Skip to main content

Establishment profile

TITANIUM FINISHING COMPANY

248 MAIN ST, EAST GREENVILLE, PA, 18041
332813Electroplating, Plating, Polishing, Anodizing, and Coloring

Download as PDF →

OSHA inspections
5
over 42 years
Violations
11
$1,170 in penalties
Penalties
$1,170
$106 avg
Accident investigations on record
2 National Emphasis Program inspections

Summary

TITANIUM FINISHING COMPANY has accumulated 11 OSHA violations across 5 inspections over 42 years of recorded history, with $1,170 in total assessed penalties.

The establishment sits in the 70th percentile for violations within its industry-state peer group of 281 employers. Inspection frequency runs at the 82nd percentile. The most recent enforcement activity was recorded 3 years ago.

Federal records were found in 1 of 15 sources. Sources without matching records returned empty for this establishment.

Agency coverage

TITANIUM FINISHING COMPANY appears in OSHA workplace safety record only. No matching records were found in WHD wage enforcement, MSHA mine safety, EPA environmental compliance, NLRB labor relations, OFLC visa and labor certification (historical), FMCSA motor carrier registration, SAM.gov federal debarment, CMS nursing home enforcement, UVA Corporate Prosecution Registry, CPSC product recalls, or NHTSA vehicle recalls. Single-agency enforcement records typically indicate either a discrete incident-based inspection or a low-risk operational profile.

OSHA workplace safety

Inspections
5
0.1 / yr · last 42 yrs
Violations
11
0.3 / yr
Penalties
$1,170
$106 avg / violation
45% serious55% other
Inspection trigger · planned
5 of 5

20% of inspections at this establishment produced violations,

Most-cited OSHA standards

Top OSHA standards cited at this employer, ranked by citation count. Standards (CFR sections) cluster citations into safety themes -- machine guarding, lockout-tagout, hazard communication, fall protection, process safety, etc. A concentration on one or two sections reveals a pattern that individual citations don’t. 11 distinct standards shown · 11 citations in this view · $1,170 in penalties.

CFR sectionCitationsInspectionsTotal penaltyFirst citedLast cited
29 CFR 1910.0303 G02 I11$450Mar 1994Mar 1994
29 CFR 1910.0147 C0111$360Mar 1994Mar 1994
29 CFR 1910.0242 B11$360Mar 1994Mar 1994
29 CFR 1910.0145 C0311Mar 1994Mar 1994
29 CFR 1910.0157 G0111Mar 1994Mar 1994
29 CFR 1910.0333 B02 I11Mar 1994Mar 1994
29 CFR 1910.1200 F05 I11Mar 1994Mar 1994
29 CFR 1903.0002 A0111Mar 1994Mar 1994
29 CFR 1910.1200 F05 II11Mar 1994Mar 1994
29 CFR 1904.0002 A11Mar 1994Mar 1994
29 CFR 1910.0120 Q0211Mar 1994Mar 1994

Source: OSHA inspection citations (violation_detail). CFR section codes can be looked up at osha.gov/laws-regs for the formal standard text. Per-inspection detail and the specific violation descriptions are available by expanding individual inspections below.

Peer comparison

70th

Above average violations in NAICS 3328 within PA. Peer group: 281 employers. This establishment has 11 OSHA violations; peer median is 4.

Fewer violationsMore violations
Penalty percentile
47th
peer median: $1,325
Inspection frequency
82nd
peer median: 2

Safety self-report (OSHA 300A)

No self-reported injury rates filed with OSHA's Injury Tracking Application for TITANIUM FINISHING COMPANY. Verify directly with OSHA Injury Tracking Application

Industry benchmark

Industry avg TRIR
4.1
BLS SOII 2024
Industry avg DART
2.3
BLS SOII 2024
Self-reported TRIR
Not in OSHA ITA

BLS rates reflect industry-wide averages. Self-reported figures come from OSHA’s Injury Tracking Application; absence of self-reported data does not necessarily indicate non-compliance — many establishments fall below the ITA reporting threshold.

