Establishment profile
ECLIPSE COMPANIES LLC
17822 CHILLICOTHE ROAD, CHAGRIN FALLS, OH, 44023
238110 — Poured Concrete Foundation and Structure Contractors
Summary
ECLIPSE COMPANIES LLC has accumulated 0 OSHA violations across 1 inspection over 13 years of recorded history.
The most recent federal enforcement activity was recorded 4 years ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
ECLIPSE COMPANIES LLC appears in OSHA workplace safety, WHD wage enforcement, OFLC visa and labor certification (historical), and FMCSA motor carrier registration records only. No matching records were found in MSHA mine safety, EPA environmental compliance, NLRB labor relations, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
Peer comparison
Fewer violations than most other employers in NAICS 2381 within OH. Peer group: 14,550 employers. This establishment has 0 OSHA violations; peer median is 2.
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 55 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for ECLIPSE COMPANIES LLC. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 4+ years. Most recent activity: 4 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
Department of Labor Wage & Hour Division — minimum-wage, overtime, child-labor, FMLA, and prevailing-wage enforcement.
Wage and hour breakdown by law
Per-statute totals across all closed DOL Wage & Hour cases against this employer. Backwages reflect amounts the agency assessed; civil penalty is the separate fine where applicable. Some acts (Davis-Bacon, SCA, CWHSSA, H-2B, CCPA) don't carry a civil penalty field in DOL's data. 2 statutes · 6 violations · $1,947 in backwages
| Statute | Period | Cases | Violations | Workers | Backwages | Civil penalty |
|---|---|---|---|---|---|---|
| FLSA — minimum wage & overtime | Aug 2015 – Mar 2016 | 2 | 2 | 2 | $1,073 | — |
| Davis-Bacon (federal construction) | Feb 2022 | 1 | 4 | 2 | $874 | — |
Source: DOL WHD enforcement database, aggregated per statute. Lifetime totals. A case can cite multiple statutes — so the total here may exceed the case count in the table above.
Wage and hour cases
Closed DOL Wage & Hour Division cases (FLSA, FMLA, H-2B, MSPA, and related statutes). Backwages reflect amounts the agency assessed; civil penalty (CMP) is a separate fine levied on top, where the statute provides for one (FLSA / H-1B / H-2A / MSPA / FMLA / EPPA / FLSA Child Labor; other acts have no CMP column in DOL’s data). The Statutes column lists which laws each case cited. 3 cases · 6 violations · $1,947 in backwages · 4 workers affected
| Case period | Industry | Statutes | Violations | Workers | Backwages | Civil penalty |
|---|---|---|---|---|---|---|
| Aug 2021 – Feb 2022 | Commercial and Institutional Building Construction | Davis-Bacon | 4 | 2 | $874 | — |
| Feb 2016 – Mar 2016 | Water and Sewer Line and Related Structures Construction | FLSA | 1 | 1 | $631 | — |
| Aug 2013 – Aug 2015 | Highway, Street, and Bridge Construction | FLSA | 1 | 1 | $442 | — |
Source: DOL WHD enforcement database. Cases shown reflect those the agency has closed and made public. A violation count is the agency’s tally of cited violations (one violation can affect many workers); the workers column counts distinct employees the agency found to be affected.
Mine safety (MSHA)
No MSHA mine safety violations on file for ECLIPSE COMPANIES LLC. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for ECLIPSE COMPANIES LLC. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
Office of Foreign Labor Certification — labor condition applications for H-1B, H-2A, H-2B visa programs. Wage ratio = offered / prevailing wage. Historical data only: DOL ended OFLC Performance Data Disclosure publication in 2026, so the figures above reflect filings through the last ingested cycle and are not being refreshed. Treat as a historical snapshot, not a current signal.
