Establishment profile
TROY BOILER WORKS, INC.
2800 7TH AVE., TROY, NY, 12180
332313 — Plate Work Manufacturing
EIN 141494252
Summary
TROY BOILER WORKS, INC. has accumulated 30 OSHA violations across 11 inspections over 50 years of recorded history, with $11,945 in total assessed penalties.
The establishment sits in the 90th percentile for violations within its industry-state peer group of 575 employers. Inspection frequency runs at the 96th percentile. The most recent enforcement activity was recorded 11 years ago.
Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.
Agency coverage
TROY BOILER WORKS, INC. appears in OSHA workplace safety and FMCSA motor carrier registration records only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls.
OSHA workplace safety
73% of inspections at this establishment produced violations, with 5 inspections producing serious-or-greater violations.
Peer comparison
Worse on violations than most other employers in NAICS 3323 within NY. Peer group: 575 employers. This establishment has 30 OSHA violations; peer median is 5.
Safety self-report (OSHA 300A)
Recordable injury rates the employer filed with OSHA’s Injury Tracking Application. DART covers cases with days away, restricted, or transferred; TRIR is the total recordable case rate.
Reported for 51 average annual employees at this establishment.
Source: OSHA ITA Form 300A (employer self-reported). Rates are per 100 full-time equivalent workers. Establishments below the ~10-FTE threshold are not required to report.
Industry benchmark
BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.
Inspection breakdown
Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.
OSHA severe injury reports
No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for TROY BOILER WORKS, INC.. Verify directly with Occupational Safety and Health Administration →
Activity timeline
No federal enforcement activity has been recorded against this establishment in 11+ years. Most recent activity: 11 years ago. Data on this page is refreshed weekly.
Wage & Hour Division (WHD)
No WHD wage, overtime, or child-labor enforcement cases on file for TROY BOILER WORKS, INC.. Verify directly with Wage and Hour Division →
Mine safety (MSHA)
No MSHA mine safety violations on file for TROY BOILER WORKS, INC.. Verify directly with Mine Safety and Health Administration →
Labor relations (NLRB)
No NLRB unfair labor practice charges or union representation cases on file for TROY BOILER WORKS, INC.. Verify directly with National Labor Relations Board →
Visa & labor certification (OFLC)
No H-1B, H-2A, or H-2B labor condition applications on file for TROY BOILER WORKS, INC.. Verify directly with Office of Foreign Labor Certification →
Environmental compliance (EPA)
No EPA inspections or formal enforcement actions on file for TROY BOILER WORKS, INC.. Verify directly with Environmental Protection Agency →
Motor carrier safety (FMCSA)
Federal Motor Carrier Safety Administration — DOT-regulated carrier registration and fleet data.
Federal criminal prosecution record
No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for TROY BOILER WORKS, INC.. Verify directly with UVA Corporate Prosecution Registry →
Federal contracts
This location
- Department of DefenseBIOREACTOR, SEPARATOR, ETHANOL TANKcontract · Last action 2014-05-08$719,000
- Department of DefenseTO COVER THE COST OF LABOR, MATERIAL AND EQUIPMENT FOR THE BOILER CONTROLS MAINTENANCE FOR A BASE AND TWO OPTIONS, AT WATERVLIET ARSENAL, NY 12189-4000contract · Last action 2023-08-14$140,667
- Department of DefenseTO COVER THE COST OF BOILER PLANT CONTROL CALIBRATION/REPAIR AT THE WATERVLIET ARSENAL FOR A BASE AND TWO OPTION YEARS, WATERVLIET, NY 12189.contract · Last action 2025-10-16$125,472
