Skip to main content

Establishment profile

CHESTER BROSS CONSTRUCTION

RTE. 24, HANNIBAL, MO, 63401

Download as PDF →

OSHA inspections
1
over 33 years
Violations
0
Penalties
$0
Violations across 2 federal agencies
Enforcement actions from multiple agencies may indicate systemic compliance issues across functions.

Summary

CHESTER BROSS CONSTRUCTION has accumulated 0 OSHA violations across 1 inspection over 33 years of recorded history.

The most recent federal enforcement activity was recorded 33 years ago.

Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

CHESTER BROSS CONSTRUCTION appears in OSHA workplace safety, MSHA mine safety, and NLRB labor relations records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

Inspections
1
0.0 / yr · last 33 yrs
Violations
0
0.0 / yr
Penalties
$0
Inspection trigger · planned
1 of 1

Peer comparison

0th

Fewer violations than most other employers. Peer group: 39,933 employers. This establishment has 0 OSHA violations; peer median is 1.

Fewer violationsMore violations
Penalty percentile
0th
peer median: $0
Inspection frequency
0th
peer median: 1

Safety self-report (OSHA 300A)

No self-reported injury rates filed with OSHA's Injury Tracking Application for CHESTER BROSS CONSTRUCTION. Verify directly with OSHA Injury Tracking Application

Inspection breakdown

Planned
1

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for CHESTER BROSS CONSTRUCTION. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
33 years ago

No federal enforcement activity has been recorded against this establishment in 33+ years. Most recent activity: 33 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for CHESTER BROSS CONSTRUCTION. Verify directly with Wage and Hour Division

Mine safety (MSHA)

Company-level in MO — for CHESTER BROSS CONSTRUCTION, not this location alone

Violations
18
Assessed penalties
$3,828

Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other CHESTER BROSS CONSTRUCTION operations in the same state.

MSHA citations

Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 18 citations · 7S&S · 18 contractor · $3,828 proposed / $2,828 paid.

CitationMineDateSectionS&SNegligenceProposedPaid
7863688
EDINA PLANT (KC01)
Knox, MO
contractor: Chester Bross Construction Co
May 2008YesHighNegligence$1,235$644
7863691
EDINA PLANT (KC01)
Knox, MO
contractor: Chester Bross Construction Co
May 2008YesModNegligence$334$167
7863690
EDINA PLANT (KC01)
Knox, MO
contractor: Chester Bross Construction Co
May 2008YesModNegligence$334$167
6205613
CLARKSVILLE PLANT
Pike, MO
contractor: Chester Bross Construction Co
May 2001YesModNegligence$321$321
6205612
CLARKSVILLE PLANT
Pike, MO
contractor: Chester Bross Construction Co
May 2001YesModNegligence$321$321
6241490
Hannibal Plant
Ralls, MO
contractor: Chester Bross Construction Co
Aug 2007YesModNegligence$243$243
6565541
Hannibal Plant
Ralls, MO
contractor: Chester Bross Construction Co
Jan 2010NoHighNegligence$162$162
7863689
EDINA PLANT (KC01)
Knox, MO
contractor: Chester Bross Construction Co
May 2008YesModNegligence$150$75
9352596
Central Stone Portable Pl#1 (CS48)
Marion, MO
contractor: Chester Bross Construction Co
Jul 2018NoModNegligence$118$118
8623759
Taylor Sand & Gravel Pit
Marion, MO
contractor: Chester Bross Construction Co
May 2012NoModNegligence$100$100
6578120
Selma Plant Quarry & Mill
Jefferson, MO
contractor: Chester Bross Construction Co
Jan 2011NoModNegligence$100$100
6565542
Hannibal Plant
Ralls, MO
contractor: Chester Bross Construction Co
Jan 2010NoModNegligence$100$100
6241491
Hannibal Plant
Ralls, MO
contractor: Chester Bross Construction Co
Aug 2007NoModNegligence$100$100
6241489
Hannibal Plant
Ralls, MO
contractor: Chester Bross Construction Co
Aug 2007NoModNegligence$100$100
6205614
CLARKSVILLE PLANT
Pike, MO
contractor: Chester Bross Construction Co
May 2001NoModNegligence$55$55
6205611
CLARKSVILLE PLANT
Pike, MO
contractor: Chester Bross Construction Co
May 2001NoModNegligence$55$55
6205632
CLARKSVILLE PLANT
Pike, MO
contractor: Chester Bross Construction Co
Jul 2001No
6205631
CLARKSVILLE PLANT
Pike, MO
contractor: Chester Bross Construction Co
Jul 2001No

Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).

