Establishment profile
VCNA PRAIRIE, INC.
799 S. ROHLWING RD., ADDISON, IL, 60101
Operated by VCNA Prairie LLC · 1 of 3 establishments
327320 — Ready-Mix Concrete Manufacturing
EIN 833479355
Summary
VCNA PRAIRIE, INC. has accumulated 5 OSHA violations across 2 inspections over 11 years of recorded history, with $22,000 in total assessed penalties.
The establishment sits in the 70th percentile for violations within its industry-state peer group of 248 employers. Inspection frequency runs at the 64th percentile. The most recent enforcement activity was recorded 10 years ago.
Federal records were found in 3 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
VCNA PRAIRIE, INC. appears in OSHA workplace safety, MSHA mine safety, and NLRB labor relations records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
100% of inspections at this establishment produced violations, with 2 inspections producing serious-or-greater violations.
Most-cited OSHA standards
Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 3 distinct standards shown · 5 citations in this view · $22,000 in penalties.
| CFR section | Citations | Inspections | Total penalty | First cited | Last cited |
|---|---|---|---|---|---|
| 29 CFR 1910.0023 C03 | 2 | 2 | $11,000 | Sep 2015 | Mar 2016 |
| 29 CFR 1910.0146 C02 | 2 | 2 | $7,500 | Sep 2015 | Mar 2016 |
| 29 CFR 1910.0146 E01 | 1 | 1 | $3,500 | Sep 2015 | Sep 2015 |
Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.
Peer comparison
Above average violations in NAICS 3273 within IL. Peer group: 248 employers. This establishment has 5 OSHA violations; peer median is 2.
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 109 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
Self-reported events under 29 CFR 1904.39 (24-hour notification of hospitalization, amputation, or loss of an eye) · Apr 2015
Most frequent event: Other fall to lower level 11 to 15 feet
Source: OSHA Severe Injury Reports (federal OSHA only; state-plan states like California, Oregon, and Washington maintain their own programs and do not consistently report into this feed).
Severe injury reports — events
Each row is a hospitalization, amputation, or eye-loss event the employer self-reported to OSHA under 29 CFR 1904.39. Narratives are written by the reporting employer.
| Date | Event | Body part | Outcome | |
|---|---|---|---|---|
| Apr 3, 2015 | Other fall to lower level 11 to 15 feet | Nonclassifiable | Hospitalized |
Source: OSHA Severe Injury Reports. Federal-OSHA jurisdiction only by default; some state-plan programs report voluntarily.
Activity timeline
No federal enforcement activity has been recorded against this establishment in 10+ years. Most recent activity: 10 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for VCNA PRAIRIE, INC.. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
Company-level in IL — for VCNA Prairie LLC, not this location alone
Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other VCNA Prairie LLC operations in the same state.
MSHA citations
Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 31S&S · $120,079 proposed / $89,617 paid.
| Citation | Mine | Date | Section | S&S | Negligence | Proposed | Paid |
