Skip to main content

Establishment profile

VCNA PRAIRIE, INC.

799 S. ROHLWING RD., ADDISON, IL, 60101
Operated by VCNA Prairie LLC · 1 of 3 establishments
327320Ready-Mix Concrete Manufacturing
EIN 833479355

Download as PDF →

OSHA inspections
2
over 11 years
Violations
5
$22,000 in penalties
Penalties
$22,000
$4,400 avg
Violations across 3 federal agencies
Enforcement actions from multiple agencies may indicate systemic compliance issues across functions.
Accident investigations on record
1 National Emphasis Program inspections

Summary

VCNA PRAIRIE, INC. has accumulated 5 OSHA violations across 2 inspections over 11 years of recorded history, with $22,000 in total assessed penalties.

The establishment sits in the 70th percentile for violations within its industry-state peer group of 248 employers. Inspection frequency runs at the 64th percentile. The most recent enforcement activity was recorded 10 years ago.

Federal records were found in 3 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

VCNA PRAIRIE, INC. appears in OSHA workplace safety, MSHA mine safety, and NLRB labor relations records only. No matching records were found in WHD wage enforcement, EPA environmental compliance, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.

OSHA workplace safety

Inspections
2
0.2 / yr · last 11 yrs
Violations
5
0.5 / yr
Penalties
$22,000
$4,400 avg / violation
80% serious20% other
Inspection trigger · referral
2 of 2

100% of inspections at this establishment produced violations, with 2 inspections producing serious-or-greater violations.

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 3 distinct standards shown · 5 citations in this view · $22,000 in penalties.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
29 CFR 1910.0023 C0322$11,000Sep 2015Mar 2016
29 CFR 1910.0146 C0222$7,500Sep 2015Mar 2016
29 CFR 1910.0146 E0111$3,500Sep 2015Sep 2015

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

70th

Above average violations in NAICS 3273 within IL. Peer group: 248 employers. This establishment has 5 OSHA violations; peer median is 2.

Fewer violationsMore violations
Penalty percentile
91st
peer median: $849
Inspection frequency
64th
peer median: 1

Safety self-report (OSHA 300A)

Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.

DART rate
3.9
vs industry
+2.3
TRIR
6.3
vs industry
+3.8

Reported for 109 average annual employees at this establishment.

Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.

Industry benchmark

Industry avg TRIR
2.5
BLS SOII 2024
Industry avg DART
1.6
BLS SOII 2024
Self-reported TRIR
6.3
OSHA ITA Form 300A (employer self-reported)

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Referral
2

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

Self-reported events under 29 CFR 1904.39 (24-hour notification of hospitalization, amputation, or loss of an eye) · Apr 2015

Reports
1
Hospitalizations
1
Amputations
0
Eye losses
0

Most frequent event: Other fall to lower level 11 to 15 feet

Source: OSHA Severe Injury Reports (federal OSHA only; state-plan states like California, Oregon, and Washington maintain their own programs and do not consistently report into this feed).

Severe injury reports — events

Each row is a hospitalization, amputation, or eye-loss event the employer self-reported to OSHA under 29 CFR 1904.39. Narratives are written by the reporting employer.

DateEventBody partOutcome
Apr 3, 2015Other fall to lower level 11 to 15 feetNonclassifiableHospitalized

Source: OSHA Severe Injury Reports. Federal-OSHA jurisdiction only by default; some state-plan programs report voluntarily.

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
10 years ago

No federal enforcement activity has been recorded against this establishment in 10+ years. Most recent activity: 10 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for VCNA PRAIRIE, INC.. Verify directly with Wage and Hour Division

Mine safety (MSHA)

Company-level in IL — for VCNA Prairie LLC, not this location alone

Violations
613
Assessed penalties
$187,150

Mine Safety & Health Administration — citations issued at mining operations. MSHA records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other VCNA Prairie LLC operations in the same state.

MSHA citations

Mine Safety and Health Administration citations. S&S (significant and substantial) marks violations that could reasonably contribute to a serious injury. Negligence rating is MSHA’s operator-culpability assessment (none, low, moderate, high, or reckless disregard). Proposed = assessed at issuance; Paid = post-settlement / appeal. 100 citations · 31S&S · $120,079 proposed / $89,617 paid.

