Establishment profile
CHERENZIA EXCAVATION INC.
18 POST ROAD, WESTERLY, RI, 02891
238910 — Site Preparation Contractors
Summary
CHERENZIA EXCAVATION INC. has accumulated 2 OSHA violations across 5 inspections over 31 years of recorded history, with $875 in total assessed penalties.
The establishment sits in the 63rd percentile for violations within its industry-state peer group of 384 employers. Inspection frequency runs at the 98th percentile. The most recent enforcement activity was recorded 15 years ago.
Federal records were found in 3 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
CHERENZIA EXCAVATION INC. appears in OSHA workplace safety, MSHA mine safety, and EPA environmental compliance records only. No matching records were found in WHD wage enforcement, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
40% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 2 distinct standards shown · 2 citations in this view · $875 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1926.0652 A01 | 1 | 1 | $875 | Sep 2001 | Sep 2001 |
| 29 CFR 1904.0040 A | 1 | 1 | — | Oct 2010 | Oct 2010 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Above average violations in NAICS 2389 within RI. Peer group: 384 employers. This establishment has 2 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for CHERENZIA EXCAVATION INC.. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for CHERENZIA EXCAVATION INC.. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 15+ years. Most recent activity: 15 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for CHERENZIA EXCAVATION INC.. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in RI — for CHERENZIA EXCAVATION INC., not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other CHERENZIA EXCAVATION INC. operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 49S&S · 91 contractor · $87,942 proposed / $78,329 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 8800942 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | May 2014 | — | Yes | HighNegligence | $8,893 | $2,465 |
| 8800938 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | May 2014 | — | Yes | HighNegligence | $8,893 | $8,893 |
| 8710401 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Sep 2012 | — | Yes | ModNegligence | $6,624 | $6,624 |
| 8708300 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Sep 2012 | — | Yes | ModNegligence | $6,624 | $6,624 |
| 8710403 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Sep 2012 | — | No | ModNegligence | $2,678 | $2,678 |
| 6536836 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Jun 2009 | — | No | ModNegligence | $2,678 | $1,824 |
| 8712911 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Feb 2013 | — | No | HighNegligence | $1,304 | $1,304 |
| 8914869 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | May 2015 | — | Yes | LowNegligence | $1,203 | $963 |
| 8915559 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | May 2015 | — | Yes | ModNegligence | $1,203 | $842 |
| 8798117 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Jan 2014 | — | Yes | LowNegligence | $1,203 | $1,203 |
| 8798115 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Jan 2014 | — | Yes | LowNegligence | $1,203 | $1,203 |
| 8710405 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Sep 2012 | — | Yes | ModNegligence | $1,203 | $1,203 |
| 6536838 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Jun 2009 | — | No | LowNegligence | $1,203 | $800 |
| 6536837 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Jun 2009 | — | No | LowNegligence | $1,203 | $800 |
| 6536832 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Jun 2009 | — | No | LowNegligence | $1,203 | $800 |
| 6536829 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Jun 2009 | — | No | LowNegligence | $1,203 | $800 |
| 6057018 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Dec 2007 | — | Yes | ModNegligence | $1,203 | $1,203 |
| 6047232 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Jun 2007 | — | Yes | ModNegligence | $1,203 | $1,203 |
| 8710414 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Sep 2012 | — | Yes | ModNegligence | $1,111 | $1,111 |
| 6534771 | White Rock Quarry Washington, RI contractor: Cherenzia Excavation Inc | Aug 2009 | — | Yes | HighNegligence | $1,026 | $1,026 |
| 6047246 | White Rock Quarry Washington, RI contractor: Cherenzia Excavation Inc | Jun 2007 | — | Yes | HighNegligence | $1,026 | $1,026 |
| 8800937 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | May 2014 | — | Yes | ModNegligence | $897 | $897 |