|---|---|---|---|---|---|---|---|
| 9620611 | Yard 95-Manteno Kankakee, IL | Jul 2021 | — | Yes | ModNegligence | $21,022 | $6,331 |
| 9620612 | Yard 95-Manteno Kankakee, IL | Jul 2021 | — | No | ModNegligence | $4,243 | $1,278 |
| 9620607 | Yard 95-Manteno Kankakee, IL | Jul 2021 | — | No | HighNegligence | $4,243 | $4,243 |
| 9620604 | Yard 95-Manteno Kankakee, IL | Jul 2021 | — | No | ModNegligence | $4,243 | $1,278 |
| 9620603 | Yard 95-Manteno Kankakee, IL | Jul 2021 | — | No | ModNegligence | $4,243 | $1,278 |
| 9620602 | Yard 95-Manteno Kankakee, IL | Jul 2021 | — | No | ModNegligence | $4,243 | $1,278 |
| 9444958 | Yard 95-Manteno Kankakee, IL | Jan 2021 | — | No | HighNegligence | $4,243 | $4,243 |
| 9445492 | Yard 88 - Pontiac Livingston, IL | Aug 2020 | — | Yes | ModNegligence | $4,194 | $4,194 |
| 9444769 | Yard 95-Manteno Kankakee, IL | Mar 2020 | — | Yes | ModNegligence | $3,871 | $3,871 |
| 9444787 | Yard 88 - Pontiac Livingston, IL | Apr 2020 | — | No | LowNegligence | $2,211 | $332 |
| 9620606 | Yard 95-Manteno Kankakee, IL | Jul 2021 | — | Yes | ModNegligence | $2,065 | $2,065 |
| 9444993 | Yard 88 - Pontiac Livingston, IL | Jun 2021 | — | No | LowNegligence | $2,065 | $187 |
| 9620835 | Yard 95-Manteno Kankakee, IL | Nov 2021 | — | Yes | HighNegligence | $1,907 | $1,907 |
| 8957594 | Yard 91 - Elburn Kane, IL | Oct 2018 | — | Yes | HighNegligence | $1,421 | $1,421 |
| 8957593 | Yard 91 - Elburn Kane, IL | Oct 2018 | — | Yes | HighNegligence | $1,421 | $1,421 |
| 9620615 | Yard 95-Manteno Kankakee, IL | Jul 2021 | — | Yes | ModNegligence | $1,385 | $1,385 |
| 9620605 | Yard 95-Manteno Kankakee, IL | Jul 2021 | — | Yes | ModNegligence | $1,385 | $1,385 |
| 9444989 | Yard 88 - Pontiac Livingston, IL | Jun 2021 | — | Yes | ModNegligence | $1,385 | $1,385 |
| 8662753 | Yard 99 - Ashkum Iroquois, IL | May 2012 | — | Yes | ModNegligence | $1,304 | $1,304 |
| 6561119 | Yard 99 - Ashkum Iroquois, IL | Jan 2011 | — | Yes | ModNegligence | $1,304 | $1,304 |
| 6561118 | Yard 99 - Ashkum Iroquois, IL | Jan 2011 | — | Yes | ModNegligence | $1,304 | $1,304 |
| 9196311 | Yard 99 - Ashkum Iroquois, IL | May 2020 | — | No | HighNegligence | $1,166 | $1,166 |
| 9690663 | Yard 95-Manteno Kankakee, IL | Dec 2022 | — | No | ModNegligence | $1,063 | $1,063 |
| 9690660 | Yard 95-Manteno Kankakee, IL | Dec 2022 | — | No | ModNegligence | $1,063 | $1,063 |
| 9621930 | Yard 88 - Pontiac Livingston, IL | Dec 2022 | — | No | ModNegligence | $1,063 | $1,063 |
| 9444999 | Yard 88 - Pontiac Livingston, IL | Jun 2021 | — | Yes | LowNegligence | $1,006 | $1,006 |
| 9444939 | Yard 57 - Paxton Ford, IL | Oct 2020 | — | Yes | ModNegligence | $994 | $994 |
| 9444937 | Yard 57 - Paxton Ford, IL | Oct 2020 | — | Yes | ModNegligence | $994 | $994 |
| 9444935 | Yard 57 - Paxton Ford, IL | Oct 2020 | — | Yes | ModNegligence | $994 | $994 |
| 9621151 | Yard 88 - Pontiac Livingston, IL | Jun 2022 | — | No | ModNegligence | $987 | $987 |
| 9691825 | Yard 88 - Pontiac Livingston, IL | May 2023 | — | No | HighNegligence | $980 | $980 |
| 8849515 | Yard 88 - Pontiac Livingston, IL | Jun 2015 | — | Yes | ModNegligence | $946 | $946 |
| 9620613 | Yard 95-Manteno Kankakee, IL | Jul 2021 | — | No | ModNegligence | $929 | $929 |