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for ECLIPSE COMPANIES LLC. Verify directly with Environmental Protection Agency →
Motor carrier safety (FMCSA)
Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for ECLIPSE COMPANIES LLC. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- Department of TransportationPROJECT NC NP BLRI 2M31; NC NP BLRI 2N24; NC NP BLRI 2M26, 2N22: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 344.3 TO 351.9. THE WORK INCLUDES SLIDE REPAIRS, CULVERT CLEANING, CULVERT INSTALLATION, STONE MASONRY HEADWALL INSTALLATION, Dcontract · Last action 2025-12-17$29,698,000
- Department of TransportationPROJECT NC NP BLRI 2M28; NC NP BLRI 2M29: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 336.7, 336.75, 336.85, 336.95, 337.2, 338.2 AND MP 338.4. THE WORK INCLUDES SLIDE REPAIRS, CULVERT CLEANING, CULVERT INSTALLATION, STONE MASONRY HEADWALcontract · Last action 2026-04-21$18,953,608
- Department of TransportationPROJECT NP-GREE 11(1) THE PROJECT CONSISTS OF RECONSTRUCTION OF ROADWAYS AND PARKING AREAS, CONSTRUCTION OF A BRIDGE, AND REPLACEMENT OF CULVERTS IN THE GREENBELT PARK. THE WORK INCLUDES FULL-DEPTH RECONSTRUCTION OF ASPHALT PAVEMENT, ASPHALT PAVEMENT MILL AND OVERLAY, ASPHALT REMOVAL ON BIKE TRAIL, A GEOSYNTHETIC REINFORCED SOIL-INTEGRATED BRIDGE SYSTEM (GRS-IBS) BRIDGE CONSTRUCTION, HEADWALL AND BOX CULVERT INSTALLATIONS, GRAVEL DIAPHRAGM INSTALLATION AS STORMWATER MANAGEMENT, STEEL-BACKED TIMBER GUARDRAIL REPLACEMENT, AND OTHER MISCELLANEOUS WORK.contract · Last action 2024-05-20$6,482,398
- Department of TransportationAR ERFO FS OZSTF810 2022-1(1): THE PROJECT CONSISTS OF THE PERMANENT SLIDE REPAIR OF WHITE ROCK ROAD (NFSR 1003) AND EAST FLY GAP ROAD (NFSR 1503). THE WORK INCLUDES ROADWAY RECONSTRUCTION AND RECONDITIONING, EMBANKMENT STABILIZATION, CULVERT REPLACcontract · Last action 2025-10-10$5,735,000
- Department of TransportationPROJECT OH ERFO FS WAYNE914 2021-1(1) THE PROJECT CONSISTS OF THE REPAIR AND RECONSTRUCTION OF VESUVIUS ROAD (FS 1955) AND HANGING ROCK SPUR A (FS 105A). THE WORK INCLUDES THE REHABILITATION OF SIX SITES, INVOLVING SLOPE REPAIRS, DEEP PATCHING, ROcontract · Last action 2025-07-18$4,710,697
- Department of DefenseIGF::OT::IGF HARPERSFIELD DAM RENOVATIONcontract · Last action 2020-10-21$4,534,935
- Department of TransportationPROJECT NC ERFO NP BLRI 2024-1(4) THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONINcontract · Last action 2025-12-22$3,777,135
- Department of TransportationPROJECT MS NP NATR 3P28: THE PROJECT CONSISTS OF MILLING AND ROAD OVERLAY OF ACCESS RAMPS TO INTERSTATE 55. THE WORK ALSO INCLUDES BRIDGE REPAIR, SIGNING, PAVEMENT STRIPING AND OTHER MISCELLANEOUS WORK.contract · Last action 2025-09-17$3,298,650
- Department of TransportationPROJECT NP-CHAT 102(1), 906(1), 907(1), 908(1): THE PROJECT CONSISTS OF REHABILITATION/RECONSTRUCTION OF THE ROADWAY AND PARKING AREAS, MILLING AND ASPHALT OVERLAY, INSTALLATION OF NEW SIGNS, PAVEMENT MARKING, DEVELOPMENT AND IMPLEMENTATION OF A TRAcontract · Last action 2026-03-27$3,063,807
- Department of TransportationPROJECT TN ERFO FS CHRKE804 2020-1(1) THE PROJECT CONSISTS OF REPAIRS TO ROCKY TOP ROAD (FS 402) FOR A LENGTH OF 3.43 MILES, INCLUDING ROADWAY AND DITCH RECONDITIONING, AGGREGATE SURFACING, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.contract · Last action 2025-08-21$2,754,992
