Establishment profile
BRASWELL PRECISION, INC.
2406 PEPPERMILL DR., GLEN BURNIE, MD, 21061
332710 — Machine Shops
Summary
BRASWELL PRECISION, INC. has accumulated 52 OSHA violations across 3 inspections over 33 years of recorded history, with $12,945 in total assessed penalties.
The establishment sits in the 91st percentile for violations within its industry-state peer group of 83 employers. Inspection frequency runs at the 68th percentile. The most recent enforcement activity was recorded 8 years ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
BRASWELL PRECISION, INC. appears in OSHA workplace safety record only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls. Single-agency enforcement records typically indicate either a discrete incident-based inspection or a low-risk operational profile.
OSHA workplace safety
100% of inspections at this establishment produced violations, with 3 inspections producing serious-or-greater violations.
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 20 distinct standards shown · 30 citations in this view · $11,795 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1910.0215 B09 | 3 | 3 | $125 | Mar 1993 | Jul 2018 |
| 29 CFR 1910.1200 E01 | 2 | 2 | $1,440 | Mar 1993 | May 2011 |
| 29 CFR 1910.0242 B | 2 | 2 | $1,035 | Mar 1993 | May 2011 |
| 29 CFR 1910.1200 F05 II | 2 | 2 | $900 | Mar 1993 | May 2011 |
| 29 CFR 1910.1200 F05 I | 2 | 2 | $900 | Mar 1993 | May 2011 |
| 29 CFR 1910.0212 A01 | 2 | 2 | $650 | Mar 1993 | Jul 2018 |
| 29 CFR 5040.5 B01 | 2 | 2 | $105 | Mar 1993 | May 2011 |
| 29 CFR 5040.6 A01 | 2 | 2 | $45 | Mar 1993 | May 2011 |
| 29 CFR 1910.0215 A04 | 2 | 2 | — | May 2011 | Jul 2018 |
| 29 CFR 1910.0147 C04 I | 1 | 1 | $990 | May 2011 | May 2011 |
| 29 CFR 1910.1200 H | 1 | 1 | $900 | Mar 1993 | Mar 1993 |
| 29 CFR 1910.0024 B | 1 | 1 | $900 | Mar 1993 | Mar 1993 |
| 29 CFR 1910.1200 G08 | 1 | 1 | $900 | Mar 1993 | Mar 1993 |
| 29 CFR 1910.0178 L01 I | 1 | 1 | $820 | May 2011 | May 2011 |
| 29 CFR 1910.0151 C | 1 | 1 | $585 | May 2011 | May 2011 |
| 29 CFR 1910.0303 B01 | 1 | 1 | $300 | Jul 2018 | Jul 2018 |
| 29 CFR 1910.0305 B01 II | 1 | 1 | $300 | Jul 2018 | Jul 2018 |
| 29 CFR 1910.0022 D01 | 1 | 1 | $300 | Mar 1993 | Mar 1993 |
| 29 CFR 1910.0305 G01 III | 1 | 1 | $300 | Mar 1993 | Mar 1993 |
| 29 CFR 1910.0023 C01 | 1 | 1 | $300 | Mar 1993 | Mar 1993 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Worse on violations than most other employers in NAICS 3327 within MD. Peer group: 83 employers. This establishment has 52 OSHA violations; peer median is 14.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for BRASWELL PRECISION, INC.. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for BRASWELL PRECISION, INC.. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 8+ years. Most recent activity: 8 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for BRASWELL PRECISION, INC.. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
