
| 9392857 | YAVAPAI PLANT 22 Yavapai, AZ contractor: Fann Contracting | Mar 2019 | — | Yes | HighNegligence | $977 | $782 |
| 9392846 | YAVAPAI PLANT 22 Yavapai, AZ contractor: Fann Contracting | Mar 2019 | — | Yes | HighNegligence | $977 | $977 |
| 8755080 | Portable Plant #1 Yavapai, AZ | Jul 2013 | — | Yes | ModNegligence | $807 | $807 |
| 9393172 | Portable Plant #1 Yavapai, AZ | Jun 2019 | — | Yes | ModNegligence | $708 | $708 |
| 9393171 | Portable Plant #1 Yavapai, AZ | Jun 2019 | — | Yes | ModNegligence | $708 | $708 |
| 9393093 | Portable Plant #1 Yavapai, AZ | Mar 2019 | — | Yes | ModNegligence | $708 | $708 |
| 9393091 | Portable Plant #1 Yavapai, AZ | Mar 2019 | — | No | ModNegligence | $558 | $558 |
| 9343337 | Portable Plant #1 Yavapai, AZ | Jun 2018 | — | Yes | HighNegligence | $502 | $502 |
| 9343336 | Portable Plant #1 Yavapai, AZ | Jun 2018 | — | Yes | HighNegligence | $502 | $502 |
| 9343329 | Portable Plant #1 Yavapai, AZ | Jun 2018 | — | Yes | HighNegligence | $502 | $502 |
| 9343327 | Portable Plant #1 Yavapai, AZ | Jun 2018 | — | Yes | HighNegligence | $502 | $502 |
| 6325889 | Portable Plant #1 Yavapai, AZ | Feb 2007 | — | No | ModNegligence | $440 | — |
| 8871615 | Portable Plant #1 Yavapai, AZ | Feb 2015 | — | No | HighNegligence | $425 | $425 |
| 6296656 | Qmax Co Red Lake Quarry Coconino, AZ contractor: Fann Contracting | Jul 2004 | — | Yes | ModNegligence | $425 | $425 |
| 6296655 | Qmax Co Red Lake Quarry Coconino, AZ contractor: Fann Contracting | Jul 2004 | — | Yes | ModNegligence | $425 | $425 |
| 9908406 | Portable Plant #1 Yavapai, AZ | Jul 2024 | — | Yes | ModNegligence | $421 | $421 |
| 9393089 | Portable Plant #1 Yavapai, AZ | Mar 2019 | — | Yes | LowNegligence | $405 | $405 |
| 9343361 | Portable Plant #1 Yavapai, AZ | Aug 2018 | — | Yes | ModNegligence | $336 | $336 |
| 9343345 | Portable Plant #1 Yavapai, AZ | Jun 2018 | — | Yes | ModNegligence | $336 | $336 |
| 9343065 | Portable Plant #1 Yavapai, AZ | Jun 2018 | — | Yes | ModNegligence | $336 | $336 |
| 9343064 | Portable Plant #1 Yavapai, AZ | Jun 2018 | — | Yes | ModNegligence | $336 | $336 |
| 9343063 | Portable Plant #1 Yavapai, AZ | Jun 2018 | — | Yes | ModNegligence | $336 | $336 |
| 9343330 | Portable Plant #1 Yavapai, AZ | Jun 2018 | — | Yes | HighNegligence | $336 | $336 |
| 6325890 | Portable Plant #1 Yavapai, AZ | Feb 2007 | — | No | ModNegligence | $324 | — |
| 9392852 | YAVAPAI PLANT 22 Yavapai, AZ contractor: Fann Contracting | Mar 2019 | — | No | LowNegligence | $293 | $121 |
| 6311261 | Portable Plant #1 Yavapai, AZ | May 2006 | — | No | ModNegligence | $286 | $60 |
| 6311256 | Portable Plant #1 Yavapai, AZ | May 2006 | — | No | ModNegligence | $286 | $60 |
| 8829890 | Portable Plant #1 Yavapai, AZ | Aug 2014 | — | Yes | ModNegligence | $285 | $285 |
| 8829872 | Portable Plant #1 Yavapai, AZ | Aug 2014 | — | Yes | ModNegligence | $285 | $285 |
| 8829867 | Portable Plant #1 Yavapai, AZ | Aug 2014 | — | Yes | ModNegligence | $285 | $285 |
| 8829862 | Portable Plant #1 Yavapai, AZ | Aug 2014 | — | Yes | ModNegligence | $285 | $285 |
| 6453636 | Portable Plant #1 Yavapai, AZ | Mar 2009 | — | Yes | ModNegligence | $285 | $285 |
| 9908407 | Portable Plant #1 Yavapai, AZ | Jul 2024 | — | No | HighNegligence | $280 | $280 |
