Establishment profile
A&S CONSTRUCTION
HWY 50 & HWY 196 JUNCTION, MCCLAVE, CO, 81057
Operated by A & S Construction Co Inc · 1 of 3 establishments
237310 — Highway, Street, and Bridge Construction
Summary
A&S CONSTRUCTION has accumulated 2 OSHA violations across 1 inspection over 20 years of recorded history, with $3,200 in total assessed penalties.
The establishment sits in the 74th percentile for violations within its industry-state peer group of 451 employers. The most recent enforcement activity was recorded 20 years ago.
Federal records were found in 2 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
A&S CONSTRUCTION appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
100% of inspections at this establishment produced violations,
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 2 distinct standards shown · 2 citations in this view · $3,200 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1926.0200 G01 | 1 | 1 | $2,500 | Sep 2005 | Sep 2005 |
| 29 CFR 1926.0102 A01 | 1 | 1 | $700 | Sep 2005 | Sep 2005 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Above average violations in NAICS 2373 within CO. Peer group: 451 employers. This establishment has 2 OSHA violations; peer median is 0.
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 74 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for A&S CONSTRUCTION. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 20+ years. Most recent activity: 20 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for A&S CONSTRUCTION. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in CO — for A & S Construction Co Inc, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other A & S Construction Co Inc operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 69S&S · 100 contractor · $218,270 proposed / $188,322 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 8754873 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Oct 2013 | — | Yes | HighNegligence | $31,100 | $21,770 |
| 9728234 | Portable Crusher #2 Pueblo, CO contractor: A & S Construction Co | Mar 2024 | — | Yes | HighNegligence | $20,039 | $20,039 |
| 9728233 | Portable Crusher #2 Pueblo, CO contractor: A & S Construction Co | Mar 2024 | — | Yes | HighNegligence | $18,035 | $18,035 |
| 7940670 | Portable Crusher #2 Pueblo, CO contractor: A & S Construction Co | Mar 2000 | — | Yes | HighNegligence | $8,000 | $8,000 |
| 8753976 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Jul 2013 | — | Yes | HighNegligence | $7,578 | $7,578 |
| 6582063 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Nov 2010 | — | Yes | HighNegligence | $6,996 | $6,996 |
| 6422933 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Aug 2007 | 104(g)(1) | No | HighNegligence | $6,500 | $6,500 |
| 7940671 | Portable Crusher #2 Pueblo, CO contractor: A & S Construction Co | Mar 2000 | — | Yes | HighNegligence | $6,000 | $4,800 |
| 6422942 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Aug 2007 | — | Yes | ModNegligence | $5,200 | $1,235 |
| 9397673 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Jul 2019 | — | Yes | HighNegligence | $4,840 | $4,840 |
| 6300228 | Portable Crusher #2 Pueblo, CO contractor: A & S Construction Co | Aug 2004 | — | Yes | HighNegligence | $4,100 | $3,280 |
| 6300227 | Portable Crusher #2 Pueblo, CO contractor: A & S Construction Co | Aug 2004 | — | Yes | HighNegligence | $4,100 | $3,280 |
| 6415139 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Oct 2007 | — | No | HighNegligence | $4,000 | $4,000 |
| 6422936 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Aug 2007 | — | Yes | ModNegligence | $4,000 | $971 |
| 6422935 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Aug 2007 | — | Yes | ModNegligence | $4,000 | $971 |
| 8753977 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Jul 2013 | — | Yes | HighNegligence | $3,784 | $3,784 |
| 9822605 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Jul 2024 | — | Yes | ModNegligence | $3,642 | $3,642 |
| 9476585 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Apr 2021 | — | Yes | ModNegligence | $3,616 | $3,616 |
| 6422932 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Aug 2007 | — | Yes | ModNegligence | $3,400 | $828 |