Inspection breakdown

Planned
5

Complaint- and accident-triggered inspections are stronger risk signals than routine planned inspections.

OSHA severe injury reports

No severe injury reports (hospitalization, amputation, or loss of an eye) on file under 29 CFR 1904.39 for TITANIUM FINISHING COMPANY. Verify directly with Occupational Safety and Health Administration

Activity timeline

Data refreshed
Weekly
First OSHA inspection
Most recent activity
3 years ago

No federal enforcement activity has been recorded against this establishment in 3+ years. Most recent activity: 3 years ago. Data on this page is refreshed weekly.

Wage & Hour Division (WHD)

No WHD wage, overtime, or child-labor enforcement cases on file for TITANIUM FINISHING COMPANY. Verify directly with Wage and Hour Division

Mine safety (MSHA)

No MSHA mine safety violations on file for TITANIUM FINISHING COMPANY. Verify directly with Mine Safety and Health Administration

Labor relations (NLRB)

No NLRB unfair labor practice charges or union representation cases on file for TITANIUM FINISHING COMPANY. Verify directly with National Labor Relations Board

Visa & labor certification (OFLC) — historical

No H-1B, H-2A, or H-2B labor condition applications on file (historical data only — DOL ended OFLC publication) for TITANIUM FINISHING COMPANY. Verify directly with Office of Foreign Labor Certification

Environmental compliance (EPA)

No EPA inspections or formal enforcement actions on file for TITANIUM FINISHING COMPANY. Verify directly with Environmental Protection Agency

EPA-registered facilities

Every EPA ECHO facility associated with this employer, sorted most-significant first. Each row links to EPA’s Detailed Facility Report for the source-of-truth record. Permits column lists active programs (Air = Clean Air Act, Water = Clean Water Act, RCRA = hazardous waste, TRI = Toxics Release Inventory reporting). 1 facility.

FacilityPermitsStatusInspectionsFormal actionsPenaltiesLast inspectedECHO
TITANIUM FINISHING COMPANY
248 MAIN ST · EAST GREENVILLE, PA, 18041
Water00Aug 2018View →

Source: EPA ECHO (Enforcement and Compliance History Online). Compliance status follows EPA’s own labels (“Sig Violation” = significant noncompliance; QNCR = quarters of noncompliance over the recent reporting window). Inactive facilities (struck through) retain historical enforcement records even after operations ceased.

Federal criminal prosecution record

No federal criminal prosecutions, plea agreements, or deferred-prosecution agreements on file for TITANIUM FINISHING COMPANY. Verify directly with UVA Corporate Prosecution Registry