| 9444994 | Yard 88 - Pontiac Livingston, IL | Jun 2021 | — | No | ModNegligence | $929 | $929 |
| 9444969 | Yard 88 - Pontiac Livingston, IL | Jan 2021 | — | No | ModNegligence | $929 | $929 |
| 9444968 | Yard 88 - Pontiac Livingston, IL | Jan 2021 | — | No | ModNegligence | $929 | $929 |
| 9444961 | Yard 95-Manteno Kankakee, IL | Jan 2021 | — | No | ModNegligence | $929 | $929 |
| 9444960 | Yard 95-Manteno Kankakee, IL | Jan 2021 | — | No | ModNegligence | $929 | $929 |
| 9444957 | Yard 95-Manteno Kankakee, IL | Jan 2021 | — | No | ModNegligence | $929 | $929 |
| 9621080 | Yard 95-Manteno Kankakee, IL | Mar 2022 | — | Yes | ModNegligence | $909 | $909 |
| 8662737 | Yard 88 - Pontiac Livingston, IL | Apr 2012 | — | Yes | ModNegligence | $873 | $873 |
| 6504834 | Yard 99 - Ashkum Iroquois, IL | Aug 2010 | — | Yes | ModNegligence | $873 | $873 |
| 9445420 | Yard 95-Manteno Kankakee, IL | May 2020 | — | No | HighNegligence | $782 | $782 |
| 9444771 | Yard 95-Manteno Kankakee, IL | Mar 2020 | — | No | HighNegligence | $782 | $782 |
| 9444768 | Yard 95-Manteno Kankakee, IL | Mar 2020 | — | No | HighNegligence | $782 | $782 |
| 9444767 | Yard 95-Manteno Kankakee, IL | Mar 2020 | — | No | HighNegligence | $782 | $782 |
| 9444766 | Yard 95-Manteno Kankakee, IL | Mar 2020 | — | No | HighNegligence | $782 | $782 |
| 9444763 | Yard 95-Manteno Kankakee, IL | Mar 2020 | — | No | HighNegligence | $782 | $782 |
| 9444762 | Yard 95-Manteno Kankakee, IL | Mar 2020 | — | No | HighNegligence | $782 | $782 |
| 5118123 | Yard 95-Manteno Kankakee, IL | Nov 2025 | — | Yes | ModNegligence | $755 | $755 |
| 9444941 | Yard 57 - Paxton Ford, IL | Oct 2020 | — | No | ModNegligence | $666 | $666 |
| 5118150 | Metz Quarry Livingston, IL | Feb 2026 | — | Yes | ModNegligence | $642 | $642 |
| 8956989 | Yard 88 - Pontiac Livingston, IL | Apr 2018 | — | Yes | ModNegligence | $589 | $589 |
| 9691834 | Yard 95-Manteno Kankakee, IL | May 2023 | — | No | ModNegligence | $558 | $558 |
| 9445406 | Yard 88 - Pontiac Livingston, IL | May 2020 | — | No | HighNegligence | $523 | $523 |
| 9445404 | Yard 88 - Pontiac Livingston, IL | May 2020 | — | No | HighNegligence | $523 | $523 |
| 9196309 | Yard 99 - Ashkum Iroquois, IL | May 2020 | — | Yes | ModNegligence | $523 | $523 |
| 9444765 | Yard 95-Manteno Kankakee, IL | Mar 2020 | — | Yes | LowNegligence | $523 | $523 |
| 9622972 | Shale Quarry Livingston, IL | Aug 2022 | — | Yes | ModNegligence | $481 | $481 |
| 9690666 | Yard 95-Manteno Kankakee, IL | Dec 2022 | — | No | LowNegligence | $477 | $477 |
| 9690661 | Yard 95-Manteno Kankakee, IL | Dec 2022 | — | No | ModNegligence | $477 | $477 |
| 9621931 | Yard 88 - Pontiac Livingston, IL | Dec 2022 | — | No | ModNegligence | $477 | $477 |
| 9621929 | Yard 88 - Pontiac Livingston, IL | Dec 2022 | — | No | ModNegligence | $477 | $477 |
| 8661982 | Yard 99 - Ashkum Iroquois, IL | Oct 2011 | — | No | HighNegligence | $450 | $450 |
| 9621149 | Yard 88 - Pontiac Livingston, IL | Jun 2022 | — | No | LowNegligence | $442 | $442 |
| 9691823 | Yard 88 - Pontiac Livingston, IL | May 2023 | — | No | LowNegligence | $439 | $439 |
| 6554941 | Yard 95-Manteno Kankakee, IL | Jan 2011 | — | Yes | ModNegligence | $425 | $425 |