| 8710407 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Sep 2012 | — | No | LowNegligence | $873 | $873 |
| 7739644 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Feb 2001 | — | Yes | ModNegligence | $872 | $872 |
| 8712913 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Feb 2013 | — | No | ModNegligence | $828 | $828 |
| 6057046 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Oct 2007 | — | Yes | ModNegligence | $828 | $828 |
| 8798109 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Jan 2014 | — | Yes | ModNegligence | $807 | $807 |
| 6022823 | 30 X 42 PORTABLE #1 Washington, RI | Jul 2004 | — | No | HighNegligence | $800 | $800 |
| 7739704 | 30 X 42 PORTABLE #1 Washington, RI | Jun 2001 | — | Yes | ModNegligence | $760 | $760 |
| 7739645 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Feb 2001 | — | Yes | ModNegligence | $760 | $760 |
| 6028584 | 30 X 42 PORTABLE #1 Washington, RI | Sep 2005 | — | Yes | ModNegligence | $723 | $723 |
| 6022821 | 30 X 42 PORTABLE #1 Washington, RI | Jul 2004 | — | Yes | HighNegligence | $700 | $700 |
| 6057027 | White Rock Quarry Washington, RI contractor: Cherenzia Excavation Inc | Dec 2007 | — | Yes | ModNegligence | $687 | $687 |
| 7739643 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Feb 2001 | — | No | ModNegligence | $655 | $655 |
| 8645324 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Mar 2011 | — | Yes | ModNegligence | $634 | $634 |
| 8645322 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Mar 2011 | — | Yes | ModNegligence | $634 | $634 |
| 6022820 | 30 X 42 PORTABLE #1 Washington, RI | Jul 2004 | — | No | HighNegligence | $625 | $625 |
| 6063143 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Sep 2008 | — | Yes | ModNegligence | $585 | $585 |
| 8915562 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | May 2015 | — | No | LowNegligence | $540 | $432 |
| 8800934 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | May 2014 | — | No | ModNegligence | $540 | $540 |
| 8710404 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Sep 2012 | — | No | ModNegligence | $540 | $540 |
| 8708296 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Sep 2012 | — | No | ModNegligence | $540 | $540 |
| 8708295 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Sep 2012 | — | No | ModNegligence | $540 | $540 |
| 8708293 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Sep 2012 | — | No | ModNegligence | $540 | $540 |
| 6057020 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Dec 2007 | — | No | ModNegligence | $540 | $540 |
| 6047231 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Jun 2007 | — | No | ModNegligence | $540 | $540 |
| 6538398 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Jan 2010 | — | No | ModNegligence | $499 | $499 |
| 6538397 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Jan 2010 | — | No | ModNegligence | $499 | $499 |
| 7739706 | 30 X 42 PORTABLE #1 Washington, RI | Jun 2001 | — | No | ModNegligence | $475 | $475 |
| 7739705 | 30 X 42 PORTABLE #1 Washington, RI | Jun 2001 | — | Yes | ModNegligence | $475 | $475 |
| 8800948 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | May 2014 | — | No | HighNegligence | $473 | $473 |
| 6057028 | White Rock Quarry Washington, RI contractor: Cherenzia Excavation Inc | Dec 2007 | — | No | ModNegligence | $460 | $460 |
| 6028583 | 30 X 42 PORTABLE #1 Washington, RI | Sep 2005 | — | Yes | ModNegligence | $440 | $440 |
| 8805387 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Jan 2015 | — | Yes | ModNegligence | $425 | $425 |
| 6056254 | White Rock Quarry Washington, RI contractor: Cherenzia Excavation Inc | Mar 2008 | — | Yes | LowNegligence | $425 | $425 |
| 8712910 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Feb 2013 | — | No | ModNegligence | $392 | $392 |
| 8658101 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Feb 2012 | — | Yes | ModNegligence | $392 | $392 |
| 6063148 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Sep 2008 | — | No | HighNegligence | $392 | $392 |
| 8798110 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Jan 2014 | — | Yes | LowNegligence | $362 | $362 |
| 8710402 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Sep 2012 | — | Yes | LowNegligence | $362 | $362 |
| 8708298 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Sep 2012 | — | Yes | LowNegligence | $362 | $362 |
| 8708297 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Sep 2012 | — | Yes | LowNegligence | $362 | $362 |
| 7747000 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | May 2002 | — | Yes | ModNegligence | $340 | $340 |
