Establishment profile
TUMON CORPORATION
TAITANO ROAD, HARMON, GU, 96929
721310 — Rooming and Boarding Houses, Dormitories, and Workers' Camps
Summary
TUMON CORPORATION has accumulated 3 OSHA violations across 4 inspections over 22 years of recorded history, with $1,125 in total assessed penalties.
The establishment sits in the 67th percentile for violations within its industry-state peer group of 28 employers. Inspection frequency runs at the 81st percentile. The most recent enforcement activity was recorded 20 years ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
TUMON CORPORATION appears in OSHA workplace safety record only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification, FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls. Single-agency enforcement records typically indicate either a discrete incident-based inspection or a low-risk operational profile.
OSHA workplace safety
50% of inspections at this establishment produced violations,
Peer comparison
Above average violations in NAICS 7213 within GU. Peer group: 28 employers. This establishment has 3 OSHA violations; peer median is 2.
Safety self-report (OSHA 300A)
No self-reported injury rates filed with OSHA's Injury Tracking Application for TUMON CORPORATION. Verify directly with OSHA Injury Tracking Application →
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for TUMON CORPORATION. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 20+ years. Most recent activity: 20 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for TUMON CORPORATION. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
No MSHA mine safety violations on file for TUMON CORPORATION. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for TUMON CORPORATION. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC)
No H-1B, H-2A, or H-2B labor condition applications on file for TUMON CORPORATION. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for TUMON CORPORATION. Verify directly with Environmental Protection Agency →
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for TUMON CORPORATION. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- Department of DefenseCOMPRESSED GAS CYLINDER STORAGE FACILITYcontract · Last action 2011-08-29$5,368,345
- Department of DefenseTAS::17 1805::TAS REPAIR AND MODERNINZE BACHELOR QUARTERS BUILDING 579, CAMP COVINGTON THE SCOPE OF WORK IS TO FURNISH ALL LABOR, MATERIAL, EQUIPMENT AND INCIDENTALS REQUIRED TO REPAIR AND ALTER BLDG. 579 SPACES TO COMPLY WITH BEQ CONSTRUCTION STANDARDS AS OUTLINED IN MIL-HDBK 1036A FOR TRANSIENT PERSONNEL, REPLACE INTERIOR/ EXTERIOR DOORS WITH A CARD KEY SYSTEM, AND REPLACE INTERIOR/EXTERIOR DOORS TO MEET 170-MPH WIND VELOCITY AND IBC 2003 MINIMUM DESIGN CATEGORY D REQUIREMENTS. ARRA::YES::ARRAcontract · Last action 2011-11-02$3,330,881
- Department of DefenseWR #CCW4R REPAIR AND RENOVATE EXISTING A-WING OF BUILDING 4175, APRA HEIGHTS, GUAMcontract · Last action 2011-09-12$2,274,633
- Department of DefenseWR# 31183contract · Last action 2008-09-29$816,655
- Department of DefenseWR 93501contract · Last action 2009-04-02$661,909
- Department of Homeland Security2220970, SECTOR GUAM - BLDG 1 RENOVATIONcontract · Last action 2010-05-11$644,217
- Department of DefenseWR 30956Bcontract · Last action 2009-04-27$512,290
- Department of Homeland Security3622723, RPL A/C-BLDG 1, SECTOR GUAM CASREPcontract · Last action 2011-06-20$420,145
- Department of DefenseWORK REQUEST 65557 REPAIR/UPGRADE EXISTING 10 INCH CAST IRON PIPE 2/12 INCH POLYVINYL CHLORIDE PIPS AT NAVAL MAGAZINE RD, NAVAL MAGAZINE, US NBG.contract · Last action 2009-09-09$361,197
- Department of DefenseWR30958Acontract · Last action 2009-08-02$335,561
- Department of DefenseWR# 30984contract · Last action 2009-03-23$317,635
- Department of DefenseFIRST OPTION PERIOD IDIQcontract · Last action 2011-05-08$239,016
- Department of DefenseMISCELLANEOUS REPAIRS TO NBG THEATER, BLDG 1981. REPAIRS SHALL INCLUDE THE INSTALLATION OF GYPSUM BOARD CEILIGN AND REPLACEMENT OF ACOUSTICAL CEILING PANELS, FLOOR TILES, EXTERIOR DOORS, CEILING LIGHT FIXTURES AND REPLACEMENT AND RECONFIGURATION OF AIR CONDITIONING DIFFUSERS AND GILLES AND PROVIDE POWER SUPPLY FOR GOVERNMENT-FURNISHED CONCESSION EQUIPMENTS.contract · Last action 2012-09-25$207,386
- Department of DefenseTHE PURPOSE OF THIS TASK ORDER IS TO PAVE EMERGENCY ACCESS ROADS AT HIGH SECURED MAGAZINE, NBGMS.contract · Last action 2012-10-31$170,331
- Department of DefenseSECOND OPTION PERIOD IDIQ - WR CFRFY / CGKBH REPAVE&EXTEND ROAD TO SCRAP YARD DEFENSE LOGISTICS AGENCY - DISPOSAL SERVICE, BLDG 631, NBGAHcontract · Last action 2012-02-13$162,931