Federal contracts

This location

Obligated (5-yr)
$5K
Obligated (all-time)
$45K
Awards
17
Top agency
National Aeronautics and Space Administration
$44K
Top agencies by obligation (this location)
National Aeronautics and Space Administration$44K
Department of Defense$900.04
Largest awards
  • National Aeronautics and Space Administration
    IGF::OT::IGF SMALL BUSINESS SET-ASIDE, 63 OFFERS PLACE OF PERFORMANCE: VENDOR SITE FABRICATION OF COMMERCIAL SERVICES AND SUPPLIES FOR GODDARD SPACE FLIGHT CENTER THE ADVANCED MANUFACTURING BRANCH (AMB) IS RESPONSIBLE FOR MAINTAINING A COMPLETE MANUFACTURING FACILITY TO MEET THE CENTER'S RESEARCH AND DEVELOPMENT REQUIREMENTS AND ASSIST IN THE FABRICATION OF HARDWARE REQUIREMENTS FROM MULTIPLE NASA PROJECT MISSIONS. THIS FACILITY INCLUDES CONVENTIONAL MACHINING EQUIPMENT, NUMERICALLY CONTROLLED (NC) MACHINING CENTERS, SHEET METAL AND WELDING FABRICATION EQUIPMENT AND REMOTELY LOCATED STAFF SHOPS. VENDORS SHALL PROVIDE FABRICATION SERVICES AND SUPPLIES TO THE MANUFACTURING ENGINEERING GROUP IN THEIR RESPECTIVE AREAS OF EXPERTISE FOR THE DEVELOPMENT OF INSTRUMENTS AND SPACE FLIGHT AND NON-SPACEFLIGHT HARDWARE INTERCHANGEABLE PIECE PARTS. VENDORS WILL MANUFACTURE PER ENGINEERING DRAWINGS WITH AEROSPACE INDUSTRY TOLERANCES AND PROVIDE FABRICATION CAPABILITIES IN ACCORDANCE WITH THE STATEMENT OF WORK. TO FABRICATE CLOSE TOLERANCE AEROSPACE INSTRUMENTS AND SPACE FLIGHT GRADE PARTS, IN VARIOUS MATERIALS SUCH AS (BUT NOT LIMITED TO) ALUMINUM, TITANIUM, HIGH STRENGTH STEEL AND NICKEL ALLOY, ENGINEERING PLASTICS, AND COMPOSITES BASED ON INDUSTRY ENGINEERING DRAWINGS, PROVIDED IN ELECTRONIC FORMAT, TO INDUSTRY STANDARD TOLERANCES AND SPECIFICATIONS. PARTS MAY RANGE IN COMPLEXITY FROM VERY SIMPLE TO VERY COMPLEX, WITH QUANTITIES. EACH DISCIPLINE IS FURTHER DIVIDED INTO SUBCATEGORIES BASED ON THE EXPECTED SIZE OF FABRICATED PARTS. THE FABRICATIONS OF PRODUCTS OR SERVICES PROPOSED AS "SPACEFLIGHT" ARE REQUIRED TO BE, ISO 900I OR AS9100 COMPLAINT, ITEMS PROPOSED AS "NON-FLIGHT" WILL NOT REQUIRE RESPONDENTS TO BE ISO 9001 OR AS9100 COMPLIANT. OFFERS SHALL INDICATE IF THEY ARE ISO 9001 OR AS9100 COMPLAINT AND PROVIDE SUPPORTING DOCUMENTATION.
    contract · Last action 2020-03-10
    $20,977
  • National Aeronautics and Space Administration
    COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL.
    contract · Last action 2014-09-08
    $14,119
  • National Aeronautics and Space Administration
    SB SET-ASIDE, 42 OFFERS.BPA VENDORS SHALL PROVIDE FABRICATION SERVICES AT VENDORS SITE&SUPPLIES TO GSFC IN THEIR RESPECTIVE AREAS OF EXPERTISE FOR THE DEVELOPMENT OF INSTRUMENTS SPACE FLIGHT&NON-SPACEFLIGHT HARDWARE INTERCHANGEABLE PIECE PARTS. .
    contract · Last action 2025-05-12
    $6,020
  • National Aeronautics and Space Administration
    COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL.
    contract · Last action 2009-06-29
    $3,197
  • Department of Defense
    AIGF::OT::IGF NODIZING SERVICE
    contract · Last action 2013-11-18
    $150
  • Department of Defense
    SERVICE, VENDOR
    contract · Last action 2010-08-18
    $125
  • Department of Defense
    IGF::OT::IGF SERVICE,