No MSHA mine safety violations on file for BRASWELL PRECISION, INC.. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for BRASWELL PRECISION, INC.. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for BRASWELL PRECISION, INC.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for BRASWELL PRECISION, INC.. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for BRASWELL PRECISION, INC.. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- National Aeronautics and Space AdministrationCOMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL.contract · Last action 2015-04-15$141,339
- National Aeronautics and Space AdministrationCOMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL.contract · Last action 2009-07-08$129,849
- National Aeronautics and Space AdministrationIGF::OT::IGF SMALL BUSINESS SET-ASIDE, 63 OFFERS PLACE OF PERFORMANCE: VENDOR SITE FABRICATION OF COMMERCIAL SERVICES AND SUPPLIES FOR GODDARD SPACE FLIGHT CENTER THE ADVANCED MANUFACTURING BRANCH (AMB) IS RESPONSIBLE FOR MAINTAINING A COMPLETE MANUFACTURING FACILITY TO MEET THE CENTER'S RESEARCH AND DEVELOPMENT REQUIREMENTS AND ASSIST IN THE FABRICATION OF HARDWARE REQUIREMENTS FROM MULTIPLE NASA PROJECT MISSIONS. THIS FACILITY INCLUDES CONVENTIONAL MACHINING EQUIPMENT, NUMERICALLY CONTROLLED (NC) MACHINING CENTERS, SHEET METAL AND WELDING FABRICATION EQUIPMENT AND REMOTELY LOCATED STAFF SHOPS. VENDORS SHALL PROVIDE FABRICATION SERVICES AND SUPPLIES TO THE MANUFACTURING ENGINEERING GROUP IN THEIR RESPECTIVE AREAS OF EXPERTISE FOR THE DEVELOPMENT OF INSTRUMENTS AND SPACE FLIGHT AND NON-SPACEFLIGHT HARDWARE INTERCHANGEABLE PIECE PARTS. VENDORS WILL MANUFACTURE PER ENGINEERING DRAWINGS WITH AEROSPACE INDUSTRY TOLERANCES AND PROVIDE FABRICATION CAPABILITIES IN ACCORDANCE WITH THE STATEMENT OF WORK. TO FABRICATE CLOSE TOLERANCE AEROSPACE INSTRUMENTS AND SPACE FLIGHT GRADE PARTS, IN VARIOUS MATERIALS SUCH AS (BUT NOT LIMITED TO) ALUMINUM, TITANIUM, HIGH STRENGTH STEEL AND NICKEL ALLOY, ENGINEERING PLASTICS, AND COMPOSITES BASED ON INDUSTRY ENGINEERING DRAWINGS, PROVIDED IN ELECTRONIC FORMAT, TO INDUSTRY STANDARD TOLERANCES AND SPECIFICATIONS. PARTS MAY RANGE IN COMPLEXITY FROM VERY SIMPLE TO VERY COMPLEX, WITH QUANTITIES. EACH DISCIPLINE IS FURTHER DIVIDED INTO SUBCATEGORIES BASED ON THE EXPECTED SIZE OF FABRICATED PARTS. THE FABRICATIONS OF PRODUCTS OR SERVICES PROPOSED AS "SPACEFLIGHT" ARE REQUIRED TO BE, ISO 900I OR AS9100 COMPLAINT, ITEMS PROPOSED AS "NON-FLIGHT" WILL NOT REQUIRE RESPONDENTS TO BE ISO 9001 OR AS9100 COMPLIANT. OFFERS SHALL INDICATE IF THEY ARE ISO 9001 OR AS9100 COMPLAINT AND PROVIDE SUPPORTING DOCUMENTATION.contract · Last action 2020-07-06$112,436
- National Aeronautics and Space AdministrationCOMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL.contract · Last action 2014-01-31$88,500
- National Aeronautics and Space AdministrationIGF::OT::IGF COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL.contract · Last action 2020-02-04$62,933
