Establishment profile
CRITICAL PATH METALWORKS, INC.
614 CLIFF ST., WESTCLIFFE, CO, 81252
332312 — Fabricated Structural Metal Manufacturing
Summary
CRITICAL PATH METALWORKS, INC. has accumulated 3 OSHA violations across 2 inspections over 10 years of recorded history, with $540 in total assessed penalties.
The establishment sits in the 45th percentile for violations within its industry-state peer group of 234 employers. Inspection frequency runs at the 54th percentile. The most recent enforcement activity was recorded 7 years ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
CRITICAL PATH METALWORKS, INC. appears in OSHA workplace safety and FMCSA motor carrier registration records only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
50% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 3 distinct standards shown · 3 citations in this view · $540 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1910.0134 H02 I | 1 | 1 | $180 | Aug 2016 | Aug 2016 |
| 29 CFR 1910.0178 Q07 | 1 | 1 | $180 | Aug 2016 | Aug 2016 |
| 29 CFR 1910.1200 G08 | 1 | 1 | $180 | Aug 2016 | Aug 2016 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Below average violations in NAICS 3323 within CO. Peer group: 234 employers. This establishment has 3 OSHA violations; peer median is 3.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for CRITICAL PATH METALWORKS, INC.. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for CRITICAL PATH METALWORKS, INC.. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 7+ years. Most recent activity: 7 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for CRITICAL PATH METALWORKS, INC.. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
No MSHA mine safety violations on file for CRITICAL PATH METALWORKS, INC.. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for CRITICAL PATH METALWORKS, INC.. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for CRITICAL PATH METALWORKS, INC.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for CRITICAL PATH METALWORKS, INC.. Verify directly with Environmental Protection Agency →
EPA-registered facilities
Every EPA ECHO facility associated with this employer, sorted most-significant first. Each row links to EPA’s Detailed Facility Report for the source-of-truth record. Permits column lists active programs (Air = Clean Air Act, Water = Clean Water Act, RCRA = hazardous waste, TRI = Toxics Release Inventory reporting). 1 facility · 1 marked inactive.
| Facility | Permits | Status | Inspections | Formal actions | Penalties | Last inspected | ECHO |
|---|---|---|---|---|---|---|---|
CRITICAL PATH METALWORKS INC 614 CLIFF STREET · SILVER CLIFF, CO, 81252 | Air | No Violation Identified | 0 | 0 | — | — | View → |
Source: EPA ECHO (Enforcement and Compliance History Online). Compliance status follows EPA’s own labels (“Sig Violation” = significant noncompliance; QNCR = quarters of noncompliance over the recent reporting window). Inactive facilities (struck through) retain historical enforcement records even after operations ceased.
Motor carrier safety (FMCSA)
Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2018-11-13 | Planned | 0 | — | $0 | |
| 2016-06-30 | Planned | 3 | — | $540 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in fabricated structural metal manufacturing within CO, ordered by federal enforcement volume:
- PEAK CUSTOM FABRICATION, INC.COLORADO SPRINGS — 2 federal enforcement records
- PIKES PEAK STEEL LLCCOLORADO SPRINGS — 2 federal enforcement records
- WESTERN SLOPE IRON & SUPPLY, INC.GRAND JUNCTION — 2 federal enforcement records
- ZIMKOR INDUSTRIESLITTLETON — 2 federal enforcement records
- AFCO STEEL, LLCGREELEY — 2 federal enforcement records
- VESTAS TOWERSPUEBLO — 2 federal enforcement records
- ROCKY MOUNTAIN STEEL INC.OLATHE — 2 federal enforcement records
- VESTAS TOWERS AMERICAPUEBLO — 2 federal enforcement records
- VISION AIR HVAC INCPUEBLO — 2 federal enforcement records
- BOULDER STEEL, INC.BROOMFIELD — 2 federal enforcement records
Related searches
- Fabricated Structural Metal ManufacturingAll employers in this industry
- Employers in COState-wide enforcement data
- Fabricated Structural Metal in COIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on CRITICAL PATH METALWORKS, INC. from every major federal compliance and enforcement source. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is CRITICAL PATH METALWORKS, INC.'s OSHA violation history?
- CRITICAL PATH METALWORKS, INC. has 2 OSHA inspections on record with 3 violations and $540 in total penalties.
- How does CRITICAL PATH METALWORKS, INC.'s safety record compare to its industry?
- CRITICAL PATH METALWORKS, INC. operates in the fabricated structural metal manufacturing industry. The industry average Total Recordable Incident Rate (TRIR) is 3.4.