Establishment profile
COPENHAVER CONSTRUCTION INC
ADDY-GIFFORD RD., ADDY, WA, 99101
237310 — Highway, Street, and Bridge Construction
Summary
COPENHAVER CONSTRUCTION INC has accumulated 0 OSHA violations across 1 inspection over 20 years of recorded history.
The most recent federal enforcement activity was recorded 20 years ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
COPENHAVER CONSTRUCTION INC appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
Peer comparison
Fewer violations than most other employers in NAICS 2373 within WA. Peer group: 925 employers. This establishment has 0 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for COPENHAVER CONSTRUCTION INC. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for COPENHAVER CONSTRUCTION INC. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 20+ years. Most recent activity: 20 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for COPENHAVER CONSTRUCTION INC. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in WA — for COPENHAVER CONSTRUCTION INC, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other COPENHAVER CONSTRUCTION INC operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 53S&S · $220,038 proposed / $145,368 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 9431276 | Portable #2 Lincoln, WA | Mar 2019 | — | Yes | HighNegligence | $16,400 | $3,326 |
| 9617948 | Portable #4 Lincoln, WA | May 2023 | — | Yes | ModNegligence | $11,709 | $3,528 |
| 9617939 | Portable #4 Lincoln, WA | May 2023 | — | Yes | ModNegligence | $11,709 | $3,528 |
| 9505023 | Portable #2 Lincoln, WA | Jun 2020 | — | Yes | HighNegligence | $10,373 | $7,261 |
| 9505019 | Portable #2 Lincoln, WA | Jun 2020 | — | Yes | HighNegligence | $10,373 | $10,373 |
| 9505017 | Portable #2 Lincoln, WA | Jun 2020 | — | Yes | HighNegligence | $9,335 | $7,468 |
| 9505011 | Portable #2 Lincoln, WA | Jun 2020 | — | Yes | ModNegligence | $9,335 | $4,000 |
| 9688649 | Portable # 3 Lincoln, WA | Mar 2025 | — | No | HighNegligence | $5,574 | — |
| 9688644 | Portable # 3 Lincoln, WA | Mar 2025 | — | No | HighNegligence | $5,574 | — |
| 9617169 | Portable #4 Lincoln, WA | Mar 2022 | — | Yes | HighNegligence | $5,290 | $5,290 |
| 9617931 | Portable #4 Lincoln, WA | May 2023 | — | No | ModNegligence | $5,262 | $318 |
| 9617930 | Portable #4 Lincoln, WA | May 2023 | — | No | ModNegligence | $5,262 | $318 |
| 9990272 | Portable # 3 Lincoln, WA | May 2025 | — | Yes | ModNegligence | $4,047 | $4,047 |
| 9617325 | Portable #4 Lincoln, WA | Aug 2022 | — | Yes | ModNegligence | $3,546 | $3,546 |
| 9617322 | Portable #4 Lincoln, WA | Aug 2022 | — | Yes | ModNegligence | $3,546 | $3,546 |
| 9617320 | Portable #4 Lincoln, WA | Aug 2022 | — | Yes | ModNegligence | $3,546 | $3,546 |
| 9617170 | Portable #4 Lincoln, WA | Mar 2022 | — | Yes | ModNegligence | $3,546 | $3,546 |
| 9617999 | Portable #4 Lincoln, WA | Aug 2023 | — | No | HighNegligence | $3,528 | $246 |
| 9617987 | Portable #4 Lincoln, WA | Aug 2023 | — | No | HighNegligence | $3,528 | $712 |
