Establishment profile
WHITAKER CONSTRUCTION CO. INC.
200 BLOCK OF E MAIN STREET, GRANTSVILLE, UT, 84029
237110 — Water and Sewer Line and Related Structures Construction
Summary
WHITAKER CONSTRUCTION CO. INC. has accumulated 0 OSHA violations across 1 inspection over 7 years of recorded history.
The most recent federal enforcement activity was recorded 7 years ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
WHITAKER CONSTRUCTION CO. INC. appears in OSHA workplace safety and MSHA mine safety records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
Peer comparison
Fewer violations than most other employers in NAICS 2371 within UT. Peer group: 328 employers. This establishment has 0 OSHA violations; peer median is 1.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for WHITAKER CONSTRUCTION CO. INC.. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for WHITAKER CONSTRUCTION CO. INC.. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 7+ years. Most recent activity: 7 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for WHITAKER CONSTRUCTION CO. INC.. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in UT — for WHITAKER CONSTRUCTION CO. INC., not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other WHITAKER CONSTRUCTION CO. INC. operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 69 citations · 10S&S · 30 contractor · $13,062 proposed / $13,062 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 9725728 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Mar 2023 | — | Yes | HighNegligence | $2,065 | $2,065 |
| 9901972 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Aug 2023 | — | Yes | ModNegligence | $935 | $935 |
| 9725730 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Mar 2023 | — | Yes | ModNegligence | $558 | $558 |
| 9654279 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Jul 2022 | — | Yes | ModNegligence | $518 | $518 |
| 9654277 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Jul 2022 | — | Yes | ModNegligence | $518 | $518 |
| 9725735 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Mar 2023 | — | Yes | ModNegligence | $252 | $252 |
| 9901978 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Aug 2023 | — | No | ModNegligence | $189 | $189 |
| 9901977 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Aug 2023 | — | No | HighNegligence | $189 | $189 |
| 9901975 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Aug 2023 | — | No | ModNegligence | $189 | $189 |
| 9901757 | Plymouth Box Elder, UT | Oct 2023 | — | Yes | ModNegligence | $167 | $167 |
| 9725736 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Mar 2023 | — | Yes | ModNegligence | $167 | $167 |
| 9725734 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Mar 2023 | — | Yes | ModNegligence | $167 | $167 |
| 9725731 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Mar 2023 | — | Yes | ModNegligence | $167 | $167 |
| 9907331 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | May 2024 | — | No | ModNegligence | $161 | $161 |
| 5055463 | Plymouth Box Elder, UT | Mar 2026 | — | No | ModNegligence | $151 | $151 |
| 5055715 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Aug 2025 | — | No | ModNegligence | $151 | $151 |
| 9826695 | Plymouth Box Elder, UT | Mar 2025 | — | No | HighNegligence | $151 | $151 |
| 9826694 | Plymouth Box Elder, UT | Mar 2025 | — | No | HighNegligence | $151 | $151 |
| 9826693 | Plymouth Box Elder, UT | Mar 2025 | — | No | HighNegligence | $151 | $151 |
| 9826692 | Plymouth Box Elder, UT | Mar 2025 | — | No | ModNegligence | $151 | $151 |
| 9826691 | Plymouth Box Elder, UT | Mar 2025 | — | No | ModNegligence | $151 | $151 |
| 9826679 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Feb 2025 | — | No | HighNegligence | $151 | $151 |
| 9826678 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Feb 2025 | — | No | HighNegligence | $151 | $151 |
| 9826677 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Feb 2025 | — | No | HighNegligence | $151 | $151 |
| 9826676 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Feb 2025 | — | No | ModNegligence | $151 | $151 |
| 9826675 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Feb 2025 | — | No | ModNegligence | $151 | $151 |
| 9826674 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Feb 2025 | — | No | ModNegligence | $151 | $151 |
| 9826673 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Feb 2025 | — | No | ModNegligence | $151 | $151 |
| 9901981 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Aug 2023 | — | No | HighNegligence | $147 | $147 |
| 9901974 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Aug 2023 | — | No | ModNegligence | $147 | $147 |
| 9901973 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Aug 2023 | — | No | ModNegligence | $147 | $147 |
| 9901759 | Plymouth Box Elder, UT | Oct 2023 | — | No | ModNegligence | $143 | $143 |
| 9901758 | Plymouth Box Elder, UT | Oct 2023 | — | No | ModNegligence | $143 | $143 |
| 9901756 | Plymouth Box Elder, UT | Oct 2023 | — | No | ModNegligence | $143 | $143 |
| 9901755 | Plymouth Box Elder, UT | Oct 2023 | — | No | ModNegligence | $143 | $143 |
| 9728100 | Whitaker Construction - Wellsville Pit Cache, UT | Sep 2023 | — | No | ModNegligence | $143 | $143 |
