Skip to main content

Establishment profile

ALL PHASE ELECTRIC

360 NEW HEMPSTEAD ROAD, NEW CITY, NY, 10956
238210Electrical Contractors and Other Wiring Installation Contractors

Download as PDF →

OSHA inspections
1
over 23 years
Violations
1
$450 in penalties
Penalties
$450
$450 avg
Violations across 2 federal agencies
Enforcement actions from multiple agencies may indicate systemic compliance issues across functions.

Summary

ALL PHASE ELECTRIC has accumulated 1 OSHA violation across 1 inspection over 23 years of recorded history, with $450 in total assessed penalties.

The establishment sits in the 35th percentile for violations within its industry-state peer group of 4,912 employers. The most recent enforcement activity was recorded 23 years ago.

Federal records were found in 2 of 16 sources. Sources without matching records returned empty for this establishment.

Agency coverage

ALL PHASE ELECTRIC appears in OSHA workplace safety and NLRB labor relations records only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, OFLC visa and labor certification, FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

Inspections
1
0.0 / yr · last 23 yrs
Violations
1
0.0 / yr
Penalties
$450
$450 avg / violation
100% serious0% other
Inspection trigger · planned
1 of 1

100% of inspections at this establishment produced violations,

Peer comparison

35th

Below average violations in NAICS 2382 within NY. Peer group: 4,912 employers. This establishment has 1 OSHA violation; peer median is 1.

Fewer violationsMore violations
Penalty percentile
45th
peer median: $656
Inspection frequency
0th
peer median: 1

Safety self-report (OSHA 300A)

No self-reported injury rates filed with OSHA's Injury Tracking Application for ALL PHASE ELECTRIC. Verify directly with OSHA Injury Tracking Application

Industry benchmark

Industry avg TRIR
1.8
BLS SOII 2024
Industry avg DART
1.1
BLS SOII 2024
Self-reported TRIR
Not in OSHA ITA

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Planned
1

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for ALL PHASE ELECTRIC. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
23 years ago

No federal enforcement activity has been recorded against this establishment in 23+ years. Most recent activity: 23 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for ALL PHASE ELECTRIC. Verify directly with Wage and Hour Division

Mine safety (MSHA)

No MSHA mine safety violations on file for ALL PHASE ELECTRIC. Verify directly with Mine Safety and Health Administration

Labor relations (NLRB)

Company-level in NY — for ALL PHASE ELECTRIC, not this location alone

Total cases
2
Unfair labor practice
2

National Labor Relations Board — unfair labor practice charges and union representation cases. The NLRB records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other ALL PHASE ELECTRIC locations in the same state.

Visa & labor certification (OFLC)

No H-1B, H-2A, or H-2B labor condition applications on file for ALL PHASE ELECTRIC. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for ALL PHASE ELECTRIC. Verify directly with Environmental Protection Agency

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for ALL PHASE ELECTRIC. Verify directly with UVA Corporate Prosecution Registry

Inspection history

DateTriggerViolationsSeriousPenalty
2003-04-01Programmed Related11$450

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Other employers in this industry and state

Other employers in electrical contractors and other wiring installation contractors within NY, ordered by federal enforcement volume:

Related searches

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

About this data

This profile aggregates federal enforcement records on ALL PHASE ELECTRIC from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Frequently asked

What is ALL PHASE ELECTRIC's OSHA violation history?
ALL PHASE ELECTRIC has 1 OSHA inspection on record with 1 violation and $450 in total penalties.
How does ALL PHASE ELECTRIC's safety record compare to its industry?
ALL PHASE ELECTRIC operates in the electrical contractors and other wiring installation contractors industry. The industry average Total Recordable Incident Rate (TRIR) is 1.8.