| 7746999 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | May 2002 | — | Yes | ModNegligence | $340 | $340 |
| 7726590 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Apr 2000 | — | Yes | ModNegligence | $340 | $340 |
| 8710412 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Sep 2012 | — | No | ModNegligence | $334 | $334 |
| 8577165 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Aug 2010 | — | Yes | ModNegligence | $334 | $334 |
| 6063145 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Sep 2008 | — | Yes | ModNegligence | $334 | $334 |
| 6534770 | White Rock Quarry Washington, RI contractor: Cherenzia Excavation Inc | Aug 2009 | — | Yes | ModNegligence | $308 | $308 |
| 8800947 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | May 2014 | — | Yes | LowNegligence | $285 | $285 |
| 8800946 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | May 2014 | — | Yes | LowNegligence | $285 | $285 |
| 8712944 | White Rock Quarry Washington, RI contractor: Cherenzia Excavation Inc | Apr 2013 | — | Yes | ModNegligence | $285 | $285 |
| 6063142 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Sep 2008 | — | No | ModNegligence | $263 | $263 |
| 7739647 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Feb 2001 | — | No | ModNegligence | $259 | $259 |
| 7726591 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Apr 2000 | — | Yes | ModNegligence | $259 | $259 |
| 7726586 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Apr 2000 | — | Yes | ModNegligence | $259 | $259 |
| 6041677 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Dec 2005 | — | Yes | HighNegligence | $247 | $247 |
| 6022805 | 30 X 42 PORTABLE #1 Washington, RI | Jul 2004 | — | Yes | ModNegligence | $247 | $247 |
| 6013637 | White Rock Quarry Washington, RI contractor: Cherenzia Excavation Inc | Oct 2003 | — | Yes | ModNegligence | $247 | $247 |
| 8915561 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | May 2015 | — | No | LowNegligence | $243 | $243 |
| 8915560 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | May 2015 | — | No | LowNegligence | $243 | $243 |
| 8800944 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | May 2014 | — | No | ModNegligence | $243 | $243 |
| 8800941 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | May 2014 | — | No | LowNegligence | $243 | $243 |
| 8800940 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | May 2014 | — | No | LowNegligence | $243 | $233 |
| 8800936 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | May 2014 | — | No | ModNegligence | $243 | $243 |
| 8800935 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | May 2014 | — | No | ModNegligence | $243 | $243 |
| 8800931 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | May 2014 | — | No | ModNegligence | $243 | $243 |
| 8798120 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Jan 2014 | — | No | LowNegligence | $243 | $243 |
| 8798119 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Jan 2014 | — | No | LowNegligence | $243 | $243 |
| 8798118 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Jan 2014 | — | No | LowNegligence | $243 | $243 |
| 8798116 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Jan 2014 | — | No | LowNegligence | $243 | $243 |
| 8798114 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Jan 2014 | — | No | ModNegligence | $243 | $243 |
| 8708294 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Sep 2012 | — | No | ModNegligence | $243 | $243 |
| 6536835 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Jun 2009 | — | No | ModNegligence | $243 | $243 |
| 6536834 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Jun 2009 | — | No | LowNegligence | $243 | $243 |
| 6536833 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Jun 2009 | — | No | LowNegligence | $243 | $243 |
| 6536831 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Jun 2009 | — | No | LowNegligence | $243 | $243 |
| 6536830 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Jun 2009 | — | No | LowNegligence | $243 | $243 |
| 6057021 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Dec 2007 | — | No | ModNegligence | $243 | $243 |
| 6047230 | PLANT 7 Washington, RI contractor: Cherenzia Excavation Inc | Jun 2007 | — | No | ModNegligence | $243 | $243 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for CHERENZIA EXCAVATION INC.. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for CHERENZIA EXCAVATION INC.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
EPA Enforcement and Compliance History — Clean Air Act, Clean Water Act, RCRA, Safe Drinking Water Act. Status: No Violation Identified.
