Skip to main content

Establishment profile

CENTRAL PREMIX CONCRETE CO

BOONE & WASHINGTON, SPOKANE, WA, 99201

Download as PDF →

OSHA inspections
3
over 36 years
Violations
3
Penalties
$0
$0 avg
Violations across 3 federal agencies
Enforcement actions from multiple agencies may indicate systemic compliance issues across functions.

Summary

CENTRAL PREMIX CONCRETE CO has accumulated 3 OSHA violations across 3 inspections over 36 years of recorded history.

The establishment sits in the 58th percentile for violations within its industry-state peer group of 67,392 employers. Inspection frequency runs at the 94th percentile. The most recent enforcement activity was recorded 30 years ago.

Federal records were found in 3 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

CENTRAL PREMIX CONCRETE CO appears in OSHA workplace safety, MSHA mine safety, and NLRB labor relations records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

Inspections
3
0.1 / yr · last 36 yrs
Violations
3
0.1 / yr
Penalties
$0
Inspection trigger · planned
3 of 3

33% of inspections at this establishment produced violations,

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 3 distinct standards shown · 3 citations in this view.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
29 CFR 1550.027001 A11May 1990May 1990
29 CFR 1550.048001 K11May 1990May 1990
29 CFR 1550.048001 Q11May 1990May 1990

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

58th

Above average violations. Peer group: 67,392 employers. This establishment has 3 OSHA violations; peer median is 2.

Fewer violationsMore violations
Penalty percentile
0th
peer median: $0
Inspection frequency
94th
peer median: 1

Safety self-report (OSHA 300A)

No self-reported injury rates filed with OSHA's Injury Tracking Application for CENTRAL PREMIX CONCRETE CO. Verify directly with OSHA Injury Tracking Application

Inspection breakdown

Planned
3

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for CENTRAL PREMIX CONCRETE CO. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
30 years ago

No federal enforcement activity has been recorded against this establishment in 30+ years. Most recent activity: 30 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for CENTRAL PREMIX CONCRETE CO. Verify directly with Wage and Hour Division

Mine safety (MSHA)

Company-level in WA — for CENTRAL PREMIX CONCRETE CO, not this location alone

Violations
306
Assessed penalties
$48,848

Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other CENTRAL PREMIX CONCRETE CO operations in the same state.

MSHA citations

Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 35S&S · 22 contractor · $34,296 proposed / $34,082 paid.