- Department of TransportationTHIS PROJECT CONSISTS OF REPAIRING SLOPE FAILURES AT MILEPOST 106.6 AND MILEPOST 109.7 THE WORK INCLUDES DESIGN SERVICES, EXCAVATION, EMBANKMENT CONSTRUCTION, AND OTHER MISCELLANEOUS WORK.contract · Last action 2024-09-04$2,526,528
- Department of TransportationPROJECT TX FTFW SAMA 10(1)_2: THE PROJECT CONSISTS OF THE REHABILITATION AND REALIGNMENT OF THE ENTRANCE ROAD WITHIN THE SAN MARCOS AQUATIC RESOURCES CENTER.contract · Last action 2025-03-19$2,262,573
- Department of TransportationPROJECT MS ERFO FW HILL 2020-1(1): THE PROJECT CONSISTS OF THE REMOVAL AND RECONSTRUCTION OF TWO BOARDWALKS AND THE REHABILITATION OF ALLIGATOR SLOUGH NATURE TRAIL AND PARKING. THE WORK INCLUDES GRADING, DRAINAGE, AGGREGATE SURFACE COURSE, CONCRETcontract · Last action 2025-07-29$2,255,831
- Department of TransportationPROJECT AR FW BLD 11(1): THE PROJECT CONSISTS OF ROADWAY RECONSTRUCTION AND RESURFACING OF GRANARY SOUTH ROAD (ROUTE 011). THE WORK INCLUDES BANK STABILIZATION, AGGREGATE BASE (LIMESTONE), AGGREGATE SURFACE COURSE (LIMESTONE), PIPE CULVERT REPLACEMEcontract · Last action 2026-02-26$2,144,405
- Department of TransportationPROJECT TN NP GRSM 10N(5) THE PROJECT CONSISTS OF REPAIRING STORM DAMAGE ON NEWFOUND GAP ROAD WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES CONSTRUCTING A REINFORCED ROCKERY WALL, CONSTRUCTING AN AGGREGATE-TOPSOIL COURSE SHOULDcontract · Last action 2026-03-05$2,072,575
- Department of TransportationPROJECT ME NP ACAD BRG(1): THE PROJECT CONSISTS OF BRIDGE REHABILITATION AND REPAIR OF WILDWOOD ENTRANCE AND JORDAN POND-SEAL HARBOR BRIDGES. THE WORK INCLUDES CUTTING WEEP HOLE OPENINGS INTO ABUTMENTS; CLEANING AND SEALING BRIDGE JOINTS; EROSION REcontract · Last action 2025-03-19$1,936,039
- Department of DefenseEMERGENCY ACCESS ROAD, TOWN OF MARTIN, FLOYD COUNTY, KENTUCKYcontract · Last action 2020-02-05$1,795,824
- Department of TransportationPROJECT FW-GRCO TRL(1): THE PROJECT CONSISTS OF REPLACING THE DAMAGED BOARDWALK ON HEADQUARTERS BOARDWALK TRAIL. THE WORK INCLUDES DESIGN SERVICES, TIMBER PILE AND TIMBER BOARDWALK CONSTRUCTION, AND OTHER MISCELLANEOUS WORK.contract · Last action 2024-07-17$1,730,806
- Department of DefenseMDHP RP-18-03, CONSTRUCTION OF FIVE RISER PIPE GRADE CONTROL STRUCTURES.contract · Last action 2025-11-13$1,659,000
- Department of TransportationKY NP MACA 16(1), 200(1): THE PROJECT CONSISTS OF RECONFIGURATION OF THE INTERSECTION OF CAVE CITY ROAD AND FROZEN NIAGARA ROAD. THE WORK INCLUDES INTERSECTION AND ROADWAY REALIGNMENT, ROADWAY OBLITERATION, CLEARING AND GRUBBING, DRAINAGE IMPROVEMENcontract · Last action 2025-09-04$1,636,293
- Department of TransportationPROJECT FW BIOA 12(1) THE PROJECT CONSISTS OF RECONSTRUCTION OF THE FALLING TIMBER BRIDGE ON SHAPE CHARGE ROAD (FW ROUTE 012). THE WORK INCLUDES REPLACEMENT OF FALLING TIMBER BRIDGE, RECONSTRUCTION OF APPROACHES, AGGREGATE RESURFACING, REMOVAL OF Scontract · Last action 2024-02-14$1,527,506
- Department of TransportationPROJECT NC NP BLRI 2F12: THE PROJECT CONSISTS OF ROADWAY RECONSTRUCTION AND DRAINAGE REPAIRS AT MP 276.35. THE WORK INCLUDES BRIDGE WORK; GUARD WALL CONSTRUCTION; LOWER RETAINING WALL WORK; DRAINAGE STRUCTURE REPLACEMENTS; AND OTHER MISCELLANEOUS WOcontract · Last action 2025-07-30$1,495,405
