Skip to main content

Establishment profile

ZACHER EXCAVATING INC.

MCKAY AVE., ALEXANDRIA, MN, 56308

Download as PDF →

OSHA inspections
2
over 27 years
Violations
6
$997 in penalties
Penalties
$997
$166 avg
Accident investigations on record
1 National Emphasis Program inspections

Summary

ZACHER EXCAVATING INC. has accumulated 6 OSHA violations across 2 inspections over 27 years of recorded history, with $997 in total assessed penalties.

The establishment sits in the 84th percentile for violations within its industry-state peer group of 43,050 employers. Inspection frequency runs at the 78th percentile. The most recent enforcement activity was recorded 26 years ago.

Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

ZACHER EXCAVATING INC. appears in OSHA workplace safety and FMCSA motor carrier registration records only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

Inspections
2
0.1 / yr · last 27 yrs
Violations
6
0.2 / yr
Penalties
$997
$166 avg / violation
100% serious0% other
Inspection trigger · complaint
1 of 2
Inspection trigger · planned
1 of 2

100% of inspections at this establishment produced violations, with 2 inspections producing serious-or-greater violations.

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 6 distinct standards shown · 6 citations in this view · $997 in penalties.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
29 CFR 1926.0652 A0111$262Jun 1999Jun 1999
29 CFR 5207.010011$210Sep 1999Sep 1999
29 CFR 1926.0651 J0211$210Jun 1999Jun 1999
29 CFR 1926.0100 A11$158Jun 1999Jun 1999
29 CFR 1926.0651 C0211$157Jun 1999Jun 1999
29 CFR 1820.6530811Jun 1999Jun 1999

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

84th

Worse on violations than most other employers. Peer group: 43,050 employers. This establishment has 6 OSHA violations; peer median is 1.

Fewer violationsMore violations
Penalty percentile
91st
peer median: $0
Inspection frequency
78th
peer median: 1

Safety self-report (OSHA 300A)

No self-reported injury rates filed with OSHA's Injury Tracking Application for ZACHER EXCAVATING INC.. Verify directly with OSHA Injury Tracking Application

Inspection breakdown

Planned
1
Complaint
1

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for ZACHER EXCAVATING INC.. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
26 years ago

No federal enforcement activity has been recorded against this establishment in 26+ years. Most recent activity: 26 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for ZACHER EXCAVATING INC.. Verify directly with Wage and Hour Division

Mine safety (MSHA)

No MSHA mine safety violations on file for ZACHER EXCAVATING INC.. Verify directly with Mine Safety and Health Administration

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for ZACHER EXCAVATING INC.. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for ZACHER EXCAVATING INC.. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for ZACHER EXCAVATING INC.. Verify directly with Environmental Protection Agency

Motor carrier safety (FMCSA)