- Department of DefenseWR C4JF5contract · Last action 2010-10-20$153,881
- Department of DefenseWR 65633contract · Last action 2009-02-08$146,989
- Department of DefenseBASE PERIOD IDIQ INSTALL AREA LIGHTING AT PLAYGROUNDS, 2 SITES, NAVAL HOSPITAL HOUSING AREA, NAVAL HOSPITAL, GUAMcontract · Last action 2009-09-29$123,894
- Department of DefenseWR C8RL5 - FIRST OPTION PERIOD IDIQcontract · Last action 2010-09-21$121,360
- Department of DefenseWR 31122contract · Last action 2008-12-01$81,685
- Department of DefenseDESIGN BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT BASE PERIOD IDIQcontract · Last action 2013-04-11$0
- Department of DefenseMINIMUM GUARANTEEcontract · Last action 2009-09-29$0
- Department of DefenseBASE PERIOD IDIQcontract · Last action 2009-07-19$0
- Department of DefenseBASE YEARcontract · Last action 2008-11-12$0
- Department of DefenseWR 32767 PROVIDE LIGHTING AT JOGGING PATH, NEW APRA HOUSING AREA, CNRM, GUAMcontract · Last action 2008-04-24$0
- Department of DefenseWR# 49130contract · Last action 2008-04-16$0
- Department of DefenseWORK REQUEST 30680contract · Last action 2008-04-08$0
- Department of DefenseWR #S 30658, 30759, 30864, 30868, 30812A THIS IS A "DESIGN-BUILD" PROJECT INTENDED TO REPLACE AND UPGRADE THE FIRE ALARM SYSTEM, AND REPLACE AND UPGRADE THE AUTOMATIC WET PIPE SPRINKLER SYSTEM AT VARIOUS BUILDINGS AT CAMP COVINGTON, MAIN BASE, GUAM.contract · Last action 2008-04-08$0
- Department of DefenseINSTALL FLUSHING CONNECTIONS TO AUTOMATIcontract · Last action 2008-03-11$0
- Department of DefenseWR NOS. 30737 & 30790 THIS IS A "DESIGN-BUILD" PROJECT TO REPLACE ROLL-UP AN DOUBLE-DOORS, REPLACE WINDOWS, REPAIR WALLS, AND PAINT DOORS AT VARIOUS BUILDINGS, CAMP COVINGTON, GUAM. THE CONTRACTOR SHALL ALSO PROVIDE NEW ELECTRICAL LINE DIAGRAMS FOR NEW ROLL-UP DOORS ELECTRICAL WIRING, AND REPLACE ROLL-UP DOORS, ELECTRIC MOTORS, WIRES, CONTROLS, AND SAFETY DEVICES. ROLL-UP DOORS SHALL BE OPERATED BY ELECTRIC POWER WITH AUXILIARY HAND CHAIN OPERATION, AND SHALL BE COMPLETE AND READY FOR USE. NEW EXTERIOR DOORS, WINDOWS, AND REPLACED ROLL-UP DOORS SHALL MEET 170 MPH WIND-LOAD CRITERIA WITH AN EXPOSURE FACTOR COEFFICIENT (CE) OF EXPOSURE "D" PER MRACS AND ENGINEERING SYSTEMS REQUIREMENTS.contract · Last action 2008-02-04$0
- Department of DefenseWORK REQUEST 32782 REPAIR/REPLACE SWALES AT STAIRWAYS, NEW APRA HOUSING, GUAMcontract · Last action 2008-01-28$0
- Department of DefenseWR#30126, REPLACE SWITCHBOARD & INSTALL COMPRESSED AIR LINES @ DELTA & ECHO PIERS, CNMcontract · Last action 2008-01-21$0
- Department of DefenseWR 30726contract · Last action 2007-11-18$0
Federal contract dollars to this establishment. Primary NAICS: 236220 - COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION. Last action: 2013-04-11. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2005-08-30 | Planned | 0 | — | $0 | |
| 2004-11-16 | Programmed Related | 1 | 1 | $900 | |
| 2004-03-05 | Planned | 2 | — | $225 | |
| 2004-02-27 | Planned | 0 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in rooming and boarding houses, dormitories, and workers' camps within GU, ordered by federal enforcement volume:
- GRAND PLAZA HOTELTUMON — 1 federal enforcement record
- AGBAYANI CONSTRUCTION CORPORATIONBARRIGADA — 1 federal enforcement record
- GUAM YOOSHIN CORPORATIONMANGILAO — 1 federal enforcement record
- CROWN BAKERYMANGILAO — 1 federal enforcement record
- INLAND BUILDERS CORPORATIONHARMON — 1 federal enforcement record
- HUA SHENG INTERNATIONAL GROUP CORPHARMON — 1 federal enforcement record
- S.M.D. CORPORATIONYIGO — 1 federal enforcement record
- HARMON CORPORATIONDEDEDO — 1 federal enforcement record
- THE BAYVIEW HOTELTUMON — 1 federal enforcement record
Related searches
- Rooming and Boarding Houses, Dormitories, and Workers' CampsAll employers in this industry
- Employers in GUState-wide enforcement data
- Rooming and Boarding in GUIndustry × state cross-filter
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →About this data
This profile aggregates federal enforcement records on TUMON CORPORATION from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Frequently asked
- What is TUMON CORPORATION's OSHA violation history?
- TUMON CORPORATION has 4 OSHA inspections on record with 3 violations and $1,125 in total penalties.
- How does TUMON CORPORATION's safety record compare to its industry?
- TUMON CORPORATION operates in the rooming and boarding houses, dormitories, and workers' camps industry. The industry average Total Recordable Incident Rate (TRIR) is 0.6.