    contract · Last action 2013-06-25
    $125
  • Department of Defense
    IGF::OT::IGF SERVICE
    contract · Last action 2013-06-25
    $125
  • Department of Defense
    IGF::OT::IGF ANODIZING SERVICE
    contract · Last action 2013-03-21
    $125
  • Department of Defense
    IGF::OT::IGF FARMOUT SERVICE
    contract · Last action 2013-03-13
    $125
  • Department of Defense
    IGF::OT::IGF SERVICE, VENDOR
    contract · Last action 2013-03-13
    $125
  • National Aeronautics and Space Administration
    SB SET-ASIDE, 42 OFFERS.BPA VENDORS SHALL PROVIDE FABRICATION SERVICES AT VENDORS SITE&SUPPLIES TO GSFC IN THEIR RESPECTIVE AREAS OF EXPERTISE FOR THE DEVELOPMENT OF INSTRUMENTS SPACE FLIGHT&NON-SPACEFLIGHT HARDWARE INTERCHANGEABLE PIECE PARTS. .
    contract · Last action 2025-05-12
    $0
  • National Aeronautics and Space Administration
    IGF::OT::IGF SMALL BUSINESS SET-ASIDE, 63 OFFERS PLACE OF PERFORMANCE: VENDOR SITE FABRICATION OF COMMERCIAL SERVICES AND SUPPLIES FOR GODDARD SPACE FLIGHT CENTER THE ADVANCED MANUFACTURING BRANCH (AMB) IS RESPONSIBLE FOR MAINTAINING A COMPLETE MANUFACTURING FACILITY TO MEET THE CENTER'S RESEARCH AND DEVELOPMENT REQUIREMENTS AND ASSIST IN THE FABRICATION OF HARDWARE REQUIREMENTS FROM MULTIPLE NASA PROJECT MISSIONS. THIS FACILITY INCLUDES CONVENTIONAL MACHINING EQUIPMENT, NUMERICALLY CONTROLLED (NC) MACHINING CENTERS, SHEET METAL AND WELDING FABRICATION EQUIPMENT AND REMOTELY LOCATED STAFF SHOPS. VENDORS SHALL PROVIDE FABRICATION SERVICES AND SUPPLIES TO THE MANUFACTURING ENGINEERING GROUP IN THEIR RESPECTIVE AREAS OF EXPERTISE FOR THE DEVELOPMENT OF INSTRUMENTS AND SPACE FLIGHT AND NON-SPACEFLIGHT HARDWARE INTERCHANGEABLE PIECE PARTS. VENDORS WILL MANUFACTURE PER ENGINEERING DRAWINGS WITH AEROSPACE INDUSTRY TOLERANCES AND PROVIDE FABRICATION CAPABILITIES IN ACCORDANCE WITH THE STATEMENT OF WORK. TO FABRICATE CLOSE TOLERANCE AEROSPACE INSTRUMENTS AND SPACE FLIGHT GRADE PARTS, IN VARIOUS MATERIALS SUCH AS (BUT NOT LIMITED TO) ALUMINUM, TITANIUM, HIGH STRENGTH STEEL AND NICKEL ALLOY, ENGINEERING PLASTICS, AND COMPOSITES BASED ON INDUSTRY ENGINEERING DRAWINGS, PROVIDED IN ELECTRONIC FORMAT, TO INDUSTRY STANDARD TOLERANCES AND SPECIFICATIONS. PARTS MAY RANGE IN COMPLEXITY FROM VERY SIMPLE TO VERY COMPLEX, WITH QUANTITIES. EACH DISCIPLINE IS FURTHER DIVIDED INTO SUBCATEGORIES BASED ON THE EXPECTED SIZE OF FABRICATED PARTS. THE FABRICATIONS OF PRODUCTS OR SERVICES PROPOSED AS "SPACEFLIGHT" ARE REQUIRED TO BE, ISO 900I OR AS9100 COMPLAINT, ITEMS PROPOSED AS "NON-FLIGHT" WILL NOT REQUIRE RESPONDENTS TO BE ISO 9001 OR AS9100 COMPLIANT. OFFERS SHALL INDICATE IF THEY ARE ISO 9001 OR AS9100 COMPLAINT AND PROVIDE SUPPORTING DOCUMENTATION.
    contract · Last action 2019-10-09
    $0
  • National Aeronautics and Space Administration