Labor relations (NLRB)

Company-level in MO — for CHESTER BROSS CONSTRUCTION, not this location alone

Total cases
1
Unfair labor practice
1

National Labor Relations Board — unfair labor practice charges and union representation cases. The NLRB records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other CHESTER BROSS CONSTRUCTION locations in the same state.

NLRB cases

National Labor Relations Board cases involving this employer. Includes unfair labor practice (ULP) filings and representation election proceedings. NLRB enforcement is process-driven; no per-case monetary penalty is assessed (remedies are case-by-case backpay orders, posting requirements, election re-runs, etc.). 1 case · 1 ULP

Case numberTypeFiledClosedStatusRegion
14-CA-138600Unfair labor practiceOct 2014Nov 2014ClosedRegion 14, Saint Louis, Missouri

Source: NLRB case files. Rows shown are those the agency has published. Region numbers (1–31) correspond to NLRB's geographic offices.

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for CHESTER BROSS CONSTRUCTION. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for CHESTER BROSS CONSTRUCTION. Verify directly with Environmental Protection Agency

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for CHESTER BROSS CONSTRUCTION. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$0
Obligated (all-time)
$3.3M
Awards
36
Top agency
Department of Defense
$3.3M
Largest awards
  • Department of Defense
    TAS::57 3404::TAS, RECOVERY--, PROJ. YWHG 080008, REPAIR ASPHALT, OVERRUN: RUNWAYS 01, 19, WHITEMAN AFB, FUNDING FOR REPAIR ASPHALT OVERRUNS RUNWAYS 01 & 19 ON WHITEMAN AFB MO UNDER THE AMERICAN RECOVERY & REINVESTMENT ACT OF 2009. ARRA::YES::ARRA
    contract · Last action 2009-09-01
    $568,716
  • Department of Defense
    TAS::57 3404::TAS, RECOVERY--, PROJ. YWHG 050172, REPAIR FLIGHTLINE ROAD: A-10 RAMP PH1, WHITEMAN AFB, FUNDING REPAIR FLIGHTLINE ROAD A-10 RAMP, PHASE I ON WHITEMAN AFB MO UNDER THE AMERICAN RECOVERY & REINVESTMENT ACT OF 2009. ARRA::YES::ARRA
    contract · Last action 2010-02-25
    $489,400
  • Department of Defense
    OPT YR 4 (30 APR 08 - 29 APR 09)
    contract · Last action 2009-07-17
    $440,022
  • Department of Defense
    ROAD MAINTENANCE AND REPAIRS
    contract · Last action 2008-08-28
    $341,119
  • Department of Defense
    FLIGHTLINE ROAD BUILDING 30-52
    contract · Last action 2009-09-01
    $324,966
  • Department of Defense
    EDUCATION CENTER PARKING LOT
    contract · Last action 2009-03-03
    $268,725
  • Department of Defense
    OPT YR 4 (30 APR 08 - 29 APR 09)
    contract · Last action 2009-05-11
    $267,725
  • Department of Defense
    DELIVERY ORDER
    contract · Last action 2008-09-17
    $141,897
  • Department of Defense
    OPT YR 4 (30 APR 08 - 29 APR 09)
    contract · Last action 2009-11-17
    $115,498
  • Department of Defense
    ROAD MAINTENANCE AND REPAIRS
    contract · Last action 2009-01-27
    $113,444
  • Department of Defense
    REHABILITATION OF RECREATIONAL AREAS
    contract · Last action 2008-12-22
    $57,084
  • Department of Defense
    REHABILITATION OF RECREATIONAL AREAS
    contract · Last action 2009-03-09
    $31,434
  • Department of Defense
    FACILITIES RECOVERY
    contract · Last action 2008-09-30
    $28,532
  • Department of Defense
    REHABILITATION OF RECREATIONAL AREAS
    contract · Last action 2008-07-18
    $24,324
  • Department of Defense
    REHABILITATION OF RECREATIONAL AREAS
    contract · Last action 2008-10-24
    $22,772
  • Department of Defense
    REHABILITATION OF RECREATIONAL AREAS
