Skip to main content

Establishment profile

FANN CONTRACTING, INC.

PONDEROSA PLAZA DRIVE, PRESCOTT, AZ, 86301
238910Site Preparation Contractors
EIN 860213861

Download as PDF →

OSHA inspections
3
over 32 years
Violations
2
$4,925 in penalties
Penalties
$4,925
$2,463 avg
Violations across 3 federal agencies
Enforcement actions from multiple agencies may indicate systemic compliance issues across functions.
Accident investigations on record
1 National Emphasis Program inspections

Summary

FANN CONTRACTING, INC. has accumulated 2 OSHA violations across 3 inspections over 32 years of recorded history, with $4,925 in total assessed penalties.

The establishment sits in the 67th percentile for violations within its industry-state peer group of 1,166 employers. Inspection frequency runs at the 98th percentile. The most recent enforcement activity was recorded 14 years ago.

Federal records were found in 3 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

FANN CONTRACTING, INC. appears in OSHA workplace safety, WHD wage enforcement, MSHA mine safety, and FMCSA motor carrier registration records only. No matching records were found in EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

Inspections
3
0.1 / yr · last 32 yrs
Violations
2
0.1 / yr
Penalties
$4,925
$2,463 avg / violation
50% serious50% other
Inspection trigger · planned
2 of 3

67% of inspections at this establishment produced violations,

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 2 distinct standards shown · 2 citations in this view · $4,925 in penalties.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
29 CFR 1926.0652 A0111$3,000Aug 2004Aug 2004
29 CFR 1926.0651 K0111$1,925Oct 1994Oct 1994

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

67th

Above average violations in NAICS 2389 within AZ. Peer group: 1,166 employers. This establishment has 2 OSHA violations; peer median is 1.

Fewer violationsMore violations
Penalty percentile
95th
peer median: $0
Inspection frequency
98th
peer median: 1

Safety self-report (OSHA 300A)

Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.

DART rate
1.8
vs industry
+0.8
TRIR
4.1
vs industry
+2.6

Reported for 236 average annual employees at this establishment.

Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.

Industry benchmark

Industry avg TRIR
1.5
BLS SOII 2024
Industry avg DART
1.0
BLS SOII 2024
Self-reported TRIR
4.1
OSHA ITA Form 300A (employer self-reported)

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Planned
2

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for FANN CONTRACTING, INC.. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
14 years ago

No federal enforcement activity has been recorded against this establishment in 14+ years. Most recent activity: 14 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

Cases
1
Back wages owed
$0

Department of Labor Wage & Hour Division — minimum-wage, overtime, child-labor, FMLA, and prevailing-wage enforcement.

Wage and hour cases

Closed DOL Wage & Hour Division cases (FLSA, FMLA, H-2B, MSPA, and related statutes). Backwages reflect amounts the agency assessed; civil penalty (CMP) is a separate fine levied on top, where the statute provides for one (FLSA / H-1B / H-2A / MSPA / FMLA / EPPA / FLSA Child Labor; other acts have no CMP column in DOL’s data). The Statutes column lists which laws each case cited. 1 case · $0 in backwages

Case periodIndustryStatutesViolationsWorkersBackwagesCivil penalty
May 2011 – Nov 2011Highway, Street, and Bridge Construction0

Source: DOL WHD enforcement database. Cases shown reflect those the agency has closed and made public. A violation count is the agency’s tally of cited violations (one violation can affect many workers); the workers column counts distinct employees the agency found to be affected.

Mine safety (MSHA)

Company-level in AZ — for FANN CONTRACTING, INC., not this location alone

Violations
188
Assessed penalties
$74,481

Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other FANN CONTRACTING, INC. operations in the same state.

MSHA citations

Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 54S&S · 15 contractor · $65,991 proposed / $58,229 paid.