| 8585587 | Portable Plant #1 Yavapai, AZ | Jul 2012 | — | No | ModNegligence | $263 | $197 |
| 9430657 | Portable Plant #1 Yavapai, AZ | Mar 2020 | — | No | LowNegligence | $254 | $254 |
| 6311253 | Portable Plant #1 Yavapai, AZ | May 2006 | — | No | ModNegligence | $228 | $60 |
| 9343348 | Portable Plant #1 Yavapai, AZ | Jul 2018 | — | No | HighNegligence | $225 | $225 |
| 8871616 | Portable Plant #1 Yavapai, AZ | Feb 2015 | — | No | LowNegligence | $190 | $190 |
| 9430660 | Portable Plant #1 Yavapai, AZ | Mar 2020 | — | No | ModNegligence | $171 | $171 |
| 9430659 | Portable Plant #1 Yavapai, AZ | Mar 2020 | — | No | ModNegligence | $171 | $171 |
| 9430656 | Portable Plant #1 Yavapai, AZ | Mar 2020 | — | No | ModNegligence | $171 | $171 |
| 8755081 | Portable Plant #1 Yavapai, AZ | Jul 2013 | — | No | ModNegligence | $162 | $162 |
| 5052568 | Portable Plant #1 Yavapai, AZ | Jul 2025 | — | No | LowNegligence | $151 | $151 |
| 9343060 | Portable Plant #1 Yavapai, AZ | Jun 2018 | — | Yes | ModNegligence | $151 | $151 |
| 9343341 | Portable Plant #1 Yavapai, AZ | Jun 2018 | — | Yes | ModNegligence | $151 | $151 |
| 9343335 | Portable Plant #1 Yavapai, AZ | Jun 2018 | — | Yes | ModNegligence | $151 | $151 |
| 8942972 | Portable Plant #1 Yavapai, AZ | Oct 2017 | — | Yes | ModNegligence | $148 | $148 |
| 9393179 | Portable Plant #1 Yavapai, AZ | Jun 2019 | — | No | ModNegligence | $142 | $142 |
| 9393178 | Portable Plant #1 Yavapai, AZ | Jun 2019 | — | No | ModNegligence | $142 | $142 |
| 9393177 | Portable Plant #1 Yavapai, AZ | Jun 2019 | — | No | ModNegligence | $142 | $142 |
| 9393176 | Portable Plant #1 Yavapai, AZ | Jun 2019 | — | No | ModNegligence | $142 | $142 |
| 9393175 | Portable Plant #1 Yavapai, AZ | Jun 2019 | — | No | ModNegligence | $142 | $142 |
| 9393174 | Portable Plant #1 Yavapai, AZ | Jun 2019 | — | No | ModNegligence | $142 | $142 |
| 9393173 | Portable Plant #1 Yavapai, AZ | Jun 2019 | — | No | ModNegligence | $142 | $142 |
| 9393170 | Portable Plant #1 Yavapai, AZ | Jun 2019 | — | No | ModNegligence | $142 | $142 |
| 9393090 | Portable Plant #1 Yavapai, AZ | Mar 2019 | — | No | ModNegligence | $142 | $142 |
| 8829885 | Portable Plant #1 Yavapai, AZ | Aug 2014 | — | Yes | ModNegligence | $127 | $127 |
| 8829881 | Portable Plant #1 Yavapai, AZ | Aug 2014 | — | Yes | ModNegligence | $127 | $127 |
| 8829878 | Portable Plant #1 Yavapai, AZ | Aug 2014 | — | Yes | ModNegligence | $127 | $127 |
| 8829868 | Portable Plant #1 Yavapai, AZ | Aug 2014 | — | Yes | ModNegligence | $127 | $127 |
| 8829863 | Portable Plant #1 Yavapai, AZ | Aug 2014 | — | Yes | ModNegligence | $127 | $127 |
| 8584854 | Portable Plant #1 Yavapai, AZ | Jun 2011 | — | Yes | LowNegligence | $127 | $100 |
| 8584853 | Portable Plant #1 Yavapai, AZ | Jun 2011 | — | Yes | LowNegligence | $127 | $100 |
| 6453634 | Portable Plant #1 Yavapai, AZ | Mar 2009 | — | Yes | ModNegligence | $127 | $127 |
| 6453631 | Portable Plant #1 Yavapai, AZ | Mar 2009 | — | Yes | ModNegligence | $127 | $127 |
| 9477684 | Portable Plant #1 Yavapai, AZ | Dec 2021 | — | No | HighNegligence | $125 | $125 |
| 9477683 | Portable Plant #1 Yavapai, AZ | Dec 2021 | — | No | HighNegligence | $125 | $125 |