| 9617946 | Portable #4 Lincoln, WA | May 2023 | — | Yes | ModNegligence | $3,528 | $3,528 |
| 9617927 | Portable #4 Lincoln, WA | May 2023 | — | Yes | ModNegligence | $3,528 | $1,637 |
| 9431275 | Portable #2 Lincoln, WA | Mar 2019 | — | Yes | HighNegligence | $3,326 | $3,326 |
| 9611506 | Portable #4 Lincoln, WA | Jun 2021 | — | Yes | ModNegligence | $3,082 | $3,082 |
| 9505022 | Portable #2 Lincoln, WA | Jun 2020 | — | Yes | ModNegligence | $2,811 | $847 |
| 9617989 | Portable #4 Lincoln, WA | Aug 2023 | — | No | HighNegligence | $2,364 | $2,364 |
| 9617947 | Portable #4 Lincoln, WA | May 2023 | — | No | ModNegligence | $2,364 | $712 |
| 9617928 | Portable #4 Lincoln, WA | May 2023 | — | No | HighNegligence | $2,364 | $2,364 |
| 8870344 | Portable #1 Lincoln, WA | Mar 2015 | — | Yes | HighNegligence | $2,106 | $2,106 |
| 7999673 | Portable #1 Lincoln, WA | Aug 2001 | — | Yes | HighNegligence | $1,800 | $1,800 |
| 9688514 | Portable # 3 Lincoln, WA | Jun 2024 | — | Yes | ModNegligence | $1,773 | $1,773 |
| 9688645 | Portable # 3 Lincoln, WA | Mar 2025 | — | No | ModNegligence | $1,679 | $1,679 |
| 8568310 | Portable #4 Lincoln, WA | Aug 2023 | — | Yes | ModNegligence | $1,585 | $1,585 |
| 9617996 | Portable #4 Lincoln, WA | Aug 2023 | — | Yes | ModNegligence | $1,585 | $1,585 |
| 9617990 | Portable #4 Lincoln, WA | Aug 2023 | — | Yes | ModNegligence | $1,585 | $1,585 |
| 8611625 | Portable #1 Lincoln, WA | Jan 2014 | — | No | HighNegligence | $1,412 | $1,412 |
| 9612360 | Portable #4 Lincoln, WA | Mar 2021 | — | Yes | HighNegligence | $1,385 | $1,385 |
| 9505012 | Portable #2 Lincoln, WA | Jun 2020 | — | Yes | LowNegligence | $1,263 | $620 |
| 9434929 | Portable #2 Lincoln, WA | Feb 2020 | — | Yes | ModNegligence | $1,263 | $1,263 |
| 9434927 | Portable #2 Lincoln, WA | Feb 2020 | — | Yes | ModNegligence | $1,263 | $1,263 |
| 9431285 | Portable #2 Lincoln, WA | Mar 2019 | — | Yes | HighNegligence | $1,242 | $1,242 |
| 9431283 | Portable #2 Lincoln, WA | Mar 2019 | — | Yes | HighNegligence | $1,242 | $1,242 |
| 8882252 | Portable #4 Lincoln, WA | Mar 2025 | — | Yes | ModNegligence | $1,219 | $1,219 |
| 8882251 | Portable #4 Lincoln, WA | Mar 2025 | — | Yes | ModNegligence | $1,219 | $1,219 |
| 9688516 | Portable # 3 Lincoln, WA | Jun 2024 | — | Yes | ModNegligence | $1,188 | $1,188 |
| 9617945 | Portable #4 Lincoln, WA | May 2023 | — | Yes | ModNegligence | $1,152 | $1,152 |
| 9617941 | Portable #4 Lincoln, WA | May 2023 | — | Yes | ModNegligence | $1,152 | $1,152 |
| 9617171 | Portable #4 Lincoln, WA | Mar 2022 | — | Yes | ModNegligence | $1,069 | $1,069 |
| 9617988 | Portable #4 Lincoln, WA | Aug 2023 | — | No | HighNegligence | $1,063 | $1,063 |
| 7981674 | Portable #1 Lincoln, WA | Aug 2008 | — | Yes | HighNegligence | $1,052 | $1,052 |
| 8870337 | Portable #1 Lincoln, WA | Mar 2015 | — | Yes | ModNegligence | $1,026 | $1,026 |
| 8870984 | Portable #1 Lincoln, WA | Feb 2016 | — | Yes | ModNegligence | $946 | $946 |
| 8870556 | Portable #1 Lincoln, WA | Aug 2015 | — | Yes | ModNegligence | $946 | $946 |
| 8870555 | Portable #1 Lincoln, WA | Aug 2015 | — | Yes | ModNegligence | $946 | $946 |