CitationMineDateSectionS&SNegligenceProposedPaid
9620611
Yard 95-Manteno
Kankakee, IL
Jul 2021YesModNegligence$21,022$6,331
9620612
Yard 95-Manteno
Kankakee, IL
Jul 2021NoModNegligence$4,243$1,278
9620607
Yard 95-Manteno
Kankakee, IL
Jul 2021NoHighNegligence$4,243$4,243
9620604
Yard 95-Manteno
Kankakee, IL
Jul 2021NoModNegligence$4,243$1,278
9620603
Yard 95-Manteno
Kankakee, IL
Jul 2021NoModNegligence$4,243$1,278
9620602
Yard 95-Manteno
Kankakee, IL
Jul 2021NoModNegligence$4,243$1,278
9444958
Yard 95-Manteno
Kankakee, IL
Jan 2021NoHighNegligence$4,243$4,243
9445492
Yard 88 - Pontiac
Livingston, IL
Aug 2020YesModNegligence$4,194$4,194
9444769
Yard 95-Manteno
Kankakee, IL
Mar 2020YesModNegligence$3,871$3,871
9444787
Yard 88 - Pontiac
Livingston, IL
Apr 2020NoLowNegligence$2,211$332
9620606
Yard 95-Manteno
Kankakee, IL
Jul 2021YesModNegligence$2,065$2,065
9444993
Yard 88 - Pontiac
Livingston, IL
Jun 2021NoLowNegligence$2,065$187
9620835
Yard 95-Manteno
Kankakee, IL
Nov 2021YesHighNegligence$1,907$1,907
8957594
Yard 91 - Elburn
Kane, IL
Oct 2018YesHighNegligence$1,421$1,421
8957593
Yard 91 - Elburn
Kane, IL
Oct 2018YesHighNegligence$1,421$1,421
9620615
Yard 95-Manteno
Kankakee, IL
Jul 2021YesModNegligence$1,385$1,385
9620605
Yard 95-Manteno
Kankakee, IL
Jul 2021YesModNegligence$1,385$1,385
9444989
Yard 88 - Pontiac
Livingston, IL
Jun 2021YesModNegligence$1,385$1,385
8662753
Yard 99 - Ashkum
Iroquois, IL
May 2012YesModNegligence$1,304$1,304
6561119
Yard 99 - Ashkum
Iroquois, IL
Jan 2011YesModNegligence$1,304$1,304
6561118
Yard 99 - Ashkum
Iroquois, IL
Jan 2011YesModNegligence$1,304$1,304
9196311
Yard 99 - Ashkum
Iroquois, IL
May 2020NoHighNegligence$1,166$1,166
9690663
Yard 95-Manteno
Kankakee, IL
Dec 2022NoModNegligence$1,063$1,063
9690660
Yard 95-Manteno
Kankakee, IL
Dec 2022NoModNegligence$1,063$1,063
9621930
Yard 88 - Pontiac
Livingston, IL
Dec 2022NoModNegligence$1,063$1,063
9444999
Yard 88 - Pontiac
Livingston, IL
Jun 2021YesLowNegligence$1,006$1,006
9444939
Yard 57 - Paxton
Ford, IL
Oct 2020YesModNegligence$994$994
9444937
Yard 57 - Paxton
Ford, IL
Oct 2020YesModNegligence$994$994
9444935
Yard 57 - Paxton
Ford, IL
Oct 2020YesModNegligence$994$994
9621151
Yard 88 - Pontiac
Livingston, IL
Jun 2022NoModNegligence$987$987
9691825
Yard 88 - Pontiac
Livingston, IL
May 2023NoHighNegligence$980$980
8849515
Yard 88 - Pontiac
Livingston, IL
Jun 2015YesModNegligence$946$946
9620613
Yard 95-Manteno
Kankakee, IL
Jul 2021NoModNegligence$929$929
9444994
Yard 88 - Pontiac
Livingston, IL
Jun 2021NoModNegligence$929$929
9444969
Yard 88 - Pontiac
Livingston, IL
Jan 2021NoModNegligence$929$929
9444968
Yard 88 - Pontiac
Livingston, IL
Jan 2021NoModNegligence$929$929
9444961
Yard 95-Manteno
Kankakee, IL
Jan 2021NoModNegligence$929$929
9444960
Yard 95-Manteno
Kankakee, IL
Jan 2021NoModNegligence$929$929
9444957
Yard 95-Manteno
Kankakee, IL
Jan 2021NoModNegligence$929$929
9621080
Yard 95-Manteno
Kankakee, IL
Mar 2022YesModNegligence$909$909
8662737
Yard 88 - Pontiac
Livingston, IL
Apr 2012YesModNegligence$873$873
6504834
Yard 99 - Ashkum
Iroquois, IL
Aug 2010YesModNegligence$873$873
9445420
Yard 95-Manteno
Kankakee, IL
May 2020NoHighNegligence$782$782
9444771
Yard 95-Manteno
Kankakee, IL
Mar 2020NoHighNegligence$782$782
9444768
Yard 95-Manteno
Kankakee, IL
Mar 2020NoHighNegligence$782$782
9444767
Yard 95-Manteno
Kankakee, IL
Mar 2020NoHighNegligence$782$782
9444766
Yard 95-Manteno
Kankakee, IL
Mar 2020NoHighNegligence$782$782
9444763
Yard 95-Manteno
Kankakee, IL
Mar 2020NoHighNegligence$782$782
9444762
Yard 95-Manteno
Kankakee, IL
Mar 2020NoHighNegligence$782$782
5118123