| 9477658 | YAVAPAI PLANT 22 Yavapai, AZ contractor: Fann Contracting | Jun 2021 | — | No | ModNegligence | $125 | $125 |
| 6307028 | Portable Plant #1 Yavapai, AZ | Oct 2004 | — | Yes | ModNegligence | $124 | $124 |
| 6307027 | Portable Plant #1 Yavapai, AZ | Oct 2004 | — | Yes | ModNegligence | $124 | $124 |
| 9430655 | Portable Plant #1 Yavapai, AZ | Mar 2020 | — | No | LowNegligence | $123 | $123 |
| 9392859 | YAVAPAI PLANT 22 Yavapai, AZ contractor: Fann Contracting | Mar 2019 | — | No | ModNegligence | $121 | $121 |
| 9393095 | Portable Plant #1 Yavapai, AZ | Mar 2019 | — | No | LowNegligence | $121 | $121 |
| 9393094 | Portable Plant #1 Yavapai, AZ | Mar 2019 | — | No | LowNegligence | $121 | $121 |
| 9392856 | YAVAPAI PLANT 22 Yavapai, AZ contractor: Fann Contracting | Mar 2019 | — | No | ModNegligence | $121 | $121 |
| 9392855 | YAVAPAI PLANT 22 Yavapai, AZ contractor: Fann Contracting | Mar 2019 | — | No | ModNegligence | $121 | $121 |
| 9392854 | YAVAPAI PLANT 22 Yavapai, AZ contractor: Fann Contracting | Mar 2019 | — | No | LowNegligence | $121 | $95 |
| 9392853 | YAVAPAI PLANT 22 Yavapai, AZ contractor: Fann Contracting | Mar 2019 | — | No | LowNegligence | $121 | $95 |
| 9392851 | YAVAPAI PLANT 22 Yavapai, AZ contractor: Fann Contracting | Mar 2019 | — | No | ModNegligence | $121 | $121 |
| 9392849 | YAVAPAI PLANT 22 Yavapai, AZ contractor: Fann Contracting | Mar 2019 | — | No | LowNegligence | $121 | $95 |
| 9392848 | YAVAPAI PLANT 22 Yavapai, AZ contractor: Fann Contracting | Mar 2019 | — | No | LowNegligence | $121 | $95 |
| 9392847 | YAVAPAI PLANT 22 Yavapai, AZ contractor: Fann Contracting | Mar 2019 | — | No | ModNegligence | $121 | $121 |
| 9343364 | Portable Plant #1 Yavapai, AZ | Aug 2018 | — | No | ModNegligence | $118 | $118 |
| 9343362 | Portable Plant #1 Yavapai, AZ | Aug 2018 | — | No | ModNegligence | $118 | $118 |
| 9343360 | Portable Plant #1 Yavapai, AZ | Aug 2018 | — | Yes | LowNegligence | $118 | $118 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for FANN CONTRACTING, INC.. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for FANN CONTRACTING, INC.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for FANN CONTRACTING, INC.. Verify directly with Environmental Protection Agency →
EPA-registered facilities
Every EPA ECHO facility associated with this employer, sorted most-significant first. Each row links to EPA’s Detailed Facility Report for the source-of-truth record. Permits column lists active programs (Air = Clean Air Act, Water = Clean Water Act, RCRA = hazardous waste, TRI = Toxics Release Inventory reporting). 1 facility · $72,128 in assessed penalties.
| Facility | Permits | Status | Inspections | Formal actions | Penalties | Last inspected | ECHO |
|---|---|---|---|---|---|---|---|
FANN CONTRACTING, INC. 6725 GENERATION LANE · PRESCOTT, AZ, 86301 | Air | No Violation Identified | 0 | 1 | $72,128 | — | View → |
Source: EPA ECHO (Enforcement and Compliance History Online). Compliance status follows EPA’s own labels (“Sig Violation” = significant noncompliance; QNCR = quarters of noncompliance over the recent reporting window). Inactive facilities (struck through) retain historical enforcement records even after operations ceased.