| 6422907 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Aug 2007 | — | Yes | HighNegligence | $2,976 | $1,569 |
| 8753980 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Jul 2013 | — | Yes | HighNegligence | $2,536 | $2,536 |
| 8753979 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Jul 2013 | — | Yes | HighNegligence | $2,536 | $2,536 |
| 9397628 | Wash Plant 2 Fremont, CO contractor: A & S Construction Co. | May 2019 | — | Yes | HighNegligence | $2,421 | $2,421 |
| 9397621 | Wash Plant 2 Fremont, CO contractor: A & S Construction Co. | May 2019 | — | Yes | HighNegligence | $2,421 | $2,421 |
| 9348108 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Nov 2018 | — | No | HighNegligence | $2,421 | $2,421 |
| 9348107 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Nov 2018 | — | Yes | HighNegligence | $2,361 | $2,361 |
| 9304025 | Portable Crusher # 5 Pueblo, CO contractor: A & S Construction Co. | Jan 2017 | — | Yes | HighNegligence | $2,314 | $2,314 |
| 8754882 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Oct 2013 | — | Yes | ModNegligence | $2,282 | $2,282 |
| 8754881 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Oct 2013 | — | Yes | ModNegligence | $2,282 | $2,282 |
| 8931858 | Portable Crusher #6 Fremont, CO contractor: A & S Construction Co. | May 2015 | — | Yes | HighNegligence | $2,000 | $2,000 |
| 6422937 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Aug 2007 | — | No | ModNegligence | $2,000 | $112 |
| 6422934 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Aug 2007 | — | No | ModNegligence | $2,000 | $112 |
| 9476587 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Apr 2021 | — | No | ModNegligence | $1,500 | $1,500 |
| 9341331 | Portable Crusher # 5 Pueblo, CO contractor: A & S Construction Co. | Aug 2017 | — | Yes | HighNegligence | $1,392 | $1,392 |
| 6582666 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Dec 2010 | — | Yes | ModNegligence | $1,304 | $1,304 |
| 7868471 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Mar 2008 | — | No | HighNegligence | $1,304 | $1,304 |
| 7868470 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Mar 2008 | — | No | HighNegligence | $1,304 | $1,304 |
| 9476586 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Apr 2021 | — | Yes | ModNegligence | $1,089 | $1,089 |
| 9347623 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Apr 2018 | — | Yes | ModNegligence | $1,031 | $1,031 |
| 8838098 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Apr 2017 | — | Yes | ModNegligence | $1,010 | $1,010 |
| 9398514 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Jun 2020 | — | No | HighNegligence | $994 | $994 |
| 9397669 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Jul 2019 | — | No | HighNegligence | $977 | $977 |
| 6422906 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Aug 2007 | — | Yes | HighNegligence | $971 | $971 |
| 8938698 | Portable Crusher #6 Fremont, CO contractor: A & S Construction Co. | Jan 2016 | — | Yes | HighNegligence | $946 | $946 |
| 6582663 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Dec 2010 | — | Yes | ModNegligence | $946 | $946 |
| 6582662 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Dec 2010 | — | Yes | ModNegligence | $946 | $946 |
| 6582661 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Dec 2010 | — | Yes | ModNegligence | $946 | $946 |
| 9303879 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Nov 2017 | — | No | ModNegligence | $691 | $691 |
| 9303878 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Nov 2017 | — | No | ModNegligence | $691 | $691 |
| 8589640 | Portable Crusher #1 Moffat, CO contractor: A & S Construction Co. | Nov 2011 | — | Yes | ModNegligence | $687 | $687 |
| 6445581 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Feb 2009 | — | Yes | ModNegligence | $687 | $687 |
| 6445580 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Feb 2009 | — | No | ModNegligence | $687 | $687 |
| 9348087 | Portable Crusher # 5 Pueblo, CO contractor: A & S Construction Co. | Oct 2018 | — | No | HighNegligence | $638 | $638 |
| 9341333 | Portable Crusher # 5 Pueblo, CO contractor: A & S Construction Co. | Aug 2017 | — | Yes | HighNegligence | $638 | $638 |
| 9397988 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Jan 2020 | — | No | ModNegligence | $615 | $615 |