Yard 95-Manteno
Kankakee, IL
Nov 2025YesModNegligence$755$755
9444941
Yard 57 - Paxton
Ford, IL
Oct 2020NoModNegligence$666$666
5118150
Metz Quarry
Livingston, IL
Feb 2026YesModNegligence$642$642
8956989
Yard 88 - Pontiac
Livingston, IL
Apr 2018YesModNegligence$589$589
9691834
Yard 95-Manteno
Kankakee, IL
May 2023NoModNegligence$558$558
9445406
Yard 88 - Pontiac
Livingston, IL
May 2020NoHighNegligence$523$523
9445404
Yard 88 - Pontiac
Livingston, IL
May 2020NoHighNegligence$523$523
9196309
Yard 99 - Ashkum
Iroquois, IL
May 2020YesModNegligence$523$523
9444765
Yard 95-Manteno
Kankakee, IL
Mar 2020YesLowNegligence$523$523
9622972
Shale Quarry
Livingston, IL
Aug 2022YesModNegligence$481$481
9690666
Yard 95-Manteno
Kankakee, IL
Dec 2022NoLowNegligence$477$477
9690661
Yard 95-Manteno
Kankakee, IL
Dec 2022NoModNegligence$477$477
9621931
Yard 88 - Pontiac
Livingston, IL
Dec 2022NoModNegligence$477$477
9621929
Yard 88 - Pontiac
Livingston, IL
Dec 2022NoModNegligence$477$477
8661982
Yard 99 - Ashkum
Iroquois, IL
Oct 2011NoHighNegligence$450$450
9621149
Yard 88 - Pontiac
Livingston, IL
Jun 2022NoLowNegligence$442$442
9691823
Yard 88 - Pontiac
Livingston, IL
May 2023NoLowNegligence$439$439
6554941
Yard 95-Manteno
Kankakee, IL
Jan 2011YesModNegligence$425$425
9444995
Yard 88 - Pontiac
Livingston, IL
Jun 2021NoModNegligence$416$416
9444990
Yard 88 - Pontiac
Livingston, IL
Jun 2021NoModNegligence$416$416
8849459
Yard 95-Manteno
Kankakee, IL
Apr 2015NoModNegligence$392$392
8742727
Yard 88 - Pontiac
Livingston, IL
Apr 2014NoModNegligence$392$392
8742723
Yard 88 - Pontiac
Livingston, IL
Apr 2014NoHighNegligence$392$392
8661116
Yard 99 - Ashkum
Iroquois, IL
Jun 2011YesModNegligence$392$392
6499053
Yard 99 - Ashkum
Iroquois, IL
Dec 2009YesModNegligence$392$392
9693505
Yard 95-Manteno
Kankakee, IL
Mar 2024NoModNegligence$388$388
6186981
Yard 95-Manteno
Kankakee, IL
Apr 2008YesModNegligence$362$362
9445421
Yard 95-Manteno
Kankakee, IL
May 2020NoLowNegligence$351$351
9445419
Yard 95-Manteno
Kankakee, IL
May 2020NoModNegligence$351$351
9445416
Yard 95-Manteno
Kankakee, IL
May 2020NoLowNegligence$351$351
9444764
Yard 95-Manteno
Kankakee, IL
Mar 2020NoModNegligence$351$351
9444758
Yard 95-Manteno
Kankakee, IL
Mar 2020NoModNegligence$351$351
9444946
Yard 99 - Ashkum
Iroquois, IL
Oct 2020NoModNegligence$324$324
8957791
Yard 88 - Pontiac
Livingston, IL
Feb 2019NoModNegligence$319$319
9690667
Yard 95-Manteno
Kankakee, IL
Dec 2022NoModNegligence$318$318
9690664
Yard 95-Manteno
Kankakee, IL
Dec 2022NoModNegligence$318$318
9621932
Yard 88 - Pontiac
Livingston, IL
Dec 2022NoModNegligence$318$318
9621927
Yard 88 - Pontiac
Livingston, IL
Dec 2022NoModNegligence$318$318
8662608
Yard 88 - Pontiac
Livingston, IL
Nov 2011NoLowNegligence$308$308
8662606
Yard 88 - Pontiac
Livingston, IL
Nov 2011NoModNegligence$308$308
8662605
Yard 88 - Pontiac
Livingston, IL
Nov 2011NoLowNegligence$308$308
8945330
Yard 88 - Pontiac
Livingston, IL
Jul 2017NoModNegligence$305$305
9444940
Yard 57 - Paxton
Ford, IL
Oct 2020NoLowNegligence$298$298
9621146
Yard 88 - Pontiac
Livingston, IL
Jun 2022NoModNegligence$296$296
9691827
Yard 88 - Pontiac
Livingston, IL
May 2023NoModNegligence$295$295
9691822
Yard 88 - Pontiac
Livingston, IL
May 2023NoModNegligence$295$295
9691820
Yard 88 - Pontiac
Livingston, IL
May 2023NoModNegligence$295$295
8742666
Yard 88 - Pontiac
Livingston, IL
Dec 2013NoHighNegligence$285$285
9620614
Yard 95-Manteno
Kankakee, IL
Jul 2021NoModNegligence$279$279
9620609
Yard 95-Manteno
Kankakee, IL
Jul 2021NoModNegligence$279$279
9620601
Yard 95-Manteno
Kankakee, IL
Jul 2021NoLowNegligence$279$125