    contract · Last action 2009-01-30
    $20,526
  • Department of Defense
    REHABILITATION OF RECREATIONAL AREAS
    contract · Last action 2009-02-27
    $18,847
  • Department of Defense
    REHABILITATION OF RECREATIONAL AREAS
    contract · Last action 2009-03-30
    $12,530
  • Department of Defense
    REHABILITATION OF RECREATIONAL AREAS
    contract · Last action 2009-01-14
    $12,387
  • Department of Defense
    REPAIR CURBS/GUTTERS BLDG.48
    contract · Last action 2010-02-19
    $11,979
  • Department of Defense
    REHABILITATION OF RECREATIONAL AREAS
    contract · Last action 2007-11-16
    $9,254
  • Department of Defense
    ASPHALT MATERIAL
    contract · Last action 2007-12-17
    $3,600
  • Department of Defense
    REPAIR MFH ASPHALT WALKING TRAILS
    contract · Last action 2009-09-25
    $0
  • Department of Defense
    200408!000106!5700!AC39 !509 CONS/CC !FA462504D0001 !A!N! !N!5002 ! !20040514!20050513!029779584!029779584!029779584!N!CHESTER BROSS CONSTRUCTION !8965 HIGHWAY 36 WEST !HANNIBAL !MO!63401!79432!101!29!WHITEMAN AFB !JOHNSON !MISSOURI !+000000299982!N!N!000000000000!Z222!MAINT/HIGHWAYS, ROADS, STREETS, & BRIDGES !C2 !CONSTRUCTION !000 !* !237310!E! !5!B!S! ! !D!20090521!B! ! !A! !A!N!J!2!003!B! !D!N!Z! ! !N!C!N! ! ! !C!C!A!A!000!A!B!Y! !N! ! ! ! !0001! !
    contract · Last action 2009-04-08
    $0
  • Department of Defense
    REPAIR CURB & DRAIN INLETS MFH
    contract · Last action 2009-03-27
    $0
  • Department of Defense
    MIGRATED DATA VALUE UNKNOWN
    contract · Last action 2008-09-29
    $0
  • Department of Defense
    contract · Last action 2008-08-26
    $0
  • Department of Defense
    200612!000649!5700!FA4625!509CONS/CC !FA462504D0001 !A!N! !N!5041 ! !20060928!20070930!029779584!029779584!029779584!N!CHESTER BROSS CONSTRUCTION CO !8965 HIGHWAY 36 !HANNIBAL !MO!63401!79432!101!29!WHITEMAN AFB !JOHNSON !MISSOURI !+000000349815!N!N!000000000000!Z124!MAINT/AIRPORT RUNWAYS !C2 !CONSTRUCTION !000 !NOT DISCERNABLE !237310!E! !5!B!S! ! ! !99990909!B! ! !A! !A!N!J!2!002!B! !D!N!C! ! !N!C!N! ! ! !D!D!A!A!000!A!C!Y! !N! ! ! ! !0001! !
    contract · Last action 2008-07-21
    $0
  • Department of Defense
    REPAIR ARNOLD AVENUE NORTH
    contract · Last action 2008-07-21
    $0
  • Department of Defense
    REPAIR MISC. AIRFIELD OBSTRUCTIONS (GRD)
    contract · Last action 2008-06-26
    $0
  • Department of Defense
    REPAIR MFH ROADS - SUMMIT
    contract · Last action 2008-05-06
    $0
  • Department of Defense
    REPAIR MFH DRIVEWAYS
    contract · Last action 2008-04-09
    $0
  • Department of Defense
    DEMO AIRFIELD OBSTRUCTIONS (TACAN)
    contract · Last action 2008-04-02
    $0
  • Department of Defense
    contract · Last action 2008-03-04
    $0
  • Department of Defense
    REPAIR SIDEWALKS IN MFH YWHG 07-9312
    contract · Last action 2008-02-11
    $0
  • Department of Defense
    ROAD MAINTENANCE AND REPAIRS
    contract · Last action 2007-12-10
    $0

Federal contract dollars to this establishment. Primary NAICS: 237310 - HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Last action: 2010-02-25. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
1993-06-16Planned0$0

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Related searches

About this data

This profile aggregates federal enforcement records on CHESTER BROSS CONSTRUCTION from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is CHESTER BROSS CONSTRUCTION's OSHA violation history?
CHESTER BROSS CONSTRUCTION has 1 OSHA inspection on record with 0 violations and $0 in total penalties.