- National Aeronautics and Space AdministrationSB SET-ASIDE, 42 OFFERS.BPA VENDORS SHALL PROVIDE FABRICATION SERVICES AT VENDORS SITE & SUPPLIES TO GSFC IN THEIR RESPECTIVE AREAS OF EXPERTISE FOR THE DEVELOPMENT OF INSTRUMENTS SPACE FLIGHT & NON-SPACEFLIGHT HARDWARE INTERCHANGEABLE PIECE PARTS.contract · Last action 2025-05-13$45,703
- Department of Homeland SecurityBRACKET ASSY FOR CAS JUNCTION BOX, BUSHING FOR CAS JUNCTION BOX, INSERT FOR CAS JUNTION BOX, POST FOR CAS JUNCITON BOX, STRIP FOR CAS JUNCTION BOX, RING FOR CAS JUNCTION BOXcontract · Last action 2012-11-07$36,381
- National Aeronautics and Space AdministrationFABRICATION BPA CALL 800, 801 & 802contract · Last action 2009-08-31$35,831
- Department of Homeland SecurityIGF::OT::IGF CONNECTING LINKcontract · Last action 2017-12-22$7,468
- Department of Homeland Security2040-01LG47273 BULKHEAD ASSEMBLY, WAVEGUIDEcontract · Last action 2015-08-27$5,868
- Department of Homeland SecurityBULKHEAD ASSEMBLYcontract · Last action 2017-11-08$5,468
- Department of Homeland SecurityBULKHEAD ASSEMBLY, WAVEGUIDE FOR MK-92contract · Last action 2013-01-17$4,960
- Department of Homeland SecurityHATCH GASKET RETAINING RINGcontract · Last action 2015-02-12$4,110
- National Aeronautics and Space AdministrationINNER TABScontract · Last action 2012-01-17$3,350
- National Aeronautics and Space AdministrationSB SET-ASIDE, 42 OFFERS.BPA VENDORS SHALL PROVIDE FABRICATION SERVICES AT VENDORS SITE&SUPPLIES TO GSFC IN THEIR RESPECTIVE AREAS OF EXPERTISE FOR THE DEVELOPMENT OF INSTRUMENTS SPACE FLIGHT&NON-SPACEFLIGHT HARDWARE INTERCHANGEABLE PIECE PARTS. .contract · Last action 2025-05-12$0
- National Aeronautics and Space AdministrationIGF::OT::IGF SMALL BUSINESS SET-ASIDE, 63 OFFERS PLACE OF PERFORMANCE: VENDOR SITE FABRICATION OF COMMERCIAL SERVICES AND SUPPLIES FOR GODDARD SPACE FLIGHT CENTER THE ADVANCED MANUFACTURING BRANCH (AMB) IS RESPONSIBLE FOR MAINTAINING A COMPLETE MANUFACTURING FACILITY TO MEET THE CENTER'S RESEARCH AND DEVELOPMENT REQUIREMENTS AND ASSIST IN THE FABRICATION OF HARDWARE REQUIREMENTS FROM MULTIPLE NASA PROJECT MISSIONS. THIS FACILITY INCLUDES CONVENTIONAL MACHINING EQUIPMENT, NUMERICALLY CONTROLLED (NC) MACHINING CENTERS, SHEET METAL AND WELDING FABRICATION EQUIPMENT AND REMOTELY LOCATED STAFF SHOPS. VENDORS SHALL PROVIDE FABRICATION SERVICES AND SUPPLIES TO THE MANUFACTURING ENGINEERING GROUP IN THEIR RESPECTIVE AREAS OF EXPERTISE FOR THE DEVELOPMENT OF INSTRUMENTS AND SPACE FLIGHT AND NON-SPACEFLIGHT HARDWARE INTERCHANGEABLE PIECE PARTS. VENDORS WILL MANUFACTURE PER ENGINEERING DRAWINGS WITH AEROSPACE INDUSTRY TOLERANCES AND PROVIDE FABRICATION CAPABILITIES IN ACCORDANCE WITH THE STATEMENT OF WORK. TO FABRICATE CLOSE TOLERANCE AEROSPACE INSTRUMENTS AND SPACE FLIGHT GRADE PARTS, IN VARIOUS MATERIALS SUCH AS (BUT NOT LIMITED TO) ALUMINUM, TITANIUM, HIGH STRENGTH STEEL AND NICKEL ALLOY, ENGINEERING PLASTICS, AND COMPOSITES BASED ON INDUSTRY ENGINEERING DRAWINGS, PROVIDED IN ELECTRONIC FORMAT, TO INDUSTRY STANDARD TOLERANCES AND