Motor carrier safety (FMCSA)
Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for FANN CONTRACTING, INC.. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- Department of TransportationTHIS PROJECT INCLUDES RECONSTRUCTION OF 7.47 MILES OF DESERT VIEW DRIVE, 1.1 MILES OF YAKI POINT AND KAIBAB TRAIL ACCESS ROAD, 3.59 SOUTH ENTRANCE ROAD, 1.17 VILLAGE LOOP DRIVE IN GRAND CANYON NATIONAL PARK.contract · Last action 2019-10-28$14,630,834
- Department of the InteriorTAS::14-69-9/0-0504.20::TAS PROJECT NOS. N3629100, N3349700. ROAD MAINTENANCE FOR BIA ROADS IN ARIZONA.contract · Last action 2012-08-14$13,539,780
- Department of TransportationONE SCHDEULE FOR GRADING, DRAINAGE AND SURFACING ON 7.11 MILES OF HERMIT ROAD, AND 2 OPTIONS, ONE FOR WIDENING AND BYPASS LANE CONSTRUCTION ON 1.34 MILES OF THE SOUTH ENTRANCE ROAD AND ONE FOR 1.98 MILES OF GREENWAY/BIKE PATH ALONG HERMIT ROAD.contract · Last action 2011-04-20$13,336,228
- Department of TransportationIGF::CT::IGF HFPM-12-0102; AZ PFH 3-1(2), FLAGSTAFF-CLINT WELLS; PROJECT ADVERTISEMENT FOR CONSTRUCTION; $7,098,753.00 OPTION W = $2,689,562.00 OPTION X = $3,005,036) CONTRACT# DTFH68-12-B-0005contract · Last action 2014-04-14$8,884,167
- Department of TransportationMATHER POINT IMPROVEMENTS PHASE 2 GRAND CANYON NATIONAL PARKcontract · Last action 2012-05-11$6,687,917
- Department of TransportationAZ NPS-GRCA-PRES-1(10) GRAND CANYON SOUTH RIM PAVEMENT PRES INTERAGENCY AGREEMENT DTFH68-10-X-00024 AWARDED AMOUNT: $4,487,130.50 OBLIGATION AMOUNT INCLUDES INCENTIVES.contract · Last action 2013-12-20$5,286,337
- Department of TransportationCONSTRUCT ROAD SUNRISE PARK--BIG LAKE ROADcontract · Last action 2009-09-14$712,731
- Department of the InteriorGRCA - ROADS MATERIALScontract · Last action 2020-09-03$198,400
- Department of TransportationPAVEMENT, REHABITATION, GRADING AND DRAINAGE OF ROADWAY AND ONE RESIDENCIAL PARKING LOT.contract · Last action 2012-05-04$139,192
- Department of AgricultureS-445, CROOKS, AZ-PNF-000271,contract · Last action 2022-05-11$600
Federal contract dollars to this establishment. Primary NAICS: 237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Last action: 2022-05-11. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2004-06-29 | Planned | 1 | 1 | $3,000 | |
| 2002-11-20 | Planned | 0 | — | $0 | |
| 1994-07-12 | Unprogrammed Related | 1 | — | $1,925 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in site preparation contractors within AZ, ordered by federal enforcement volume:
- SUNDT CONSTRUCTION INCGLENDALE — 3 federal enforcement records
- RICOR, INC.PHOENIX — 3 federal enforcement records
- TIFFANY CONSTRUCTION COMPANYPHOENIX — 3 federal enforcement records
- COLLINS EXCAVATING AND MATERIALS, INC.TUCSON — 2 federal enforcement records
- H & S DEVELOPERS, INC.YUMA — 2 federal enforcement records
- AGATE INCSCOTTSDALE — 2 federal enforcement records
- CON-WEAR PRODUCTS, INC.SAN MANUEL — 2 federal enforcement records
- TONTO SUPPLY, INC.BULLHEAD CITY — 2 federal enforcement records
- CKC CONSTRUCTION COMPANYTHATCHER — 2 federal enforcement records
- TEE PEE CONTRACTORS, INC.MARICOPA — 2 federal enforcement records
Related searches
- Site Preparation ContractorsAll employers in this industry
- Employers in AZState-wide enforcement data
- Site Preparation Contractors in AZIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on FANN CONTRACTING, INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is FANN CONTRACTING, INC.'s OSHA violation history?
- FANN CONTRACTING, INC. has 3 OSHA inspections on record with 2 violations and $4,925 in total penalties.
- How does FANN CONTRACTING, INC.'s safety record compare to its industry?
- FANN CONTRACTING, INC. operates in the site preparation contractors industry. The industry average Total Recordable Incident Rate (TRIR) is 1.5. FANN CONTRACTING, INC.'s self-reported DART rate is 1.84 compared to an industry average of 1.