| 8870552 | Portable #1 Lincoln, WA | Aug 2015 | — | Yes | ModNegligence | $946 | $946 |
| 8610527 | Portable #1 Lincoln, WA | Apr 2014 | — | Yes | ModNegligence | $946 | $946 |
| 8610526 | Portable #1 Lincoln, WA | Apr 2014 | — | Yes | ModNegligence | $946 | $946 |
| 8610437 | Portable #1 Lincoln, WA | May 2013 | — | Yes | ModNegligence | $946 | $946 |
| 8882259 | Portable #4 Lincoln, WA | Mar 2025 | — | No | ModNegligence | $818 | $818 |
| 8882253 | Portable #4 Lincoln, WA | Mar 2025 | — | No | ModNegligence | $818 | $818 |
| 8882250 | Portable #4 Lincoln, WA | Mar 2025 | — | No | HighNegligence | $818 | $818 |
| 9688650 | Portable # 3 Lincoln, WA | Mar 2025 | — | No | ModNegligence | $818 | — |
| 9688648 | Portable # 3 Lincoln, WA | Mar 2025 | — | No | ModNegligence | $818 | — |
| 9688511 | Portable # 3 Lincoln, WA | Jun 2024 | — | No | ModNegligence | $797 | $797 |
| 9683854 | Portable # 3 Lincoln, WA | Mar 2024 | — | Yes | HighNegligence | $797 | $797 |
| 9618000 | Portable #4 Lincoln, WA | Aug 2023 | — | No | HighNegligence | $772 | $772 |
| 8604149 | Portable #4 Lincoln, WA | Aug 2024 | — | No | ModNegligence | $736 | $736 |
| 8604148 | Portable #4 Lincoln, WA | Aug 2024 | — | No | ModNegligence | $736 | $736 |
| 8880459 | Portable #1 Lincoln, WA | Jul 2016 | — | No | ModNegligence | $722 | $722 |
| 9617327 | Portable #4 Lincoln, WA | Aug 2022 | — | No | ModNegligence | $716 | $716 |
| 9617321 | Portable #4 Lincoln, WA | Aug 2022 | — | No | ModNegligence | $716 | $716 |
| 9617172 | Portable #4 Lincoln, WA | Mar 2022 | — | No | ModNegligence | $716 | $716 |
| 9617998 | Portable #4 Lincoln, WA | Aug 2023 | — | No | ModNegligence | $712 | $712 |
| 9617994 | Portable #4 Lincoln, WA | Aug 2023 | — | No | ModNegligence | $712 | $712 |
| 9617993 | Portable #4 Lincoln, WA | Aug 2023 | — | No | ModNegligence | $712 | $712 |
| 9617992 | Portable #4 Lincoln, WA | Aug 2023 | — | No | ModNegligence | $712 | $712 |
| 9617991 | Portable #4 Lincoln, WA | Aug 2023 | — | No | ModNegligence | $712 | $712 |
| 9617944 | Portable #4 Lincoln, WA | May 2023 | — | No | ModNegligence | $712 | $712 |
| 9617938 | Portable #4 Lincoln, WA | May 2023 | — | No | HighNegligence | $712 | $712 |
| 9617937 | Portable #4 Lincoln, WA | May 2023 | — | No | ModNegligence | $712 | $712 |
| 9617935 | Portable #4 Lincoln, WA | May 2023 | — | No | HighNegligence | $712 | $712 |
| 9617926 | Portable #4 Lincoln, WA | May 2023 | — | No | ModNegligence | $712 | $712 |
| 9308295 | Portable #4 Lincoln, WA | May 2025 | — | No | ModNegligence | $642 | $642 |
| 8870339 | Portable #1 Lincoln, WA | Mar 2015 | — | Yes | ModNegligence | $634 | $634 |
| 8870338 | Portable #1 Lincoln, WA | Mar 2015 | — | Yes | ModNegligence | $634 | $634 |
| 8610529 | Portable #1 Lincoln, WA | Apr 2014 | — | Yes | ModNegligence | $634 | $634 |
| 9611507 | Portable #4 Lincoln, WA | Jun 2021 | — | No | ModNegligence | $622 | $622 |
| 8880460 | Portable #1 Lincoln, WA | Jul 2016 | — | No | ModNegligence | $484 | $484 |