- Department of TransportationKY NP CUGA BRG(1) THE WORK INCLUDES REPLACING SUPERSTRUCTURE, CLEANING AND PAINTING RUSTED AREAS OF STEEL ARCH ALONG THE FOUNDATIONS, REMOVING FLOOD DEBRIS AND FALLEN TREES, REPAIRING SCOUR ALONG FOUNDATIONS, MILL AND OVERLAY OF BRIDGE APPROACHES, Acontract · Last action 2025-09-12$1,146,991
- Department of TransportationPROJECT MO ERFO FS 2017-1(1) WORK INCLUDES THE RECONSTRUCTION AND REPAIR OF MULTIPLE DAMAGED SITES ALONG THE JOHN J. AUDUBON TRAIL INCLUDING REALIGNMENT AT 2 SITES, PLACING RIPRAP, DITCH RECONDITIONING, AND OTHER MISCELLANEOUS WORK.contract · Last action 2023-10-11$1,127,341
- Department of TransportationPROJECT PA ERFO FW CHV 2020-1(1): THE PROJECT CONSISTS OF THE REHABILITATION OF BACK NINE TRAIL, RIDGE NATURE TRAIL AND RIDGE NATURE PARKING AREA. THE WORK INCLUDES REMOVING AND REPLACING ASPHALT CONCRETE PAVEMENT, ROADWAY EXCAVATION, ROADBED RECONDcontract · Last action 2025-09-16$961,797
- Department of TransportationPROJECT: MS NP NATR BMS FY23(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 14 BRIDGES ALONG THE NATCHEZ TRACE PARKWAY. THE WORK INCLUDES THE REPAIR OF DETERIORATED EXPANSION JOINTS, CLEANING AND RESEALING JOINTS, CONCRETE REPcontract · Last action 2024-09-19$916,875
- Department of TransportationTHE PROJECT CONSISTS OF THE RECONSTRUCTION OF HATCHERY ENTRANCE ROAD (ROUTE 010), VISITOR OVERFLOW PARKING (ROUTE 900), VISITOR PARKING (ROUTE 903), AND 301AZ WITHIN THE NASHUA NATIONAL FISH HATCHERY. THE WORK INCLUDES ROADWAY EXCAVATION, AGGREGATE Bcontract · Last action 2025-09-04$716,733
- Department of TransportationPROJECT MS NP NATR BMS FY24(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 14 BRIDGES ALONG THE NATCHEZ TRACE PARKWAY. THE WORK INCLUDES THE REPAIR OF DETERIORATED EXPANSION JOINTS, CLEANING AND RESEALING JOINTS, CONCRETE REPAcontract · Last action 2026-02-25$529,912
- Department of TransportationPROJECT IN NP INDU 0945(2): THE PROJECT CONSISTS OF BRIDGE SUPERSTRUCTURE REMOVAL, TEMPORARY TRAFFIC CONTROL, AND OTHER MISCELLANEOUS WORK.contract · Last action 2023-02-14$398,739
- Department of TransportationPROJECT LA NP JELA 7530-001P THE PROJECT CONSISTS OF THE REHABILITATION OF STRUCTURE 7530-001P OVER BAYOU DES FAMILLES IN THE JEAN LAFITTE NATIONAL HISTORICAL PARK AND PRESERVE. THE WORK INCLUDES PERFORMING DESIGN SERVICES, REMOVING AND REPLACING BRcontract · Last action 2025-11-03$270,460
- Department of AgricultureNRE-2926, DOGE APPROVED 7/15 080109 RHELM CON ROAD MAINTENANCE CONTRACTcontract · Last action 2026-03-11$206,715
- Department of TransportationPROJECT NP NATR 3N16, 3H25, ETC, TO INITIALLY AUTHORIZE GAOA FUNDS FOR DESIGN-BUILD SOLICITATION AND RELEASE OF THE /RFQ/ RFPcontract · Last action 2024-06-07$25,000
- Department of AgricultureIDIQ ROAD MAINTENANCE/CONSTRUCTION SERVICES MISSISSIPPI NF-NORTH ZONEcontract · Last action 2025-01-24$2,000
- Department of AgricultureIDIQ ROAD MAINTENANCE/CONSTRUCTION SERVICES MISSISSIPPI NF-WEST ZONEcontract · Last action 2025-01-23$2,000
- Department of TransportationSOUTH-ATLANTIC REGION CONSTRUCTION MATOC: INDEFINITE DELIVERY, INDEFINITE QUANTITY (IDIQ) CONTRACT TO PERFORM SUBSEQUENT TASK ORDERS FOR HIGHWAY, STREET, AND/OR BRIDGE CONSTRUCTION SERVICES, POTENTIALLY WITH INCIDENTAL DESIGN SERVICES AND/OR DESIGcontract · Last action 2026-04-10$0