| 9398504 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Jun 2020 | — | Yes | ModNegligence | $567 | $567 |
| 9398502 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Jun 2020 | — | Yes | ModNegligence | $567 | $567 |
| 8932383 | Portable Crusher #3 Las Animas, CO contractor: A & S Construction Co. | Oct 2016 | — | Yes | HighNegligence | $524 | $524 |
| 8754140 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Jun 2014 | — | No | ModNegligence | $499 | $499 |
| 9820011 | Portable Crusher # 5 Pueblo, CO contractor: A & S Construction Co. | Mar 2024 | — | No | ModNegligence | $492 | $492 |
| 8754879 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Oct 2013 | — | No | ModNegligence | $460 | $460 |
| 8753982 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Jul 2013 | — | No | ModNegligence | $460 | $460 |
| 8753981 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Jul 2013 | — | No | ModNegligence | $460 | $460 |
| 8753819 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Oct 2012 | — | Yes | HighNegligence | $460 | $460 |
| 9902579 | Portable Crusher #3 Las Animas, CO contractor: A & S Construction Co. | Nov 2023 | — | Yes | ModNegligence | $439 | $439 |
| 8754134 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | May 2014 | — | No | ModNegligence | $425 | $425 |
| 9341332 | Portable Crusher # 5 Pueblo, CO contractor: A & S Construction Co. | Aug 2017 | — | Yes | HighNegligence | $420 | $420 |
| 9476534 | Portable Crusher # 5 Pueblo, CO contractor: A & S Construction Co. | Nov 2020 | — | Yes | ModNegligence | $412 | $412 |
| 9303866 | Portable Crusher #3 Las Animas, CO contractor: A & S Construction Co. | Nov 2017 | — | Yes | HighNegligence | $395 | $395 |
| 6415167 | Portable Crusher #2 Pueblo, CO contractor: A & S Construction Co | Jan 2008 | — | No | HighNegligence | $392 | $392 |
| 8838384 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Oct 2016 | — | Yes | ModNegligence | $380 | $380 |
| 8838378 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Oct 2016 | — | Yes | HighNegligence | $380 | $380 |
| 7941219 | Portable Crusher #2 Pueblo, CO contractor: A & S Construction Co | Apr 2000 | — | Yes | ModNegligence | $371 | $371 |
| 9478275 | Wash Plant 2 Fremont, CO contractor: A & S Construction Co. | Mar 2021 | — | Yes | ModNegligence | $355 | $355 |
| 8932382 | Portable Crusher #3 Las Animas, CO contractor: A & S Construction Co. | Oct 2016 | — | Yes | ModNegligence | $351 | $351 |
| 8838355 | Portable Crusher #3 Las Animas, CO contractor: A & S Construction Co. | Oct 2016 | — | Yes | ModNegligence | $351 | $351 |
| 8763582 | Portable Crusher #1 Moffat, CO contractor: A & S Construction Co. | Aug 2016 | — | Yes | ModNegligence | $351 | $351 |
| 9656465 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Feb 2022 | — | No | HighNegligence | $349 | $349 |
| 8753810 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Oct 2012 | — | Yes | ModNegligence | $343 | $343 |
| 8589540 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Nov 2011 | — | No | ModNegligence | $334 | $334 |
| 9822604 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Jul 2024 | — | No | ModNegligence | $328 | $328 |
| 9476589 | Portable Crusher # 5 Pueblo, CO contractor: A & S Construction Co. | May 2021 | — | No | ModNegligence | $328 | $328 |
| 9476588 | Portable Crusher # 5 Pueblo, CO contractor: A & S Construction Co. | May 2021 | — | No | ModNegligence | $328 | $328 |
| 9476351 | Coaldale Fremont, CO contractor: A & S Construction Co. | Jul 2020 | — | Yes | ModNegligence | $324 | $324 |
| 9476350 | Coaldale Fremont, CO contractor: A & S Construction Co. | Jul 2020 | — | Yes | ModNegligence | $324 | $324 |
| 9476349 | Coaldale Fremont, CO contractor: A & S Construction Co. | Jul 2020 | — | Yes | ModNegligence | $324 | $324 |
| 8938692 | Portable Crusher #6 Fremont, CO contractor: A & S Construction Co. | Jan 2016 | — | Yes | HighNegligence | $324 | $324 |
| 9348106 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Nov 2018 | — | No | HighNegligence | $311 | $311 |
| 8753826 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Oct 2012 | — | Yes | ModNegligence | $308 | $308 |