- Department of DefenseCUTLER HPAC TANKScontract · Last action 2024-07-09$74,776
- Department of DefenseTO COVER THE COST OF LABOR, MATERIAL AND EQUIPMENT FOR BOILER MAINTENANCE CONTRACT FOR HOUSING UNITS AT WATERVLIET ARSENAL, NY 12189-4000contract · Last action 2022-01-31$53,972
- Department of Veterans AffairsREVIEW THE CONDITIONS AND DESCALE TUBES IN A VICTORY BOILERcontract · Last action 2022-01-26$53,000
- Department of Veterans AffairsREPAIR BROKEN WATER LINEcontract · Last action 2010-05-09$42,576
- Department of Veterans AffairsEMERGENCY BOILER REPAIRcontract · Last action 2026-04-03$34,354
- Department of Veterans AffairsEMERGENCY BOILER REPAIRcontract · Last action 2021-08-10$32,905
- Department of Veterans AffairsALBANY VAMC - BOILER REPAIR SERVICEcontract · Last action 2026-01-14$32,418
- Department of Veterans AffairsCONDENSATE TANKcontract · Last action 2025-08-28$29,441
- Department of DefenseTO COVER THE COST OF LABOR, MATERIAL AND EQUIPMENT FOR THE BOILER MAINTENANCE AT BUILDING 136, FOR THE WATERVLIET ARSENAL, NY 12189-4000contract · Last action 2020-06-23$25,861
- General Services AdministrationIGF::OT::IGF BOILER REPAIR AT LEO O'BRIEN FEDERAL BUILDINGcontract · Last action 2014-02-19$25,717
- Department of Veterans AffairsEMERGENCY BOILER TUBE REPAIR SERVICES, BOILER 1 AND BOILER 3contract · Last action 2025-01-22$21,678
- Department of Veterans AffairsEMERGENCY BOILER REPAIRcontract · Last action 2024-09-11$20,365
- Department of Veterans AffairsEMERGENCY REPAIR FOR BOILER #1 CASTLE POINT CAMPUScontract · Last action 2024-10-25$19,600
- Department of Veterans AffairsBOILER TUBE REPAIRcontract · Last action 2023-10-10$16,917
- Department of Veterans AffairsEMERGENCY BOILER REPAIRScontract · Last action 2025-10-06$14,560
- Department of DefenseIGF::OT::IGF REPAIR THE #4 BOILER TUBE AND APPLY PATCH, AT BUILDING 136, WATERVLIET ARSENAL, WATERVLIET, NYcontract · Last action 2017-05-22$14,372
- Department of Veterans AffairsEMERGENCY HOT WATER TANK REPAIRcontract · Last action 2021-08-03$11,935
- Department of DefenseIGF:OT::IGF - REPAIR THE DONLEE BOILER AT THE WATERVLIET ARSENAL, NY.contract · Last action 2013-08-07$11,903
- Department of DefenseIGF::OT::IGF TO COVER THE COST OF LABOR, MATERIAL AND EQUIPMENT FOR THE REPAIR OF BOILER TUBE FOR DONNELLY BOILER, AT THE BOILER HOUSE, BUILDING 136, AT THE WATERVLIET ARSENAL, NY 12189-4000contract · Last action 2015-01-30$11,573
- Department of Veterans AffairsEMERGENCY REPAIRS TO BOILERcontract · Last action 2021-10-21$9,806
- Department of Veterans AffairsHEATING COILS FOR KITCHEN HVAC UNITcontract · Last action 2011-01-31$8,320
- Department of Veterans AffairsEMERGENCY REPAIR OF BLOWDOWN LINE ON BOILER #1 THE REPAIR WILL ENTAIL THE REMOVAL OF THE BLOWDOWN NOZZLE AND INSTALLING A NEW .5 SCHEDULE 80 BLOWDOWN PIPE WITH NEW FLANGE. THIS WILL BE DONE BY CUTTING OUT THE OLD PIPE INSIDE THE DRUM, PREPARING THE PENETRATION HOLE, INSTALLING THE NEW NOZZLE, WELDING OUT.contract · Last action 2018-09-20$8,275
- Department of Veterans AffairsEMERGENCY REPAIR OF BOILER TUBE #3 AT THE STRATTON VAMCcontract · Last action 2018-09-04$8,100
- Department of Veterans AffairsEMERGENCY BOILER TUBE REPAIRcontract · Last action 2019-08-13$7,400
- Department of DefenseR/R LEAK TUBE BOILER#5 B-136contract · Last action 2009-04-03$7,200
- Department of DefenseEMERGENCY BOILER REPAIRcontract · Last action 2011-11-23$6,953
- Department of Veterans AffairsEMERGENCY REPAIR OF BOILER #3 TUBE.contract · Last action 2019-10-04$6,800
- Department of Veterans AffairsNONEcontract · Last action 2011-05-12$6,727
- Department of Veterans AffairsIGF::OT::IGF EMERGENCY BOILER REPAIR AT THE ALBANY VA MEDICAL CENTERcontract · Last action 2013-09-23$6,090
- Department of Veterans AffairsREPAIR WELD BOILER TUBE # 3contract · Last action 2020-11-30$5,177