- Department of TransportationSOUTH REGION CONSTRUCTION MATOC: INDEFINITE DELIVERY, INDEFINITE QUANTITY (IDIQ) CONTRACT TO PERFORM SUBSEQUENT TASK ORDERS FOR HIGHWAY, STREET, AND/OR BRIDGE CONSTRUCTION SERVICES POTENTIALLY WITH INCIDENTAL DESIGN SERVICES AND/OR DESIGN-BUILD SEcontract · Last action 2026-02-10$0
- Department of TransportationPROJECT: MID-WEST REGIONAL CONSTRUCTION IDIQ MATOC.contract · Last action 2025-09-04$0
- Department of TransportationPROJECT: NORTH EASTERN REGIONAL CONSTRUCTION IDIQ MATOC.contract · Last action 2025-09-03$0
- Department of TransportationPROJECT: SOUTH-ATLANTIC REGIONAL CONSTRUCTION IDIQ MATOC.contract · Last action 2025-09-02$0
- Department of TransportationPROJECT: SOUTH REGIONAL CONSTRUCTION IDIQ MATOC.contract · Last action 2025-06-12$0
- Department of AgricultureMS SOUTH ROAD MNT_CONS VENDOR POOL: 24D0015 MS SOUTH C&O DIRT 24D0016 MS SOUTH ECLIPSE 24D0017 MS SOUTH HUNT 24D0018 MS SOUTH SYTE 24D0019 MS SOUTH UPHILL 24D0020 MS SOUTH VEG MGT 24D0021 MS SOUTH WP 24D0022 MS SOUTH WALTER 24D0023 MS SOcontract · Last action 2025-01-27$0
- Department of AgricultureSACC II MULTIPLE AWARD INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) CONSTRUCTION CONTRACT - ECLIPSE COMPANIES, LLCcontract · Last action 2024-09-11$0
- Department of AgricultureFOREST SERVICE - REGION 8 TRAILS BLANKET PURCHASE AGREEMENT (BPA)contract · Last action 2024-04-22$0
Federal contract dollars to this establishment. Primary NAICS: 237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Last action: 2026-04-21. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2012-08-23 | Unprogrammed Related | 0 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in poured concrete foundation and structure contractors within OH, ordered by federal enforcement volume:
- 21ST CENTURY CONCRETE CONSTRUCTION INC.CLEVELAND — 2 federal enforcement records
- J. Goss ConcreteMassillon — 2 federal enforcement records
- PHOENIX CEMENT INC.AVON — 2 federal enforcement records
- 21ST CENTURY CONCRETE CONSTRUCTIONNEW PHILADELPHIA — 2 federal enforcement records
- PHOENIX CEMENT INC.BEREA — 2 federal enforcement records
- NORTH AMERICAN CEMENTBAY VILLAGE — 2 federal enforcement records
- CLEVELAND CEMENT CONTRACTORS INC.CLEVELAND — 2 federal enforcement records
- CLEVELAND CEMENT CONTRACTORS INC.CLEVELAND — 2 federal enforcement records
- NORTH AMERICAN CEMENT CO. INC.LORAIN — 2 federal enforcement records
- Mulford Concrete Inc.Marion — 2 federal enforcement records
Related searches
- Poured Concrete Foundation and Structure ContractorsAll employers in this industry
- Employers in OHState-wide enforcement data
- Poured Concrete Foundation in OHIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on ECLIPSE COMPANIES LLC from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is ECLIPSE COMPANIES LLC's OSHA violation history?
- ECLIPSE COMPANIES LLC has 1 OSHA inspection on record with 0 violations and $0 in total penalties.
- How does ECLIPSE COMPANIES LLC's safety record compare to its industry?
- ECLIPSE COMPANIES LLC operates in the poured concrete foundation and structure contractors industry. The industry average Total Recordable Incident Rate (TRIR) is 2.8. ECLIPSE COMPANIES LLC's self-reported DART rate is 0 compared to an industry average of 2.