| 9683815 | Portable # 3 Lincoln, WA | Aug 2023 | — | Yes | ModNegligence | $477 | $477 |
| 9707578 | Portable # 3 Lincoln, WA | Jun 2023 | — | Yes | ModNegligence | $477 | $477 |
| 9434944 | Portable #4 Lincoln, WA | Apr 2020 | — | Yes | ModNegligence | $448 | $448 |
| 9501504 | Portable #4 Lincoln, WA | Feb 2020 | — | Yes | ModNegligence | $448 | $448 |
| 8870983 | Portable #1 Lincoln, WA | Feb 2016 | — | No | ModNegligence | $425 | $425 |
| 8870562 | Portable #1 Lincoln, WA | Aug 2015 | — | No | ModNegligence | $425 | $425 |
| 8870560 | Portable #1 Lincoln, WA | Aug 2015 | — | No | ModNegligence | $425 | $425 |
| 8870559 | Portable #1 Lincoln, WA | Aug 2015 | — | No | ModNegligence | $425 | $425 |
| 8870557 | Portable #1 Lincoln, WA | Aug 2015 | — | No | ModNegligence | $425 | $425 |
| 8870346 | Portable #1 Lincoln, WA | Mar 2015 | — | No | ModNegligence | $425 | $425 |
| 8870342 | Portable #1 Lincoln, WA | Mar 2015 | — | No | ModNegligence | $425 | $425 |
| 8611624 | Portable #1 Lincoln, WA | Jan 2014 | — | No | ModNegligence | $425 | $425 |
| 8611623 | Portable #1 Lincoln, WA | Jan 2014 | — | No | ModNegligence | $425 | $425 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for COPENHAVER CONSTRUCTION INC. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for COPENHAVER CONSTRUCTION INC. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for COPENHAVER CONSTRUCTION INC. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for COPENHAVER CONSTRUCTION INC. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2005-08-25 | Unprogrammed Related | 0 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in highway, street, and bridge construction within WA, ordered by federal enforcement volume:
- GARY MERLINO CONSTRUCTION CO INCSEATTLE — 4 federal enforcement records
- ACE PAVING CO INCPORT ORCHARD — 3 federal enforcement records
- TOMMER CONSTRUCTION COMPANY INCEPHRATA — 3 federal enforcement records
- GARY MERLINO CONSTRUCTION COTACOMA — 3 federal enforcement records
- NORTHWEST CONSTRUCTION INCLYNNWOOD — 3 federal enforcement records
- LAKESIDE INDUSTRIESMONROE — 3 federal enforcement records
- TUCCI & SONS INCTACOMA — 3 federal enforcement records
- LAKESIDE INDUSTRIESLONGVIEW — 3 federal enforcement records
- GARY MERLINO CONSTRUCTION CO INCSEATTLE — 3 federal enforcement records
- GARY MERLINO CONSTRUCTION CO INCTACOMA — 3 federal enforcement records
Related searches
- Highway, Street, and Bridge ConstructionAll employers in this industry
- Employers in WAState-wide enforcement data
- Highway, Street, and in WAIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on COPENHAVER CONSTRUCTION INC from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is COPENHAVER CONSTRUCTION INC's OSHA violation history?
- COPENHAVER CONSTRUCTION INC has 1 OSHA inspection on record with 0 violations and $0 in total penalties.
- How does COPENHAVER CONSTRUCTION INC's safety record compare to its industry?
- COPENHAVER CONSTRUCTION INC operates in the highway, street, and bridge construction industry. The industry average Total Recordable Incident Rate (TRIR) is 2.5.