CitationMineDateSectionS&SNegligenceProposedPaid
9343363
Portable Plant #1
Yavapai, AZ
Aug 2018YesHighNegligence$4,721$4,721
9343359
Portable Plant #1
Yavapai, AZ
Aug 2018NoHighNegligence$4,721$3,500
9343358
Portable Plant #1
Yavapai, AZ
Aug 2018NoHighNegligence$4,721$4,721
9343354
Portable Plant #1
Yavapai, AZ
Aug 2018YesHighNegligence$4,721$3,500
9343353
Portable Plant #1
Yavapai, AZ
Aug 2018YesHighNegligence$4,721$3,500
9343352
Portable Plant #1
Yavapai, AZ
Aug 2018YesHighNegligence$4,721$4,721
9430658
Portable Plant #1
Yavapai, AZ
Mar 2020YesModNegligence$3,124$1,000
9343059
Portable Plant #1
Yavapai, AZ
Jun 2018YesHighNegligence$2,361$2,361
9343328
Portable Plant #1
Yavapai, AZ
Jun 2018YesHighNegligence$2,361$2,361
6454958
Portable Plant #1
Yavapai, AZ
Jun 2010YesModNegligence$1,795$1,795
9343334
Portable Plant #1
Yavapai, AZ
Jun 2018YesHighNegligence$1,211$1,211
9343347
Portable Plant #1
Yavapai, AZ
Jul 2018YesHighNegligence$1,118$1,118
9343343
Portable Plant #1
Yavapai, AZ
Jun 2018YesHighNegligence$1,118$1,118
9343342
Portable Plant #1
Yavapai, AZ
Jun 2018YesHighNegligence$1,118$1,118
9343333
Portable Plant #1
Yavapai, AZ
Jun 2018YesHighNegligence$1,118$1,118
9392857
YAVAPAI PLANT 22
Yavapai, AZ
contractor: Fann Contracting
Mar 2019YesHighNegligence$977$782
9392846
YAVAPAI PLANT 22
Yavapai, AZ
contractor: Fann Contracting
Mar 2019YesHighNegligence$977$977
8755080
Portable Plant #1
Yavapai, AZ
Jul 2013YesModNegligence$807$807
9393172
Portable Plant #1
Yavapai, AZ
Jun 2019YesModNegligence$708$708
9393171
Portable Plant #1
Yavapai, AZ
Jun 2019YesModNegligence$708$708
9393093
Portable Plant #1
Yavapai, AZ
Mar 2019YesModNegligence$708$708
9393091
Portable Plant #1
Yavapai, AZ
Mar 2019NoModNegligence$558$558
9343337
Portable Plant #1
Yavapai, AZ
Jun 2018YesHighNegligence$502$502
9343336
Portable Plant #1
Yavapai, AZ
Jun 2018YesHighNegligence$502$502
9343329
Portable Plant #1
Yavapai, AZ
Jun 2018YesHighNegligence$502$502
9343327
Portable Plant #1
Yavapai, AZ
Jun 2018YesHighNegligence$502$502
6325889
Portable Plant #1
Yavapai, AZ
Feb 2007NoModNegligence$440
8871615
Portable Plant #1
Yavapai, AZ
Feb 2015NoHighNegligence$425$425
6296656
Qmax Co Red Lake Quarry
Coconino, AZ
contractor: Fann Contracting
Jul 2004YesModNegligence$425$425
6296655
Qmax Co Red Lake Quarry
Coconino, AZ
contractor: Fann Contracting
Jul 2004YesModNegligence$425$425
9908406
Portable Plant #1
Yavapai, AZ
Jul 2024YesModNegligence$421$421
9393089
Portable Plant #1
Yavapai, AZ
Mar 2019YesLowNegligence$405$405
9343361