| 9444995 | Yard 88 - Pontiac Livingston, IL | Jun 2021 | — | No | ModNegligence | $416 | $416 |
| 9444990 | Yard 88 - Pontiac Livingston, IL | Jun 2021 | — | No | ModNegligence | $416 | $416 |
| 8849459 | Yard 95-Manteno Kankakee, IL | Apr 2015 | — | No | ModNegligence | $392 | $392 |
| 8742727 | Yard 88 - Pontiac Livingston, IL | Apr 2014 | — | No | ModNegligence | $392 | $392 |
| 8742723 | Yard 88 - Pontiac Livingston, IL | Apr 2014 | — | No | HighNegligence | $392 | $392 |
| 8661116 | Yard 99 - Ashkum Iroquois, IL | Jun 2011 | — | Yes | ModNegligence | $392 | $392 |
| 6499053 | Yard 99 - Ashkum Iroquois, IL | Dec 2009 | — | Yes | ModNegligence | $392 | $392 |
| 9693505 | Yard 95-Manteno Kankakee, IL | Mar 2024 | — | No | ModNegligence | $388 | $388 |
| 6186981 | Yard 95-Manteno Kankakee, IL | Apr 2008 | — | Yes | ModNegligence | $362 | $362 |
| 9445421 | Yard 95-Manteno Kankakee, IL | May 2020 | — | No | LowNegligence | $351 | $351 |
| 9445419 | Yard 95-Manteno Kankakee, IL | May 2020 | — | No | ModNegligence | $351 | $351 |
| 9445416 | Yard 95-Manteno Kankakee, IL | May 2020 | — | No | LowNegligence | $351 | $351 |
| 9444764 | Yard 95-Manteno Kankakee, IL | Mar 2020 | — | No | ModNegligence | $351 | $351 |
| 9444758 | Yard 95-Manteno Kankakee, IL | Mar 2020 | — | No | ModNegligence | $351 | $351 |
| 9444946 | Yard 99 - Ashkum Iroquois, IL | Oct 2020 | — | No | ModNegligence | $324 | $324 |
| 8957791 | Yard 88 - Pontiac Livingston, IL | Feb 2019 | — | No | ModNegligence | $319 | $319 |
| 9690667 | Yard 95-Manteno Kankakee, IL | Dec 2022 | — | No | ModNegligence | $318 | $318 |
| 9690664 | Yard 95-Manteno Kankakee, IL | Dec 2022 | — | No | ModNegligence | $318 | $318 |
| 9621932 | Yard 88 - Pontiac Livingston, IL | Dec 2022 | — | No | ModNegligence | $318 | $318 |
| 9621927 | Yard 88 - Pontiac Livingston, IL | Dec 2022 | — | No | ModNegligence | $318 | $318 |
| 8662608 | Yard 88 - Pontiac Livingston, IL | Nov 2011 | — | No | LowNegligence | $308 | $308 |
| 8662606 | Yard 88 - Pontiac Livingston, IL | Nov 2011 | — | No | ModNegligence | $308 | $308 |
| 8662605 | Yard 88 - Pontiac Livingston, IL | Nov 2011 | — | No | LowNegligence | $308 | $308 |
| 8945330 | Yard 88 - Pontiac Livingston, IL | Jul 2017 | — | No | ModNegligence | $305 | $305 |
| 9444940 | Yard 57 - Paxton Ford, IL | Oct 2020 | — | No | LowNegligence | $298 | $298 |
| 9621146 | Yard 88 - Pontiac Livingston, IL | Jun 2022 | — | No | ModNegligence | $296 | $296 |
| 9691827 | Yard 88 - Pontiac Livingston, IL | May 2023 | — | No | ModNegligence | $295 | $295 |
| 9691822 | Yard 88 - Pontiac Livingston, IL | May 2023 | — | No | ModNegligence | $295 | $295 |
| 9691820 | Yard 88 - Pontiac Livingston, IL | May 2023 | — | No | ModNegligence | $295 | $295 |
| 8742666 | Yard 88 - Pontiac Livingston, IL | Dec 2013 | — | No | HighNegligence | $285 | $285 |
| 9620614 | Yard 95-Manteno Kankakee, IL | Jul 2021 | — | No | ModNegligence | $279 | $279 |
| 9620609 | Yard 95-Manteno Kankakee, IL | Jul 2021 | — | No | ModNegligence | $279 | $279 |
| 9620601 | Yard 95-Manteno Kankakee, IL | Jul 2021 | — | No | LowNegligence | $279 | $125 |
Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).