DOT number
1099856
Operation
C

Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for ZACHER EXCAVATING INC.. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$0
Obligated (all-time)
$546K
Awards
99
Top agency
Department of the Interior
$546K
Largest awards (top 50 of 99)
  • Department of the Interior
    DAM/WATER CONTROL STRUCTURE MODIFICATION TO INCLUDE EXCAVATION AND REMOVAL OF PIPE; FILLING AND COMPACTING; DRIVING OF SHEET PILES; CUTTING OFF AND FINISHING PILES; RIP RAP PLACEMENT, AND SITE FINISHING
    contract · Last action 2009-09-24
    $49,606
  • Department of the Interior
    RUBY RED RESTORATION
    contract · Last action 2010-10-12
    $34,190
  • Department of the Interior
    100 HOURS OF 90+ HP FLYWHEEL DOZER AND 50 HOURS OF EXCAVATOR (BACKHOE)
    contract · Last action 2011-09-15
    $24,977
  • Department of the Interior
    90+ HP LOW GROUND PRESSURE DOZER, 140+ HP LOW GROUND PRESSURE DOZER, SELF-LOADING MOTOR SCRAPER
    contract · Last action 2011-02-07
    $24,938
  • Department of the Interior
    90+ HP LOW GROUND PRESSURE DOZER, 140+ HP LOW GROUND PRESSURE DOZER, EXCAVATOR (BACKHOE)
    contract · Last action 2011-07-25
    $24,934
  • Department of the Interior
    50 HOURS OF EXCAVATOR (BACKHOE) AND 86 HOURS OF 140+HP CRAWLER DOZER
    contract · Last action 2011-08-24
    $24,934
  • Department of the Interior
    140+HP LOW GROUND PRESSURE DOZER, SELF-LOADING MOTOR SCRAPER AND 90+ LOW GROUND PRESSURE CRAWLER DOZER WITH OPERATOR
    contract · Last action 2011-09-06
    $24,933
  • Department of the Interior
    CRAWLER DOZER AND EXCAVATOR WORK.
    contract · Last action 2010-04-26
    $21,189
  • Department of the Interior
    EQUIPMENT WITH OPERATOR.
    contract · Last action 2009-08-06
    $19,841
  • Department of the Interior
    TERRACE REMOVAL.
    contract · Last action 2010-07-26
    $15,000
  • Department of the Interior
    INSTALL TILE ON WATERFOWL PRODUCTION AREA.
    contract · Last action 2008-10-15
    $14,994
  • Department of the Interior
    WETLAND RESTORATION WORK
    contract · Last action 2009-10-12
    $12,433
  • Department of the Interior
    SUNDHEIM REBUILD IN POPE COUNTY MN
    contract · Last action 2010-08-16
    $11,975
  • Department of the Interior
    EXCAVATOR AND DOZER WORK.
    contract · Last action 2009-09-21
    $11,912
  • Department of the Interior
    EXCAVATOR (BACKHOE) & 140+ FLYWHEEL HP DOZER
    contract · Last action 2010-08-23
    $11,439
  • Department of the Interior
    25 HOURS OF EXCAVATOR AND 35 HOURS OF 90+ HP CRAWLER DOZER
    contract · Last action 2011-08-24
    $10,147
  • Department of the Interior
    PROVIDE EQUIPMENT AND OPERATOR TO PERFORM DIRT WORK.
    contract · Last action 2009-08-21
    $9,750
  • Department of the Interior
    20 HOURS EXCAVATOR; 25 HOURS 140+ HP LOW GROUND PRESSURE DOZER; 10 HOURS LABORER; AND EXCAVATOR MATTS
    contract · Last action 2011-08-24
    $9,262
  • Department of the Interior
    EQUIPMENT WITH OPERATOR.
    contract · Last action 2010-03-01
    $9,188
  • Department of the Interior
    EQUIPMENT WITH OPERATOR TO PERFORM TREE REMOVAL.
    contract · Last action 2009-02-25
    $8,865
  • Department of the Interior
    LOW GROUND PRESSURE CRAWLER DOZER WITH OPERATOR
    contract · Last action 2010-06-03
    $8,389
  • Department of the Interior
    90+HP LOW GROUND PRESSURE CRAWLER DOZER
    contract · Last action 2010-07-23
    $7,966
  • Department of the Interior
    17 HOURS OF 140+ HP CRAWLER DOZER AND 17 HOURS OF EXCAVATOR (BACKHOE)
    contract · Last action 2011-08-24
    $6,261
  • Department of the Interior
    MOBILIZATION, EQUIPMENT AND OPERATOR
    contract · Last action 2009-08-11
    $5,820
  • Department of the Interior
    EQUIPMENT WITH OPERATOR
    contract · Last action 2011-07-25
    $5,667
  • Department of the Interior
    MOBILIZATION, LABOR AND EQUIPMENT
    contract · Last action 2009-08-11
    $5,500
  • Department of the Interior
    MOBILIZATION, EQUIPMENT AND OPERATOR
    contract · Last action 2009-08-11
    $5,500
  • Department of the Interior
    TERRACE REMOVAL
    contract · Last action 2010-09-01
    $5,400
  • Department of the Interior
    EQUIPMENT WITH OPERATOR TO PERFORM WETLAND RESTORATION WORK.
    contract · Last action 2009-08-06
    $5,141
  • Department of the Interior
    90+ HP DOZER WITH OPERATOR
    contract · Last action 2009-11-02
    $4,544
  • Department of the Interior
    DOZER/OPERATOR
    contract · Last action 2010-09-08
    $4,500
  • Department of the Interior
    LOW GROUND PRESSURE DOZER 90+ HORSEPOWER
    contract · Last action 2010-06-25
    $4,345
  • Department of the Interior
    LOW GROUND PRESSURE CRAWLER DOZER WITH OPERATOR
    contract · Last action 2010-05-25
    $4,345
  • Department of the Interior
    LOW GROUND PRESSURE DOZER 90+ HP & EXCAVATOR
    contract · Last action 2010-07-01
    $4,286
  • Department of the Interior
    U OF M WCS REPAIRS
    contract · Last action 2011-07-21
    $3,915
  • Department of the Interior
    FULL SWING BACKHOE AND 90+HP DOZER WORK.
    contract · Last action 2009-08-17
    $3,791
  • Department of the Interior
    EXCAVATOR AND CRAWLER DOZER
    contract · Last action 2010-09-21
    $3,756
  • Department of the Interior
    90+HP LOW GROUND PRESSURE CRAWLER DOZER AND EXCAVATOR
    contract · Last action 2010-07-22
    $3,721
  • Department of the Interior
    EXCAVATOR (BACKHOE) WITH PADS
    contract · Last action 2009-10-01
    $3,701
  • Department of the Interior
    WETLAND RESTORATION WORK.
    contract · Last action 2008-11-03
    $3,569
  • Department of the Interior
    140 HP CRAWLER DOZER
    contract · Last action 2010-07-02
    $3,310
  • Department of the Interior
    WETLAND RESTORATION
    contract · Last action 2010-08-19
    $3,185
  • Department of the Interior
    WETLAND RESTORATION
    contract · Last action 2010-08-19
    $3,030
  • Department of the Interior
    90+ HP CRAWLER DOZER WORK
    contract · Last action 2009-09-16
    $3,003
  • Department of the Interior
    45 YARDS CLASS I RIPRAP (3-6 INCHES DIAMETER) AND 45 YARDS OF CLAS II RIPRAP (6-12 INCHES DIAMETER)
    contract · Last action 2011-08-24
    $2,970
  • Department of the Interior
    CRAWLER DOZER AND SKID LOAD WITH OPERATOR
    contract · Last action 2010-05-04
    $2,921
  • Department of the Interior
    ROCK
    contract · Last action 2012-02-27
    $2,825
  • Department of the Interior
    ROCK FOR WETLAND RESTORATION SPILLWAY
    contract · Last action 2009-10-19
    $2,587
  • Department of the Interior
    EQUIPMENT & OPERATOR FOR STUMP REMOVAL AND TREE CLEANUP
    contract · Last action 2010-06-03
    $2,550
  • Department of the Interior
    WETLAND RESTORATIONS
    contract · Last action 2007-10-09
    $2,475

Federal contract dollars to this establishment. Primary NAICS: 238910 - SITE PREPARATION CONTRACTORS. Last action: 2012-03-26. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
1999-08-24Planned11$210
1999-05-13Complaint55$787

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Related searches

About this data

This profile aggregates federal enforcement records on ZACHER EXCAVATING INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is ZACHER EXCAVATING INC.'s OSHA violation history?
ZACHER EXCAVATING INC. has 2 OSHA inspections on record with 6 violations and $997 in total penalties.