    IGF::OT::IGF SMALL BUSINESS SET-ASIDE, 63 OFFERS PLACE OF PERFORMANCE: VENDOR SITE FABRICATION OF COMMERCIAL SERVICES AND SUPPLIES FOR GODDARD SPACE FLIGHT CENTER THE ADVANCED MANUFACTURING BRANCH (AMB) IS RESPONSIBLE FOR MAINTAINING A COMPLETE MANUFACTURING FACILITY TO MEET THE CENTER'S RESEARCH AND DEVELOPMENT REQUIREMENTS AND ASSIST IN THE FABRICATION OF HARDWARE REQUIREMENTS FROM MULTIPLE NASA PROJECT MISSIONS. THIS FACILITY INCLUDES CONVENTIONAL MACHINING EQUIPMENT, NUMERICALLY CONTROLLED (NC) MACHINING CENTERS, SHEET METAL AND WELDING FABRICATION EQUIPMENT AND REMOTELY LOCATED STAFF SHOPS. VENDORS SHALL PROVIDE FABRICATION SERVICES AND SUPPLIES TO THE MANUFACTURING ENGINEERING GROUP IN THEIR RESPECTIVE AREAS OF EXPERTISE FOR THE DEVELOPMENT OF INSTRUMENTS AND SPACE FLIGHT AND NON-SPACEFLIGHT HARDWARE INTERCHANGEABLE PIECE PARTS. VENDORS WILL MANUFACTURE PER ENGINEERING DRAWINGS WITH AEROSPACE INDUSTRY TOLERANCES AND PROVIDE FABRICATION CAPABILITIES IN ACCORDANCE WITH THE STATEMENT OF WORK. TO FABRICATE CLOSE TOLERANCE AEROSPACE INSTRUMENTS AND SPACE FLIGHT GRADE PARTS, IN VARIOUS MATERIALS SUCH AS (BUT NOT LIMITED TO) ALUMINUM, TITANIUM, HIGH STRENGTH STEEL AND NICKEL ALLOY, ENGINEERING PLASTICS, AND COMPOSITES BASED ON INDUSTRY ENGINEERING DRAWINGS, PROVIDED IN ELECTRONIC FORMAT, TO INDUSTRY STANDARD TOLERANCES AND SPECIFICATIONS. PARTS MAY RANGE IN COMPLEXITY FROM VERY SIMPLE TO VERY COMPLEX, WITH QUANTITIES. EACH DISCIPLINE IS FURTHER DIVIDED INTO SUBCATEGORIES BASED ON THE EXPECTED SIZE OF FABRICATED PARTS. THE FABRICATIONS OF PRODUCTS OR SERVICES PROPOSED AS "SPACEFLIGHT" ARE REQUIRED TO BE, ISO 900I OR AS9100 COMPLAINT, ITEMS PROPOSED AS "NON-FLIGHT" WILL NOT REQUIRE RESPONDENTS TO BE ISO 9001 OR AS9100 COMPLIANT. OFFERS SHALL INDICATE IF THEY ARE ISO 9001 OR AS9100 COMPLAINT AND PROVIDE SUPPORTING DOCUMENTATION.
    contract · Last action 2019-08-15
    $0
  • Department of Defense
    IGF::OT::IGF ANODIZING OF SCREWS
    contract · Last action 2015-03-04
    $0
  • National Aeronautics and Space Administration
    COMPREHENSIVE FABRICATION NEEDS FOR SPACEFLIGHT HARDWARE PARTS, INSTRUMENT COMPONENTS, STRUCTURES, FIXTURES, ASSEMBLY TOOLS, SPACE VEHICLE PARTS, ETC.; ASSEMBLY OF FABRICATED ITEMS AND ALL REQUIRED DOCUMENTATION. THE CONTRACTOR SHALL MANUFACTURE, ASSEMBLE, AND PREPARE DOCUMENTATION FOR SPACEFLIGHT AND NON-FLIGHT PARTS IN SUPPORT OF THE MANUFACTURING ENGINEERING GROUP AND GSFC PROJECTS. THE CONTRACTOR SHALL PROVIDE THE REQUIRED PERSONNEL, FACILITIES, AND MATERIALS, UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT, TO ACCOMPLISH THE ISSUED DELIVERY ORDERS. THE CONTRACTOR SHALL PROVIDE EMERGENCY REPAIR OR MODIFICATION IN SUPPORT OF REJECTED OR DEFECTIVE CRITICAL ITEMS; THIS INCLUDES PERFORMING REPAIR OR MODIFICATION AND RETURNING TO GSFC WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. THE CONTRACTOR SHALL FACILITATE TECHNICAL INTERCHANGE MEETINGS AT THE CONTRACTOR S FABRICATION FACILITY FOR DESIGN INTERPRETATION FOR WORK IN PROGRESS AND CONTRACTOR/END-USER COLLABORATION FOR CRITICAL ITEMS WITHIN A NEGOTIATED TIME FRAME PER DELIVERY ORDER. CRITICAL ITEMS ARE DEFINED AS THOSE SPACEFLIGHT AND GROUND SUPPORT ITEMS HAVING A SIGNIFICANT IMPACT ON TEST SCHEDULES, ASSEMBLY SCHEDULES, OR SHIPPING SCHEDULES AFFECTING LAUNCH SCHEDULES. APPROXIMATELY 40% OF THE WORK TO BE PERFORMED ON THIS CONTRACT WILL BE CONSIDERED CRITICAL.
    contract · Last action 2009-08-24
    $0
  • National Aeronautics and Space Administration
    FABRICATION BPA
    contract · Last action 2009-01-15
    $0