Labor relations (NLRB)
Company-level in IL — for VCNA Prairie LLC, not this location alone
National Labor Relations Board — unfair labor practice charges and union representation cases. The NLRB records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other VCNA Prairie LLC locations in the same state.
NLRB cases
National Labor Relations Board cases involving this employer. Includes unfair labor practice (ULP) filings and representation election proceedings. NLRB enforcement is process-driven; no per-case monetary penalty is assessed (remedies are case-by-case backpay orders, posting requirements, election re-runs, etc.). 3 cases · 3 ULP
| Case number | Type | Filed | Closed | Status | Region |
|---|---|---|---|---|---|
| 25-CA-219471 | Unfair labor practice | May 2018 | Aug 2018 | Closed | Region 25, Indianapolis, Indiana |
| 13-CA-128738 | Unfair labor practice | May 2014 | Jul 2014 | Closed | Region 13, Chicago, Illinois |
| 25-CA-086202 | Unfair labor practice | Jul 2012 | Sep 2012 | Closed | Region 25, Indianapolis, Indiana |
Source: NLRB case files. Rows shown are those the agency has published. Region numbers (1–31) correspond to NLRB's geographic offices.
Visa & labor certification (OFLC) — historical
No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for VCNA PRAIRIE, INC.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for VCNA PRAIRIE, INC.. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for VCNA PRAIRIE, INC.. Verify directly with UVA Corporate Prosecution Registry →
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2016-02-19 | Referral | 2 | 2 | $8,000 | |
| 2015-04-14 | Referral | 3 | 2 | $14,000 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Part of a larger organization
VCNA PRAIRIE, INC. is one of 3 establishments rolled up under the parent organization VCNA Prairie LLC.
Federal enforcement records on this page represent activity at this specific establishment only. The full enforcement footprint of VCNA Prairie LLC across all 3 of its tracked locations is viewable on the parent profile.
Other employers in this industry and state
Other employers in ready-mix concrete manufacturing within IL, ordered by federal enforcement volume:
- MEYER MATERIAL CODes Plaines — 4 federal enforcement records
- ROANOKE CONCRETE PRODUCTS CO.BLOOMINGTON — 3 federal enforcement records
- ROANOKE CONCRETE PRODUCTS CO.EAST PEORIA — 3 federal enforcement records
- GUNITE CORPORATIONROCKFORD — 3 federal enforcement records
- Prairie Materials Sales, Inc.Bloomington — 2 federal enforcement records
- MEYER MATERIAL COMPANYELGIN — 2 federal enforcement records
- WESTERN SAND & GRAVEL CO.SPRING VALLEY — 2 federal enforcement records
- VCNA PRAIRIE, INC.HODGKINS — 2 federal enforcement records
- PRAIRIE MATERIAL SALES, INC.NORTHBROOK — 2 federal enforcement records
- VCNA PRAIRIE LLC DBA PRAIRIE MATERIALCHICAGO — 2 federal enforcement records
Other locations under this parent
Other establishments operated by VCNA Prairie LLC, ordered by federal enforcement volume:
- VCNA PRAIRIE, INC.HODGKINS, IL — 2 federal enforcement records
- VCNA PRAIRIE, INC.BATAVIA, IL — 2 federal enforcement records
Related searches
- All VCNA Prairie LLC locationsParent rollup
- Ready-Mix Concrete ManufacturingAll employers in this industry
- Employers in ILState-wide enforcement data
- Ready-Mix Concrete Manufacturing in ILIndustry × state cross-filter
About this data
This profile aggregates federal enforcement records on VCNA PRAIRIE, INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code. This establishment resolves to the parent rollup VCNA Prairie LLC, which operates 3 establishments in our dataset.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →Frequently asked
- What is VCNA PRAIRIE, INC.'s OSHA violation history?
- VCNA PRAIRIE, INC. has 2 OSHA inspections on record with 5 violations and $22,000 in total penalties.
- How does VCNA PRAIRIE, INC.'s safety record compare to its industry?
- VCNA PRAIRIE, INC. operates in the ready-mix concrete manufacturing industry. The industry average Total Recordable Incident Rate (TRIR) is 2.5. VCNA PRAIRIE, INC.'s self-reported DART rate is 3.93 compared to an industry average of 1.6.