Portable Plant #1
Yavapai, AZ
Aug 2018YesModNegligence$336$336
9343345
Portable Plant #1
Yavapai, AZ
Jun 2018YesModNegligence$336$336
9343065
Portable Plant #1
Yavapai, AZ
Jun 2018YesModNegligence$336$336
9343064
Portable Plant #1
Yavapai, AZ
Jun 2018YesModNegligence$336$336
9343063
Portable Plant #1
Yavapai, AZ
Jun 2018YesModNegligence$336$336
9343330
Portable Plant #1
Yavapai, AZ
Jun 2018YesHighNegligence$336$336
6325890
Portable Plant #1
Yavapai, AZ
Feb 2007NoModNegligence$324
9392852
YAVAPAI PLANT 22
Yavapai, AZ
contractor: Fann Contracting
Mar 2019NoLowNegligence$293$121
6311261
Portable Plant #1
Yavapai, AZ
May 2006NoModNegligence$286$60
6311256
Portable Plant #1
Yavapai, AZ
May 2006NoModNegligence$286$60
8829890
Portable Plant #1
Yavapai, AZ
Aug 2014YesModNegligence$285$285
8829872
Portable Plant #1
Yavapai, AZ
Aug 2014YesModNegligence$285$285
8829867
Portable Plant #1
Yavapai, AZ
Aug 2014YesModNegligence$285$285
8829862
Portable Plant #1
Yavapai, AZ
Aug 2014YesModNegligence$285$285
6453636
Portable Plant #1
Yavapai, AZ
Mar 2009YesModNegligence$285$285
9908407
Portable Plant #1
Yavapai, AZ
Jul 2024NoHighNegligence$280$280
8585587
Portable Plant #1
Yavapai, AZ
Jul 2012NoModNegligence$263$197
9430657
Portable Plant #1
Yavapai, AZ
Mar 2020NoLowNegligence$254$254
6311253
Portable Plant #1
Yavapai, AZ
May 2006NoModNegligence$228$60
9343348
Portable Plant #1
Yavapai, AZ
Jul 2018NoHighNegligence$225$225
8871616
Portable Plant #1
Yavapai, AZ
Feb 2015NoLowNegligence$190$190
9430660
Portable Plant #1
Yavapai, AZ
Mar 2020NoModNegligence$171$171
9430659
Portable Plant #1
Yavapai, AZ
Mar 2020NoModNegligence$171$171
9430656
Portable Plant #1
Yavapai, AZ
Mar 2020NoModNegligence$171$171
8755081
Portable Plant #1
Yavapai, AZ
Jul 2013NoModNegligence$162$162
5052568
Portable Plant #1
Yavapai, AZ
Jul 2025NoLowNegligence$151$151
9343060
Portable Plant #1
Yavapai, AZ
Jun 2018YesModNegligence$151$151
9343341
Portable Plant #1
Yavapai, AZ
Jun 2018YesModNegligence$151$151
9343335
Portable Plant #1
Yavapai, AZ
Jun 2018YesModNegligence$151$151
8942972
Portable Plant #1
Yavapai, AZ
Oct 2017YesModNegligence$148$148
9393179
Portable Plant #1
Yavapai, AZ
Jun 2019NoModNegligence$142$142
9393178
Portable Plant #1
Yavapai, AZ
Jun 2019NoModNegligence$142$142
9393177
Portable Plant #1
Yavapai, AZ
Jun 2019NoModNegligence$142$142
9393176
Portable Plant #1
Yavapai, AZ
Jun 2019NoModNegligence$142$142
9393175
Portable Plant #1
Yavapai, AZ
Jun 2019NoModNegligence$142$142
9393174
Portable Plant #1
Yavapai, AZ
Jun 2019NoModNegligence$142$142