CitationMineDateSectionS&SNegligenceProposedPaid
8556460
Toppenish Facility
Yakima, WA
Mar 2011YesModNegligence$4,329$4,329
8565285
Sullivan Road Facility
Spokane, WA
Dec 2010YesHighNegligence$2,282$2,282
6483610
Pasco Facility
Franklin, WA
contractor: Central Pre-Mix Concrete Co.
Oct 2009YesHighNegligence$2,282$2,068
8556157
Toppenish Facility
Yakima, WA
Jun 2010YesHighNegligence$1,944$1,944
6433419
Toppenish Facility
Yakima, WA
Apr 2008YesModNegligence$1,530$1,530
7963720
Sullivan Road Facility
Spokane, WA
Sep 2007NoModNegligence$1,026$1,026
7963719
Sullivan Road Facility
Spokane, WA
Sep 2007NoModNegligence$1,026$1,026
6483605
Pasco Facility
Franklin, WA
contractor: Central Pre-Mix Concrete Co.
Oct 2009YesModNegligence$687$687
8605327
Pasco Facility
Franklin, WA
contractor: Central Pre-Mix Concrete Co.
Nov 2011YesModNegligence$634$634
8780496
Toppenish Facility
Yakima, WA
Sep 2014YesModNegligence$585$585
8696559
Pasco Facility
Franklin, WA
contractor: Central Pre-Mix Concrete Co.
Apr 2013YesModNegligence$585$585
8696524
Pasco Facility
Franklin, WA
contractor: Central Pre-Mix Concrete Co.
Feb 2013YesModNegligence$585$585
8556149
Toppenish Facility
Yakima, WA
Jun 2010YesModNegligence$585$585
8556147
Toppenish Facility
Yakima, WA
Jun 2010YesModNegligence$585$585
8556145
Toppenish Facility
Yakima, WA
Jun 2010YesModNegligence$585$585
6433421
Toppenish Facility
Yakima, WA
Apr 2008NoModNegligence$460$460
6433418
Toppenish Facility
Yakima, WA
Apr 2008NoModNegligence$460$460
7963779
Sullivan Road Facility
Spokane, WA
Jan 2008NoModNegligence$460$460
8556148
Toppenish Facility
Yakima, WA
Jun 2010NoHighNegligence$392$392
6399428
Sullivan Road Facility
Spokane, WA
Apr 2010YesModNegligence$392$392
7979312
Toppenish Facility
Yakima, WA
Oct 2007YesLowNegligence$392$392
6396379
Toppenish Facility
Yakima, WA
Apr 2007YesModNegligence$375$375
6350394
Pasco Facility
Franklin, WA
contractor: Central Pre-Mix Concrete Co.
Dec 2003YesModNegligence$350$350
8611593
Sullivan Road Facility
Spokane, WA
Oct 2013YesLowNegligence$308$308
8605799
Pasco Facility
Franklin, WA
contractor: Central Pre-Mix Concrete Co.
Apr 2012NoModNegligence$308$308
6399438
Sullivan Road Facility
Spokane, WA
Apr 2010YesModNegligence$308$308
7967311
Pasco Facility
Franklin, WA
contractor: Central Pre-Mix Concrete Co.
Jul 2009YesModNegligence$308$308
6443768
Toppenish Facility
Yakima, WA
Feb 2009NoModNegligence$285$285
6443767
Toppenish Facility
Yakima, WA
Feb 2009NoModNegligence$285$285
6396378
Toppenish Facility
Yakima, WA
Apr 2007YesLowNegligence$268$268
8786100
Toppenish Facility
Yakima, WA
Sep 2014YesModNegligence$263$263
8565733
Toppenish Facility
Yakima, WA
Aug 2011NoModNegligence$263$263
8565732
Toppenish Facility
Yakima, WA
Aug 2011NoModNegligence$263$263
6363704
Matheson Pit
Benton, WA
May 2005YesModNegligence$217$217
8563624
Sullivan Road Facility
Spokane, WA
May 2012YesModNegligence$207$207
6433420
Toppenish Facility
Yakima, WA
Apr 2008NoLowNegligence$207$207
7990344
Yakima Crusher
Yakima, WA
Oct 2000YesModNegligence$196$196
8562915
Pasco Facility
Franklin, WA
contractor: Central Pre-Mix Concrete Co.
May 2011YesModNegligence$190$190
6336362
Pasco Facility
Franklin, WA
contractor: Central Pre-Mix Concrete Co.
Jan 2003YesModNegligence$184$184
9431060
Sullivan Road Facility
Spokane, WA
Jan 2019NoModNegligence$181$181
6384145
Sullivan Road Facility
Spokane, WA
Sep 2006YesLowNegligence$177$177
6384144
Sullivan Road Facility
Spokane, WA
Sep 2006YesLowNegligence$177$177
6350340
Matheson Pit
Benton, WA
Apr 2004YesModNegligence$177$177
8556146
Toppenish Facility
Yakima, WA
Jun 2010YesModNegligence$176$176
7959465
Matheson Pit
Benton, WA
May 2007YesModNegligence$162$162
8880977
Sullivan Road Facility
Spokane, WA
Feb 2017NoModNegligence$160$160
6396296
Sullivan Road Facility
Spokane, WA
Jan 2007YesModNegligence$154$154
9990956
Sullivan Road Facility
Spokane, WA
Apr 2025NoLowNegligence$151$151
9501667
Sullivan Road Facility
Spokane, WA
Nov 2024NoLowNegligence$147$147
9501666
Sullivan Road Facility
Spokane, WA
Nov 2024NoLowNegligence$147$147
6384139
Sullivan Road Facility
Spokane, WA
Sep 2006YesLowNegligence$144$144
9707554
Crestline Facility
Spokane, WA
Jun 2023NoModNegligence$143$143
8870948
Sullivan Road Facility
Spokane, WA
Dec 2015NoModNegligence$138$138
8784576
Sullivan Road Facility
Spokane, WA
Mar 2015NoModNegligence$138$138
8565283
Sullivan Road Facility
Spokane, WA
Dec 2010YesLowNegligence$138$138
6483609
Pasco Facility
Franklin, WA
contractor: Central Pre-Mix Concrete Co.
Oct 2009NoModNegligence$138$138
6483608
Pasco Facility
Franklin, WA
contractor: Central Pre-Mix Concrete Co.
Oct 2009NoModNegligence$138$138
6483606
Pasco Facility
Franklin, WA
contractor: Central Pre-Mix Concrete Co.
Oct 2009NoModNegligence$138$138
7981719
Toppenish Facility
Yakima, WA
Nov 2007NoModNegligence$138$138
7979311
Toppenish Facility
Yakima, WA
Oct 2007NoModNegligence$138$138
7979307
Toppenish Facility
Yakima, WA
Oct 2007NoModNegligence$138$138
8696560
Pasco Facility
Franklin, WA
contractor: Central Pre-Mix Concrete Co.
Apr 2013NoModNegligence$131$131
8562462
Pasco Facility
Franklin, WA
contractor: Central Pre-Mix Concrete Co.
Dec 2010NoModNegligence$127$127
8558609
Pasco Facility
Franklin, WA
contractor: Central Pre-Mix Concrete Co.
Jan 2010NoModNegligence$127$127
9431999
Sullivan Road Facility
Spokane, WA
Jan 2020NoModNegligence$123$123
9431061
Sullivan Road Facility
Spokane, WA
Jan 2019NoLowNegligence$121$121
9370736
Crestline Facility
Spokane, WA
Jun 2018NoModNegligence$118$118
9370718
Sullivan Road Facility
Spokane, WA
Mar 2018NoModNegligence$118$118
9370717
Sullivan Road Facility
Spokane, WA
Mar 2018NoModNegligence$118$118
9370716
Sullivan Road Facility
Spokane, WA
Mar 2018NoModNegligence$118$118
9370715
Sullivan Road Facility
Spokane, WA
Mar 2018NoModNegligence$118$118
9370714
Sullivan Road Facility
Spokane, WA
Mar 2018NoModNegligence$118$118
9370713
Sullivan Road Facility
Spokane, WA
Mar 2018NoModNegligence$118$118
9370712
Sullivan Road Facility
Spokane, WA
Mar 2018NoModNegligence$118$118
8780499
Toppenish Facility
Yakima, WA
Sep 2014NoModNegligence$117$117
6389980
Pasco Facility
Franklin, WA
contractor: Central Pre-Mix Concrete Co.
Apr 2014NoModNegligence$117$117
8563650
Toppenish Facility
Yakima, WA
Jul 2012NoModNegligence$117$117
8556459
Toppenish Facility
Yakima, WA
Mar 2011NoLowNegligence$117$117
8556158
Toppenish Facility
Yakima, WA
Jun 2010NoModNegligence$117$117
8556156
Toppenish Facility
Yakima, WA
Jun 2010NoModNegligence$117$117
8556152
Toppenish Facility
Yakima, WA
Jun 2010NoModNegligence$117$117
8556150
Toppenish Facility
Yakima, WA
Jun 2010NoModNegligence$117$117
8556144
Toppenish Facility
Yakima, WA
Jun 2010NoModNegligence$117$117
8556141
Toppenish Facility
Yakima, WA
Jun 2010NoModNegligence$117$117
8880978
Sullivan Road Facility
Spokane, WA
Feb 2017NoModNegligence$116$116
6399315
Crestline Facility
Spokane, WA
Jun 2008NoModNegligence$108$108
8784755
Sullivan Road Facility
Spokane, WA
Nov 2014NoLowNegligence$100$100
8784754
Sullivan Road Facility
Spokane, WA
Nov 2014NoModNegligence$100$100
8784819
Pasco Facility
Franklin, WA
contractor: Central Pre-Mix Concrete Co.
Oct 2014NoModNegligence$100$100
8784818
Pasco Facility
Franklin, WA
contractor: Central Pre-Mix Concrete Co.
Oct 2014NoModNegligence$100$100
8784817
Pasco Facility
Franklin, WA
contractor: Central Pre-Mix Concrete Co.
Oct 2014NoModNegligence$100$100
8780498
Toppenish Facility
Yakima, WA
Sep 2014NoModNegligence$100$100
8780497
Toppenish Facility
Yakima, WA
Sep 2014NoModNegligence$100$100
8780495
Toppenish Facility
Yakima, WA
Sep 2014NoModNegligence$100$100
8780494
Toppenish Facility
Yakima, WA
Sep 2014NoModNegligence$100$100
8780493
Toppenish Facility
Yakima, WA
Sep 2014NoModNegligence$100$100
6389979
Pasco Facility
Franklin, WA
contractor: Central Pre-Mix Concrete Co.
Apr 2014NoLowNegligence$100$100
6389924
Pasco Facility
Franklin, WA
contractor: Central Pre-Mix Concrete Co.
Dec 2013NoModNegligence$100$100
8780018
Toppenish Facility
Yakima, WA
Oct 2013NoLowNegligence$100$100
8780115
Crestline Facility
Spokane, WA
Sep 2013NoModNegligence$100$100

Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).

Labor relations (NLRB)

Company-level in WA — for CENTRAL PREMIX CONCRETE CO, not this location alone

Total cases
2
Unfair labor practice
2

National Labor Relations Board — unfair labor practice charges and union representation cases. The NLRB records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other CENTRAL PREMIX CONCRETE CO locations in the same state.

NLRB cases

National Labor Relations Board cases involving this employer. Includes unfair labor practice (ULP) filings and representation election proceedings. NLRB enforcement is process-driven; no per-case monetary penalty is assessed (remedies are case-by-case backpay orders, posting requirements, election re-runs, etc.). 2 cases · 2 ULP

Case numberTypeFiledClosedStatusRegion
19-CA-179850Unfair labor practiceJul 2016Aug 2016ClosedRegion 19, Seattle, Washington
19-CA-179820Unfair labor practiceJul 2016Aug 2016ClosedRegion 19, Seattle, Washington

Source: NLRB case files. Rows shown are those the agency has published. Region numbers (1–31) correspond to NLRB's geographic offices.

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for CENTRAL PREMIX CONCRETE CO. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for CENTRAL PREMIX CONCRETE CO. Verify directly with Environmental Protection Agency

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for CENTRAL PREMIX CONCRETE CO. Verify directly with UVA Corporate Prosecution Registry

Inspection history

DateTriggerViolationsSeriousPenalty
1996-02-13Planned0$0
1990-08-27Programmed Related0$0
1990-04-09Programmed Related3$0

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Related searches

About this data

This profile aggregates federal enforcement records on CENTRAL PREMIX CONCRETE CO from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is CENTRAL PREMIX CONCRETE CO's OSHA violation history?
CENTRAL PREMIX CONCRETE CO has 3 OSHA inspections on record with 3 violations and $0 in total penalties.