Federal contract dollars to this establishment. Primary NAICS: 332813 - ELECTROPLATING, PLATING, POLISHING, ANODIZING, AND COLORING. Last action: 2025-05-12. Source: USAspending.gov, net obligations. Recipient address is the SAM registration / HQ address, not necessarily the worksite.

Inspection history

DateTriggerViolationsSeriousPenalty
2023-01-24Planned0$0
2019-11-21Planned0$0
2016-04-27Planned0$0
1994-03-17Planned115$1,170
1984-04-10Planned0$0

Source: OSHA IMIS. Citation amounts reflect initially assessed penalties; final amounts after appeal may differ.

In the news

Other employers in this industry and state

Other employers in electroplating, plating, polishing, anodizing, and coloring within PA, ordered by federal enforcement volume:

Related searches

About this data

This profile aggregates federal enforcement records on TITANIUM FINISHING COMPANY from every major federal compliance and enforcement source plus the UVA Corporate Prosecution Registry. OSHA workplace safety inspections, WHD wage cases, MSHA mine safety, EPA environmental enforcement, NLRB labor relations, OFLC visa/labor certification, FMCSA motor carrier registration, SAM.gov debarments, CMS nursing-home records, BLS industry safety benchmarks, OSHA ITA self-reported injury rates, SEC enforcement and financial disclosures, CPSC and NHTSA recalls.

Establishments are matched across agencies using normalized employer name, state, and ZIP code.

OSHA citations typically appear 3–8 months after the inspection, so very recent enforcement actions may not yet be reflected. Profiles may be incomplete if the establishment operates under multiple legal names or files under variations our entity-matching rules don’t yet cover. To report a missing record or correction, email corrections@fastdol.com.

Need API access, bulk download, or licensed redistribution? The website is free. Programmatic and licensed access is handled separately.

Contact sales →

Frequently asked

What is TITANIUM FINISHING COMPANY's OSHA violation history?
TITANIUM FINISHING COMPANY has 5 OSHA inspections on record with 11 violations and $1,170 in total penalties.
How does TITANIUM FINISHING COMPANY's safety record compare to its industry?
TITANIUM FINISHING COMPANY operates in the electroplating, plating, polishing, anodizing, and coloring industry. The industry average Total Recordable Incident Rate (TRIR) is 4.1.