| 9725737 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Mar 2023 | — | No | ModNegligence | $143 | $143 |
| 9725727 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Mar 2023 | — | No | ModNegligence | $143 | $143 |
| 9654295 | Plymouth Box Elder, UT | Oct 2022 | — | No | ModNegligence | $133 | $133 |
| 9654281 | Whitaker Construction - Wellsville Pit Cache, UT | Aug 2022 | — | No | ModNegligence | $133 | $133 |
| 9654278 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Jul 2022 | — | No | ModNegligence | $133 | $133 |
| 9478690 | Plymouth Box Elder, UT | Oct 2021 | — | No | ModNegligence | $125 | $125 |
| 9474871 | Plymouth Box Elder, UT | May 2021 | — | No | ModNegligence | $125 | $125 |
| 9430906 | Whitaker Construction - Wellsville Pit Cache, UT | Feb 2021 | — | No | LowNegligence | $125 | $125 |
| 9430905 | Whitaker Construction - Wellsville Pit Cache, UT | Feb 2021 | — | No | ModNegligence | $125 | $125 |
| 9474619 | Whitaker Construction - Wellsville Pit Cache, UT | Nov 2020 | — | No | ModNegligence | $123 | $123 |
| 9475044 | Whitaker Construction - Wellsville Pit Cache, UT | Jun 2020 | — | No | ModNegligence | $123 | $123 |
| 9399868 | Plymouth Box Elder, UT | Jan 2020 | — | No | LowNegligence | $123 | $123 |
| 9309282 | Plymouth Box Elder, UT | Jul 2019 | — | No | ModNegligence | $121 | $121 |
| 9309265 | Whitaker Construction - Wellsville Pit Cache, UT | Jun 2019 | — | No | ModNegligence | $121 | $121 |
| 8837395 | Plymouth Box Elder, UT | May 2018 | — | No | ModNegligence | $118 | $118 |
| 8836960 | Whitaker Construction - Wellsville Pit Cache, UT | Apr 2018 | — | No | ModNegligence | $118 | $118 |
| 8837618 | Whitaker Construction - Wellsville Pit Cache, UT | Jun 2017 | — | No | ModNegligence | $116 | $116 |
| 8930992 | Plymouth Box Elder, UT | Apr 2017 | — | No | ModNegligence | $116 | $116 |
| 8930991 | Plymouth Box Elder, UT | Apr 2017 | — | No | ModNegligence | $116 | $116 |
| 8930931 | Plymouth Box Elder, UT | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 8930930 | Plymouth Box Elder, UT | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 8930929 | Plymouth Box Elder, UT | Oct 2016 | — | No | ModNegligence | $114 | $114 |
| 8825557 | Whitaker Construction - Wellsville Pit Cache, UT | Aug 2016 | — | No | ModNegligence | $114 | $114 |
| 8930516 | Plymouth Box Elder, UT | Jul 2016 | — | No | ModNegligence | $114 | $114 |
| 8825533 | Whitaker Construction - Wellsville Pit Cache, UT | Mar 2016 | — | No | LowNegligence | $100 | $100 |
| 8824955 | Whitaker Construction - Wellsville Pit Cache, UT | Jan 2016 | — | No | HighNegligence | $100 | $100 |
| 6591547 | Portable Number One Utah, UT | Apr 2012 | — | No | ModNegligence | $100 | $100 |
| 6591432 | Portable Number One Utah, UT | Oct 2011 | — | No | LowNegligence | $100 | $100 |
| 6590682 | Portable Number One Utah, UT | Jun 2011 | — | No | LowNegligence | $100 | $100 |
| 6425396 | Portable Number One Utah, UT | Feb 2010 | — | No | ModNegligence | $100 | $100 |
| 5055714 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Aug 2025 | — | No | ModNegligence | — | — |
| 5055713 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Aug 2025 | — | No | ModNegligence | — | — |
| 5055712 | Round Valley Rock Morgan, UT contractor: Whitaker Construction Co, Inc. | Aug 2025 | — | No | ModNegligence | — | — |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for WHITAKER CONSTRUCTION CO. INC.. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for WHITAKER CONSTRUCTION CO. INC.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for WHITAKER CONSTRUCTION CO. INC.. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for WHITAKER CONSTRUCTION CO. INC.. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2019-06-14 | Referral | 0 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in water and sewer line and related structures construction within UT, ordered by federal enforcement volume:
- TNT GENERAL CONTRACTORSNEPHI — 3 federal enforcement records
- SUNROC CORPST. GEORGE — 3 federal enforcement records
- QUALITY EXCAVATIONST GEORGE — 3 federal enforcement records
- W W CLYDE & COOREM — 3 federal enforcement records
- WW CLYDE & CODRAPER — 3 federal enforcement records
- INTERSTATE ROCK PRODUCTSHURRICANE — 3 federal enforcement records
- KNIFE RIVER CORPORATIONWEST JORDAN — 2 federal enforcement records
- EUGENE MORGAN & SON EXCAVATINGSALT LAKE CITY — 2 federal enforcement records
- KENNY SENG CONSTRUCTION, INC.EAGLE MOUNTAIN — 2 federal enforcement records
- TERRY R BROTHERSON EXCAVATING INCLAYTON — 2 federal enforcement records
Related searches
- Water and Sewer Line and Related Structures ConstructionAll employers in this industry
- Employers in UTState-wide enforcement data
- Water and Sewer in UTIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on WHITAKER CONSTRUCTION CO. INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is WHITAKER CONSTRUCTION CO. INC.'s OSHA violation history?
- WHITAKER CONSTRUCTION CO. INC. has 1 OSHA inspection on record with 0 violations and $0 in total penalties.
- How does WHITAKER CONSTRUCTION CO. INC.'s safety record compare to its industry?
- WHITAKER CONSTRUCTION CO. INC. operates in the water and sewer line and related structures construction industry. The industry average Total Recordable Incident Rate (TRIR) is 1.9.