EPA-registered facilities
Every EPA ECHO facility associated with this employer, sorted most-significant first. Each row links to EPA’s Detailed Facility Report for the source-of-truth record. Permits column lists active programs (Air = Clean Air Act, Water = Clean Water Act, RCRA = hazardous waste, TRI = Toxics Release Inventory reporting). 3 facilities · 2 marked inactive.
| Facility | Permits | Status | Inspections | Formal actions | Penalties | Last inspected | ECHO |
|---|---|---|---|---|---|---|---|
CHERENZIA EXCAVATION INC 25 LEDWARD AVE · WESTERLY, RI, 02891 | RCRA | No Violation Identified QNCR 6 | 1 | 0 | — | Sep 2024 | View → |
CHERENZIA EXCAVATION, INC. 109 WHITE ROCK RD · WESTERLY, RI, 02891 | Air | No Violation Identified | 0 | 0 | — | Sep 2014 | View → |
CHERENZIA EXCAVATION, INC. 64 OLD HOPKINTON RD · WESTERLY, RI, 02891 | Air | No Violation Identified | 0 | 0 | — | Sep 2014 | View → |
Source: EPA ECHO (Enforcement and Compliance History Online). Compliance status follows EPA’s own labels (“Sig Violation” = significant noncompliance; QNCR = quarters of noncompliance over the recent reporting window). Inactive facilities (struck through) retain historical enforcement records even after operations ceased.
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for CHERENZIA EXCAVATION INC.. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2010-09-21 | Unprogrammed Related | 1 | — | $0 | |
| 2008-09-04 | Planned | 0 | — | $0 | |
| 2001-09-04 | Complaint | 1 | 1 | $875 | |
| 1995-08-31 | Complaint | 0 | — | $0 | |
| 1994-11-07 | Planned | 0 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in site preparation contractors within RI, ordered by federal enforcement volume:
- DIGREGORIO CORPORATIONEAST PROVIDENCE — 3 federal enforcement records
- DIGREGORIO CORPORATIONJOHNSTON — 3 federal enforcement records
- DIGREGORIO, INC.PAWTUCKET — 3 federal enforcement records
- DIGREGORIO CORPORATIONSMITHFIELD — 3 federal enforcement records
- R.P. IANNUCCILLO AND SONS CONSTRUCTION COMPANYBRISTOL — 2 federal enforcement records
- EAST COAST CONSTRUCTIONPORTSMOUTH — 2 federal enforcement records
- GEORGE SHERMAN SAND & GRAVEL CO, INC.NARRAGANSETT — 2 federal enforcement records
- PATRIOT HAULING COMPANY, INC.JOHNSTON — 2 federal enforcement records
- J.R. VINAGRO CORPORATIONPROVIDENCE — 2 federal enforcement records
- RAVEN CONSTRUCTION INCEAST GREENWICH — 2 federal enforcement records
Related searches
- Site Preparation ContractorsAll employers in this industry
- Employers in RIState-wide enforcement data
- Site Preparation Contractors in RIIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on CHERENZIA EXCAVATION INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is CHERENZIA EXCAVATION INC.'s OSHA violation history?
- CHERENZIA EXCAVATION INC. has 5 OSHA inspections on record with 2 violations and $875 in total penalties.
- How does CHERENZIA EXCAVATION INC.'s safety record compare to its industry?
- CHERENZIA EXCAVATION INC. operates in the site preparation contractors industry. The industry average Total Recordable Incident Rate (TRIR) is 1.5.