| 8753825 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Oct 2012 | — | Yes | ModNegligence | $308 | $308 |
| 8753824 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Oct 2012 | — | Yes | ModNegligence | $308 | $308 |
| 8753822 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Oct 2012 | — | Yes | ModNegligence | $308 | $308 |
| 8753817 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Oct 2012 | — | Yes | ModNegligence | $308 | $308 |
| 8753808 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Oct 2012 | — | Yes | HighNegligence | $308 | $308 |
| 8753806 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Oct 2012 | — | Yes | ModNegligence | $308 | $308 |
| 6582203 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Dec 2009 | — | Yes | ModNegligence | $308 | $308 |
| 9820010 | Portable Crusher # 5 Pueblo, CO contractor: A & S Construction Co. | Mar 2024 | — | No | HighNegligence | $305 | $305 |
| 6299542 | Portable Crusher #3 Las Animas, CO contractor: A & S Construction Co. | Mar 2004 | — | Yes | ModNegligence | $305 | $305 |
| 9398511 | Portable Crusher #4 Pueblo, CO contractor: A & S Construction Co | Jun 2020 | — | No | ModNegligence | $298 | $298 |
| 9657612 | Portable Crusher #1 Moffat, CO contractor: A & S Construction Co. | Apr 2022 | — | No | ModNegligence | $296 | $296 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for A&S CONSTRUCTION. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for A&S CONSTRUCTION. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for A&S CONSTRUCTION. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for A&S CONSTRUCTION. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2005-08-10 | Referral | 2 | 2 | $3,200 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Part of a larger organization
A&S CONSTRUCTION is one of 3 establishments rolled up under the parent organization A & S Construction Co Inc.
Federal enforcement records on this page represent activity at this specific establishment only. The full enforcement footprint of A & S Construction Co Inc across all 3 of its tracked locations is viewable on the parent profile.
Other employers in this industry and state
Other employers in highway, street, and bridge construction within CO, ordered by federal enforcement volume:
- CASTLE ROCK CONSTRUCTION COMPANY OF COLORADO, LLCDENVER — 3 federal enforcement records
- LAWRENCE CONSTRUCTIONCOLORADO SPRINGS — 3 federal enforcement records
- LAWRENCE CONSTRUCTION COMPANYCOLORADO SPRINGS — 3 federal enforcement records
- LAWRENCE CONSTRUCTION COMPANYTRINIDAD — 3 federal enforcement records
- LAWRENCE CONSTRUCTION CO.PEYTON — 3 federal enforcement records
- MARTIN MARIETTA MATERIALS, INCAURORA — 3 federal enforcement records
- AMES CONSTRUCTION, INC.KREMMLING — 3 federal enforcement records
- CASTLE ROCK CONSTRUCTION CO. OF COLORADO LLCHUGO — 3 federal enforcement records
- LAWRENCE CONSTRUCTION COMPANYBURLINGTON — 3 federal enforcement records
- MARTIN MARIETTA MATERIALS, INCDENVER — 3 federal enforcement records
Other locations under this parent
Other establishments operated by A & S Construction Co Inc, ordered by federal enforcement volume:
- A & S CONSTRUCTION COSAPINERO, CO — 2 federal enforcement records
- A&S CONSTRUCTION COMPANYLA JUNTA, CO — 1 federal enforcement record
Related searches
- All A & S Construction Co Inc locationsParent rollup
- Highway, Street, and Bridge ConstructionAll employers in this industry
- Employers in COState-wide enforcement data
- Highway, Street, and in COIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on A&S CONSTRUCTION from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code. This establishment resolves to the parent rollup A & S Construction Co Inc, which operates 3 establishments in our dataset.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is A&S CONSTRUCTION's OSHA violation history?
- A&S CONSTRUCTION has 1 OSHA inspection on record with 2 violations and $3,200 in total penalties.
- How does A&S CONSTRUCTION's safety record compare to its industry?
- A&S CONSTRUCTION operates in the highway, street, and bridge construction industry. The industry average Total Recordable Incident Rate (TRIR) is 2.5. A&S CONSTRUCTION's self-reported DART rate is 2.21 compared to an industry average of 1.5.