9393173
Portable Plant #1
Yavapai, AZ
Jun 2019NoModNegligence$142$142
9393170
Portable Plant #1
Yavapai, AZ
Jun 2019NoModNegligence$142$142
9393090
Portable Plant #1
Yavapai, AZ
Mar 2019NoModNegligence$142$142
8829885
Portable Plant #1
Yavapai, AZ
Aug 2014YesModNegligence$127$127
8829881
Portable Plant #1
Yavapai, AZ
Aug 2014YesModNegligence$127$127
8829878
Portable Plant #1
Yavapai, AZ
Aug 2014YesModNegligence$127$127
8829868
Portable Plant #1
Yavapai, AZ
Aug 2014YesModNegligence$127$127
8829863
Portable Plant #1
Yavapai, AZ
Aug 2014YesModNegligence$127$127
8584854
Portable Plant #1
Yavapai, AZ
Jun 2011YesLowNegligence$127$100
8584853
Portable Plant #1
Yavapai, AZ
Jun 2011YesLowNegligence$127$100
6453634
Portable Plant #1
Yavapai, AZ
Mar 2009YesModNegligence$127$127
6453631
Portable Plant #1
Yavapai, AZ
Mar 2009YesModNegligence$127$127
9477684
Portable Plant #1
Yavapai, AZ
Dec 2021NoHighNegligence$125$125
9477683
Portable Plant #1
Yavapai, AZ
Dec 2021NoHighNegligence$125$125
9477658
YAVAPAI PLANT 22
Yavapai, AZ
contractor: Fann Contracting
Jun 2021NoModNegligence$125$125
6307028
Portable Plant #1
Yavapai, AZ
Oct 2004YesModNegligence$124$124
6307027
Portable Plant #1
Yavapai, AZ
Oct 2004YesModNegligence$124$124
9430655
Portable Plant #1
Yavapai, AZ
Mar 2020NoLowNegligence$123$123
9392859
YAVAPAI PLANT 22
Yavapai, AZ
contractor: Fann Contracting
Mar 2019NoModNegligence$121$121
9393095
Portable Plant #1
Yavapai, AZ
Mar 2019NoLowNegligence$121$121
9393094
Portable Plant #1
Yavapai, AZ
Mar 2019NoLowNegligence$121$121
9392856
YAVAPAI PLANT 22
Yavapai, AZ
contractor: Fann Contracting
Mar 2019NoModNegligence$121$121
9392855
YAVAPAI PLANT 22
Yavapai, AZ
contractor: Fann Contracting
Mar 2019NoModNegligence$121$121
9392854
YAVAPAI PLANT 22
Yavapai, AZ
contractor: Fann Contracting
Mar 2019NoLowNegligence$121$95
9392853
YAVAPAI PLANT 22
Yavapai, AZ
contractor: Fann Contracting
Mar 2019NoLowNegligence$121$95
9392851
YAVAPAI PLANT 22
Yavapai, AZ
contractor: Fann Contracting
Mar 2019NoModNegligence$121$121
9392849
YAVAPAI PLANT 22
Yavapai, AZ
contractor: Fann Contracting
Mar 2019NoLowNegligence$121$95
9392848
YAVAPAI PLANT 22
Yavapai, AZ
contractor: Fann Contracting
Mar 2019NoLowNegligence$121$95
9392847
YAVAPAI PLANT 22
Yavapai, AZ
contractor: Fann Contracting
Mar 2019NoModNegligence$121$121
9343364
Portable Plant #1
Yavapai, AZ
Aug 2018NoModNegligence$118$118
9343362
Portable Plant #1
Yavapai, AZ
Aug 2018NoModNegligence$118$118
9343360
Portable Plant #1
Yavapai, AZ
Aug 2018YesLowNegligence$118$118

Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for FANN CONTRACTING, INC.. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for FANN CONTRACTING, INC.. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for FANN CONTRACTING, INC.. Verify directly with Environmental Protection Agency

EPA-registered facilities

Every EPA ECHO facility associated with this employer, sorted most-significant first. Each row links to EPA’s Detailed Facility Report for the source-of-truth record. Permits column lists active programs (Air = Clean Air Act, Water = Clean Water Act, RCRA = hazardous waste, TRI = Toxics Release Inventory reporting). 1 facility · $72,128 in assessed penalties.

FacilityPermitsStatusInspectionsFormal actionsPenaltiesLast inspectedECHO
FANN CONTRACTING, INC.
6725 GENERATION LANE · PRESCOTT, AZ, 86301
AirNo Violation Identified01$72,128View →

Source: EPA ECHO (Enforcement and Compliance History Online). Compliance status follows EPA’s own labels (“Sig Violation” = significant noncompliance; QNCR = quarters of noncompliance over the recent reporting window). Inactive facilities (struck through) retain historical enforcement records even after operations ceased.

Motor carrier safety (FMCSA)

DOT number
1165845
Operation
B

Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for FANN CONTRACTING, INC.. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$600
Obligated (all-time)
$63.4M
Awards
10
Top agency
Department of Transportation
$49.7M
Top agencies by obligation (this location)
Department of Transportation$49.7M
Department of the Interior$13.7M
Department of Agriculture$600
Largest awards
  • Department of Transportation
    THIS PROJECT INCLUDES RECONSTRUCTION OF 7.47 MILES OF DESERT VIEW DRIVE, 1.1 MILES OF YAKI POINT AND KAIBAB TRAIL ACCESS ROAD, 3.59 SOUTH ENTRANCE ROAD, 1.17 VILLAGE LOOP DRIVE IN GRAND CANYON NATIONAL PARK.
    contract · Last action 2019-10-28
    $14,630,834
  • Department of the Interior
    TAS::14-69-9/0-0504.20::TAS PROJECT NOS. N3629100, N3349700. ROAD MAINTENANCE FOR BIA ROADS IN ARIZONA.
    contract · Last action 2012-08-14
    $13,539,780
  • Department of Transportation
    ONE SCHDEULE FOR GRADING, DRAINAGE AND SURFACING ON 7.11 MILES OF HERMIT ROAD, AND 2 OPTIONS, ONE FOR WIDENING AND BYPASS LANE CONSTRUCTION ON 1.34 MILES OF THE SOUTH ENTRANCE ROAD AND ONE FOR 1.98 MILES OF GREENWAY/BIKE PATH ALONG HERMIT ROAD.
    contract · Last action 2011-04-20
    $13,336,228
  • Department of Transportation
    IGF::CT::IGF HFPM-12-0102; AZ PFH 3-1(2), FLAGSTAFF-CLINT WELLS; PROJECT ADVERTISEMENT FOR CONSTRUCTION; $7,098,753.00 OPTION W = $2,689,562.00 OPTION X = $3,005,036) CONTRACT# DTFH68-12-B-0005
    contract · Last action 2014-04-14
    $8,884,167
  • Department of Transportation
    MATHER POINT IMPROVEMENTS PHASE 2 GRAND CANYON NATIONAL PARK
    contract · Last action 2012-05-11
    $6,687,917
  • Department of Transportation
    AZ NPS-GRCA-PRES-1(10) GRAND CANYON SOUTH RIM PAVEMENT PRES INTERAGENCY AGREEMENT DTFH68-10-X-00024 AWARDED AMOUNT: $4,487,130.50 OBLIGATION AMOUNT INCLUDES INCENTIVES.
    contract · Last action 2013-12-20
    $5,286,337
  • Department of Transportation
    CONSTRUCT ROAD SUNRISE PARK--BIG LAKE ROAD
    contract · Last action 2009-09-14
    $712,731
  • Department of the Interior
    GRCA - ROADS MATERIALS
    contract · Last action 2020-09-03
    $198,400
  • Department of Transportation
    PAVEMENT, REHABITATION, GRADING AND DRAINAGE OF ROADWAY AND ONE RESIDENCIAL PARKING LOT.
    contract · Last action 2012-05-04
    $139,192
  • Department of Agriculture
    S-445, CROOKS, AZ-PNF-000271,
    contract · Last action 2022-05-11
    $600

Federal contract dollars to this establishment. Primary NAICS: 237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Last action: 2022-05-11. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
2004-06-29Planned11$3,000
2002-11-20Planned0$0
1994-07-12Unprogrammed Related1$1,925

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Other employers in this industry and state

Other employers in site preparation contractors within AZ, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on FANN CONTRACTING, INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is FANN CONTRACTING, INC.'s OSHA violation history?
FANN CONTRACTING, INC. has 3 OSHA inspections on record with 2 violations and $4,925 in total penalties.
How does FANN CONTRACTING, INC.'s safety record compare to its industry?
FANN CONTRACTING, INC. operates in the site preparation contractors industry. The industry average Total Recordable Incident Rate (TRIR) is 1.5. FANN CONTRACTING, INC.'s self-reported DART rate is 1.84 compared to an industry average of 1.