- Department of DefenseFSC: Z242 NAME: REPAIR EMERGENCY LEAK IN B136 BOILER TUBEcontract · Last action 2009-12-08$4,650
- Department of Veterans AffairsBOILER REPAIRcontract · Last action 2011-07-01$4,277
- Department of Veterans AffairsEMERGENCY BOILER REPAIRcontract · Last action 2025-03-20$3,999
- Department of Veterans AffairsBOILER REPAIRS FOR ALBANY VAMC.contract · Last action 2011-08-30$3,963
- Department of DefenseIGF::OT::IGF TO COVER THE COST OF LABOR, MATERIAL AND EQUIPMENT FOR INSPECTION OF OPENING AND CLOSING DONNELLY FIRESIDE BOILER #6, AT THE WATERVLIET ARSENAL, NY 12189-4000.contract · Last action 2015-04-21$3,958
- Department of Veterans AffairsBOILER VALVE REPAIRcontract · Last action 2025-10-15$3,195
- Department of Veterans AffairsBOILER REPAIR BY PIN WELDING CRACK IN REAR D TUBE SCREEN WALL TUBEcontract · Last action 2020-07-01$2,750
- Department of DefenseREPAIR BOILER TUBEcontract · Last action 2012-02-13$2,719
- Department of DefenseEMERGENCY REPAIR BLDG 7 BOILERcontract · Last action 2013-03-04$2,647
Federal contract dollars to this establishment. Primary NAICS: 332420 - METAL TANK (HEAVY GAUGE) MANUFACTURING. Last action: 2026-04-03. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.
Inspection history
| Date | Trigger | Violations | Serious | Penalty | |
|---|---|---|---|---|---|
| 2014-11-20 | Follow-up | 0 | — | $0 | |
| 2014-05-30 | Planned | 3 | 3 | $4,900 | |
| 2008-09-10 | Planned | 6 | 5 | $3,500 | |
| 2004-01-15 | Planned | 1 | 1 | $2,500 | |
| 1997-08-22 | Planned | 1 | 1 | $625 | |
| 1983-03-25 | Planned | 0 | — | $0 | |
| 1982-05-19 | Planned | 6 | 2 | $420 | |
| 1979-05-02 | Planned | 2 | — | $0 | |
| 1977-03-11 | Planned | 5 | — | $0 | |
| 1975-11-03 | Follow-up | 0 | — | $0 | |
| 1975-09-25 | Planned | 6 | — | $0 |
Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.
In the news
Other employers in this industry and state
Other employers in plate work manufacturing within NY, ordered by federal enforcement volume:
- ISLAND INTERNATIONAL EXTERIOR FABRICATORS, LLCCALVERTON — 3 federal enforcement records
- OEHLERS WELDING AND FABRICATION, INC.BUFFALO — 2 federal enforcement records
- MONO SYSTEMS INC.BUFFALO — 1 federal enforcement record
- ALTON MANUFACTURING INCROCHESTER — 1 federal enforcement record
- NIEDAX MONOSYSTEMS, INC.BUFFALO — 1 federal enforcement record
- TROY BOILER WORKS, INC.GERMANTOWN — 1 federal enforcement record
- R N D MACHINE COMPANY INC.BUFFALO — 1 federal enforcement record
- ALBANY STEEL INC.MENANDS — 1 federal enforcement record
- METTALOGIX CUSTOM DESIGN & FABRICATION, INC.UTICA — 1 federal enforcement record
- MILLER METAL FABRICATING, INC.ROCHESTER — 1 federal enforcement record
Related searches
- Plate Work ManufacturingAll employers in this industry
- Employers in NYState-wide enforcement data
- Plate Work Manufacturing in NYIndustry × state cross-filter
Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.
Contact sales →About this data
This profile aggregates federal enforcement records on TROY BOILER WORKS, INC. from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.
Establishments are matched across agencies using normalized employer name, state, and ZIP code.
OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.
Frequently asked
- What is TROY BOILER WORKS, INC.'s OSHA violation history?
- TROY BOILER WORKS, INC. has 11 OSHA inspections on record with 30 violations and $11,945 in total penalties.
- How does TROY BOILER WORKS, INC.'s safety record compare to its industry?
- TROY BOILER WORKS, INC. operates in the plate work manufacturing industry. The industry average Total Recordable Incident Rate (TRIR) is 3.8. TROY BOILER WORKS, INC.'s self-reported DART rate is 2.12 compared to an industry average of 1.9.