Source: MSHA citation database. “Contractor” annotations indicate the cited party was on-site at the mine but not the mine’s operator -- responsibility attaches to the contractor LLC, not the mine’s owner. Section codes reference 30 CFR (the Mine Safety and Health regulations).

Labor relations (NLRB)

Company-level in IL — for VCNA Prairie LLC, not this location alone

Total cases
3
Unfair labor practice
3

National Labor Relations Board — unfair labor practice charges and union representation cases. The NLRB records cases at the company/regional level (no worksite address), so these are matched by company name and state and may span other VCNA Prairie LLC locations in the same state.

NLRB cases

National Labor Relations Board cases involving this employer. Includes unfair labor practice (ULP) filings and representation election proceedings. NLRB enforcement is process-driven; no per-case monetary penalty is assessed (remedies are case-by-case backpay orders, posting requirements, election re-runs, etc.). 3 cases · 3 ULP

Case numberTypeFiledClosedStatusRegion
25-CA-219471Unfair labor practiceMay 2018Aug 2018ClosedRegion 25, Indianapolis, Indiana
13-CA-128738Unfair labor practiceMay 2014Jul 2014ClosedRegion 13, Chicago, Illinois
25-CA-086202Unfair labor practiceJul 2012Sep 2012ClosedRegion 25, Indianapolis, Indiana

Source: NLRB case files. Rows shown are those the agency has published. Region numbers (1–31) correspond to NLRB's geographic offices.

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for VCNA PRAIRIE, INC.. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for VCNA PRAIRIE, INC.. Verify directly with Environmental Protection Agency

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for VCNA PRAIRIE, INC.. Verify directly with UVA Corporate Prosecution Registry

Inspection history

DateTriggerViolationsSeriousPenalty
2016-02-19Referral22$8,000
2015-04-14Referral32$14,000

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Part of a larger organization

VCNA PRAIRIE, INC. is one of 3 establishments rolled up under the parent organization VCNA Prairie LLC.

Federal enforcement records on this page represent activity at this specific establishment only. The full enforcement footprint of VCNA Prairie LLC across all 3 of its tracked locations is viewable on the parent profile.

Other employers in this industry and state

Other employers in ready-mix concrete manufacturing within IL, ordered by federal enforcement volume:

Other locations under this parent

Other establishments operated by VCNA Prairie LLC, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on VCNA PRAIRIE, INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code. This establishment resolves to the parent rollup VCNA Prairie LLC, which operates 3 establishments in our dataset.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is VCNA PRAIRIE, INC.'s OSHA violation history?
VCNA PRAIRIE, INC. has 2 OSHA inspections on record with 5 violations and $22,000 in total penalties.
How does VCNA PRAIRIE, INC.'s safety record compare to its industry?
VCNA PRAIRIE, INC. operates in the ready-mix concrete manufacturing industry. The industry average Total Recordable Incident Rate (TRIR) is 2.5. VCNA PRAIRIE, INC.'s self-reported DART rate is 3.93 compared to an industry average of 1.6.