SPECIFICATIONS. PARTS MAY RANGE IN COMPLEXITY FROM VERY SIMPLE TO VERY COMPLEX, WITH QUANTITIES. EACH DISCIPLINE IS FURTHER DIVIDED INTO SUBCATEGORIES BASED ON THE EXPECTED SIZE OF FABRICATED PARTS. THE FABRICATIONS OF PRODUCTS OR SERVICES PROPOSED AS "SPACEFLIGHT" ARE REQUIRED TO BE, ISO 900I OR AS9100 COMPLAINT, ITEMS PROPOSED AS "NON-FLIGHT" WILL NOT REQUIRE RESPONDENTS TO BE ISO 9001 OR AS9100 COMPLIANT. OFFERS SHALL INDICATE IF THEY ARE ISO 9001 OR AS9100 COMPLAINT AND PROVIDE SUPPORTING DOCUMENTATION.contract · Last action 2019-08-15$0
- Department of Defense8503241812!PROTECTIVE COLLARcontract · Last action 2017-03-16$0
- National Aeronautics and Space AdministrationLAB EQUIPUIPMENT- RADIO FREQUENCY, POWER CONTROLcontract · Last action 2011-09-14$0
- National Aeronautics and Space AdministrationCOMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL.contract · Last action 2009-08-25$0
- National Aeronautics and Space AdministrationFABRICATION SERVICES FOR THE MECHANICAL ENGINEERING GROUP RELATIVE TO MACHINING, SHEET METAL, WELDING, PLATING, INSPECTION, HEAT TREATING, COMPOSITES, AND MATERIAL CUTTING. COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL.contract · Last action 2009-07-08$0
Federal contract dollars to this establishment. Primary NAICS: 332999 - ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING. Last action: 2025-05-13. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2018-05-09 | Planned | 11 | 3 | $1,125 | |
| 2011-03-30 | Planned | 22 | 8 | $4,470 | |
| 1992-11-19 | Planned | 19 | 13 | $7,350 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in machine shops within MD, ordered by federal enforcement volume:
- COVINGTON MACHINE AND WELDING, INC.ANNAPOLIS — 2 federal enforcement records
- SERVICE MACHINE SHOP, INC.NORTH BETHESDA — 2 federal enforcement records
- CLARK MACHINE CORPORATIONROSEDALE — 2 federal enforcement records
- A.I.M., INC.PARKTON — 2 federal enforcement records
- RAY MACHINE INC.BALTIMORE — 2 federal enforcement records
- HOUSE OF BALANCE, INCELKRIDGE — 1 federal enforcement record
- GENERAL MACHINE SHOP, INC.LANDOVER — 1 federal enforcement record
- MANUFACTURING SUPPORT INDUSTRIES INCHEBRON — 1 federal enforcement record
- AEROSTAR MACHINE, INC.ARBUTUS — 1 federal enforcement record
- GREATER MARYLAND TOOL & MFG. CORP.MOUNTAIN LAKE PARK — 1 federal enforcement record
Related searches
- Machine ShopsAll employers in this industry
- Employers in MDState-wide enforcement data
- Machine Shops in MDIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on BRASWELL PRECISION, INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is BRASWELL PRECISION, INC.'s OSHA violation history?
- BRASWELL PRECISION, INC. has 3 OSHA inspections on record with 52 violations and $12,945 in total penalties.
- How does BRASWELL PRECISION, INC.'s safety record compare to its industry?
- BRASWELL PRECISION, INC. operates in the machine shops industry. The industry average Total Recordable Incident Rate (TRIR) is 2.7.